Sei sulla pagina 1di 7

MATERIALS REVIEWER Ans: Concrete beam sample

1. What is the sample for compressive 11. What are the tests needed for the 2.650
strength determination of a structural cu.m Item 201 (Aggregate Base
concrete? Course)?

Ans: concrete cylinder sample Ans: CBR, abrasion, GPCD

2. What is the test to determine the 12. How many grading tests are required for
consistency of concrete? a 3,200 cu.m selected borrow topping
(Item 104)?
Ans: Slump test
Ans: 3 grading tests
3. What is the length required for RSB
sample for quality test? 13. As a materials Engineer, what will you
recommend if you find out that the
Ans: 1.0 m/10,000 kg/size/shipment materials to be used as Item 200 if finer
than the required materials?
4. How many samples should be taken for
every 75 cu.m fresh concrete? Ans: blend Item 200 with coarser
materials
Ans: 1 set consist of 3-pcs sample
14. What is the standard specification for LL
5. What is the required size of test and PI of Item 201?
specimen for G.I. sheets?
Ans: maximum of 25% and maximum
Ans: 3 pcs-60 mm in 1 sht/100 sheets of 6% respectively

6. What kind of paint that has a reflectance 15. What is the CBR requirement for Item
or beads? 201?

Ans: Reflectorized Paint Ans: 80% maximum

7. For how long or how many hours shall a 16. What is that construction material that
bituminous prime coat be left has a property of being a dark brown to
undisturbed? black cementitious material in which the
predominating substance is bitumen?
Ans: 24 hours
Ans: asphalt
8. What is the rate of application of
bituminous tack coat? 17. What asphalt is used for sealing weaken
plane joint of concrete pavement?
Ans: 0.2 to 0.7 L/sq.m
Ans: Blown Asphalt
9. What is the penetration grade of blown
asphalt? 18. What is Item 311 of the DPWH
Specification (Blue Book)?
Ans: 0 to 30 penetration grade
Ans: Portland cement Concrete
10. What kind of sample is taken for flexural Pavement
test?
19. What is the machine used for abrasion
test? Ans: 110 ± 5oC

Ans: Los Angeles Abrasion Machine 29. Why is it that cooling an oven dried
sample before weighing is advisable?
20. How to determine the degree of
compaction of Items 104, 200, & 201? Ans: because it can affect its weight

Ans: by Field Density Test 30. What is the use of blown asphalt?

21. What is the formula in obtaining the value Ans: as joint filler and water proofing
of PI?
31. What is the difference between
Ans: Liquid Limit minus Plastic Limit hygroscopic moisture content from
natural moisture content?
22. What are the other terms for sieve
analysis? Ans: hygroscopic moisture content
is the moisture content of an air- dried
Ans: Grading Test, Particle Size sample while natural moisture content
Distribution Test, Mechanical is the moisture content of the original
Analysis sample from the field.

23. What is the degree of compaction of the 32. As a Materials Engineer, how can you
soil if the wet density is 2,200 kg/m3, with determine that the sample placed in the
an actual moisture content of 10.2% and oven is already oven – dried?
a maximum dry density of 1,960 kg/m3?
Ans: if the sample reaches its
Ans: 101.23% constant weight

24. How many concrete cores shall be taken 33. An admixture is being introduced to the
for one (1) kilometer concrete pavement? fresh concrete mixture for heavily
reinforced concrete structure using a
Ans: 5 holes/km/lane pumpcrete to pump out the fresh
concrete mix, what admixture should it
25. If the group index of a soil is high, what be?
indication does it mean?
Ans: Superplasticizer
Ans: the soil is clayey
34. What is the moisture content of the soil
26. For how many bags of cement does a 10 having an original weight of 162.5 grams
kgs. sample represents? and an oven – dried weight of 138.2
grams?
Ans:
2000 bags Ans: 17.58%

27. For 15, 000 kgs RSB, how many samples 35. What asphalt is commonly known as hot
shall be submitted for Quality Test? asphalt or penetration grade asphalt?
Ans: Asphalt Cement
Ans: 2 pcs – 1 m sample
36. How many days does the sample for
28. In oven drying a sample for test, what Immersion – Compression Test be
temperature shall be maintained? soaked in water?
Ans: No. 40 (0.425 mm)
Ans: 4 days @ 50 oC

45. What compaction rammer shall used if


37. If ductility test is for asphalt, _____ is for the specs given for Moisture – Density
cement? Relation Test (MDR) is T – 180?

Ans: Magnesium Oxide, Insoluble Ans: 4.54 kg with 457 mm drop


Residue, Loss on Ignition
46. A bean mold measuring 6” x 6” x 20 is to
38. Paint is composed of _____ be used for sampling concrete, how
many blows/tamps per layer shall be
Ans: 35% vehicle, 50% pigment, 15% applied?
beads
Ans: 60 blows/layer
39. What is the size of tamping rod used in
tamping concrete sample? 47. If asphalt mix having a weight of 3,020g
and an aggregate weighing 2,865.98g,
Ans: 16 mm Ø and 610 mm long with what is the % asphalt by weight of mix?
hemispherical tip
Ans: 5.10%
40. What is the temperature to be maintained
when curing sample after its initial 48. What is the material used for Bituminous
curing? Prime Coat?

Ans: 23o C ± 1.7o C Ans: Cut-back asphalt

41. Concrete cylinders are cured and ready 49. In Item 303, application of cover
for test. Temperature between 63°F to aggregates shall be evenly spread over
85°F are permitted for a period not to the surface at the rate of approximately
exceed _____ hours immediately prior to _____?
test if free moisture is maintained on the
surface of the specimen at all times. Ans: 0.004 to 0.007 m3/m2

Ans: three (3) 50. Applying the tolerance of 0.4% for


asphalt content to your answer in prob.
42. The molds of specimen not to be 47, what is the acceptable range of
transported shall be removed after initial asphalt content?
curing of _____ hours and should be
cured to the standard curing temperature Ans: 4.7% to 5.5%
of 73.4 °F ± 3°F
51. An embankment having a PI of 30%, LL
Ans: Twenty-four (24) of 40% and GI of 0, what is the degree of
compaction for this kind of soil?
43. High plasticity index means _____ of a
soil? Ans: 95% degree of compaction

Ans: high degree of compressibility 52. The minimum cement factor for concrete
Class “A” is 9 bags/ cu.m, how about for
44. Sample to be used for liquid limit and concrete Class “B”?
plastic limit tests should pass to what
sieve? Ans: 8 bags/ cu.m
53. Quality control testing in a DPWH project
is the responsibility of the_____? 60. Penetration test is for asphalt: cement is
to _____?
Ans: Contractor
Ans: consistency
54. As Materials Engineer, when is the right
time to start sampling and testing 61. Slump test is a very important test in
aggregates? fresh concrete to determine _____?

Ans: Once the source is identified Ans: consistency of concrete

55. The minimum compressive strength for 62. How many samples should be taken for
concrete Class “P” is 5,000 psi, what is an asphalt mix for each full day’s
the minimum compressive strength for operation?
concrete Class “C”?
Ans: at least one but not to exceed
Ans: 3000 psi three samples

56. The volume of concrete mixer per batch 63. The thickness of asphalt core using a
shall not exceed the mixer’s nominal caliper is based on how many
capacity in cu.m as shown on the measurements?
manufacturer’s standard plate on the
mixer, except that an overload up to Ans: four (4)
_____ percent above the mixer’s nominal
capacity may be permitted provided 64. The thickness of concrete core using a
concrete test data for strength, caliper is based on how many
segregation, and uniform consistency measurements?
are satisfactory, and provided that no
spillage of concrete takes place. Ans: nine (9)

Ans: Ten (10) 65. Failed samples do not necessarily mean


that the structure it represents is
57. Where do we take additional cores when defective, why?
the measurement of any core taken from
pavement is deficient in thickness by Ans: may be the sampling is incorrect
more than 25 mm?
66. The specification calls for a 1: 2:4
Ans: at no less than 5 meter intervals concrete mix. In a one bagger mixer,
parallel to the centerline in each which of the following amount of water is
direction from the affected location most likely required for the mix?

58. Under what climatic condition do we use Ans: 20 liters


lower penetration grade or hard asphalt?
67. How many samples shall be submitted
Ans: hot climate (cold climate – for test if 315 pails of flat wall enamel
higher penetration grade or soft paint are to be used in the project?
asphalt)
Ans: four (4) pails
59. What is the basis for the acceptance or
rejection of any construction material? 68. The spot test on asphalt is used to
determine ______.
Ans: Materials test results/reports
Ans: overheating during the process
of manufacture 76. If sample splitter is not available for use
in reducing samples for test, what is the
69. Aggregate Sub – base course has a alternative way of reducing sample for
volume of 5, 000 cu.m and to be laid in a testing size?
15cm compacted depth. How many
samples shall be submitted for CBR test Ans: apply quartering method and get
and for sieve analysis? two opposite sides as sample

Ans: 2 samples for CBR and 17 77. The road will not be opened to traffic until
samples for sieve analysis test specimens molded and cured have
attained the minimum strength
70. How many samples shall be submitted requirements. If such tests are not
for quality test if 60 tons of Bituminous conducted prior to the specified age the
Prime Coat is to be used in the project? pavement shall not be operated to traffic
until _____ days after the concrete was
Ans: placed.
Two (2) samples
Ans: Fourteen (14)
71. How many compaction tests shall be
conducted for Item 201 having a volume 78. As the work progresses, the Materials
of 8,250 cu.m? Engineer should know how many sample
has been submitted and tested and how
Ans: Six (6) compaction tests many samples are to be submitted, in
other words the ME must refer to what
72. What composed of Materials Quality report so that he/she may be updated on
Control Monthly Reports? the balance and on file quality test of the
construction materials being used in the
Ans: Summary of field tests and project?
status of test
Ans: Status of Test
73. What is the required mixing of mortar for
Item 505 (Stone Masonry)? 79. It is the minimum moisture content at
which the soil can be molded without
Ans: 1 part cement and 2 parts sand breaking or crumbling up to 1/8” (3.2
by volume with sufficient water mm).

74. What is the required mixing of mortar for Ans: Plastic Limit
Item 500 (Pipe Culverts and Storm
Drains)? 80. The _____ is expressed as the moisture
content corresponding to 25 blows.
Ans: 1 part cement and 2 parts sand
by volume with sufficient water Ans: Liquid Limit

75. Before the project starts, the materials 81. The concrete has been tested for
Engineer or the technician must have a consistency by the use of a slump cone
program on how many samples for each with base and tamping rod. After the test,
item of work should be tested based on the height of concrete measured is 178
the minimum testing requirements. What mm. what is the slump of the concrete?
program or report is this?
Ans: 127 mm
Ans: Quality Control Program
82. What is the rate of revolution per minute 89. Along the slope of high embankment
of an abrasion Machine used for testing _____ is provided as an erosion control
the mass percent of wear? measures and also to improve the
stability of the slope.
Ans: 30 – 33 rpm
Answer: Berm
83. If the design of concrete mix has the
following corrected batch weights: 90. If course aggregate like embankment is
cement = 40 kgs, fine aggregates = 65 to be placed in layers, how many layers
kgs, coarse aggregate = 115 kgs, and should a 40 cm thick Aggregate Base
water = 15 liters. What is your actual Course is placed?
batch weights for 1 cu.m Class “A”
concrete? Ans: Three (3)

Ans: 360 bags of cement; 585 kgs of 91. How long does a vibrator be inserted in a
fine aggregates; 1035 kgs coarse concrete mix?
aggregates; 130 liters water
Answer: not to exceed 15 seconds at
84. After the soil has been tested in an 50 – 60 cm interval
Abrasion Machine, the mass % of wear
computed is equal to 21%. If this material 92. Sample submitted for test should have a
is for Item 201, does it pass the DPWH tag bearing the name of the project, the
specs? quantity represented, kind of sample,
original source, who sampled and who
Ans: Yes, because the specs is 50% submitted it, the date sampled and date
maximum submitted and etc. What is the common
name of that tag for you as Materials
85. Quality Control Assurance Report should Engineer?
be submitted every _____?
Ans: Sample Card
Ans: week
93. The ME should always be alert of his
86. One of the duties of Materials Engineer is schedule with regards to the number of
to see to it that all the construction days of a quality test that takes place.
materials be tested: Since not all construction materials can
be tested just for a day or even a week
Ans: before it is incorporated into so, what is the lead time should he
work consider for a quality test of a cement
sample?
87. What is the maximum depth or roadway
embankment per horizontal layer in loose Ans: One (1) month
measurement?
94. CBR Sample for test has been
Ans: 200 mm loose measurement compacted but it should be soaked for
how many days before testing?
88. Why is it that 6 samples are needed for
quality test of concrete masonry? Ans: Four (4)

Ans: 3 samples for compressive 95. If sieve analysis and plasticity test are
strength and 3 samples for absorption used for Soil Classification, what test that
its result be used in field density test?
Ans: Compaction Test or Moisture
Density Relation Test

96. Heavy rains occur the night before prior


to your scheduled field density test, are
you going to pursue your schedule?
Why?

Ans: No, because the moisture


content is high and can affect the
result

97. Checking the gradation of composite


aggregates and asphalt content of
asphalt mix can be done by what test?

Ans: Extraction Test

98. In soil and sub – surface explorations for


flood control design of foundation
condition, a soil sample was taken for
field and laboratory tests. The test
required for soil was taken, except

Ans: specific gravity, abrasion, water


content, Atterberg Limits, gradation,
compaction, relative density

99. Structure crossing above such covered


underground drainage conduit shall be
laid at least _____ above the top of the
conduit.

Ans: 1.0 m, 0.5 m, 1.5 m, 2.0 m

100. Class of stones for riprap ranging from 30


kgs to a maximum of 70 kgs with at least
50% of the stones weighing more than 50
kgs.

Ans: Class B

Potrebbero piacerti anche