Government of India (Ministry of Road Transport & Highways)

Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/1/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time

1 REP/NH-216/STR/038 7/1/2018 5.00 PM


Checking of Granular bed for pipe 154+919 BHS 7/2/2018 10.00AM
portion

2 REP/NH-216/STR/039 7/1/2018 5.00 PM


Checking of Granular bed for pipe 154+939 BHS 7/2/2018 11.00AM
portion
Checking of Granular bed for pipe
3 REP/NH-216/STR/040 7/1/2018 5.00 PM
portion
155+164 BHS 7/2/2018 12.00PM

4 REP/NH-216/STR/041 7/1/2018 5.00 PM


Checking of Granular bed for pipe 163+247 BHS 7/2/2018 2.00PM
portion

5 REP/NH-216/STR/042 7/1/2018 5.00 PM


Checking of Granular bed for pipe 155+864 BHS 7/2/2018 3.00PM
portion
Checking of Granular bed for pipe
6 REP/NH-216/STR/043 7/1/2018 5.00 PM
portion
154+628 BHS 7/2/2018 4.00PM

Checking and allow to M15 PCC for Pipe


7 REP/NH-216/STR/044 7/1/2018 5.00 PM
culvert Head wall
162+666 BHS 7/2/2018 5.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/2/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time

1 REP/NH-216/STR/045 7/2/2018 5.00 PM


Checking of Pipe laying & Jointing for 154+919 BHS 7/3/2018 10.00AM
Pipe Culvert

2 REP/NH-216/STR/046 7/2/2018 5.00 PM


Checking of Pipe laying & Jointing for 154+939 BHS 7/3/2018 11.00AM
Pipe Culvert
Checking of Pipe laying & Jointing for
3 REP/NH-216/STR/047 7/2/2018 5.00 PM
Pipe Culvert
155+164 BHS 7/3/2018 12.00PM

4 REP/NH-216/STR/048 7/2/2018 5.00 PM


Checking of Pipe laying & Jointing for 163+247 BHS 7/3/2018 2.00PM
Pipe Culvert

5 REP/NH-216/STR/049 7/2/2018 5.00 PM


Checking of Pipe laying & Jointing for 155+864 BHS 7/3/2018 3.00PM
Pipe Culvert
Checking of Pipe laying & Jointing for
6 REP/NH-216/STR/050 7/2/2018 5.00 PM
Pipe Culvert
154+628 BHS 7/3/2018 4.00PM

Checking and allow to M25 PCC for Pipe


7 REP/NH-216/STR/051 7/2/2018 5.00 PM
culvert Head wall 1st Lif
162+666 BHS 7/3/2018 5.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/3/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/052 7/3/2018 5.00 PM
culvert Head wall 2nd Lif
154+919 BHS 7/4/2018 10.00AM

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/053 7/3/2018 5.00 PM
culvert Head wall 2nd Lif
154+939 BHS 7/4/2018 11.00AM

Checking and allow to M25 PCC for Pipe


3 REP/NH-216/STR/054 7/3/2018 5.00 PM
culvert Head wall 2nd Lif
155+164 BHS 7/4/2018 12.00PM

Checking and allow to M25 PCC for Pipe


4 REP/NH-216/STR/055 7/3/2018 5.00 PM
culvert Head wall 2nd Lif
163+247 BHS 7/4/2018 2.00PM

Checking and allow to M25 PCC for Pipe


5 REP/NH-216/STR/056 7/3/2018 5.00 PM
culvert Head wall 2nd Lif
155+864 BHS 7/4/2018 3.00PM

Checking and allow to M25 PCC for Pipe


6 REP/NH-216/STR/057 7/3/2018 5.00 PM
culvert Head wall 2nd Lif
154+628 BHS 7/4/2018 4.00PM

7 REP/NH-216/STR/058 7/3/2018 5.00 PM Checking of Granular bed for pipe portion 162+666 BHS 7/4/2018 5.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/4/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/059 7/4/2018 5.00 PM
culvert Head wall Final Lif
154+919 BHS 7/5/2018 10.00AM

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/060 7/4/2018 5.00 PM
culvert Head wall Final Lif
154+939 BHS 7/5/2018 11.00AM

Checking and allow to M25 PCC for Pipe


3 REP/NH-216/STR/061 7/4/2018 5.00 PM
culvert Head wall Final Lif
155+164 BHS 7/5/2018 12.00PM

Checking and allow to M25 PCC for Pipe


4 REP/NH-216/STR/062 7/4/2018 5.00 PM
culvert Head wall Final Lif
163+247 BHS 7/5/2018 2.00PM

Checking and allow to M25 PCC for Pipe


5 REP/NH-216/STR/063 7/4/2018 5.00 PM
culvert Head wall Final Lif
155+864 BHS 7/5/2018 3.00PM

Checking and allow to M25 PCC for Pipe


6 REP/NH-216/STR/064 7/4/2018 5.00 PM
culvert Head wall Final Lif
154+628 BHS 7/5/2018 4.00PM

Checking of Pipe laying & Jointing for


7 REP/NH-216/STR/065 7/4/2018 5.00 PM
Pipe Culvert
162+666 BHS 7/5/2018 5.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/16/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time

1 REP/NH-216/STR/066 7/16/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
148+548 BHS 7/17/2018 10.00AM

Checking and allow to M15 PCC for Pipe


2 REP/NH-216/STR/067 7/16/2018 5.00 PM culvert Head wall
148+548 BHS 7/17/2018 4.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/18/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time

1 REP/NH-216/STR/068 7/18/2018 5.00 PM Inspection forInventory


to collection of Pipe Culvert
data
166+410 RHS 7/19/2018 10.00AM

2 REP/NH-216/STR/069 7/18/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
150+904 BHS 7/19/2018 2.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/19/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time

1 REP/NH-216/STR/070 7/19/2018 5.00 PM Checking of Pipe laying & Jointing for 154+628 BHS 7/20/2018 10.00AM
Pipe Culvert

2 REP/NH-216/STR/071 7/19/2018 5.00 PM Checking of Pipe laying & Jointing for 154+919 BHS 7/20/2018 11.00AM
Pipe Culvert
Checking of Pipe laying & Jointing for
3 REP/NH-216/STR/072 7/19/2018 5.00 PM Pipe Culvert
154+939 BHS 7/20/2018 12.00PM

4 REP/NH-216/STR/073 7/19/2018 5.00 PM Checking of Pipe laying & Jointing for 155+164 BHS 7/20/2018 2.00PM
Pipe Culvert

5 REP/NH-216/STR/074 7/19/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
155+864 BHS 7/20/2018 3.00PM

6 REP/NH-216/STR/075 7/19/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
163+056 BHS 7/20/2018 4.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/20/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time

1 REP/NH-216/STR/076 7/20/2018 8.00 AM Checking and allow to M15 PCC leveling 163+056 BHS 7/20/2018 5.00 PM
Course for Pipe Culvert head wall

2 REP/NH-216/STR/077 7/20/2018 9.00 AM Checking and allow to M15 PCC leveling 150+940 BHS 7/20/2018 6.00 PM
Course for Pipe Culvert head wall
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/20/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/078 7/20/2018 5.00 PM culvert Head wall 1st Lif
163+056 BHS 7/21/2018 4.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/22/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time

1 REP/NH-216/STR/079 7/22/2018 5.00 PM Checking and allow to M15 PCC leveling 155+864 BHS 7/23/2018 10.00 AM
Course for Pipe Culvert head wall

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/080 7/22/2018 5.00 PM culvert Head wall 2nd Lif
154+919 BHS 7/23/2018 12.00 PM

Checking and allow to M25 PCC for Pipe


3 REP/NH-216/STR/081 7/22/2018 5.00 PM culvert Head wall 2nd Lif
154+939 BHS 7/23/2018 3.00 PM

Checking and allow to M25 PCC for Pipe


4 REP/NH-216/STR/082 7/22/2018 5.00 PM culvert Head wall 1st Lif
150+940 LHS 7/23/2018 5.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/23/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/083 7/23/2018 5.00 PM culvert Head wall 2nd Lif
155+164 BHS 7/24/2018 10.00 AM

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/084 7/23/2018 5.00 PM culvert Head wall 2nd Lif
154+628 BHS 7/24/2018 12.00 PM

Checking and allow to M25 PCC for Pipe


3 REP/NH-216/STR/085 7/23/2018 5.00 PM culvert Head wall 1st Lif
155+864 BHS 7/24/2018 3.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/24/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/086 7/24/2018 5.00 PM culvert Head wall 3rd Lif
154+919 BHS 7/25/2018 11.00 AM

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/087 7/24/2018 5.00 PM culvert Head wall 3rd Lif
154+939 BHS 7/25/2018 4.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/25/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/088 7/25/2018 9.00 AM Check the excavation for Line Drain 160+050 160+100 RHS 7/25/2018 4.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/25/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/089 7/25/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
136+032 BHS 7/26/2018 11.00 AM

Checking and allow to M25 PCC for Pipe


2 REP/NH-216/STR/090 7/25/2018 5.00 PM culvert Head wall 3rd Lif
155+164 BHS 7/26/2018 12.00 PM

Checking and allow to M25 PCC for Pipe


3 REP/NH-216/STR/091 7/25/2018 5.00 PM culvert Head wall 3rd Lif 154+628 BHS 7/26/2018 3.00 PM

7/25/2018 5.00 PM Checking Course


and allow to M15 PCC leveling
4 REP/NH-216/STR/092 for Line Drain
160+050 160+100 RHS 7/26/2018 4.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/26/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/093 7/26/2018 5.00 PM Check the excavation for Line Drain 160+000 160+050 RHS 7/27/2018 10.00 AM

7/26/2018 5.00 PM Checking Course


and allow to M15 PCC leveling
2 REP/NH-216/STR/094 160+000 160+050 RHS 7/27/2018 4.00 PM
for Line Drain
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/29/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

Checking and allow to M40 RCC for 2 x 2


1 REP/NH-216/STR/095 7/29/2018 5.00 PM Precast Box Segment
Casting yard - 7/30/2018 10.00 AM

Checking of Granular bed for pipe


2 REP/NH-216/STR/096 7/29/2018 5.00 PM 155+864 BHS 7/30/2018 11.00 AM
portion
Checking and allow to M25 PCC for Pipe
3 REP/NH-216/STR/097 7/29/2018 5.00 PM culvert Head wall 1st Lif 148+548 LHS 7/30/2018 12.00 PM

Checking and allow to M25 PCC for Pipe


4 REP/NH-216/STR/098 7/29/2018 5.00 PM culvert Head wall 1st Lif
148+548 RHS 7/30/2018 2.00 PM

Checking of Pipe laying & Jointing for


5 REP/NH-216/STR/099 7/29/2018 5.00 PM Pipe Culvert
155+864 BHS 7/30/2018 4.00 PM

Checking and allow to M25 PCC for Pipe


6 REP/NH-216/STR/100 7/29/2018 5.00 PM culvert Head wall 2nd Lif
162+666 RHS 7/30/2018 5.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/30/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time

1 REP/NH-216/STR/101 7/30/2018 5.00 PM Check the excavation for Line Drain 151+800 151+900 LHS 7/31/2018 10.00 AM

2 REP/NH-216/STR/102 7/30/2018 5.00 PM Check the excavation for Line Drain 159+800 160+000 RHS 7/31/2018 11.00 AM

3 REP/NH-216/STR/103 7/30/2018 5.00 PM Checking Course


and allow to M15 PCC leveling 151+800 151+900 LHS 7/31/2018 4.00 PM
for Line Drain

7/30/2018 5.00 PM Checking Course


and allow to M15 PCC leveling
4 REP/NH-216/STR/104 159+900 160+000 RHS 7/31/2018 5.00 PM
for Line Drain