KT HYDROGEN REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

SOciete Nationale de RAffinage EPC PHASE 2 EXPANSION Cameroon Refining LS - Lump Sum 15/05/2014
(SONARA) SONARA REFINERY
- SONARA PHASE II EXPANSION Limbe H2-Hydrogen - EPC 30/09/2017
PROJECT
-
-
25 000 Nm3/h

Peroxidos do Brasil/Solvay FEASIBILITY STUDY - HPU Brazil Refining LS - Lump Sum 07/04/2014
CAPACITY INCREASING
- PEROXIDOS DO BRASIL Curitiba H2-Hydrogen - FS 27/05/2014
REFINERY
-
-
4 000 Nm3/h

PEMEX REFINACION NEW HYDROGEN MEXICO Refining LS - Lump Sum 09/07/2013


PRODUCTION UNIT
- NEW HYDROGEN CADEREYTA JIMENEX H2-Hydrogen - EPC 09/07/2015
PRODUCTION UNIT
CADEREYTA REFINERY
-
-
25 000 Nm3/h

OOO LUKOIL MODULARIZED HYDROGEN Russia Refining LS - Lump Sum 30/01/2013


PERMNEFTORGSINTEZ PRODUCTION PLANT
- HYDROGEN PACKAGE UNIT PERM H2-Hydrogen - EPC 30/07/2014
FOR OIL RESIDUE
PROCESSING COMPLEX
-
-
40 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 1 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

MINISTRY OF OIL/MIDLAND HYDROGEN PLANT WITH Iraq Refining LS - Lump Sum 13/12/2012
REFINERY COMPANY ANCILLARIES
- DAURA REFINERY Daura H2-Hydrogen - EPC 31/03/2015
-
-
4 000 Nm3/h
MINISTRY OF OIL/NORTH FEASIBILITY STUDY, FEED Iraq Refining LS - Lump Sum 07/12/2012
REFINERY COMPANY OBE AND PSA SUPPLY FOR
REVAMPING OF HPU UNIT 08
- BAIJI REFINERY Baiji H2-Hydrogen - FS FEED P 01/01/2015
-
-
71 500 Nm3/h

Egyptian Refining Company SUPPLY OF HYDROGEN & Egypt Refining LS - Lump Sum 27/07/2012
SULPHUR RECOVERY UNITS
FOR ERC REFINERY PLANT
PROJECT
GS Engineering & Construction SRU+HPU UNITS FOR ERC Mostorod H2-Hydrogen - EP 27/10/2014
REFINERY
-
-
100 000 Nm3/h

SCOP BASIC ENGINEERING DESIGN Iraq Refining LS - Lump Sum 09/03/2011


PACKAGE FOR HPU/SRU
Foster Wheeler Energy Ltd NEW NASSIRIYA REFINERY Nassiriya H2-Hydrogen - BEDP 10/09/2011
PROJECT
-
-
360 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 2 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Nynas AB HYDROGEN PRODUCTION Sweden Refining LSTK - Lump Sum 30/09/2010


UNIT REVAMP TurnKey
Tecnimont KT HG3 REVAMP Nynashamn H2-Hydrogen - E P C CS PMC 30/11/2011
-
-
5 000 Nm3/h
Soukhna Refinery SRPC REFINERY - 24.000 Egypt Refining LSTK - Lump Sum 29/05/2009
Petrochemicals Co. BBLD TurnKey
Technip KTI SpA BUILD OWN OPERATE & Ain Soukhna H2-Hydrogen - FS B FEED E P C CS 29/11/2010
TRANSFER OF HYDROGEN COM SU PMC OM
PTODUCTION UNIT,
NITROGEN PRODUCTION UNIT
& PLANT AIR PRODUCTION
UNIT
-
-
166 000 Nm3/h

Lukoil Neftochim Bourgas BOURGAS REFINERY Bulgaria Petrochemicals LS - Lump Sum 09/02/2009
UPGRADE
Technip Italy SpA HYDROGEN PRODUCTION Bourgas H2-Hydrogen - B FEED 09/01/2010
UNIT - BEP+FEED
-
-
77 500 Nm3/h

Iplom SpA HYDROGEN PRODUCTION Italy Refining LS - Lump Sum 02/02/2009


UNIT
Technip KTI SpA HYDROCONVERSION Busalla H2-Hydrogen - EPC 20/05/2012
PROJECT
-
-
16 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 3 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Nynas Refinery AB HG4 Unit Sweden Refining LS - Lump Sum 18/06/2008


Technip KTI SpA Hydrogen Generation Plant Nynashamn H2-Hydrogen - EPC 30/06/2010
-
-
15 000 Nm3/h
Dega Srl NEW HYDROGEN Italy - LS - Lump Sum 04/06/2008
PRODUCTION PLANT AND CO2
RECOVERY
Technip KTI SpA HYDROCONVERSION Busalla H2-Hydrogen - FEED 20/10/2008
PROJECT
-
-
16 000 Nm3/h

Egyptian Refining Company Egyptian Refinery Project Egypt Refining LS - Lump Sum 11/02/2008
Consortium Technology Lisensor for Mostorod H2-Hydrogen - FEED 01/06/2008
- GS Engineering & hydrogen and sulphur recovery
Construction/Mitsui
-
-
88 000 Nm3/h

INA Industrija Nafte D.D. RIJEKA HYDROCRACKER Croatia Refining LSTK - Lump Sum 07/11/2007
COMPLEX PROJECT TurnKey
Technip KTI SpA HYDROGEN GENERATION Rijeka H2-Hydrogen - EPC 07/05/2010
UNIT
-
-
81 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 4 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Nynas Refinery AB - Sweden - TF - Rates 21/09/2007


Technip KTI SpA Hydrogen Generation Unit Nynashamn H2-Hydrogen - FEED 30/04/2008
-
-
15 000 Nm3/h
Mazeikiu Nafte AB Refinery Expansion Project Lithuania - LS - Lump Sum 06/12/2006
Technip KTI SpA Hydrogen Plant Mazeikiai H2-Hydrogen - EPC 31/01/2009
-
-
60 000 Nm3/h

Saudi Aramco Jubail Export Refinery Saudi Arabia Petrochemicals R - Reimbursable 01/12/2006
Technip Italy SpA Sulphur Recovery Unit, Amine, Al Jubail H2-Hydrogen - FEED 30/06/2007
Tail Gas Treatment, Sour Water
Stripper & Hydrogen Plant
-
-
264 000 Nm3/h

Saudi Aramco JUBAIL EXPORT REFINERY Saudi Arabia Refining R - Reimbursable 01/12/2006
Technip KTI SpA SULPHUR RECOVERY UNIT, Al Jubail H2-Hydrogen - B 28/02/2006
AMINE, TAIL GAS TREATMENT
SOUR WATER STRIPPER &
HYDROGEN PLANT
-
-
264 000 Nm3/h

Moa Nickel SA ME EXPANSION PROJECT Cuba Miscellaneous Industries LS - Lump Sum 07/11/2006
PHASE
Technip KTI SpA HYDROGEN PLANT Moa H2-Hydrogen - EP 07/10/2007
-
-
2 100 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 5 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Samir Samir Upgrade Project Morocco Refining LS - Lump Sum 08/05/2006


Technip KTI SpA Steam Reformer Package Mohammedia H2-Hydrogen - EP 08/08/2007
-
-
102 000 Nm3/h
WMC Resources Ltd Hydrogen Plant Replacement Australia - R - Reimbursable 24/11/2005
Project
Technip Oceania Hydrogen Plant Perth H2-Hydrogen - B 28/03/2006
-
-
10 000 Nm3/h

Qatar General Petroleum Corp LAFFAN REFINERY PROJECT Qatar Refining LS - Lump Sum 25/10/2005
(QGPC)
GS Engineering & Construction HYDROGEN PLANT Ras Laffan H2-Hydrogen - EP 10/02/2006
-
-
12 500 Nm3/h

Total South Pars Oil Development Project Iran Petrochemicals LS - Lump Sum 20/05/2005
Technip KTI SpA Sulphur Recovery Unit, Tail Gas 151 H2-Hydrogen - FEED 20/05/2006
Treatment and DSO Recovery
and Hydrogen Plant
-
-
1 500 Nm3/h

Ecopetrol S.A Combustion Hydrotreat Colombia - LS - Lump Sum 17/05/2004


Barrancabermeja Refinery
Axens Hydrogen Plant Barrancabermeja H2-Hydrogen - B 28/09/2004
-
-
21 250 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 6 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

ERG Raffinerie Mediterranee Srl Northern Plant Italy - LS - Lump Sum 01/12/2003
(Ergmed)
Technip KTI SpA Hydrogen Plant Priolo H2-Hydrogen - B 30/04/2004
-
-
22 000 Nm3/h
Hellenic Petroleum SA HPU Expansion Project Greece - LS - Lump Sum 01/09/2003
Technip Italy SpA Expansion Study Hydrogen Plant Thessaloniki H2-Hydrogen - B 24/12/2003
-
-
7 330 Nm3/h

Motor Oil Hellas Refinery Expansion 2005 Greece Refining LS - Lump Sum 11/08/2003
Technip Italy SpA Steam Reformer Corinth H2-Hydrogen - EPC 30/03/2005
-
-
65 000 Nm3/h

GTL Oryx GAS TO LIQUID PLANT (GTL) Qatar Refining LS - Lump Sum 11/08/2003
Technip Italy SpA HYDROGEN PLANT Ras Laffan H2-Hydrogen - EP 31/07/2004
-
-
27 000 Nm3/h

Gasco OGD-III&AGD-II Project UAE - LS - Lump Sum 01/08/2003


Bechtel Ltd. Hydrogen Manufacturing Unit Ruwais H2-Hydrogen - B 31/12/2006
3rd NGL Train
-
-
3 340 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 7 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Motor Oil Hellas REFINERY UPGRADING Greece - LS - Lump Sum 16/10/2002


PROJECT
Technip Italy SpA HYDROGEN PLANT Corinth H2-Hydrogen - B 28/02/2003
-
-
65 000 Nm3/h
Danieli & Co. USC PROJECT Italy - LS - Lump Sum 02/09/2002
Technip KTI SpA HYDROGEN OFF GAS, CO Butrio Udine H2-Hydrogen - FEED 15/02/2003
-
-
205 000 Nm3/h

Siad Societ Italiana SpA Hydrogen Production Plant Italy - LS - Lump Sum 02/05/2002
Technip KTI SpA Hydrogen Plant Osio Sopra H2-Hydrogen - E P CS SU 24/03/2004
-
-
1 500 Nm3/h

Samir Upgrading Project Morocco - LS - Lump Sum 04/04/2002


Technip KTI SpA Hydrogen Plant Mohammedia H2-Hydrogen - B 31/12/2002
-
-
102 000 Nm3/h

Sapio SpA (now GreenGas) Upgrade Project of Existing HPU Italy - LS - Lump Sum 22/01/2002
Technip KTI SpA Hydrogen Plant Mantova H2-Hydrogen - EPC 28/02/2004
-
-
17 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 8 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Hellenic Petroleum SA HELLENIC REFINERY Greece - LS - Lump Sum 13/01/2000


COMPLEX U-1800
Technip KTI SpA HYDROGEN PLANT Corinth H2-Hydrogen - EPC 31/10/2001
-
-
6 000 Nm3/h
Suez Oil Processing Co. Implementation of Hydrogen Egypt - LS - Lump Sum 23/09/1998
(SOPCO) Plant
Technip KTI SpA Hydrogen Plant Suez H2-Hydrogen - EPC 23/12/2000
-
-
19 500 Nm3/h

Middle East Oil Refinery Midor Refinery Project Egypt - LS - Lump Sum 21/01/1998
(MIDOR)
Technip Italy SpA Hydrogen Plant, Sulphur Alexandria H2-Hydrogen - E P CS SU 31/12/2000
Recovery Unit & Steam
Superheater
-
-
64 000 Nm3/h

Condea Augusta SpA OXO/SELAS Reforming Plant Italy - LS - Lump Sum 01/01/1998
Technip KTI SpA Hydrogen Plant Revamp with a Augusta H2-Hydrogen - E P C SU 31/12/2000
Secondary
-
-
5 000 Nm3/h

Sukhothai Petroleum Co, - Thailand - LS - Lump Sum 01/05/1997


Toyo Eng. Co, Hydrogen Plant Songkla H2-Hydrogen - FEED 31/03/1998
-
-
66 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 9 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

C&T Quincy Galtine Smart Hydrogen Production Venezuela - LS - Lump Sum 01/03/1997
APCI & Chemical Inc. Hydrogen Plant HER Reformer Quincy H2-Hydrogen - FEED 31/12/2000
-
-
1 720 Nm3/h
Perdue Farms Inc (PFI) SMART HYDROGEN Venezuela Basic Chemicals LS - Lump Sum 01/10/1996
PRODUCTION PLANT
APCI & Chemical Inc. HYDROGEN PLANT HER Salisbury Meriland H2-Hydrogen - EP 30/11/1998
REFORMER
-
-
860 Nm3/h

Iplom SpA Hydrogen Production Plant Unit Italy - LS - Lump Sum 01/03/1996
1100
Technip KTI SpA Hydrogen Plant Busalla H2-Hydrogen - EPC 01/12/1997
-
-
8 000 Nm3/h

Finnish Peroxides KUUSANKOSKI HYDROGEN Finland Petrochemicals LS - Lump Sum 01/03/1996


PLANT
Technip KTI SpA REVAMP HYDROGEN PLANT Kuusankoski H2-Hydrogen - EP 01/12/1996
-
-
1 700 Nm3/h

Agip Petroli SpA - Italy - LS - Lump Sum 01/01/1996


Technip KTI SpA Hydrogen Plant Milazzo H2-Hydrogen - FEED 31/12/1997
-
-
53 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 10 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Petrobras SA - Brazil - LS - Lump Sum 01/12/1995


Consortium Ultratec Tenenge Hydrogen Plant Fortaleza H2-Hydrogen - E P CS 01/12/1997
-
-
1 500 Nm3/h
Sitt Tatt Ind. Gases SDM BHD - Malaysia Petrochemicals LS - Lump Sum 01/12/1995
Technip KTI SpA HYDROGEN PLANT Banting H2-Hydrogen - E P CS 01/12/1997
-
-
2 500 Nm3/h

Peroxidos do Brasil/Solvay - Brazil Petrochemicals LS - Lump Sum 01/12/1995


Technip KTI SpA HYDROGEN PLANT Curitiba H2-Hydrogen - E P CS 01/12/1996
-
-
4 000 Nm3/h

Fibrex S.A. - Romania Petrochemicals LS - Lump Sum 01/10/1995


Technip KTI SpA HYDROGEN PLANT AND 1900 Savinesti Neamt H2-Hydrogen - E P CS 01/12/1996
CO2 RECOVERY UNIT
-
-
6 500 Mkcal/h

Chiyoda/Petromin Lubricating oil LUBEREF II PROJECT Saudi Arabia Refining LS - Lump Sum 29/10/1994
ref co.
Chiyoda Corp HYDROGEN PLANT Yanbu H2-Hydrogen - EPC 31/12/1997
-
-
4 100 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 11 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Azochim S.A. Ammonia Plant Romania - LS - Lump Sum 14/10/1994


MKTI (Now Technip Germany) Front Section Revamp 1000 Piatra Neamt H2-Hydrogen - EP 31/12/1996
MPTD NH3
-
-
1 000 Nm3/h
Paramo AS Pardubice - Czech Republic - LS - Lump Sum 24/03/1994
Prokop Engineering Hydrogen Plant Pardubice H2-Hydrogen - FEED E P SU 31/12/1995
-
-
1 600 Nm3/h

Finnish Peroxides Hydrogen Plant 2 Finland - LS - Lump Sum 01/06/1993


Technip KTI SpA Hydrogen Plant Kuusankoski H2-Hydrogen - EPC 31/12/1994
-
-
1 500 Nm3/h

Erdemir - Turkey - LS - Lump Sum 01/04/1993


Selas SA Hydrogen Plant Eregli H2-Hydrogen - EPC 31/12/1994
-
-
500 Nm3/h

Montelfuos SpA - Italy - LS - Lump Sum 01/01/1992


Technip KTI SpA Revamp of Hydrogen Plant Bussi H2-Hydrogen - EPC 31/12/1992
-
-
1 800 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 12 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Bechtel Corp USA Fuel Cell Demonstration Project - Venezuela - LS - Lump Sum 01/01/1992
HER Reformer
Technip KTI SpA Hydrogen Plant San Francisco H2-Hydrogen - EPC 31/12/1993
-
-
500 Nm3/h
FMC Foret SA HYDROGEN REVAMP LA ZAIZA Spain Basic Chemicals LS - Lump Sum 01/01/1992
(ZARAGOZA) PROJECT
Technip KTI SpA HYDROGEN PLANT 163 H2-Hydrogen - EP 31/12/1994
-
-
1 700 Nm3/h

Genref Genref Refinery South Africa Refining LS - Lump Sum 01/01/1992


Badger Africa Pty Hydrogen plant -PSA unit Durban H2-Hydrogen - EP 31/12/1993
-
-
0.00

Eastern Refinery Ltd ERL Secondary Conversion Plant Bangladesh Refining LS - Lump Sum 01/12/1991
Technip Bitumen Off-Gas Incinerator, Chittagong H2-Hydrogen - EPC 31/12/1992
Hydrogen Unit, Steam Reforming
& Charge Heater
-
-
1 100 Nm3/h

Raffineria Mediterranea - Italy - LS - Lump Sum 01/12/1991


Technip KTI SpA Hydrogen Plant, Reformer and Milazzo H2-Hydrogen - FEED E P C 31/12/1993
Process Gas Boiler
-
-
42 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 13 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Sapio SpA (now GreenGas) - Italy - LS - Lump Sum 01/11/1991


Technip KTI SpA Hydrogen Plant Mantova H2-Hydrogen - EPC 31/12/1993
-
-
1 500 Nm3/h
Solvay C&E Spain Hydrogen Plant - Reformer De Spain - LS - Lump Sum 23/08/1991
Gas Natural
Technip KTI SpA Hydrogen Plant Torrelavega H2-Hydrogen - EPC 31/12/1992
-
-
2 500 Nm3/h

Agip Raffinazione SpA - Italy - LS - Lump Sum 19/04/1991


Technip KTI SpA Hydrogen Plant, Reformer and Sannazzaro de Burgondi H2-Hydrogen - FEED E P C 31/12/1992
Process Gas Boiler
-
-
42 000 Nm3/h

IGI SpA - Italy - LS - Lump Sum 21/10/1990


Technip KTI SpA Hydrogen Plant Novi Ligure H2-Hydrogen - EPC 30/05/1991
-
-
1 000 Nm3/h

AL Sio Sud SpA - Italy - LS - Lump Sum 01/01/1990


Technip KTI SpA Hydrogen Gas Production Plant Catania H2-Hydrogen - EPC 31/12/1991
-
-
250 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 14 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Enichem Anic (now ENI SpA) - Italy - LS - Lump Sum 06/10/1989


Technip Italy SpA Hydrogen Purification Plant Brindisi H2-Hydrogen - EPC 31/12/1990
-
-
600 Nm3/h
BOC - Great Britain - LS - Lump Sum 01/01/1989
Technip KTI SpA Hydrogen Plant Margam H2-Hydrogen - EPC 31/12/1990
-
-
600 Nm3/h

NIOC - Iran - LS - Lump Sum 01/09/1988


SnamProgetti SpA Hydrogen Plant Esfahan H2-Hydrogen - EPC 31/12/1989
-
-
500 Nm3/h

Montelfuos SpA - Italy - LS - Lump Sum 01/01/1987


Technip KTI SpA Hydrogen Plant Bussi H2-Hydrogen - EPC 31/12/1988
-
-
1 000 Nm3/h

FMC Foret SA - Spain Petrochemicals LS - Lump Sum 01/01/1987


Technip KTI SpA HYDROGEN PLANT La Zaiza H2-Hydrogen - EPC 31/12/1988
-
-
1 500 Nm3/h

S.O.L. - Italy - LS - Lump Sum 01/01/1987


Technip KTI SpA Hydrogen plant Salerno H2-Hydrogen - EPC 31/12/1988
-
-
250 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 15 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

Annunziata SpA - Italy - LS - Lump Sum 01/01/1985


Technip KTI SpA Hydrogen Plant Ceccano H2-Hydrogen - EPC 31/12/1985
-
-
300 Nm3/h
Shell chemicals STEAM REFORMER New Zeland - LS - Lump Sum 06/05/1982
Badger BV WHANGHAREI REFINERY Whangarei H2-Hydrogen - EPC 31/12/1983
-
-
180 000 Nm3/h

Clipper Oil Italiana S.p.A. - Italy - LS - Lump Sum 24/06/1980


SnamProgetti SpA Hydrogen Plant Ceccano H2-Hydrogen - EPC 28/02/1981
-
-
125 Nm3/h

Liquichimica Augusta SpA - Italy - LS - Lump Sum 01/01/1976


Technip KTI SpA Hydrogen Plant Augusta H2-Hydrogen - EPC 31/12/1977
-
-
1 600 Nm3/h

Terni Chimica - Italy - LS - Lump Sum 01/01/1972


Technip KTI SpA Hydrogen Plant Terni H2-Hydrogen - EPC 31/12/1973
-
-
1 500 Nm3/h

Rivoira SpA - Italy - LS - Lump Sum 01/01/1972


Technip KTI SpA Hydrogen Plant San Salvo H2-Hydrogen - EPC 31/12/1973
-
-
150 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 16 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance
GENERAL REFERENCES

OWNER CONTRACT INFORMATION COUNTRY FIELD OF ACTIVITY CONTRACT TYPE AWARD DATE
MAIN CONTRACTOR PROJECT DESCRIPTION LOCATION SUBFIELD UNIT SCOPE OF WORK COMPLETION DATE
UNIT TYPE
HEATER TYPE
CAPACITY

S.I.R. SpA - Italy - LS - Lump Sum 01/01/1972


Technip KTI SpA Hydrogen Plant Porto Torres H2-Hydrogen - EPC 31/12/1973
-
-
130 Nm3/h
Chimica Dauna SpA - Italy - LS - Lump Sum 01/01/1970
Technip KTI SpA Hydrogen Plant Augusta H2-Hydrogen - EPC 31/12/1971
-
-
10 000 Nm3/h

Scope of work: FS Feasibility Study - B Basic Process Engineering - FEED Front End Engineering Design - E Engineering - P Procurement - C Construction - CS Construction Page 17 of 17
Supervision - COM Commisioning - SU Start Up - PMC Project Management Consultancy - T Training - OM Operation & Maintenance