Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Duration : 11 yrs
Phase 1 5 Towers
Developme Land Development of
nt
approx. 104,207 m2,
including amenities
SITE DEVELOPMENT
VICINITY MAP
AMENITIES
Amenities
• Swimming Pool
• Clubhouse
• Function Rooms
• Basketball Court
• Tennis Court
• Badminton Courts
• Garden/Lawn
• Playground Area
• Recreational Area
• Jogging paths
COMMERCIAL AREA
TOWER 1
GFA : 34,647.61sqm.
NSA
Residential : 21,819.59 sqm.
Parking : 787.50 sqm.
Leasable : 636.98 sqm.
Construction : 30 months
Start : January, 2011
End : July, 2013
1 BR 32.57 641
2BR 63.36 2
3 BR 116.88 7
LOWER GROUN FLOOR – TOWER 1
Main Lobby
TOWER 1- UPPER GROUND FLOOR
Tower 1
8 Commercial units
14 Residential Units
TOWER 1- TYPICAL FLOOR PLAN
9 Penthouse Units
TOWER 1 – UNIT LAY-OUT
2BR Unit with Balcony -63.36 sqm. 3BR Unit with Balcony – 104.42 sqm.
3BR Unit with Balcony – 148 sqm.
PROGRESS PHOTOGRAPHS – TOWER 1
Construction : 30 months
Start : September, 2010
End : March, 2013
Turnover Date : 3rd Qtr. 2013
FULLY FURNISHED
1 BR 29.31 702
3BR 95.91 4
4 BR 147.42 2
BASEMENT PLAN- TOWER
2
52 Parking slots
Admin Office
Mail Room
Pump Room
EE Room
Storage
Tower 2
UPPER GROUND FLOOR – TOWER 2
TYPICAL FLOOR PLAN – TOWER 2
6 Penthouse Units
UNIT LAY-OUT – TOWER 2
Deluxe Unit
20.64 sqm .
3 BR Unit with Balcony - 95.91 sqm 4 BR Unit with Balcony – 147.42 sqm
LIST OF FURNISHINGS – TOWER 2
TOWER 2
PROGRESS PHOTOGRAPHS – TOWER 2
Construction : 30 months
Start : October, 2011
End : March, 2014
BASIC FINISH
1 BR 33.40 628
2BR 63.36 2
3 BR 192.31 2
4 BR 216.63 2
BASEMENT PLAN 1
8 Commercial Units
11 Residential Units
SECOND FLOOR PLAN- TOWER 3
Resort Residential Unit 1 Resort Residential Unit 2 Resort Residential Unit 1 Deluxe Unit
28.27 sqm. 34.88 sqm. 47.11 sqm.
PROGRESS PHOTOGRAPHS – TOWER 3
BASIC FINISH
2 BR 41.76 – 66.23 90
3BR 95.94 4
4 BR 149.66 2
TYPICAL FLOOR PLAN-TOWER 4
22ND- 23RD FLOOR PLAN- TOWER 4
UNIT LAY-OUT – TOWER 4
2BR -41.76sqm
Side Units
Roofdeck/Crown
Facing Amenity
Facing Taal
TOWER 5 – TYPICAL FLOOR - UNIT LAY OUT
TOWER 1
TYPE OF ROOM FLOOR FINISHES WALL FINISHES CEILING OTHERS
Living Area
Main Door: Steel Moulded Door, painted
Dining Area finish, with door hardwares & accessor
Under the counter moisture resistant
600mm x 600 mm Plain cement,semi gloss Off-form, flat painted kitchen cabinet
Kitchen Homogeneous Floor Tiles painted finish finish Counter Top : Granite Jet Black China
Kitchen faucet - single lever
Grease trap - stainless steel
PVC wooden laminated partition wall w/
Bedroom sliding door.
Moisture resistant w/ plumbing fixtures, wash basin with short
Matte Granite Tiles Floor Granite Tiles Floor Tiles: gypsum, board ceiling pedestal, single lever lavatory faucet, soap
Toilet & Bath Tiles: 300 mm x 300 mm 300mm x 300 mm painted finished. holder, tissue holder
300mm x 300 mm Ceramic Elastromeric Paint Finish - Off-form, elastromeric Balcony Railings: Handrail : Stainless steel
Balcony Floor Tiles color off- white paint finish. tubular, Balluster : MS Square Bar
TOWER 2
TYPE OF ROOM FLOOR FINISHES WALL FINISHES CEILING OTHERS
Living Area
Main Door: Steel Moulded Door, painted
Dining Area finish, with door hardwares & accessor
Under and over the counter moisture resistant
Plain cement,semi gloss Off-form, flat painted kitchen cabinet
Homogeneous Floor Tiles
Kitchen painted finish finish Counter Top : Granite Jet Black China
Kitchen faucet - single lever
Grease trap - stainless steel
KITCHEN
T&
B
DINING
KITCHEN AREA
LIVING/DINING LIVING
BEDROOM
BALCONY
T&B AREA SHOWER AREA
BASIC RESIDENTIAL UNIT DELIVERABLES – TOWER 2 (EXCLUDING FURNISHINGS)
KITCHEN AREA
LIVING AREA
T & B AREA
STEEL MOULDED DOOR
(RESIDENTIAL MAIN ENTRY)
BASIC RESIDENTIAL UNIT DELIVERABLES – TOWER 1
Splendido de Taal
Crosswinds
- Grand Quartier 1 & 2
PPS (in
000) TCP (in millions)
Total Units Units
Sales Launch to Sold to
Project Name Developer Launch Date % Sold Date Ave Ave
Crosswinds Grand Quartier 1 & 2 Brittany Corp. Jun-05 140 86% 120 97 6.6
Splendido Taal Towers Sta. Lucia Realty May-08 142 72% 102 74 4.7
Tagaytay Highlands - Woodridge Park Highlands Prime Jan-06 71 100% 70 64 14.8
Tagaytay Highlands – Woodridge Linden Highlands Prime May -10 44 23% 5 123 20.5
Tagaytay Midlands - The Horizon Highlands Prime Jul-05 108 100% 91 62 8.9
Wellington Courtyard Robinsons Jan-09 175 80% 112 68 2.8
Wind Residences - Towers 1, 2, 3 & 4 SMDC Dec-09 2,874 85% 2,437 100 3.0
Kasa Luntian Alveo 343 105 4.2
CAPITAL APPRECIATION
32%
TOWER 2 Dec-09 P80,000 P119,000 P30,000
48%
TOWER 3 Apr-11 P83,000 P107,000 P18,000
There is still room for capital
29% appreciation of 10%
TOWER 4 Feb-12 P85,000 P108,000 P14,000
27%
TOWER 5 Feb-13 P95,000 P102,000 P7,000
7%
RETURN ON INVESTMENT