Sei sulla pagina 1di 1

CLIENT: Bharat Petroleum Corporation Ltd

PIPELINE: CCK Pipeline


ELETRO CORR-DAMP
SECTION: Karur
DOCUMENT: ZINC ANODE & SSD INSTALLATION
Date:
Test Station Type
Location/Chainage
Anode Installation
Type of Sacrificial Anode
OK / NOT OK
Installation(Deepwell/Shallow bed)
Type of Sacrificial Anode (Zn/Mg) OK / NOT OK
Nos of Sacrificial Anode OK / NOT OK
Installation Depth (Mtrs) OK / NOT OK
Backfilled Material used OK / NOT OK
Distance from Pipeline ( Mtrs ) OK / NOT OK
Zinc Anode Cable size OK / NOT OK
Quantity of Cable OK / NOT OK
Cable Laying Depth OK / NOT OK
Reference to Pipe (PSP V) OK / NOT OK
Reference to Pipe (AC V) OK / NOT OK
Referenc Cell to Zinc Anode(PSP V) OK / NOT OK
Polarisation (SSD) Cell Installation
Installation of Solid State Polarisation Cell OK / NOT OK
Cable Termination & LUG OK / NOT OK

Pipe to Reference cell PSP V after installation of


OK / NOT OK
Zinc Anode & SSD

Pipe to Reference cell AC V after installation of


OK / NOT OK
Zinc Anode & SSD

Zinc Anode Serial number OK / NOT OK


SSD Serial No OK / NOT OK
Remarks:

ECDPL CCKPL

Sign:

Name:

Date: