A LIGHT LAND RIG SUMMARY

A.1.0 COMPANY REQUIREMENTS

B GENERAL RIG SPECIFICATIONS

B.1 MAST & SUBSTRUCTURE

B.1.0 COMPANY REQUIREMENTS

B.1.1 MAST

B.1.2 RACKING PLATFORM

B.1.3 SUBSTRUCTURE

B.1.4 RIG FLOOR WINCHES

B.1.5 MONKEY BOARD WORK WINCH

B.1.6 RIG FLOOR 'MAN-RIDING' WINCH

B.1.7 POWER CATWALK AND PIPE RACKS

B.2 DRAWWORKS AND ASSOCIATED EQUIPMENT

B.2.0 COMPANY REQUIREMENTS

B.2.1 DRAWWORKS

B.2.2 DRAWWORKS POWER

B.2.3 AUXILIARY BRAKE

B.2.4 AUTODRILLER (OPTION)

B.3 HOISTING EQUIPMENT

B.3.0 COMPANY REQUIREMENTS

B.3.1 CROWN BLOCK

B.3.2 TRAVELLING BLOCK

B.3.3 DRILLING LINE

B.3.4 DEAD LINE ANCHOR

B.4 ROTARY SYSTEM

B.4.0 COMPANY REQUIREMENTS


B.4.1 ROTARY TABLE

B.4.2 SOLID STEEL SPLIT TYPE MASTER BUSHINGS

B.4.3 TOP DRIVE

B.4.4 SOFT TORQUE SYSTEM FOR TOP DRIVE

C POWER SUPPLY SYSTEMS

C.1 RIGPOWERPLANT

C.1.0 COMPANY REQUIREMENTS

C.1.1 DIESEL ENGINE PLANT

C.1.2 AC- GENERATOR

C.1.3 AC-VFD

C.1.4 TRANSFORMER SYSTEM

C.1.6 RIG SERVICE AIR SYSTEM

C.2 CAMP POWER PLANT

C.2.0 COMPANY REQUIREMENTS

C.2.1 DIESEL ENGINE PLANT

C.2.2 AC- GENERATOR

D DRILLSTRING/HANDLINGTOOLS

D.1 DRILLSTRING

D.1.0 COMPANY REQUIREMENTS

D.1.1 DRILL PIPE

D.1.2 DRILL COLLARS

D.1.3 HWDP (HEAVI-WEIGHT DRILLPIPE)

D.2 HANDLING TOOLS

D.2.0 COMPANY REQUIREMENTS

D.2.1 ELEVATORS

D.2.2 SLIPS

D.2.3 POWER SLIPS

D.2.4 DC SAFETY CLAMP

D.2.5 PIPE SPINNER


D.2.6 ROTARY TONGS

D.2.7 IRON ROUGHNECK

D.2.8 PIPE HANDLING SYSTEM

D.3 FISHING EQUIPMENT

D.3.0 COMPANY REQUIREMENTS

E. WELLCONTROLEQUIPMENT

E.1 BOP STACK

E.1.0 COMPANY REQUIREMENTS

E.1.1 13 5/8" BOP

E.1.2 TEST STUMPS FOR BOP TESTING

E.1.3 BOP TEST SUB

E.2 BOP CONTROL SYSTEM

E.2.0 COMPANY REQUIREMENTS

E.2.1 ACCUMULATOR UNIT

E.2.2 TRIPLEX PUMPS

E.2.3 AIR PUMPS 51

E.2.4 DRILLER'S (REMOTE) CONTROL PANEL

E.2.5 SECOND REMOTE CONTROL PANEL

E.3 CHOKE MANIFOLD & TESTING EQUIPMENT

E.3.0 COMPANY REQUIREMENTS

E.3.1 CHOKE MANIFOLD

E.3.2 HYDRAULIC TEST PUMP

F MUDSYSTEM

F.1 HIGH PRESSURE MUD SYSTEM

F.1.0 COMPANY REQUIREMENTS

F.1.1 MUD PUMPS

F.2 LOW PRESSURE MUD SYSTEM – TANKS

F.2.0 COMPANY REQUIREMENTS

F.2.1 MUD TANK SYSTEM


F.2.2 SETTLING TANK (SAND TRAP)

F.2.3 PILL TANKS.

F.2.4 TRIP TANK

F.2.5 STRIPPING TANK

F.2.6 MUD AGITATORS

F.2.7 MIXING PUMPS

F.2.8 MUD MIXING HOPPER

F.2.9 TRANSFER PUMPS

F.2.10 CHEMICAL MIXING TANK

F.2.11 CAUSTIC MIXING UNIT

F.3 LOW PRESSURE MUD SYSTEM – PROCESS EQUIPMENT

F.3.0 COMPANY REQUIREMENTS

F.3.1 SHALE SHAKER

F.3.2 DESANDER

F.3.3 DESILTER /MUD CLEANER

F.3.4 MUD/GAS SEPARATOR (POOR BOY)

F.3.5 VACUUM DEGASSER

F.3.6 CELLAR PUMP

F.4 MUD LABORATORY – EQUIPMENT AND CHEMICALS

F.4.0 COMPANY REQUIREMENTS

G. CASING/CEMENTING

G.1 CASING EQUIPMENT

G.1.0 COMPANY REQUIREMENTS

G.1.1 SIDE DOOR ELEVATORS

G.1.2 SINGLE JOINT ELEVATORS

G.1.3 SLIP TYPE ELEVATOR/SPIDER

H. INSTRUMENTATION

H.1 DRILLINGINSTRUMENTATION

H.1.0 COMPANY REQUIREMENTS


H.2 RIG COMMUNICATION SYSTEM

H.2.0 COMPANY REQUIREMENTS

H.2.1 PUBLIC ADDRESS SYSTEM

H.2.2 INTERCOM SYSTEM

H.2.3 TALKBACK SYSTEM

H.2.4 CCTV SYSTEM

H.2.5 CAMERA SYSTEM TDS/PIPE HANDLING

K.1.0 COMPANY REQUIREMENTS

L SAFETYEQUIPMENT

L.1.0 COMPANY REQUIREMENTS

M. MISCELLANEOUSEQUIPMENT

M.1.0 COMPANY REQUIREMENTS

N RIGMOVING

N.1.0 COMPANY REQUIREMENTS

N.1.1 RIG/CAMP MOVING TIMES

N.1.2 RIG/CAMP LOADS

O OBMHANDLINGCAPABILITY

O.1.0 COMPANY REQUIREMENTS


Light Rig 1000HP Equipment List

A LIGHT Land Rig Summary

Compliance BOMCO

A.1.0 Company Requirements Yes/No? Spec.

a) The original manufacture date of the Rig is <3 yrs old on Yes
31-Dec-16.
b) The rig equipment(eg Drawworks,pumps) use AC motor Yes
with VFD speed controller.
c) The Rig has automated systems capable of picking up and Yes
laying down tubular and make and break
(DP/Casings/tubing etc) in size range 24” to 2-3/8” R2/3
tubulars from catwalk/pipebins to the well bore/rack on rig
floor without manual handling?
d) The automated equipment have sensors, interlocks and Yes
control systems to prevent accidental collision of the
automated equipment?
e) The automated DP handling system to be capable of RIH Yes
and POOH inside casing of speed > 1000 m/h and NCT (Net
Connection time) (slip to slip), < 2 min? Indicate proposed
times for RIH and POOH speeds and NCT.
f) The rig has soft torque system to mitigate stick Yes
slip/torsional vibrations while drilling?
g) BOP trolley for testing and movement of the entire BOP Yes
stack to the well centre and out in fast and efficient
manner? Indicate BOP RU/ RD times in hrs.
h) The rigs has a relatively small footprint in its class and the Rig up: First time

design is modular and wheel mounted with minimal wide 7/10D Normal

loads that can be rigged-down, moved and rigged-up fast 1D

with minimal utilization of cranes/forklifts and manual


Rig down: Normal 1D
handling? Indicate R/U, R/D times in days proposed in
detailed description below.
i) The rig has summer mitigation included in the design? Eg. Yes
Shades with mist fans in open work area and AC cabins
wherever possible.
j) All equipment shall be certified to be used in accordance Yes
with safety zone defined in API RP 505 Recommended
Practice for Classification of Locations for Electrical
Installations at Petroleum Facilities Classified as Class 1,
Zone 0, Zone 1, and Zone 2, 1st edition January 1997
including errata August 1998) and PDO Specification SP-
2037.
k) The rigs circulating system has Working pressure of 34,500 Yes
kPa

Certification

Item Description Age


Expiry
yes/no
Date

Rig Number : HOOSL 411/412/413/414

Rig Contractor: HOOSL

Year Built: 2017 New

Nominal vertical depth rating in 4000m


meters with 5” - 19.5 lbs/ft or 29
kg/m nominal weight drill pipe

Mast : New

Type: BOMCO JJ225/45-KS

Height (m) : 45M

API Static Hook Load Capacity 225000 daN


(daN):

Drawworks :

Type: BOMCOJC40DB

Drive: Driven by AC motor

Power Rating (HP): 1000HP

Max. designed hoisting Capacity 225 000 daN


with
10lines (daN):
Drilling line :

Wire type : BOMCO 6×19S-IWRC-


EEIP
Wire diameter (inch/mm):
1 1/2” (38 mm)
Nominal Breaking Strength (daN):
101,000 daN

Auxiliary Brake :

Type: BOMCO PS400D

Torque rating (daN.m): 90,000daN (90 metric


ton)

Substructure :

Type: BOMCO DZ225/7.5-XD

Height (m): 7.5m

Clear height below BOP trolley

beams (m): 6.24m

Setback load (daN): 132000 daN

Rotary capacity (daN): 225000 daN

Max. Combined load (daN): 357000 daN

Tope Drive System:

Type: NOV TDS-10SH

Drive: VFD

Maximum Torque (daN.m): 30218N.M

Maximum Speed (RPM): 182

Power Rating (HP): 1*400HP

Soft torque system maker & type: NOV

Auto driller (Option): Included in Drawworks


Rotary Table :

Type: BOMCO ZP275

Drive: Chain drive

Size(inch): 27.5”

Power Rating (HP): 600HP

Hoisting Equipment :

Crown Block :

Type: BOMCO TC250

Capacity (daN): 250000daN

Travelling Block :

Type: BOMCO YC250

Capacity (daN): 250000daN

Deadline anchor :

Type: JZG24

Capacity (daN): 24000daN

Rig Power : CAT 3516C or 3512B

Number of Engines: 2 or 3

Number of Generators : 2 or 3

Continuous generator power (HP): 1603BKW or 1101BKW

AC/VFD system: ABB/Siemens

Camp Power : C18

Number of Engines: 1

Number of Generators : 1

Continuous generator power: 500kw


Mud Pumps :

Type: BOMCO F-1300

Number of pumps: 2

Power Rating (HP): 1300HP

Max. Combined pump output 5.448 (m3/min.)


(m3/min.):

Max. pressure at max. combined


192
pump output (kPa):

345
Max. pump pressure (kPa):

Max. combined pump output @


max press (m3/min.): 2.780

Mud System :

Active tank capacity (m3): 140

Pill tank capacity (m3): 32

Reserve tank capacity (m3): 150

Water/brine tank capacity (m3): 150


Drill String :

Drill Pipe / heavypipe :

Size (inch): 5”

Length (m): 3000

Weight (kg/m): 29

Connection: NC50 (4 ½ IF) connection

Grade: G 105

Size (inch): 4”

Length (m): 3000

Weight (kg/m): 23.6

Connection: Connection double


shouldered
Grade:
G 105
Size (inch):
5” (HW)
Length (m):
400
Weight (kg/m):
74.4
Size (inch):
4” (HW)
Length (m):
400
Weight (kg/m):
44.2

Drill Collars :

Size (inch):
8" x9m, ID >2 13/16", 5
2/8" Reg
Length(m):
6 1/2" x 9m, ID >2
Weight (kg/m): 13/16", NC50

Connection: 4 3/4" x 9m,ID>2.25",


NC38
Qty:
30,30,20

Automated Handling Equipment :

Power Catwalk:

Make : BOMCO

Model/Type: DM4.5/10.5-L1

Size Range : Max. length for standpipe


transport 12m

Max. Dia for standpipe transport


Φ610mm(24")

Max. weight for standpipe


transport 45kN

Drill String Handling:

Make : BOMCO racking board


pipe hander (push up
type), Iron roughneck

Model/Type : MBM140-27/39, TZG 9


3/4-140S1

2 3/8″~9 1/2″, 2 3/8″~9


Size Range :
1/2″
Casing/Tubing Handling:

Make :
BOMCO
Model/Type :
DM4.5/10.5-L1
Size Range :
Power catwalk for casing,
tubing capacity:2 3/8″-
24″

Hydraulic elevator, casing,


tubing, DP, DC capacity:2
3/8″-9 5/8″
Blow out preventers :

Annular preventers:

Make : SHENKAI/RS

Size (inch): 13 5/8"

Pressure rating (KPa/PSI): 5000Psi

Ram type preventers:

Make : SHENKAI/ RS

Size (inch): 13 5/8"

Pressure rating (KPa/PSI): 10000Psi

Double ram type preventer Make : SHENKAI/RS

Size (inch): 13 5/8"

Pressure rating (KPa/PSI): 10000Psi

Accumulator Unit : SHENKAI

Capacity of each bottle (gal): 11 gals

Number of bottles: Twenty-four(24)

Total bottle capacity (gal): 308

Total usable fluid (gal): 1730L(460gals)

Choke Manifold :

Make : BOMCO

Size (inch): 3 1/16"

Pressure rating (KPa/PSI): 5000Psi


B General Rig Specifications

B.1 Mast & Substructure

Compliance
BOMCO Spec.
B.1.0 Company Requirements Yes/No?

l) Self supporting doubles/triples mast. Yes


m) Mast rated for a dynamic derrick load or crown load Yes
based on a hookload of 9 5/8" 59.5 kg/m casing in air at
2500m tvd plus an overpull of at least 45,000 daN.
Copy of calculations to be submitted by Contractor for
verification.

c) Mast and Substructure certified and meets API Yes


Specification 4F, RP 4G
d) Telescoping mast with independently driven mast raising Yes
system. Mast locking pins accessible without having to
climb the mast.
e) Complete Mast fitted with vapor tight, fluorescent lighting Yes,In
system, certified to be used in accordance with accordance
hazardous zones (as defined by API RP 505 with API RP
Recommended Practice for Classification of Locations for 505 , API RP
Electrical Installations at Petroleum Facilities Classified as 500, GB 3836,
Class 1, Zone 0, Zone 1, and Zone 2, 1st edition January IEC60079
1997 including errata August 1998) and PDO
Specification SP-2037 for drilling & workover operations
& wireline operations / perforating operations with 12 m
long lubricator rigged up at drill floor level. Supplied
lighting good for ambient temperature rating of 55 deg
Celsius and meets Temperature classification code T3 or
superior. Meet requirements listed in C6 Technical
specifications and Attachment 1 to Appendix 2 –
Equipment list.
f) Substructure fitted with heavy duty, vapor tight, Yes
fluorescent lighting system, certified to be used in
accordance with hazardous zones (as defined by API RP
505 Recommended Practice for Classification of Locations
for Electrical Installations at Petroleum Facilities
Classified as Class 1, Zone 0, Zone 1, and Zone 2, 1st
edition January 1997 including errata August 1998) and
PDO Specification SP-2037. Supplied lighting good for
ambient temperature rating of 55 deg Celsius and meets
Temperature classification code T3 or superior. Meet
requirements listed in C6 Technical specifications and
Attachment 1 to Appendix 2 – Equipment list.
g) Maximum height with mast down when rig moving of 11 Yes
m without removing monkey board.
h) Both mast and substructure shall be wheel mounted for yes
fast moving and are capable of moving Mast Up/Mast
Down while TDS remain in Mast.
i) Substructure capable of straddling all PDO standard Yes
cellars (Type 1,2, 3, 4 & 5 Company standard cellars –
reference to diagrams in C6) with adequate separation
between substructure beams and/or wheels so as to
clear the external walls of the cellar and avoid loading of
the walls of the cellar.
j) Setback capacity of at least 3000 m 5” 29 kg/m drill pipe Yes
+ BHA of 45,000 daN.
k) Substructure capacity of at least the combined loads Yes
listed in B.1.0 j) and B.4.0 d)
l) Clear height below rotary beams /BOP trolley (not drill Yes
floor elevation) from ground level of at least 6 m.
m) In case, rig design requires Casing stabbing board, it Yes
shall be adjustable for range 2 & 3 tubulars. Stabbing
board to have automatic stops, "dead man" controls,
anchor point outside the board and be certified as a man
riding device. Stabbing board meets all requirements
listed in C6 Technical Specifications and Attachment 1 to
Appendix 2 – Equipment list.
n) Power Catwalk with pipe bins and racks to deliver tubular Yes
from catwalk level to drill floor suitable for handling
single/double stands of tubings, drill pipe and collars
3 1/2” – 20”
o) Drill floor c/w dog house, flush set-back area, anti-slip Yes
surface i.e mats over the entire working area, two access
ways c/w swing gate (none alongside i.e parallel to the
'V' door ramp), a gate to close off the top of the ramp,
pad-eye for a lower logging sheave rated to 20,000 daN,
recessed into the rig-floor and the recess provided with a
cover. Toeboards for all rig floor railings. Hand rails to
meet OSHA specifications and API RP 54. Suitable size
for safe working.
p) Driller cabin (Dog House) to have acoustic enclosure, Yes
climate controlled, designed to allow for ergonomics and
for clear view on rig floor and monkey board, certified to
be used in accordance with hazardous zones as defied by
API RP 505 Recommended Practice for Classification of
Locations for Electrical Installations at Petroleum
Facilities Classified as Class 1, Zone 0, Zone 1, and Zone
2, 1st edition January 1997 including errata August 1998)
and PDO Specification SP-2037. All windows on the cabin
must be fitted with shatterproof safety glass and wiper.
Positive pressure system or equivalent if required.
Suitable size for safe working.
2x rig floor winch, 1x man riding winch, 1x monkey Yes
board winch.
– All winches to be fitted with cable guard
– Pneumatic winches to be fitted with silencers
- Rig floor winch of 2.5 tonne capacity, fitted with
automatic spooling device
- Rotating barrel swivel
q) The man riding system (winch, cable, sheaves etc) shall
be engineered to be one compatible unit complete with :
- Limited max pull to 150 kg

- Independent secondary braking system

Yes
- Slack line shut off mechanism

- Control leaver returns to neutral

- Crown block sheave (Crossby M-491) designed for man-


riding c/w safety sling

- Emergency STOP facility unobstructed

- Spooling device

- Drum guard

- Non Rotating wire

- Upper and lower travel limit switches

- Emergency lowering facility (auxiliary back up air vessel /


receiver – if air winch)

The winch shall not to be used for any other purpose


other than man-

riding.

Man-riding winch to meet all requirements listed in C6


Technical Specifications and Attachment 1 to Appendix 2
– Equipment list

r) Counterbalance system for rig tongs Yes

s) A certified padeye to suspend upper logging sheave Yes


during logging, rated to 20,000 daN, for operations
through the top drive and another padeye for rigging up
secondary retention. Suitable for wireline overstripping
/cut and thread operation.
t) Anchor point to suspend blocks during slip/cut. Block Yes
must be suspended by special dedicated sling from
crown block and not via fast line clamp in front of
drawworks.
u) Drainage system and drip pan to contain fluids spilled on Yes
rig floor.
v) Provision of a portable independent diesel powered Yes
hydraulic power unit capable of lowering and raising
mast without switching on the main rig power
w) Mast height shall be such that with the TDS (including Yes
saver sub) and the stand of drillpipe one metre above
the rotary table, the clearance between the travelling
block and crown block shall be a minimum of 3.0 m
x) Monkey board fingers have individual secondary Yes
retention.

Contractor Specifications

B.1.1 Mast
Make/type : BOMCO JJ225/45-KS

Height (m) : 45 m

Width of base (m x m) : 2.13 m x2 m

Width of top (m x m) : 6.9 m x6.1 m

Static hook load (daN) : 225000daN

Max. hook load with No. of lines strung (daN/Lines) : 225000(5X6)

B.1.2 Racking platform

Make/type : China brand

Racking platform capacity of drill pipe : Size/No. 5”/120


Racking platform capacity of drill collar : Size/No. 8”/6

Racking platform capacity of drill collar : Size/No. 10”/2

B.1.3 Substructure

Make/type : BOMCO DZ225/7.5-XD

Height (m) : 7.5 m

Width (m) : 9.62 m

Setback capacity (daN): 132000 daN

Rotary capacity (daN): 225000 daN

Clear height below rotary table beams (m): 6.24 m

Substructure footprint (m x m) : 9.3 m x13.6 m

B.1.4 Rig floor winches


Make : China brand

Quantity : 2

Type : XJFH-3-35

Capacity & S.W.L. (daN/lbs) : 3000daN

Wire diameter (mm) : 19

Automatic brakes : Yes

Automatic spooling : Yes

Speed (m/s) : 35

B.1.5 Monkey board work winch


Make : China brand

Quantity : 1
Type : JQH-5X48Q

Capacity & S.W.L. (daN) : 500 daN

Wire diameter (mm) : 7.8 mm

Automatic brakes : Yes

Automatic spooling : Yes

B.1.6 Rig floor 'man-riding' winch


Make : Ingersoll Rand

Quantity : 1

Type : FA150KGi-MR12A1ERSW

Capacity & S.W.L. (daN) : 150

Non-rotating wire diameter (mm) : 7/16 inch

Automatic brakes : Yes

No automatic spooling, provide manual


Automatic spooling :
spooling

B.1.7 Power Catwalk and Pipe Racks


Make : BOMCO

Type : DM4.5/10.5-L1 Power Catwalk

Capacity & S.W.L. (daN) : 45kN

Handling pipe diameter range (mm/Inch) : Φ508mm(20 in)


B.2 Drawworks and Associated Equipment

Compliance BOMCO

B.2.0 Company Requirements Yes/No? Spec.

a) Rated to provide at least a hoisting speed of 0.38m/sec Yes


(75 ft/min) based on the weight of a vertical string of
3000m of 5” 29 kg/m drill pipe in air plus bottom hole
assembly weighing 45,000 daN in air (assuming efficiency
factor of 0.8). Copy of calculations to be submitted
by Contractor for verification.
b) Safety device to prevent the travelling block colliding with
Yes
the crown block and the rig floor. Company requires the
installation of an anti-collision system over and above the
crown-o-matic.
c) AC Motor Parking Brake, Eaton or a conventional Eddy- Yes
current type auxiliary brake with independent battery
backup. Brakes backup batteries should be located in a
safe area or equipped and certified as suitable for use in
hazardous area (as defined by API RP 505
Recommended Practice for Classification of Locations for
Electrical Installations at Petroleum Facilities Classified as
Class 1, Zone 0, Zone 1, and Zone 2, 1st edition January
1997 including errata August 1998) and PDO
Specifications SP-2037. All brake and clutch linings to be
asbestos free.
d) Electric or hydraulic auxiliary brake. In case of an electric Yes hydraulic
(Eddy-current) auxiliary brake with independent battery auxiliary
backup. Size of Elmago shall be as per OEM brake
recommendation compatable with rig HP rating. Submit
Efficiency calculation proving sufficient for
maximum hookload of the rig from OEM.
e) If applicable, closed loop brake water cooling system for Yes
drawworks and auxiliary brake rated for 55 deg C ambient
temperatures with flow, temperature and fluid level
alarms.
f) Electrical motors coupled to draw-works meet Yes
requirements listed in C6 Technical Specifications and
Attachment 1 to Appendix 2 – Equipment list.
g) In case disk brakes are provided as an alternative to AC Yes
motors brakes, a minimum of 6 disk brakes are required
(including both drawworks drum flanges) , out of which at
least 2 disk brakes must function as parking brakes . The
emergency braking system button shall activate at least 4
out of the 6 disk brakes.
h) Company Option: Autodriller or ROP Optimizer system Yes, equipped Autodriller is
able to control drilling parameters (Constant WOB and with auto driller able to
torque/differential pressure). Wildcat ADS or equivalent control
constant
WOB &
pressure

Contractor Specifications

B.2.1 Drawworks
Make/type : BOMCO/JC40DB

Drum type : Lebus

Spinning cathead type : Hydraulic cathead

Breakout cathead type : Hydraulic cathead

Travelling Blocks – Crown block anti-collision safety device Yes

Travelling Blocks - Drill Floor anti-collision safety device Yes


Rated capacity (kW/HP) : 800kW/1000hp

Input power continuous (kW/HP) : 800kW/1000hp

Brake type : AC-VFD

Maximum Safe Hookload 12 lines (daN) : 260 000

Maximum Safe Hookload 10 lines (daN) : 225 000


Maximum Safe Hookload 8 lines (daN) : 185 000

B.2.2 Drawworks power


Number of electric motors : 1

Electric motor make : YONGJI, CHINA

Electric motor model : YJ31

Maximum input power continuous (kW/HP) : 1341 HP (1000 KW)

B.2.3 Auxiliary brake


BOMCO/ Hydraulic disk
Make/Type :
brake

Model : PS95

Torque Rating (daN.m) : 9500

B.2.4 Autodriller (Option)


Make/Type : Siemens/37KW
B.3 Hoisting Equipment

Compliance
BOMCO Spec.
B.3.0 Company Requirements Yes/No?

a) Block’ capacity shall be appropriate for the static hook Yes


load of the mast.
b) Hook to have spring assembly and locking device. Yes

c) Jumper bars fitted on crown block sheaves to Yes


prevent wires from jumping off the sheaves
d) Crown block protected by bumper blocks (covered Yes
with wire mesh) from accidental collision impact with
the travelling block or topdrive
e) Gooseneck and washpipe min ID = 76.2 mm. Yes

f) Swivel with 6 5/8” Reg left hand pin connection, Yes


integral with TDS.
g) Fitting for wireline entry on top of Gooseneck. The Yes
wireline entry top should have a 1502 WECO
connection with a minimum drift ID of 76.2 mm. NPT
or other fine threads are not acceptable.
h) Drilling line drum to be powered and shaded. Yes

i) Drilling line 6 x 19 RL IWRC, EIPS or EEIPS (or Yes


equivalent).
j) Drilling line sized to provide minimum safety factors of Yes
3.5 for drilling and 2.5 for running casing and fishing
operations (Shell recommended safety factors).
k) Dead line anchor with adequate load rating and fitted Yes
with jumper bars.
l) Dead line anchor meets all requirements listed in C6 Yes
Technical specifications and Attachment 1 to Appendix
2 – Equipment list.
Contractor Specifications

B.3.1 Crown block


Make/type : TC225

Rated capacity (daN) : 225 000

No. of sheaves : 6pc.

Size of Sheaves (Inch/mm) : Φ44 in/1120mm

B.3.2 Travelling block


Make/type : YC225

Rated capacity (daN) : 225 000

No. of sheaves : 5pc.

Size of Sheaves (Inch/mm) : Φ44 in/1120mm

B.3.3 Drilling line


Size (mm)/type : 32 mm/6×19S-IWRC-EEIP

Breaking strength (daN) : 78 200

Length (m) : 1200

B.3.4 Dead line Anchor


Make/type : JZG24

Load rating (daN) : 24 000

Weight sensor type : MD Totco Horizontal Tension Type


B.4 Rotary System

Compliance BOMCO

B.4.0 Company Requirements Yes/No? Spec.

a) Soft torque system for Top drive: The system should Yes NOV
be compatible with the installed TDS. A Z torque system
delivered and installed by a Shell licensed Vendor
according to the commissioning requirements specified in
the license. Surveyed & inspected yearly at contractor
cost. System must include auto tune and Z-torque option
System must have output port to download high
frequency information. Company Approved make:
ElectroProject, NOV, Bentec, Tesco. If other, check with
STRS focal point in UWD.
b) Rotary table minimum opening of 698.5 mm (27 ½”). Yes

c) Rotary back torque brake fitted with an independent Yes


operating lever to prevent uncontrolled release of reverse
torque or back torque. Emergency drive rotary table is
accpeteble in combination with TDS system.
d) Rotary table equipped with a mechanical lock that arrests Yes
forward & reverse motion.
e) Rotary table static load rating of at least 3,000m 9 5/8” Yes
59.5 kg/m casing in air.
f) Driller’s fully adjustable torque limit switch. Yes

g) Anti-slip mat on entire working area of rig floor. Yes

h) Master bushings made of solid steel (not hollow steel) Yes


and split type. Lifting points to be on top of bushings, not
internal.
i) Top of master bushing & insert bushing flush with rig Yes
floor.
j) Insert bushings available to accommodate slips for Yes
running pipe sizes from 1.99” to 20”.
k) Capability to lock rotary insert bushings described in i) Yes
above to the master bushing.
l) If applicable, Rotary table drive electric motors to meet Yes
all requirements listed in C6 Technical Specifications and
Attachment 1 to Appendix 2 – Equipment list. Also to be
fitted with certified spark arrestor and a motor flush and
overpressure. There should be an audible and visual
alarm at the driller console should the over pressure is
lost.
m)Top Drive System (TDS):
- Continuous Drilling Torque [daN.m]: 3000 daN.m
- Minimum make-up Torque [daN.m] : 5500 daN.m
- Minimum reverse/brake-out Torque [daN.m] : 6500 daN.m Yes NOV TDS-
- Minimum Hoisting [kdaN]: 250 kdan 10SH
- Drilling Speed Range - Continuous: 0 to 200 rpm
- Working pressure: Maximum rig pump pressure with
smallest OEM pump liner size or 34,500 kPa (5,000psi)
whichever is higher.
- Remote operated Upper and manual lower IBOP rated to
maximum rig pump pressure with smallest OEM pump liner
size or BOP rating whichever is higher. Backup for each on
site. To be redressed annually with Manganese trim.
- TDS installation in the mast should allow a minimum
headroom of 3 m below the crown block and the TDS with
the topdrive made to a stand of drillpipe and the bottom of
the stand is one metre above the rotary table(to take string
stretch and safety gap).
- Wireline entry port to be 3 1/16“ ID minimum. Pipe threads
like NPT not allowed, but WECO thread union allowed.
- Rated to work in an ambient temperature of 55 deg C
- Top drive unit certified to work in hazardous area (as
defined by API RP 505 Recommended Practice for
Classification of Locations for Electrical Installations at
Petroleum Facilities Classified as Class 1, Zone 0, Zone 1, and
Zone 2, 1st edition January 1997 including errata August
1998) and PDO Specification SP-2037.
- Meets all requirements listed in C-6 Technical Specifications
and Attachment 1 to Appendix 2 – Equipment list
Contractor Specifications

B.4.1 Rotary table


Make/type : BOMCO/ZP275

Minimum opening (mm/inch) : 698.5 mm/27 1/2 in

Static load rating (daN) : 450 000

Rated power (kW/HP) : 600kw/800hp

Maximum continuous torque (daN.m) : 2255

Maximum rotary speed (RPM) : 300

Emergency chain drive : no

B.4.2 Solid Steel Split type master bushings


Make/type : Bomco

2 3/8”-8 5/8”; 9 5/8”-10 3/4”; 11


Insert bushing range (mm/Inch – mm/Inch) :
3/4”-13 3/8”

Casing bushings/bowls : API 1#, API 2#, API 3#

B.4.3 Top drive


Make & Type : NOV TDS-10SH

Rated hoisintg capacity (daN) : 250ton

API rated bearing capacity (daN) 250ton

Test/working pressure (kPa) : 34 500

Remote operated upper IBOP: 15000psi

Lower IBOP: 15000psi

Drive : electric motor

Make & Type :


Rated power (kW/HP) : 400HP

Peak Rated torque (daN.m) : 74569N.M

Continuous Rated torque (daN.m) and RPM 30218N.M/85RPM

Maximum rotary speed (RPM) : 182RPM

Mudline diameter (mm/inch) : 76.2 mm(3”)

Connection : API REG 6 5/8

B.4.4 Soft Torque System for Top Drive


Make & Type : NOV

C Power Supply Systems

C.1 Rig Power Plant

Compliance
BOMCO Spec.
C.1.0 Company Requirements Yes/No?

a) Diesel electric power system (AC-VFD system). Yes

b) Diesel engine plant c/w closed loop cooling system Yes


designed for 55 deg C ambient temperatures enclosed in a
closed engine room.
c) Engines able to run on diesel. Contractor shall be Yes
responsible for
providing the diesel. Clean-burning with pollution control.
Fit with rig savers.
d) Engines housed in a separate closed Engine room. Engine Yes
room floor to be leak tight with a provision for recovering any
spilled oil. Visible and audible HC ,H2S and fire alarms installed
in the Engine room.

e) Noise level outside engine room under all normal operating Yes
conditions to below 85 dB.

f) In the drilling mode sufficient power must be available to Yes


control and power simultaneously 2 (two) mud pumps, plus
top drive, plus all auxiliaries (including but not limited to rig
lighting, all shale shakers, all mud tank agitators and mud
tank transfer pumps) all at full load, plus the drawworks at
half load.
Copy of power load calculations to be submitted for
verification.

g) Sufficient power available to supply rig offices at peak Yes


demand.

h)3 Emergency shutdown switches to shutdown AC/DC power Yes


system located at the driller's position and in the toolpusher’s
office and outside of the engine room (accessible without
opening the door of the engine room). These emergency
shutdown switches will result in a total black-out and
shutdown ALL engines on the rig Site. When the emergency
shutdown’s switch is activated, air intake valves on diesel
engines should be automatically closing. ESD switches shall be
capable of operating the air shut-off valves on the engines.

i) Provision of stable auxiliary power supply for all Yes


Company's or Company's Other Contractor(s) equipment
(including but not limited to mud logging unit, MWD unit,
centrifuge and mud cooler), when required.
j) A rig service air system with air compressors, receivers Yes
and dryers to adequately power all pneumatic rig
equipment.
k) Emergency generator available at rig Site to provide power Yes
to rig Site offices and accommodation primarily during rig
moves when main rig power plant is switched off or not
available c/w switch-over provision. It shall be connected
to MCC bus and air compressor, trip tank pump, transfer
pumps, mud agitators, rig floor HPU, BOP control unit to
be tied and into and be able to concurrently run from the
emergency generator.
l) Portable engine driven air compressor of sufficient Yes
capacity to power the BOP control unit, start the engines,
choke operation etc.
m) AC-VFD room floor covered with electrical resistance Yes
rubber mat

n) Engines meet requirements for internal combustion Yes


engines listed in C6 Technical specifications and Attachment 1
to Appendix 2 – Equipment list.

Contractor Specifications

C.1.1 Diesel engine plant


Quantity : 2 or 3

Make : Caterpillar ,USA

Type : 3516C or 3512B

Continuous output power available (kW/HP) each engine : 1603 or 1101 kW

C.1.2 AC- Generator


Quantity : 2 or 3

Make : USA

Type : SR4B

Continuous output power available (kW/HP) each generator : 1523kW or 429-470 kW


Output volts / Frequency (Volts / Hz) : 600V/60Hz

C.1.3 AC-VFD
Number of ACD-VFD Drives : Sweden

Make : ABB ACS880

Type : Sweden

Cable trays above ground level : Yes

C.1.4 Transformer system


Quantity : 1

Make : China

Type : Dry Type

Output volts (Volts) : 480V/400V 480V/208V

Frequency (Hz) : 50hz

C.1.5 Emergency Generator

Make : CAT

Type : C18

Continuous output power available (kW/HP) each generator : 500KW

Output volts / Frequency (Volts / Hz) : 400V/ 50hz

C.1.6 Rig service air system

Air Compressors

Quantity : 2

Make & Model : SULLAIR LS12-50HHAC

Rated capacity : 5.6 m³


/min

1000
Working pressure (kPa) :
Backup Air Compressors (Cold-start)

Quantity : 1

Make & Model : HV-1.0/10

Rated capacity : 1 m³
/min

1000
Working pressure (kPa) :

Air Dryer

Quantity : 1

Make & Model : China brand (HD-6HTF)

Rated capacity : 6.8m³


/min

1000
Working pressure (kPa) :

Air Receivers

Quantity : 2

Make & Type : Vertical

Rated capacity : 1.5m3

1000
Working pressure (kPa) :
C.2 Camp Power Plant

Compliance Yes/No?
C.2.0 Company Requirements
a) Sufficient power available to supply camp at peak Yes
demand.
b) Option to connect to a Company power grid 230/460 230/460 Volts/60Hz
Volts / 50Hz.
Contractor Specifications

C.2.1 Diesel engine plant


Quantity : 1

Make : CAT

Type : C18

Continuous power (kW/HP) : 500KW

C.2.2 AC- Generator


Quantity : 1

Make : CAT

Type : C18

Continuous power (kW/HP) : 500kw

Output volts (Volts) : 400V


D Drill String / Handling Tools

D.1 Drill String

Compliance
BOMCO Spec.
D.1.0 Company Requirements Yes/No?

a)Drill pipe

5” x 3,000 m, 29 kg/m and 4” x 3000m ,23.6 Kg/m , Yes


grade G, range 2, premium as per API RP 7G and
inspected to DS-1 category-5 prior to start up of contract
and category-4 at a frequency required by PDO procedure
PR-1312 Well Engineering Inspection guidelines. 5” NC50
connection. Tool joint OD of 4” drillpipe double
shouldered, high torque, no more than 5”. No grade S
pipe shall be used.

Pipe inspected to DS-1 category-5 prior to start up of contract


andcategory-4 at a frequency required by PDO procedure PR-
1312 WellEngineering Inspection guidelines. Submit original
mill certificate. Life ofDP shall be less than 8 years old at any
time during of contract. New pipeshall come with Make and
Break service from OEM and 3rd party QA/QC certificate.

To have 3 bands of a minimum of 7.5 cm of hard banding Yes


(Armacor M, Arnco-100XT/200XT/300XT type 1 and type 2
hard-facing/150XT (crack-free), Postalloy Duraband NC
(crack-free), and TCS Titanium Hardbanding (crack-free))
with surface roughness less than 50 microns. Hardbanding
height is flush to max 3/32” for all components. To have
internal coating TK-34p or equivalent.

b) Pup joints Specifications as per drill pipe. 2 each length 1.5m, Yes
3m, 4.5m
c) HWDP 5” x 400m, 74.5kg/m and 4” x 400m, 44.2kg/m Yes
Specifications as per drill pipe. 4” HWDP same connection
as 4”DP. In addition, all HWDP to
have a stress relief pin end groove, bore back on box.
d) Drill collars _8” x 30 x 9m, ID>2 13/16”, 6 5/8” Reg Yes
connections.
_6 ½” x 30 x 9m, ID>2 13/16”, NC50 connections. Yes

_4 ¾” x 20 x 9m, ID>2.25”, NC38 connections. Yes

All D/C’s to have; spiral body, recess for slips, stress relief Yes

pin groove, bore back on box.

e) Stab-in Inside BOP (Gray valve) 69,000 kPa WP for each Yes
size and connection of drill pipe (No x-over). Primary and
Back-up.
f) Float subs for each size of drill collar. One Box*Box & One Yes
Pin*Box
g) Float valves 2 per BHA for all sizes including test sub for Yes
P/T offlineprior run; re-dress kit for each run; Self filling
feature;able to run open in upper sectionand run closed
in HPsection. None ported. H2S trim; flapper and/or
plunger types as per Company request
h) Circ head 2” lo-torq valve for 34,500 kPa WP, 2” 1502 Yes
Weco top connection & circulating water bushings for all
casing sizes & connections * NC50 B, NC50 P * Weco top
i) Stab-in FOSV 69,000 kPa WP, full bore for wireline entry, 2 Yes
for each size and connection of drill pipe (No x-over), w/
removable handles for easy stabbing. Be made shortest length
possibleto minimize the weight. Class-2 API 7-1
j)X/O subs Enough to make up standard drill string Yes
configurations.
To include but not limited to; short X/O from D/C’s to IBOP’s,
X/O from D/C to drill pipe, X/O from drill pipe to tubing, X/O
from drillpipe, drillcollar to API standard connections, short sub
below IBOP as saver sub.

Side entry sub NC50 box x pin with 2” 1502 side entry with
suitable connection for all DP in use.

Rating of working pressure of pipe ram BOP.

k) All drill string components to have a unique clearly marked Yes


identification number for identification and traceability to OEM.

l) All threaded components are to be stored with storage Yes


grease and plastic thread protectors.

Contractor Specifications

D.1.1 Drill Pipe


OD/ID body inch 5”

Total length m 3000

Grade/Weight (kg/m,lbs/ft)/Range 29kg/m

Type of connection NC50

Tool joint OD inch 6-5/8”

Tool joint ID inch 3-1/2”

Type of hard banding Arnco300XT

OD/ID body inch 4”

Total length m 3000


Grade/Weight (kg/m,lbs/ft)/Range 23.6kg/m

Type of connection DSTJ NC38

Tool joint OD inch 5”

Tool joint ID inch 2-11/16”

Type of hard banding Arnco300XT

D.1.2 Drill Collars


OD/ID body 8” / 2-13/16”
inch

Quantity: 30Jt

Grade/Weight (kg/m,lbs/ft)/Range 4145H / R2

Type of connection 6-5/8” Reg

OD/ID body inch 6-1/2” / 2-13/16”

Quantity: 30Jt

Grade/Weight (kg/m,lbs/ft)/Range 4145H / R2

Type of connection NC50

OD/ID body inch 4-3/4” / 2-1/4”

Quantity: 20Jt

Grade/Weight (kg/m,lbs/ft)/Range 4145H / R2

Type of connection NC38

OD/ID body inch N/A


Quantity :

Grade/Weight (kg/m,lbs/ft)/Range

Type of connection

D.1.3 HWDP (Heavi-weight drillpipe)


OD/ID body inch 5” / 3”

Quantity : 600m

Grade/Weight (kg/m,lbs/ft)/Range 4145H/74.4kg/m / R2

Type of connection NC50

OD/ID body inch 4” / 2-1/16”

Quantity : 400m

Grade/Weight (kg/m,lbs/ft)/Range 4145H/44.2kg/m / R2

Type of connection NC46 Pin x Box


D.2 Handling Tools

Compliance
BOMCO Spec.
D.2.0 Company Requirements Yes/No?

a) Elevators Drill pipe elevators for 5” & 4” centre latch. Yes


2 sets.
8”, 6 1/2” & 4.3/4” lifting subs for use with drill pipe Yes
elevators. Lifting subs need to have a through bore to
enable circulation and box connection on top to enable
fishing if required. DC handling sub & length to allow
elevator sliding down without reaching lower T/Joint to
connect TDS

b) Slips Drill pipe hand slips with flexible handle, 2 Yes


sets for each size, API normal SDML for 5” & 4” (or
equivalent).
Minimum 16” length.

Drill collar hand slips for 8”, 6 1/2” & 4.3/4” Yes
drill collars. Varco DCS-L and DSC-R (or
equivalent)

5-1/2”, 5”, 4 ½”, 3 ½”, 2 7/8”, 2.3/8” tubing hand slips. Yes

c) Power Slips Air or Hydraulically operated power slips to Yes


handle DP size in use. Not weight
activated. Company preference is power
slips or Backsaver manufactured by Blohm
& Voss,or Varco
d) Drill collar safety clamps both manual and pneumatic type Yes
to fit all drill collars from 4 ¾” to 9 ½”. Pneumatic
hammer for safety clamps.
e) Bit breaker for each of the following tri-cone bit sizes;17 Yes
½”, 16”, 12 ¼”, 8 ½”, 6 1/8”, 5 7/8”.
f) Elevator links suitable for drilling and casing operations. Yes

g) Pneumatic Pipe spinner for sizes 2 3/8” to 9 ½”. Stabbing Yes


guides for 5” and 4” DP.
h) Lightweight Plastic Mud saver bucket for drill pipe & drill Yes
collars.
Company Option: Automated power-driven mud saver
bucket with return hose to discharge into flow line or
shaker with seas for DP & DCs.

i) A set of manual rotary tongs c/w with lug and hing jaws to Yes
make up and break down tubular 3 ½” -17 ½”.
j) Iron Roughneck or Hawkjaw model T-Wrex Junior; NOV Yes
ST-80; Eckel DPT or similar suitable for handling all
tubular sizes 3 1/2” thru 8 ½”.
k) Lifting cap closed end for all connection sizes including bit Yes
x 2 each
l) Full Pipe racking System capable of handling drill pipe
from 2-7/8” to 5”, drill collars from 4-3/4” to 9-1/2”, and
Yes
casing and tubing from 2-7/8” to 9-5/8”.
Hydraulic elevator to allow for automated pipe handling
process.
Zone management to ensure all tools operating within
safety distance of each other to prevent dangerous and
potentially disruptive and collisions.
An ergonomic, safe and efficient solution for handling
pups, stabilizers, etc that cannot be handled by the
automatic system should be available. The use of this
system should not impair the efficiency of the WORK
UNIT;
System which does not require drilling or use of mouse
hole to pick up pipe is preferred;
If possible to operate the UNIT in manual mode as a fall
back, provide detailed Hazard Analysis and Risk Assesment
to address change in mode.
The mechanized system shall give average tripping speed
over 1000 m/hr in cased hole
Contractor Specifications

D.2.1 Elevators
5” Drill Pipe (2 sets ea. minimum) (Make / Type / Capacity) DDZ5-500

4” Drill Pipe (2 sets ea. minimum) (Make / Type / Capacity) DDZ4-500

8” Drill Collar lifting subs (QTY/Length) 8”×3” -6 5/8” Reg

6 ½” Drill Collar lifting subs (QTY/Length) 6 ½” ×2 ½” - NC50

4¾” Drill Collar lifting subs (QTY/Length) 4 ¾” ×2 ½” - NC38

5” Drill Pipe (2 sets ea. minimum) (Make / Type / Capacity) 5” ×2 ½”– NC50

D.2.2 Slips
5” Drill Pipe (2 sets ea. minimum) SDML5×5

4” Drill Pipe (2 sets ea. minimum) SDML5×4

8” Drill Collar DCS-L8”

6 ½” Drill Collar DCS-L6 1/2”

4¾” Drill Collar DSC-R43/4”

D.2.3 Power Slips


Make : China brand

Model : PS275

Capable of handling sizes : 4500 kN2 3/8”~13 3/8”

D.2.4 DC safety clamp


Make : RUDONG or Equivalent

both manual and hydraulic


Model : type to fit all drill collars from
4 ¾” to 8"
Capable of handling sizes : from 4 ¾” to 8"

D.2.5 Pipe spinner


Make : RUDONG or Equivalent

Model : SSW40(3 1/2-9 1/2)

Capable of handling sizes : 3-1/2”~9-1/2”

D.2.6 Rotary Tongs


Make : RUDONG or Equivalent

1 pair manual tong, Q3 ½” -


Model :
17”-90

Capable of handling sizes : 3-1/2”-17-1/2”

D.2.7 Iron Roughneck


Make : NOV

Model : ST-80C

Capable of handling sizes : 4-1/4” to 8-1/2”

Max. Make-up /Break-out Torque (daN) : 81500 daN.m/108500daN.m

D.2.8 Pipe Handling System


Make : Bomco

Model :

Capable of handling sizes : 2-7/8” to 9-5/8”

D.3 Fishing Equipment


Compliance

D.3.0 Company Requirements Yes/No?

Not required. NOT


REQUIRED

E. Well Control Equipment

E.1 BOP Stack

Compliance BOMCO

E.1.0 Company Requirements Yes/No? Spec.

a) All well control equipment shall comply with the latest edition "Shell Yes
Pressure Control Manual for Drilling and Workover Operations
"EP 2002-1500” – September 2008 version, and PDO Specification
SP-1213 2016 revision.
b) All well control equipment shall meet the latest edition of ISO 15156 Yes
sour service. This applies to all possible flow-wetted parts of the
BOP. BOP bodies / bonnets shall be made from forgings or
castings. Casted components shall have full UT and X-Ray. BOPs
to be manufactuered in accordance with API 16A and have API
monogram (full traceability of material inspections). English
operating and maintenance manual shall be included. Contractor
shall load PMS system with the required maintenance routines.
Contractor shall have on-site access to consumables and reginal
OEM support.
c) Only genuine OEM or OEM approved spares/replacement parts shall Yes
be used in the maintenance of well control equipment. No
alterations shall be made to any well control equipment without the
written approval of the OEM or OEM approved facility.
1. Re-certification that includes remanufacturer modifications are
to be carried out by an OEM or OEM-approved facility.
2. Any replacement parts: flanges, valves, fittings, and discharge
lines used in the maintenance of choke manifold assembly
should contain metals and seals in accordance with as the
document list in section C6.
Note: For equipment where the OEM doesn’t exist anymore
through take-over the new owner takes on OEM responsibility. If
the OEM is out of business without take-over then agreement needs
to be sought with Company for an approved technical authority who
can take on the recertification.

d) All well control equipment to meet intermediate inspection Yes


requirements as per the WCAT frequency and inspection sheets or
OEM and published recommendations of the LSF Well Control
Equipment Inspection Criteria working group. The intermediate
inspection shall be verified by an independent PDO approved
verification agency. Inspection company has to witness the entire
physical intermediate inspection and checks in person.

All well control equipment shall meet major inspection


requirements as per the WCAT. The major inspection shall be
certified by OEM or OEM approved agency.

Details can be found in the WCAT online application where the


Contractor shall also keep updated the status on all their “primary
flow wetted” and “non primary flow wetted” equipment and
personnel IWCF certifications.

e) Preventers General specification is for a 13 5/8”, 34,500kPa Yes


WP BOP stack with 1 annular and two ram
preventers.
Annular, 20,700kPa or 34,500kPa, fitted with accumulator Yes

Bottle 11 gallon or as per documented OEM requirement as

close as possible to closing chamber for stripping operations.

Rams to have locking mechanism as per API STD-53 Yes

Bottom ram cavity suitable for blind/shears that can shear and seal on
all drill pipe in use (except HWDP) underconditions of pressurized
wellbore upto the rated working pressure of the Annual BOPs. Spacer
spool shall need to avoid in/external upset exposed to shear blade.
The entire BOP must be easily asscessible for maintenance and
ram/seal replacement.

Cross overs, clamps, nuts, bolts & gaskets for use on the BOP. As per Yes
API STD 53 and operator instruction: everybreak of API connections
needs new gasket to be installed. SS316-L gaskets preferred and only
SS316 and SS316-L allowed to be used.

Rams Yes

Two sets of Pipe rams, 4” , 5’’ Casing rams , 7” & 9.5/8” (including
test tools to test in thedirection of flow)

Variable rams; 4 ½” to 7”, 2 7/8” to 5”

Shearing blind rams (fitted with tandem boosters if required Yes


by OEM). Shear and seal tests with a pressurized BOP (to full
working pressure of the Annual BOP) on rig’s heaviest/highest yield
strength drill pipe as well as smallest tubular will be physically
conducted at rig start up for verification. Engineering calculations
from the OEM to be supplied by Contractor for shearing ability as
required also in the above test. Contractor shall keep the record for
audit. Contractor shall redo it if there are changes to the BOP or
hydraulic control system or tubular/accessories to be sheared.

A complete set of spare ram packers/seals for each ram size and Yes
annular rated to the environment theymay expose to (mud type,
temperature, H2S). Adequate spare parts should be available. Note
fluid wetted sealsneed replacement at opportune time after exposure
to H2S
f) Side outlets Yes
1 x 3.1/16” (min) outlets for choke line, fitted with
one hydraulically operated valve and one manual valve.

1 x 3.1/16” (min) outlets for kill line, fitted with two manual

valvesand one NRV.

g) Kill line Dedicated 2” ID (min), hard pipe or flexible HP Yes


hose with 34,500kPa rating. Or a combined choke
and kill line 3.1/16” ID as per API-16C
h) Choke line 3.1/16” ID (min) as per API-16C Yes

i) Adaptor spools to connect BOP stack to any Company supplied Yes


wellhead.
j) Spacer spools (to position BOP stack) and drilling spool as Yes
required.
k) Bellnipe, height to be adjustable, and flow line for 13 5/8” BOP. Yes

l) BOP stack handling system for positioning BOP along the centre Yes
line of the rig.
m) Combined P/T test and transport skid for the BOP stack. Design Yes
for fast R/U and R/D BOP. BOP trolley for testing and movement
of the entire BOP stack to the well centre and out in fast and
efficient manner.
n) Cup type testers for 13 3/8” #72/ #54.5, 9 5/8” #58.4/ #53.5, Yes
7” #41/ #35/ #29 casing.
o) Test subs for pressure testing kelly cocks, gray valves and BOP’s, Yes
including when fitted with casing rams. Test stump for offline P/T
of FOSV and Gray valves
p) API hub connection is allowed only on forged hub clamps. Yes

Contractor Specifications

E.1.1 13 5/8" BOP


a) Bag type preventer
Quantity : 1

Make: SHENKAI/ RS

Type: FH35-35

Size (inch) : 13 5/8"

WP (kPa) : 5000Psi

Connection top/bottom : Top Stud/ bottom flange

Fitted with accumulator bottle for stripping : Yes

b) Double Ram type preventer

Quantity : 1

Make : RS,SHENKAI

Type : FZ35-35

Single/double : Double

Size (inch) : 13 5/8"

WP (kPa) : 5000Psi

Side outlet ID (inch) : Two 3.1/16”-5000Psi

Connection top/bottom : Flanged Flanged top / bottom

Lock mechanism : Manual lock

E.1.2 Test stumps for BOP testing


Location : On BOP Skid

Complete with test tools y/n 5000Psi

E.1.3 BOP test sub


Type : Kelly Cock Test Sub

Connection : 4-1/2” IF Box


E.2 BOP Control System

Compliance BOMCO

E.2.0 Company Requirements Yes/No? Spec.

a) BOP control system to be in accordance with of EP 2002-1500 Yes


– September 2008 version
b) General system type; an independent automatic accumulator Yes
unit rated for 20,700kPa (3,000 psi) WP. Unit to be API
certified (API monogram) & as per API 16D.
c) Unit to be located remote from rig floor, and outside of Yes
Zone-2.
d) Unit to have low accumulator and air pressure and low Yes
reservoir level alarms.
e) Without recharging, the unit has to be capable of closing and Yes
opening all preventers, opening the hydraulic choke line valve
and closing again the blind / shear rams.After completion of
above operations the remaining accumulator pressure shall
be 200 psi above the accumulator pre-charge pressure. The
accumulator pressure after closing one annular and all pipe
rams (including shear rams) shall be adequate to keep the
pipe rams closed against a wellbore pressure equal to the
rated working pressure of the BOP. Calculations to
substantiate the usable accumulator volume must be
provided.
f) Annular regulators to be “True reading” type so cannot lose Yes
air/setting value when no air pressure. All relief valves to
be certified and annually checked for compliance.
g) A independent back-up power supply should be available to Yes
maintain accumulator pressure in case of failure of primary
power source. Note the comments in API-16D that “air” is
not considered an alternative power source unless the
specific conditions in (l) below are met!!
h) Design of the accumulator bottle banks must be such that Yes
any failure or leak in the system will not result in more than
25% loss of total system capacity.
i) BOP control hydraulic power unit (HPU) shall have a suitably Yes
sized dedicated air receiver with a non-return valve
supplying air to the HPU.
j) Drillers (remote) control panel to have; Yes
- Control over all BOP functions
Graphic panel showing all functions and
controls.
- Indicator lights to show function positions.
- Pressure regulator for annular preventer.
- Low accumulator system pressure warning.
- Low reservoir level warning.
- Low rig air pressure warning.
- Control for bypass valve.
k) One Second remote control panel located near or inside the Yes
contractor toolpushers office. Similar to the driller’s control
panel, it must have :

- Control over all BOP functions Graphic


panel showing all functions and controls.
- Indicator lights to show function positions.
- Pressure regulator for annular preventer.
- Low accumulator system pressure warning.
- Low reservoir level warning.
- Low rig air pressure warning.
- Control for bypass valve.

l)Remote panels operate the accumulator unit directly, not via Yes
the rig floor

m) All BOP control lines supplying hydraulic fluid from the


Hydraulic Power Unit (HPU) / BOP control system to the BOP
Yes
stack shall have a working pressure of 21,000 Kpa and shall
be API certified and shall have passed fire resistance tests
as specified in API 16D. Certification to be submitted by the
contractor.
n) All relief valves to be certified and annually checked. Yes
Contractor
Specifications

E.2.1 Accumulator unit


Make : BPM ,DONGSU

Model/type : FKDQ960-6

Installation site : Remote from rig floor

System fluid capacity (liter/US gals) : 1500L

No. of bottles installed : Twenty-four(24 )

Total bottles capacity (liter/US gals) : 11 gals

Bottle working pressure (kPa) : 3000 psi

Control manifold model : Model DQ or equivalent

Low pressure/low reservoir level alarms (y/n) : Yes

Serial (No.) : Proposed to Purchase

E.2.2 Triplex pumps


Quantity : 2

Make : SHENKAI ,BPM

Model : Model

Each driven by motor of (kW) : 18.5kW

Flow rate of pump (liter) : 41 L/MIN

At max. operating pressure (kPa / psi) : 35000KPa

E.2.3 Air pumps


Quantity : 3

Make : SHENKAI ,BPM


Model : QYB40-6OL

Flow rate of each pump (liter) : 20L

At max. operating pressure (kPa / psi) : 40Mpa

E.2.4 Driller's (remote) control panel


Make : SHENKAI ,BPM

Model : PLC Remote

Serial No. : Proposed to Purchase

Low accumulator system pressure warning Yes

Low reservoir level warning Yes

Low rig air pressure warning Yes

Pressure regulator for bag Yes

Control for by-pass valve Yes

Quantity of pressure gauges : 6 - 8 no’s

E.2.5 Second Remote control panel


Make : SHENKAI ,BPM or
Equivalent

Model : PLC Remote

Quantity : One (1)

Location site : Tool Pusher Cabin

E.3 Choke Manifold & Testing Equipment


Compliance BOMCO

E.3.0 Company Requirements Yes/No? Spec.

a) Choke manifold of 34,500kPa WP, sour service (Valves Yes


PSL3 PR2 as defined in API Spec 6A with proving COC & material
propertiesspecification), in accordance with EP2002 – 1500
September 2008 version and PDO Specifications SP-1213, 2016
Revision. Choke manifold layout shall be such that either of the
adjustable chokes can be isolated by double barriers & bleed
and repaired without interrupting the well kill operations.

b) All items of equipment on flow path to have Yes


a nominal 3” ID (min).
c) One manual adjustable and one remotely operated power Yes
choke. Spare manual choke bean to be on site to cater for
fast change out.
d) Remote control unit positioned on rig floor Yes
with view to the choke manifold. Connections and fitting for
accepting alternative air / nitrogen power available as per
API Spec 16C.
e) No threaded connections in choke manifold Yes
(with exception of gauge connections and autoclave
fittings).
f) Valves upstream of the choke shall: Yes
_ meet the temperature classification API SPEC-6A to cover
the anticipated minimum and maximum operating
conditions

_ have a PSL level 3G and performance Requirement PR2


as defined in API SPEC-6A

_ use grease that meet the high temperature specification

g) Valves downstream of the choke shall meet Yes


the P and U temperature classification under API SPEC-6A.
Choke body and equipment immediately downstream of the
chokes shall meet the temperature classification API SPEC
6A to cover the anticipated minimum and maximum
operating conditions. All valves full WP rating of 34,500 KPa.
h) One Portable air-operated hydraulic test Yes
pump rated to 69,000kPa complete with adjustable relief
valve and suitable electronic recorder.
i) A line to the poorboy & on to the trip tank in place for Yes
stripping operation

Contractor Specifications
E.3.1 Choke manifold
Make :

Size 3 1/8“

inch

Working Pressure kPa (psi) 5000psi

H2S service y/n Yes

Quantity of valves : 14

Make/model : SKJG-35

Size inch 3 1/8“

Quantity of adjustable chokes : 2

Make/type : SKJG-35

Quantity of power chokes : 1

Make/type : Shenkai

Power choke remote control panel y/n: Yes

Make/type : Shenkai

Glycol injection pump y/n

Make/type : Shenkai

E.3.2 Hydraulic test pump


Make : SANYI

Model : SKT-140

F. Mud System
F.1 High Pressure Mud System

Compliance BOMCO

F.1.0 Company Requirements Yes/No? Spec.

a) At least two (2) electric driven triplex mud pumps capable of Yes
continuously maintaining a combined minimum output of
4m3/minute at an operating pressure of 21,000kPa, 3 m3/minute
at an operating pressure of 25,000kPa, 2.5m 3/minute at an
operating pressure of 28,000kPa.

Copy of calculations to be submitted by Contractor for


verification

All mud pumps shall be in a position to suck from all the


compartments of Active,Reserve, Brine ,Water, Pill and
Intermediate tanks.

b) All components of the high pressure mud system must have a Yes
working pressure of at least equal to the maximum discharge
pressure of mud pumps (using the smallest mud pump liner
available from manufacturer) and a nominal ID of 3 ½”. Test
pressures shall be 1.5 times the working pressure, lines to be
designed and constructed in accordance with ASME B31.3, API
1104, ASME IX or equivalent standard.
c) Each mud pump shall be complete with : Yes

Dedicated centrifugal charge pump. Yes

Adjustable / resettable pressure relief valve (flanged /Weco type). Yes

Separate suction line for each pump and manifolded for either Yes
pump. Sunction line shall extend to intermediate tank also.

Pulsation dampeners on discharge line, same rating as MP max pr Yes


Replaceable suction and discharge screens. Yes

Liners and pistons to operate at the parameters specified in a) Yes


above. Company prefers that Contractors use ceramic mud
pump liners.

Electronic Pressure gauge before isolation valve. Yes

Dedicated closed piston cooling system. Yes

Isolation switch and lock-out mechanism on electric drive motors. Yes

Rigid covers to enclose all moving parts. Padlocked. Yes

Manual drive mechanism to turn power end. Yes

Cross head inspection cover to be transparent types Yes

External lubrication system fitted with low oil pressure alram Yes

Individual discharge line. Yes

Bleed-off valve (flanged or Weco) with discharge line dipping Yes

down from relief valve to mud tanks

Drip tray to contain spills. Yes

d) Standpipe with gooseneck, connected to a H-type standpipe Yes


manifold, constructed without threaded connections and
designed as follows :
Lines to drill string to be nominal 3 ½” ID (min). Yes

Minimum working pressure equal to 34,500 kPa Yes

Choke for bleeding off pressure complete with upstream gate valve Yes
for isolation.

A separate self-draining Natih fill-up line to the bell-nipple joint. Yes

Fitted with an outlet for MWD instrumentation and complete with a Yes
2" gate valve.
Ability to simultaneously pump through the drill string with one Yes
pump and down the annulus with the other at maximum pump
output. Record pressures independently.

Ability to simultaneously pump through the drill string with one Yes
pump and through the kill line with the other pump. Record
pressures independently.

Line-up all pumps using steel lines to the utility standpipe on the rig Yes
floor.

Rotary hose certified to meet API grade D, API Spec 7K-FSL2, Yes
Temperature range III (-20 deg C to 121 deg C), 3 ½” ID (min)
complete with hammer unions at both ends. Hose Working
pressure 34,500 kPa, Test Pressure 69,000 kPa. Hose to be
secured with snub lines and integral coupling. Certification for
hose to be furnished by Contractor.

e) Utility standpipe, 2" ID (min) with gooseneck, connected to Yes


standpipe manifold, constructed without threaded connections
and designed as follows :
Working pressure 34,500 kPa. Yes

Sufficient height to enable reciprocation of a casing string while Yes


cementing.

A connection to both the standpipe manifold and the HP Yes


cementing line. NOTE: during normal operations the utility
standpipe shall be disconnected from the standpipe manifold

A local pressure gauge. Yes

f) Casing wash down hose; 34,500kPa Working Pressure, Yes


sufficient length to reciprocate the casing, nominal 2” ID (min),
API grade D, API Spec 7K-FSL2, Temperature range III (-20
deg C to 121 deg C) complete with hammer unions and snub
lines.
g) Reverse circulation line, 3” nominal ID (min), located adjacent to Yes
the standpipe manifold and run directly to the shaker header
box.
h) Cementing line, 3” x 34,500 kPa WP, running from the Yes
standpipe manifold to the end of the mud tanks complete with
Weco 1502 connection
i) Low pressure casing fill up line. Yes

j) Chicksan steel; 2” nominal, 10 X “3.6m - 6 piece integral loop” Yes


(4 elbows and 2 straights), of the non-screw type w/ WECO
1502 hammer unions, suitable for sour service. Each piece
must be tagged with a unique identification number, working
pressure and last test date. Provide two each of the following
accessories (min): lo-torque plug valves; male x male subs:
female x female subs: 90 deg. T-pieces; 60 deg. Y-pieces; 90
deg. Elbows; 3" x 2" crossovers; swivel with Weco 1502
connection; non return valves.
2” lo-torq valve for 69,000 kPa WP * 5 pieces

2 x Adapter 2” WECO fig 1502 x 2-1/16” 5K flange (RX-24


gasket), WP 34,500 KPa, NACE MR01-075 sour servces. Allows
connection to WH SOV.

Restaining line set up matching pressure rating required.

Contractor Specifications

F.1.1 Mud pumps

a) Mud pump No. 1

Make : BOMCO

Model : F-1300

Mud pump driven by motors No. Type : One set AC motor

Continuous power rating of each motor kW (HP) 1000 kW

Fluid end type “I” type


Cylinders/valves cover : Screw type

Equipped with :-

Pump stroke counter type Inductive stroke sensor

Liner sizes available inch 7、6 3/4、6 1/2 、6 1/4、6、


5 1/2、5

Supercharging pump type Centrifuge pump

Independently driven by motor kW (HP) 55 kW

Type : Ex-proof motor

Discharge/suction line dia (ID x ID) inch 6X8

Working flowrate liter 55 l/s

b) Mud pump No. 2

Make : BOMCO

Model : F-1300

Mud pump driven by motors No. Type : One set AC motor

Continuous power rating of each motor kW (HP) 1000 kW

Fluid end type “I” type

Cylinders/valves cover : Screw type

Equipped with :-

Pump stroke counter type Inductive stroke sensor

Liner sizes available inch 7、6 3/4、6 1/2 、6 1/4、6、


5 1/2、5

Supercharging pump type Centrifuge pump

Independently driven by motor kW (HP) 55 kW

Type : Ex-proof motor

Discharge/suction line dia (ID x ID) inch 6X8


Working flowrate liter 55 l/s

F.2 Low Pressure Mud System – Tanks

Compliance BOMCO
Yes/No? Spec.
F.2.0 Company Requirements

a) Active tanks 100 m³


, reserve tanks 150m³
, water tanks 150m³ Yes
(approx capacities). The complete system to be capable of
working with 15kPa/m mud. System shall include a cuttings
chute to collect underflows from the solids control equipment to
feed into an open top pipe (chute) to the waste pit. Tanks to be
50-80m3 size. Pit dividers not less than 30m3.
b) All tanks covered with secured with fiber gate type grating and Yes
free of obstructions and trip hazards (e.g. valve operating
handles). Manhole covers to be marked. Tanks to have
chamfered or round corners for minimal dead volume (Maximum
acceptable dead volume is 1 m3).
Rigid handrails with a minimum of two courses and toe board. Yes
The layout of the tanks shall be such that tripping hazards are
avoided.

Skid or trailer mounted to expedite rig moving. Yes

Piping arrangement to permit the complete emptying of tanks to Yes


the waste pit using centrifugal transfer pumps via the cutting chute.
Paddle agitators both sufficient in number and power rating Yes
- minimum 15 HP motor - fitted in all compartments of active and
reserve,

water, brine tanks (excluding the sand trap and degasser tanks)to
maintain a mud of 15kPa/m in suspension.
Mud agitator blades shall be angled, sized and powered in
accordance with OEM specifications for the size of tanks.

Placed not higher than 0.5m in the tank. Agitators/Tank size shall
not cause interference with pit sensors (3rd party and/or drilling
contractor).

Low level equalization valves Yes

All tanks with high pressure mud guns and mud gun lines so the Yes
solids andweight material not be settled on bottom

All tanks in active system up to intermediate tank, reserve, water, Yes


brine tanks connected to all mud pumps

c) Active tanks Dimensioned to give detectable level change Yes


for 1m³volume change. The volume per each
5cm of all tanks shall be displayed on the active
system as display board
Sectioned for in-series treatment by process equipment Yes
ending at the suction tank.

Contain a settling tank (sand trap) of approx 10m 3capacity with Yes
sloping bottom and a minimum 12” sizebutterfly dump valve.

d) Reserve tanks Each tank approx 50m³capacity. Yes

e) Pill tanks two required. 15m3 minimum with 0.5m3 Yes


dead volume
f) Trip tank 5-8 m³capacity, calibrated for drill pipe in use Yes

Sized to give level change of at least 5cm for each stand of open Yes
ended drill pipe. 2m3/min transfer rate to emptyor fill trip tank.

Filled from flowline, w/facility to bypass w/butterfly valve Yes


Served by dedicated pump to give; 1m³
/min (min) across Yes
the bell nipple, or to fill drill pipe.

Returns from choke manifold shall be routed throughpoorboy to the Yes


flow line/trip tank.

g) Strip tank Arrangement for stripping shall meet the Yes


requirements of the standards defined in Well Engineering
Pressure Control Document and Shell Well Control Manual EP
2002-1500 September 2008 version.
Calibrated to give at least a 60cm level change for closed ended Yes
stand of drill pipe in use. 1 m3 capacity.

Suction to be from bottom of tank & tied into trip tanktransfer Yes
pump

h) Water tanks Tanks shall be provided with a low pressure Yes


circulation system.
Return/settling tank. Yes

Separate feedline to the mud pumps. Yes

Separate return line from the mud ditch to the settling tank. Yes

Venturi type mixing hopper capable of a throughput of 3-4m3/min. Yes

Centrifugal pump to displace brine to the mud pump or Yes

filtration /cement unit.

Connection from the discharge side of the mixing pump so as to be Yes


able to supply a remote unit with clean brine.

i) Mud ditch Allows for either access to or bypass of any Yes


active tank for mud being circulated in the active or reserve or
brine system. Mud ditch shall extend up to sunction tank.
j) Drill water Offloading; reserve and water tanks shall be Yes
provided with flexible hoses and fittings required for hooking up
to /Fresh water drill water/fresh water tankers for offloading.
Dedicated pump for fresh water offloading.
Reserve and water tanks shall be fitted with4" diameter hard-piped Yes
goose necks to the top of the tanks for the distribution of Company
supplied drillingwater.

k) A dedicated low pressure transfer pump (minimum capacity Yes


1.5m3/min) shall be provided for all the reserve/water tanks
dedicated.
l) Reserve and water tanks to include a suction/discharge point Yes
for water tankers and a suction/feed point for Company
supplied cementing unit. At least one water tank shall have a
centrifugal pump (2 x 3) to enable treatment of bacterial/H2S
contaminated water and its supply to the shaker area for
dilution of mud.
m) Mud mixing Yes
Two independent mixing systems shall be provided such
that the mixing pumps can discharge through either
system (i.e. 2 ring lines). Each system shall be able to
take suction from and discharge into any or all of the active
or reserve tanks. It shall be possible to use one system on any
of the active tanks (including the pill tanks) at the same time
the other system is being used to mix in any of the reserve
tanks. Also the active mixing system shall be able to
recirculate mud back across the shale shakers.All tanks shall
be connectedWith mud mixing system & shearing device and
delivery line Shall be given tanks with isolation valves and
bypass lines

Two venturi type mixing hoppers capable of a throughput Yes


of 3-4m3/minute. Fitted with a shear mixer to shear the

polyers. Easy accessible with forklift and crane. Isolation valves


shall be in suction & discharge lines so each

mud pump can be used independently if required.

Two mix pumps correctly sized for 75kW each. Capable of Yes

mixing at min 4 m3/min.


Pipe work diameter shall be compatible with the pump Yes
size provided; (i.e a 6 x 8 pump shall have a minimum 8"
dia. suction line from the tank and a 6" dia. discharge line).

Company approved dedicated caustic mixing area with Yes

emergency shower facilities (chilled showers). Water

connect to A/C.

Lifting device with Capability of handling 1.5 Ton bags of chemicals. Yes
Standalone lifting device on mud tank

Shearing unit such as an Aqua Shear, Lobestar or NOV’s HP Shear Yes


unit permit efficient shearing of high weightmuds (23 kPa/m)

n) Portable Pump to transfer liquid chemical to tank at rate Yes


200L/min
o) LCM skid, mud chemical skid (minimum 2 per rig) Yes

p) One PPE box for keeping PPE and MSDS sheets. One mud tester Yes
cabin near to intermediate tanks with working bench for checking
mud properties, writing reports, with box for keeping tools.

Contractor Specifications

F.2.1 Mud tank system


a) Active mud tanks (with proper partions)

Quantity : 3

Total capacity m3 129.5

Dimensions m Shale shaker tank/10×3×2.45

Intermediate tank/10×3×2.45

Suction tank/10.5×3×2.45

Reserve tank/10.5×3×2.45

Water tank/10.5×3×2.45
Description/Capacity No. 1 m3 Shale shaker tank divided into:
trip tank, Stripping tank,
settling tank, degasser tank,
desander tank

Capacity: 44.5

Description/Capacity No. 2 m3 Intermediate tank divided into:


desilter tank, Pill tank 1

Capacity: 33

Description/Capacity No. 3 m3 Suction tank divided into: pill


tank 2, suction tank

Capacity: 52

Capacity degasser tank m3 11

b) Reserve tanks (with partions)

Quantity : 3

Total capacity m3 3×50=150

Dimensions m 13.5 x 3 x 2.6m

Description/Capacity No. 1 m3 50

Description/Capacity No. 2 m3 50

Description/Capacity No. 3 m3 50

c) Water tanks (Brine tanks) (with partions)

Quantity : 3

Total capacity m3 3×50=150

Dimensions m 9 x 3 x 2m

Description/Capacity No. 1 m3 50

Description/Capacity No. 2 m3 50

Description/Capacity No. 3 m3 50
Included in shale shaker tank
F.2.2 Settling tank (Sand trap)
Capacity m3 13

F.2.3 Pill tanks.


Quantity : 2

Description/Capacity No.1 m3 16

Description/Capacity No.2 m3 16

Included in shale shaker tank


F.2.4 Trip tank
Capacity m3 6

Level indicator make/type : Mechanical & electrical

Electric pump make : China

Model/type : Centrifuge type /3×2

Motor output kW (HP) 15

Included in shale shaker tank


F.2.5 Stripping tank

Capacity m3 1

Equalizing facility with triptank y/n y

Transfer pump y/n y

F.2.6 Mud agitators


Quantity : 7.5Kw, 4 sets

15kw, 8 sets

Make : China brand

Model: HA-7.5\HA-15

Driven by motor of kW (HP) 7.5\15


F.2.7 Mixing pumps
Quantity : 2

Make/Model : China/centrifuge type

Driven by motor rpm x kW (HP) 75

F.2.8 Mud mixing hopper


Quantity/location : 2/mixing unit

Make/Model : Swaco

Feed pump make : China

Type/size centrifugal pump : Centrifuge type/8×6

Driven by electric motor of rpm x kW (HP) 75

F.2.9 Transfer pumps


Quantity for mud tanks : 3

Quantity for water tanks : 3

Make/Model : China

Type : AC explosion proof, 380 V, 50


Hz

Driven by motor type y

Power output kW (HP) 15

F.2.10 Chemical mixing tank


Quantity : 1

Description/Capacity m3 27.83

Chemical mixer type : Hopper


F.2.11 Caustic Mixing Unit
Quantity : 1

Type : Stainless steel

F.3 Low Pressure Mud System – Process Equipment

Compliance BOMCO

F.3.0 Company Requirements Yes/No? Spec.

Cellar pump Three (3) Ex cellar pumps shall be provided, each Yes
with a
capacity at least equal to the maximum expected flow rate. Complete
with a discharge line to the shakers or waste pit. Cellar pumps to be
electrical submersible

FLYGT pumps and not air operated WILDEN pumps

a) Shakers Minimum of two, multiple screen, linear motion or


balanced elliptical shakers, 7g force. Capable of processing 100%
of mud returns with a 15 kPa/m density through API 200 screens at
3.5m3/min. Company recommended makers – Derrick Hyperpool Yes
/DP-626, Rigtech VSM 300, Brandt VSM 300, Swaco MD-2 or MD-3.
Shakers shall be no more than 3 years old at commencement of
contract or bereplaced max 10 years.
Header boxes to be of spreader type Shared header boxand to have Yes
dump chutes to the waste pit.

Full kit of manufacturer’s recommended spare parts and listed always Yes
be available. Submit to Company monthly

Manufacturer’s preventive maintenance programme in place and Yes


records kept.
b)Screens Minimum stock of screens to be approved by UIK Yes
(depending on type Pyrmid or flat and condition of shaker).

Various API sizes from 80 size to 200 size to be available at all times.
All shakers screens are consumable items and cost of same is included
in rig operating dayrate.

Use only those recommended by OEM. Screen hours required to be Yes


recorded and report. Screen to be replaced as requested by mud
engineer / DSV.

c) Vacuum Degasser Sized to process up to 50% of the Yes


maximumcirculation rate.
The suction taken from a degasser tank of minimum capacity 10m3, Yes
located immediately down stream of the sand trap(s).

Liquids from the degasser shall discharge into a treatment tank, which Yes
shall be equipped with an adjustable low level equalisation valve to the
degasser tank. Suction/discharge Pits to be equalized. Suck from
desilter tank and discharge into degasser tank

Gas shall be vented to the (waste pit - minimum. distance from rig 30 Yes
metres) via a dedicated line (with minimal bends) which connects to
the poorboy degasser vent line which leads to the waste pit. This
dedicated line should have a NRV to prevent backflow of gas from the
poorboy degasser vent line to the Vacuum degasser (while
circulating out gas kicks).

d) Desander Sized to process 100% of the mud returns at Yes


maximum flowrate with either
2 x 12” cones or 3 x 10” cones. Feed from a 6 x 8 centrifugal pump
to produce 210-240 kPa (min) at inlet manifold.
Suction from the discharged settling tank (12m³ min capacity) Yes
immediately downstream of the degasser tank.

Overflow directed to next compartment downstream but not to suction Yes


tank.

Underflow shall be discarded to the waste pit. Yes


Equalizer line f/desander to active system so all tanks canbe equalized if Yes
required

A pressure gauge (0-50 psi range), fitted with a diaphragm seal below in Yes
order to prevent blocking of the pressure gauge with solids, shall be
installed on the feed inlet manifold.

e) Desilter/Mud cleaner Sized to process 100% of the mudreturns at Yes


maximum flowrate with either 16 x 4 ” cones. Feed from a 6 x 8
centrifugal pump to produce 340 kPa (min) at inlet manifold.
Suction from the discharged settling tank immediately downstream of Yes
the desander tank.

Overflow directed to next compartment downstream but not to suction Yes


tank.

Underflow shall be discarded to the waste pit. Mud cleanerunderflow Yes


shall be processed at 300 API screens

A pressure gauge (0-60 psi range), fitted with a diaphragm seal below Yes
in order to prevent blocking of the pressure gauge with solids, shall be
installed on the feed
inlet manifold.

f) Poor Boy Of 48” (min) diameter, with 8” lines in/out. Yes


Capable of processing 1.5m³
/min (min) highly gas cut mud. The
mud seal or liquid seal of the degasser shall be at least 10 ft or 3 m
in height. Designed and installed in
accordance with EP 2002-1500 September 2008 version. Only
external U-tube type.
Calculated capacity for the provided system is required

A large size pressure gauge (0 – 150 kPa range) to be mounted on top Yes
of the poorboy degasser.

Discharge by the most direct route with minimal bends and without any Yes
isolation points, into the Shaker header box through at least an 8" line
then trip tank.

One 8” vent line shall run from the mud-gas separator directly to the Yes
waste pit
Vent lines to be securely anchored and fitted with snub lines cross the Yes
connections.

Instrumentation & alarm mechanisms must be in place, such that if the Yes
capacity of the MGS is approached, actions can be taken to reduce the
gas rate (kill rate

reduction), or to divert the flow from the well such to by-pass the MGS
to a flare.

Hot fill line /‘hot loop’ connected to active tank & trip tank Yes
Contractor Specifications

F.3.1 Shale shaker


Quantity : 2

Make : DERRICK or SWICO

Type : FLC504 or M-I SWICO

Size screens : Processing rates 900 GPM of a


9.1 PPG fluid using Pyramid DX-
A140 (175 Mesh)

Driven by No. of electric motors : Super G™ Vibrating Motors,


2.5HP, 380/400 V, 3 Cycle, 50Hz,
1500RPM, Ex-Proof,

Combined Max. flowrate m3/min 900GPM

F.3.2 Desander
Make : DERRICK

Quantity of cones : 2

Cone size : inch 12"

Type/size centrifugal pump : Capable of processing 1,000 GPM


@ 75 ft head

Driven by electric motor of rpm x kW (HP) Centrifugal and electric motor


Model Mission Magnum Pump 6 x
8, 100 HP 1750 RPM, 60 HZ, with
mechanical seal, Impeller
size:12.5" 1500 GPM

Max. flowrate m3/min 2

Min. operating pressure with unweighted muds kPa 220Kpa


Min. Apex valve opening : inch

F.3.3 Desilter /Mud Cleaner


Make : DERRICK or SWICO

Quantity of cones : 2 DESANDER CONES


16 DESILTER CONES

Cone size : inch 10" Desander cones


4" Desilter cones

Type/size centrifugal pump :

Driven by electric motor of rpm x


kW (HP) 1500RPM, 2.5HP

Max. flowrate m3/min (2) 10" DESANDER CONES, total


1000GPM at 75 ft of head
(16) 4" DESILTER CONES, total
1280GPM at 75 ft of head

Min. operating pressure with unweighted muds kPa 340Kpa

Min. Apex valve opening : inch

F.3.4 Mud/gas separator (poor boy)


Make/type : NQF1000/0.9

Minimum diameter ID inch Liquid inlet pipe diameter: 4”

Gas discharge line OD inch 8

Gas discharge line running to : Flare Pit

Max capable of processing highly gas cut mud : m³


/min 31.67

Alarm in place if the capacity of MGS approached: Y/N / Type

F.3.5 Vacuum Degasser


Make : China
Type : HCQ300-B

Type/size centrifugal pump : HCP6X5X14

Driven by electric motor of kW (HP) 22kW

Discharge line running to : Desander compartment

Vacuum pump make : China

Type : SZB-8

F.3.6 Cellar pump


Quantity : 2

Make (e.g. Flygt) : China brand

Type : Centrifugal pump

Capacity m3/min 150 m³


/min

F.4 Mud Laboratory – Equipment and Chemicals

Compliance BOMCO

F.4.0 Company Requirements Yes/No? Spec.

a) Laboratory, 3.6m X 3.6m size at least, shall be furnished with Yes


sufficient chairs, workbench, cupboard, sink, & adequate water
supply and 100 PSI Pressure connection for API Fluid loss test.
Drain line to dump lab waste.
b) One eye wash station and one extractor fan to be installed in the Yes
mud lab

c) Laboratory shall be enclusively for mud engineer. Yes


1.1.1 G. Casing/Cementing

1.2 G.1 Casing Equipment

Compliance
BOMCO Spec.
G.1.0 Company Requirements Yes/No?

a) API casing drifts for 13 3/8” - 81.1 kg/m; 9 5/8” - 59.5 kg/m; Yes
7” 34.2 kg/m , 43.2 kg/m; 4 ½” 17.3 kg/m, 20.1 kg/m & 25.2
kg/m; Aluminimum lightweight for casing. Long nylon for tubing.
b) Circulating swage w/2” Weco 1502 for: 13 3/8” 81.1kg/m Yes
BTC/LTC, 9 5/8” 59.5 kg/m LTC /BTC /NVAM, 7” 34.2 kg/m, 43.2
kg/m LTC /NVAM / VAMTOP, 4½” 17.3 kg/m, 20.1 kg/m & 25.2
kg/m EU /NVAM /VAMTOP.
c) Water bushings for all the same sizes (casing connection pin x Yes
NC50 box). NC50 down to 7” size. NC38 for all sizes below 7”.
d) Klepo casing protectors, 2 of each size; 20”, 18 5/8”, 13 3/8”, Yes
9.5/8”, 7”, 4.1/2”. Stabbing guides for all sizes.
e) Elevators Side door casing elevators: 20’’,18 5/8”, 13 3/8”, 9 Yes
5/8”, 7”, 4 ½”.
Tubing elevators: 1 set of YT c/w 3 ½”, 2 7/8” & 2 3/8” slips, 1 set YC Yes
c/w 5 ½”, 5” & 4 ½” slips.

Single joint elevators 20’’, 18 5/8”, 13 3/8”, 9 5/8”, 7”, 4½”, 3 ½”,2 Yes
7/8” with safety latch, ¾” soft wire rope slingsand swivel.

Complete with OEM split pin secondary locking mechanizm Yes

f) Slips 20”, 18 5/8”, 13 3/8”, 9 5/8”, 7”, 5 ½”, 4½”, 3 ½”, Yes
2 7/8”,2 3/8”.
5 ½”, 5”, 4 ½”, 3 ½”, 2 7/8” & 2 3/8” tubing slips. Yes

g) Tongs one pair tongs complete with jaws for use with pipe Yes
sizes from 2 3/8” to 20” (tongs may be combined with rig tongs
specified in Section D).

h) Power tongs Casing tongs to handle 4 ½” to 20” casing and Yes


Tubingtongs to handle 2 3/8” to 4 ½”tubing
c/w torque sensator and indicator, integral backup arm. Yes

c/w power unit or use power from rig hydraulics Yes

i)Company Option: Casing Running Tool to handle all sizes of casing Yes
4 ½” 7”, 9 5/8” , 13 3/8” and casing drilling capacity

Contractor Specifications

G.1.1 Side Door Elevators


20” casing elevator SLX 20-150

18-5/8 ” casing elevator SLX 18 5/8-150

13-3/8 ” casing elevator SLX 13 3/8-150

9 5/8 ” casing elevator SLX 9 5/8-150

7” casing elevator SLX 7-150

4 ½” casing elevaotor SLX 4 1/2-150

G.1.2 Single Joint Elevators


20” casing elevator SJL 20-8

18-5/8 ” casing elevator SJL 18 5/8-8

13-3/8 ” casing elevator SJL 13 3/8-5

9 5/8 ” casing elevator SJL 9 5/8-5

7” casing elevator SJL 7-5

4 ½” casing elevaotor SJL 4 1/2-5

G.1.3 Slip Type Elevator/Spider


Make: HYT 2 3/8-3 1/2-150

Insert: HYC 23/8-5 1/2-200


Capacity: 150st

5½” Tubing Slips Applicable

5” Tubing Slips Applicable

4½” Tubing Slips Applicable

3½” Tubing Slips Applicable

2.7/8” Tubing Slips Applicable

2.3/8” Tubing slips Applicable

G.1.4Power Casing Tong

Model: RUSHI
TQ340/35Y,TQ508/70Y

Jaw Insert Sizes for Casing: 4-1/2"~20"

G.1.5 Power Tubing Tong

Model: RUSHI XQ114/6YB

Jaw Insert Sizes for Tubing: 2-3/8"~4-1/2"

G.1.6 Casing Running Tool w/ casing drilling capacity


(Option)

Make: NOV CRT-500

Insert: 4½" to 14"

Capacity: 500 ST

H. Instrumentation

H.1 Drilling Instrumentation


H.1.0 Company Requirements Complianc
e
BOMCO Spec.
Yes/No
?

a) General alarm system The alarm shall be audible Yes


under all operating
Conditions throughout the drilling location,including
external and all internal work spaces. Alarm shall not shut
off until knowledge. Fire/general alarm to be monotone.

It shall consist of the following characteristics


- Audible signal
- Visual signal
- A flashing Light.

b) At driller’s console Weight indicator. Yes

Standpipe pressure gauge; Yes


Vernier 0-
40,000kPa

Top drive panel Yes

Rotary speed tachometer. Yes

Rotary torque indicator (in Yes


daNm).
Torque sensor and indicator to read true /
absolute torque in daN.m. Relative torque
readouts in % torque or read-outs of DC
current reading in Amps only is not
acceptable.
Pump stroke counters; one per pump plus individual and Yes
cumulative totaliser.

Tong torque indicator (daN.m and Kg.f) Yes

Pit volume totaliser; computerised system (M/D Totco Yes


RigSense or equivalent)

Comprising of the following features :


Readout of total active and reserve mud
volumes.
Individual tank read out.
Loss gain meter with an accuracy of 0.1m3.
Audio and visual alarm with high and low
settings.

Company Option all PVT equipment to read Yes

real time densities of fluids in all tanks.

Mud flow indicator with high / low audio / visual alarms Yes

Trip tank indicator to give a read out in stands for the size of Yes
drill pipe in use plus a total tank volume indication calibrated
f/bottom of tank such that a volume change equivalent to one
joint of drill pipe may be detected.

Remote choke control unit; comprising the following : Yes


Standpipe and choke manifold digital pressure gauge sized in
accordance with equipment pressure ratings.
Pump stroke indicator for each pump plus individual and
cumulative totaliser.
Choke control.

Choke position speed regulator.

Utility standpipe pressure gauge; Vernier 0-40,000kPa. Yes


c) Standpipe pressure gauge, Vernier 0-40,000kPa, mounted Yes
on standpipe.(Cameron type D or equivalent). To be visible
from driller’s position.

d) t driller’s doghouse Drilling parameter recorder and


read-out;
computerized monitoring with a WITSML or
WITS0 data out port
e) WOB / string weight (daN)
Travelling Block Position
Rate of penetration (m/hr)

Rotary speed (RPM)

Rotary torque (daN.m)

Pump pressure (kPa)

f) Pump rate each pump (SPM)


Pit volume recorder; 24 hr recorder monitoring Yes
active & reserve tanks.

Flowrate recorder; 24 hr recorder. Yes

Trip tank recorder; 24 hr recorder. Yes

e) At choke manifold- Standpipe pressure gauge; Yes


Vernier 0-
28000 kPa (0 – 14000 kPa, 0 – 21000 kPa
and 0 – 35000 kPa gauges to be available for
use when required)

Choke manifold pressure gauge; Vernier 0- Yes


28000 kPa (0 – 14000 kPa, 0 – 21000 kPa
and 0 – 35000 kPa gauges to be available for

use when required). Gauges with isolation

valves for accurate reading at low/high pressure


Gauges at choke manifold to be combined on Yes
one panel and be visible from choke operating
position.

f) Deviation equipment A deviation measuring device in Yes


the range 0-8 and degrees c/w sinker bars and
overshot.

g) General Instruments Yes


Tri-cone bit gauge rings; 17 ½”, 16”,
12 ¼”, 8 ½”, 8 3/8”, 6 1/8”, 5 7/8”,

Internal / external calipers; 0-10” Yes

Steel Derrick tapes; 0-30m. 2 sets. Yes

h) Instrumentation system for complete automation of the rig YES


floor, including zone management system /full anti- collision
control
e) Drilling Data Acquisition system (eDtl) Yes
i. A suitable system to record, manage and display in real
time all the required data from the sensors stated in 1,2 and
3 at the driller’s console, the contractor site office and the
company site office.
ii. Raw Sensor Data: Hook Load ,Rotary Table Load (if
available in future), Block Height, Rotary Table RPM, Top
Drive RPM, Rotary Table Torque, Top Drive Torque,
Standpipe Pressure, Annulus Pressure, Flow Rate Out, Pump
1 SPM, Pump 2 SPM, Pump 3 SPM, Pit 1 Volume (6 outputs
required for pits must include complete active pit system),
Pit 2 Volume, Pit 3 Volume, Pit 4 Volume, Pit 5 Volume, Pit 6
Volume, Trip Tank Volume, Total HC Gas, H2S
iii. Apply rigorous quality control assurance tools for the
sensors data, including a visible and continous data quality
indicator.
iv. All parameters shall have audio and visual alarm set up
options for the data acquisition system provided by
contractor.
v. Evaluated from Raw Sensor Data, included but not limited
to: Weight on Bit, Bit Depth, Hole Depth, Instantaneous
ROP, Average ROP, Slips Status, Bit on Bottom Status, Block
Velocity, Total SPM
vi. Evaluated from Raw Sensor Data and Other
Data source or input Pump 1 Flow Rate (requires pump
stroke and piston diameter) Pump 2 Flow Rate (requires
pump stroke and piston diameter) Pump 3 Flow Rate
(requires pump stroke and piston diameter)Total Flow Rate
In (calculated from sum of Pump 1-3 Flow RateBit RPM (if
motor run, calculated from motor characteristics)Total RPM
(Rotary RPM or Top Drive RPM added to Bit RPM)MSE
(calculated from various parameters above)HSI (calculated
from various parameters above)Slip Stick (calculated from
various parameters above)Drilling Aggressiveness
(calculated from various parameters above) Rig Activity
State (WITSML compatiable
vii. The required data must be transmitted to a company
specified system at 1 hz frequency in real time as a WITS 0
protocol output to the latest specification, or WITSML
protocol at the companies discretion, as both time based
data and depth based data to a resolution of 0.5 m.
i) viii. This data must be transmitted during all
operations from spud/end of move to release of the well, in
other words during all operations other than during the
reported rig move phase.
j) ix. Data shall be transmitted using the WTS
mapping as defined by the company.
k) x. All of the required raw digital data must be
stored for a minimum of last 2 wells and current well in
secure storage on site with separate permanent offsite back
up prior to being overwritten. This data shall be available
at any time at the company’s request.
l) xi. If there is a break in transmission of data
and transmission of data stops, the contractor shall re-
transmit the missing data to fill the gap. This must be
automated on reinstatement of communications system.
m) xii. The maintenance of the system is the
responsibility of the contractor.
n) xiii. At least three screens continuously display
the trend date on site: one for rig floor, one for DSV and
one for TP.
o) xiv. Displays to be independent stations and tied
into each other so TP DSV can monitor driller’s PVT
management. Data must be retrievable such that it can be
reviewed and presented as desired by Company. A PDF file
which cannot be manipulated is not acceptable.
p) xv. Company Option: Sophisticated screen for
the driller where driller can fill in IADC report digitally,
picking up time and depth data automatically from the
sensors. Yes
q) 1.1 H.2 Rig Communication System
1.3 Communications system
Compliance
BOMCO Spec.
H.2.0 Company Requirements Yes/No?

a) YES 120Vac (10%) and


Contractor shall provide a cabin (adjacent to the radio 47-65Hz
operators accommodation) for use as a radio room at
campsite to be able to install Company supplied
communications/ telecommunication equipment.
Contractor shall provide a stable 230Vac (10%) and 47-
65Hz (minimum load 63 Amps) power supply to the
company supplied communications / telecommunication
equipment in the radio room w/UPS 5 KVA. The radio
room shall be equipped with an air conditioning system
provided by and maintained by the Contractor.

b) Public address system at the rig site. Equipment to Yes


be suitable for the zone.
c) Intercom system: between Company office, Yes
Contractor office, Drilling Engineers office, Driller's
position, Monkey board, Choke Manifold, remote
choke panel, Shale Shakers, Mud Engineer’s office
/ lab, Guard Hut and Mud Logging Unit (as and
when required). Spare line to MWD cabin to be
available. Equipment to be explosion proof.
d) Contractor shall provide by Company adequate air- Yes
conditioning in the Company supplied
communications unit at the rig Site / wellsite as well
as the rig campsite.
e) A hands free talk-back system between monkey Yes
board and driller’s console on rig floor. Equipment
to be explosion proof.
f) A CCTV system which is Milestone XProtect
software version 2016 and beyond compatible
complete with stands to cover the following areas:
 Rig Floor – mounted to cover the general
working area of the rig floor
 V-Door/Catwalk – to cover the pipe
handling operations around the catwalk and
V-door vicinity
 Shale Shaker – view over the shale
shakers and surrounding area
Yes
 BOP – Usually mounted on substructure to
view the BOP stack and to capture activities
in that area
 Drillers Console – view from behind the
driller on the console/cabin
 Monkey borad/SVC on mechanized rig
 Non Pan-Tilt Zoom (PTZ) cameras in
explosion proof housing welded on the
mast. Cameras be connected via CAT6
cables to the network hub to the PDO PC.
Prefer 360 degree view.
 display screens can choose different
cameras in DSV & TP office
g) A camera system for TDS and pipe handling system Yes
available on driller cabin. Contractor may integrate
this to system in f)
h) 6 portable radios each with spare battery for Yes
operations use (Drills etc) and one is dedicated for
DSV.

Contractor Specifications

H.2.1 Public address system


Make : China

Type : OFD
Integrated with Intercom system : Y

H.2.2 Intercom system


Make: China

Type: OFD

Number and location of stations : 11

Explosion proof y/n

H.2.3 Talkback system


Make : China

Type : TB-1

H.2.4 CCTV system


Make : China brand

Type : OFD

H.2.5 Camera system TDS/Pipe handling


Make : China brand

Type : Integrated with CCTV system


K. Rigsite Office, Sleeping and Ablution Accommodation

Compliance
BOMCO Spec.
K.1.0 Company Requirements Yes/No?

a) Mobile camp shall be designed and constructed in Yes


accordance with the standards and specifications in
C6-Technical Specifications and SP-1110
Specification for Electrical Supplies to Mobile camp.
b) Rig site offices shall be provided for : Yes
- Company site representative
- Contractor site representative
- Company assistant
supervisor/Contractor drilling engineer
c) Company site representative office & assistant site Yes
representative / wellsite drilling engineer office to be
fitted with an Uninterrupted Power Supply system
(UPS 5KVA, and minimum 30 minutes) and Power
Conditioner.
d) One-man room sleeping accommodation c/w toilet Yes
and shower facilities at rig site for Company site
representative, Contractor site representative, mud
engineer and Company assistant drilling
supervisor/Contractor drilling engineer. Company site
representative & Company asst. site representative
sleeping accommodation at rig Site to be equipped
with TV and satellite dish and receiver.
e) 25-man training/meeting room c/w PC, TV and video Yes
equipment, beamer projector c/w screen, table, chairs
(not benches), white and notice board.
f) 5-man rig site air-conditioned prayer room and Yes
ablution.
g) Sufficient sleeping accommodation at camp site for Yes
Contractor’s personnel.
h) 11 x two-man room sleeping accommodation c/w Yes
toilet and shower facilities for up to twenty two (22)
Company or Company’s Other Contractor(s)
personnel at camp site.
i) Kitchen, mess, recreation, laundry, ablution, dry and Yes
refrigerated food storage facilities in accordance with
C9 and SP-1232. A separate chiller room to be
provided.
j) Clinic to be situated at camp site and be Yes
furnished/equipped in accordance with Company’s
HSE standards in C9 & SP1232. Clinic to include but
not be limited to an ECG machine with defibrillator
(capable of transmitting data electronically) and
computer for medic.
k) 15-man campsite Prayer room caravan, air Yes
conditioned, for Muslim staff.
l) Reverse osmosis water purification plant at rig and Yes
camp sites for supply of drinking water, of adequate
capacity.
m) Company Option: Mobile Sewage Treatment Plant Yes
(MSTP ) on rig site and camp site to avoid sewage pit:
lift stations/tank feeds the wastewater from ground
level to the inlet of the treatment unit; structural skid
base w/tailboard loading system for easy
tranportation; discharge water quality compliance to
Oman government request
L. Safety Equipment

Compliance
BOMCO Spec.
L.1.0 Company Requirements Yes/No?

a) Personal Protective Equipment for all Contractor personnel at Yes


the rig site, safety hats (non metallic), hard toed safety boots,
safety overalls, ear protection (where noise levels exceed
85dB) as SP1234, impact gloves and safety glasses.
b) Personal Protective Equipment for Contractor personnel at the Yes
rig site when necessary, rubber boots, rubber aprons, rubber
gloves (elbow length for chemical handling), fullface visors,
eye shields (for grinding machines, etc.), dust masks. Welders
safety equipment, explosion proof hand torches c/w batteries
(supervisory staff only), safety belts c/w lines.
c) Hands off tools: finger saver, push/pull stick, pipe roller. Yes

d) A chemical shower/eye wash station shall be provided at all Yes


mud mixing areas and shall be supplied by immediately chilled
water <30C. In addition an eye wash station shall be
provided in the mud engineer’s laboratory and on the rig
floor.
Eye wash stations, protected from the effects of solar heating, Yes
shall be provide at the rig floor, workshops, shale shakers,
mixing hopper, engine house, mud pumps.

e) Derrick safety equipment Yes


Derrick ladder fall arrestors for 2 persons to reach monkey
board, one person to reach crown / Safety belts / Derrick ride
escape device/ Fall arrestors as deemed necessary by the
Company.
f) Substructure safety equipment Yes
Fall arrestors for 2 persons mounted under substructure with
covers
Working platform to nipple up/down BOP c/w handrails and
access ladders
g) Lift equipment Yes
Lift equipment container of sufficient capacity to properly
store lifting equip such as slings, shackles, chain hoists, web
slings c/w dedicated lockable storage spaces for web slings
and quaranting equipment.

Sufficient quantity of lifting equipment for drilling and rig


move operations.

Lifting tools for safe handling of drums, big bags, steel plates
& BOP spools.

h) Certified personnel basket for use with crane in accordance Yes


with PR-1708 and PR-1709 requirement. Crane boom fitted
man basket for working at height need to be approved by
PDO-UEQ31 team
i) Gas Monitoring : Yes
Hydrocarbon in air; linked to general alarm system,

sensors at bell nipple, shale shakers, engine intakes.

Alarm to be audible and visible from all areas of

location (including but not limited to the engine room,

SCR room, directional drillers cabin, MWD logging unit).

Two tone. Light to be of different color than H2S.

Provision for 3rd party mudlogger sensors if applicable

Hydrocarbon from mud; sensor at shaker header

tank, alarm linked to general alarm system. Alarm to be

audible and visible from all areas of location (including

but not limited to engine room, SCR room, directional

drillers cabin, MWD logging unit).


H2S in air; sensors at bellnipple, cellar, drill floor, shale Yes

shakers, vacuum degasser, suction tank, two tone alarm

audible over all areas of location, flashing red lights

visible from all areas of location (including but not limited

to engine room, SCR room, directional drillers cabin,

MWD logging unit). Two tone. Light to be of different

color than Hydrocarbon. Provision for 3rd party mud

logger sensors if applicable

H2S from mud; sensor at shaker header tank, two tone Yes

alarm audible over all areas of location, flashing red

lights visible from all areas of location (including but

not limited to engine room, SCR room, directional

drillers cabin , MWD logging unit).

Alarms to continuously sound until acknowledged Yes

j) H2S and combustible gas sensors to be connected to a Yes


Contractor supplied back-up UPS (uninterrupted power
supply) to enable gas detection to upto one hour after
primary power failure.
k) Portable handheld multi gas monitoring system, for H2S, Yes
hydrocarbon and oxygen c/w probes and aspirator pump.
l) Personal H2S monitors 12 (eg Compur 4100) + 1 test Yes
unit
m) Gas detectors/sniffers 2 (eg Drager MOD 21/31) Yes

n) Explosimeters; complete with hand held probes and aspirator Yes


pump
o) Winds socks. Minimum 4 installed on location at all times : Yes
on top of doghouse, on mud tanks, on primary H2S cabin and
secondary H2S cabin
p) Fire pump Yes
Rig Site :Portable Diesel driven or dual power fire pump at
water tank and at water pit –each capable of delivering
1.3m³
/min at 1000 kPa Campsite : Portable Diesel driven fire
or dual owerpump at water tank capable of delivering
1.3m³/ min at 1000 kPa

Sufficient hose to cover site area Yes

Adjustable spray discharge nozzles Yes

q) Fire extinguishers Dry powder type at generator rooms, mud Yes


tanks, mud pump areas.
Dry powder type at switch gear & distribution boards where Yes
temp > 40 degC

CO2 type at switch gear & electrical distribution boards where Yes
temperature < 40 degC

Dry powder wheeled type at engine room and workshops. Yes

Wet chemical fire extinguisher for kitchen Yes

n) SCBA equipment Refer to Well Engineering Business Control Yes


Document for specifications.
Minimum air capacity of 30 minutes. Yes

Two emergency equipment containers; one positioned at the main Yes


gate (primary briefing area) and the other positioned at the
opposite end of the rig site, next to the run-off (secondary
briefing area). Each container shall be equipped with a power
supply, lighting, air conditioning, a wind sock on top in clear view.

Primary briefing area6 SCBA sets + 6 spare cylinders. Yes

Resuscitator + 1 spare cylinder. Yes

Charging compressor. Yes

Stretcher with slings Yes

Maps of the rig site with search routes clearly marked. Yes
Secondary briefing area6 SCBA sets + 6 spare cylinders. Yes

Resuscitator + 1 spare cylinder. Yes

Stretcher. Yes

Maps of the rig site with search routes clearly marked. Yes

Drill floor2 SCBA sets + 8 escape packs. Yes

Shale shakers4 escape packs stored in clearly marked boxes. Yes

Company site representative office SCBA set Yes

Contractor site representative office SCBA set Yes

Company assistant supervisor/Contractor drilling engineer office Yes


SCBA set

Derrick Escape pack. Yes

o) First aid equipment Yes


First aid kits (at drill floor, Company and Contractor site
representative office)

2 resuscitators with spare charged cylinders (at clinic) Yes

stretchers (Huxley or Anderson type) and at least one basket Yes


type scoop stretcher to enable rescue of people from
heightsTripod rescue kit to rescue f/confined spaces

p) DROPS Yes
Tethered tool kit and ‘Camelbak’ style watepacks for working at
height.

q) Spill kits (minimum 2 per rig) Yes

r) Summer mitigation advices as per MOM Eg. shades with mist Yes
fans in open working area.
s) Scaffolding if required (Not aluminium scaffolding used in Yes
Zone 1 area)
t) Enough battery powered emergency lights shall be provided, Yes
including but not limited, on all principle escape routes, BOP
control unit & panels, drilling floor, power trailer/SCR/VFD,
mast (half way), shaker, mud tanks, monkeyboard, choke
manifold, assembly points, and fire pump (mini-camp).
u) DROPS Zone Management around the Catwalk and Pipe Rack Yes
Area with Hard barrier.

M. Miscellaneous Equipment

Compliance BOMCO

M.1.0 Company Requirements Yes/No? Spec.

a) Pipe racks Yes


Set of racks c/w stoppers of adequate capacity for casing,

Drill pipe and collars. Pipe racks shall be inspected and

certified as able to support the maximum expected load.

b) Pipe Baskets Yes


Trailer or oilfield type skid of adequate capacity to store

and transport the drill string.

c) Ditch magnet for each shaker header box Yes

d) Fuel storage Yes


Diesel storage tank suitably sized plus day tank on site &

camp w/minimum 7 days continous operation at normal

average consumption without re-stocking.

Tank w/doublewalls or 110% containment bunded with

drip trays in place to capture any potential spill from pipe work
and fittings. Loading & unloading manifold within a bunded area
Transfer pump Yes

In line purifier (eg centrifuge). Metering system. Yes

A heater system to heat crude certified for use in Hazardous Yes


area

Diesel storage tank suitably sized Yes

Autoclose valve on looking glass/hose to protect spill Yes

Hose transfer diesel from diesel tank in case of pipe stuck Yes

Overflow from day tank back to storage tank Yes

e) Workshop Yes
Suitable for mechanic to carry out repair work.

f) Stores Yes
Sufficient skid mounted stores and baskets for all PDO &
Contractor furnished equipment, supplies and spare
parts. Skids shall be designed to accommodate the
maximum expected loading and shall be accessible from both
sides.

Rubber store Yes

A separate store for storage of rubber elastomer s


spares at Controlled temperature. Rubber store to be UV
light protected.

g) BA store Yes
Storage containers for the storage of breathing apparatus
equipment at the rig site. Containers are to be equipped
with air conditioners and explosion proof lighting and are
to be positioned at each (opposite) end of the drilling
location.

h) Guard hut Positioned at entrance to location. Yes

i) Waste lube oil tank, skid mounted with 5m³capacity. Yes

j) Waste bin / skip for scrap steel. Yes


k) Man lift 15 meters height (MEWP, Cherry Picker or equi) Yes

l) Vehicles Forklift, rough terrain, for handling Yes


casing, tubing and drill pipe, with forks load
locking clamps,reverse alarm and spark
arrester.
Crane, mobile rough terrain, capable of Yes
handling day to day work, c/w crown saver,
weight indicator, reverse alarm and spark
arrester.

Sufficient 4WD estates or pick-ups, diesel, with airconditioning Yes


and fitted out in accordance with Company’s safety specification
for vehicles. Vehicles to be fitted with
an In Vehicle Monitoring System (IVMS).

Bus, diesel, with air conditioning and fitted out in accordance Yes
with Company’s safety specification for vehicles. Bus to be fitted
with an In Vehicle Monitoring System (IVMS).
One 4 x 4 Contractor Long wheel base vehicle must be on Yes
site at alll times that can accommodate and properly secure
a stretcher inside the vehicle. This stretcher shall be
permanently fixed at all times and shall be at a low height to
travenous transfusion . The vehicle will not be combined
with a PDO Company Site Representative vehicle or
Contractor toolpusher or mechanic/ electrician vehicle.
Vehicles which have been permanently converted into a
medical casualty evacuation vehicle must ensure that :
- Rear passenger seats are removed at all times

- A seat beside the stretcher is available for the medic.

- A Stretcher bed is fixed permanently in down position


and locked in position .

- A yellow flashing light is fixed on roof of the vehicle


- A fixed holder is available to securely hold oxygen
cylinders upright
- An In Vehicle Monitoring System (IVMS) is installed in
the vehicle –

(x2) Intravenous hooks are fixed on the side safety bars

- (x1) cupboard is built into the side wall to store accessories


and top of which is to be used as a table to place a
cardiac monitor, resuscitator, suction machine,
defibrillator

- Vehicle meets SP-2000 specifications for light vehicles

- With tetra long range radioThe following equipment shall be kept


safe and secure at rig site available as and when required for use
with the vehicle (x1) Cardiac monitor(x1) Portable automatic
external defibrillator(x1) Resuscitator (x1) Portable oxygen cylinder
with breathing apparatus (AMBU)(x1) Scoop stretcher(x1) Spinal
board with head rest(x1) Suction machine & Spare Oxygen
Cylinders(x2 each) Arm & leg splints Plasters, scissors &
forceps(x1) Thuraya phone for communication One 4WD LWB
estate car exclusively available for Company
Site representative, diesel, with air conditioning and fitted Yes

Out in accordance with Company’s safety specification for


vehicles. Vehicle to be fitted with an In Vehicle Monitoring
System (IVMS). With tetra long range radio

m) Portable diesel electric welding machine for use anywhere Yes


on location complete with welding kit and welder’s
workshop.
n) Oxy/acetylene cutting torches for use anywhere on Yes
location.
o) 2 high pressure cleaners suitable for use in Zone 1 Yes
hazardous area as defined API RP 505, 1st edition Jan
1997 including errata Aug 1998.
p) Hydraulic or pneumatic torque wrench with direct torque Yes
reading to make up BOP and wellhead nuts and studs.
Manual ring-type torque wrench to make up HP flange
connections.
q) flogging spanners and hammer wrenches for use on low Yes
pressure system. Pneumatic hammer or torque wrench for
making up TPW.
r) Portable diaphragm transfer pumps for use anywhere on Yes
location.
s) Casing centraliser / stop collar pneumatic nail hammer. Yes

t) Thuraiya satellite phone with satellite SIM card, minimum Yes


30 minutes credit available always, for Company site
representative.
u) Digital camera c/w zoom and flash, images in jpeg format. Yes

v) Two A4 photocopiers at the DSV and PE. Yes

w) A4 photocopier at radio room. Yes


x) Spares, adequate spare parts for Contractor’s equipment. Yes
Full kit of manufacturer’s recommended spare parts and
list available. Submit monthly. Manufacturer’s preventative
maintenance program in place and records kept.
Computerized PMS system with all manufacturers’
maintenance procedures & guidelines and task sheets
generated, also including a way of updating system with
any alerts.
y) Cold casing cutters to cold cut 7”, 9.5/8”, 13.3/8” casings. Yes

z) Hydraulic D/L cutter Yes

aa) Lifting Equipment register listing all certified lifting Yes


equipment at rig Site including but not limited to shackles,
eyepads, nylon slings, steel wire slings.
bb) Pressure register listing all certification history of all high Yes
pressure lines, chiksans.
cc) Crane register listing all details of repairs done to crane Yes
and certification of crane wirerope.
dd) BOP register listing all repair history of well control Yes
equipment on site and certification history.
ee) Equipment in Hazardous Area Register with certification Yes

ff) DROPS Register c/w picture book and checklists and Yes
independent dropped object survey as per PDO
Specification SP-2097
gg) Hydraulic portable hand pump w/calibrated analog gauge Yes
& adaptor to P/T cavities.
hh) All pad eyes to be provided with hard stamped individual Yes
ID numbers, SWL & certificates. Allowance to be made for
the force doubling effect of the pulley on the pad eye.
All pulleys to be of enclosed type with provision for
installation of the secondary retention system.

Dedicated pad eyes be provided for the secondary


retention system.

ii) Completed WPS, SAQ, JFSO, L&H, Environmental, HSE-MS Yes


self-assessment audits and do it regularly as per Company
requested frequency
jj) Available tie-in point on deadline hookload sensor for 3rd Yes
party (mudlogger)
kk) Gin poles for working on mud pumps. Yes

ll) Submit P&ID (Piping & Instrumentation diagram) of BOP Yes


control system, of fluid and piping system including mud
tanks, mixing lines, standpipe, choke line, choke manifold.

N. Rig Moving

Compliance Yes/No? BOMCO Spec.


N.1.0 Company Requirements
a) Both Mast and substructure shall be wheel mounted. Rig YES
shall be capable of moving Mast Up or Mast Down while
TDS remaining in Mast.
b) Power system and mud pumps shall be trailer mounted. Yes
Trailer mounted mud tanks are preferred.
c) Trailers shall be designed and constructed in accordance Yes
with Company’s transport specifications (refer to C6).
d) Rig shall be capable of moving (i.e. from rig release to Yes
spud) up to 10 kms between wells in 12 hours or less.
e) Rig shall be capable of moving during day and night time Yes

f) Rig shall be capable of lowering mast and raising mast at Yes


night using the portable tower lights mentioned in h)
below
g) All rig move loads to be marked with the following Yes
information clearly marked
- Dimensions (length x breadth x height )
- Weight (tonnes)
- King pin diameter (if applicable)
h) Four diesel driven / solar powered independently Yes
powered tower lights to be provided to facilitate rig up,
rig down and rig moves at night.
i) Trailers To be designed and constructed in Yes
accordance with
Company’s transport
specifications (refer to C6).
j) Company Option: Contractor to complete rig move on
lump sum

Contractor Specifications

N.1.1 Rig/Camp Moving Times


Rig Mast up mode Mast down mode

Rig down (including any TDS rig-down) hours 4 2.5

Rig Move (0 - 15 kilometers) 4-8 12-16


hours

Rig Move (15 - 50 kilometers) hours 8-12 16-20

Rig Move (50 - 100 kilometers) days 1-1.5 1.5-2

Rig Move (100 - 500 kilometers) days 2-3 3-4

Rig Move (> 500 kilometers) days 5 6

Rig up(including any TDS rig-up) hours 2.5

Camp

Rig down hours 8

<= 50km move days 1

50-100km move days 1

100-500km move days 1

>500km move 2
days

Rig up hours 8
N.1.2 Rig/Camp Loads
Rig Loads

Camp Loads 58
O. OBM Handling capability

BOMCO
Compliance Yes/No?
O.1.0 Company Requirements Spec.

Company Option OBM: N/A


Capability to handle Oil Based Mud taking into
account including but not limited to steam gun, all
rubber hoses, gland packings for centrifugal pumps,
BOP rubber elements, valve seats, PPE, tarpaulins,all
rig consumables and any hardware modifications to
make the rig OBM compliant. Contractor shall be
responsible for supplying a cutting skid to collect
OBM cuttings overboard from the shale shaker.
ATTACHMENT 1 - RIG/CAMP MOVE LOADS

(reference to “rig move package list”)

(List to be confirmed by 1 month prior to commencement of Contract)

RIG/CAMP LOADS

TRANSPORTER MAX.
SKID
WIDE WEIGHT
NO. OF AXLE
DESCRIPTION OR
LOADS SHORT LONG
LOAD (TONS)
LOAD
MOVE TRAILER
MOVE
(TONS)

Mast/Substructure P/M P/M

Power Trailer P/M P/M

Power set P/M P/M

Mud pumps P/M P/M

Mud tanks O/F F/B

Water tanks O/F F/B

Fuel&Crude oil
F/B F/B
tanks

Crude oil station O/F F/B

Catwalk & TBA F/B F/B

BOPs & Choke


F/B F/B
manif

Tubular O/F F/B

Materials bins F/B F/B

Waste bins O/F F/B

Storage containers F/B F/B


Rig site camp F/B F/B

Main Camp F/B F/B

Miscellanenous F/B F/B

TRANSPORT REQUIRED FOR CONVOY LOADS LISTED ABOVE

NO. OF SHORT LONG

LOADS MOVE MOVE

No. of P/M Loads P/M = Prime mover

No. of O/F Loads O/F = Oil field

No. of F/T Loads F/T = Flat Trailer

No. of Wide Loads S/D = Self driven

No. of S/D Loads

Total No. of Loads