Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/1/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
7 REP/NH-216/STR/058 7/3/2018 5.00 PM Checking of Granular bed for pipe portion 162+666 BHS 7/4/2018 5.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/4/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/059 7/4/2018 5.00 PM
culvert Head wall Final Lif
154+919 BHS 7/5/2018 10.00AM
1 REP/NH-216/STR/066 7/16/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
148+548 BHS 7/17/2018 10.00AM
2 REP/NH-216/STR/069 7/18/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
150+904 BHS 7/19/2018 2.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/19/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
1 REP/NH-216/STR/070 7/19/2018 5.00 PM Checking of Pipe laying & Jointing for 154+628 BHS 7/20/2018 10.00AM
Pipe Culvert
2 REP/NH-216/STR/071 7/19/2018 5.00 PM Checking of Pipe laying & Jointing for 154+919 BHS 7/20/2018 11.00AM
Pipe Culvert
Checking of Pipe laying & Jointing for
3 REP/NH-216/STR/072 7/19/2018 5.00 PM Pipe Culvert
154+939 BHS 7/20/2018 12.00PM
4 REP/NH-216/STR/073 7/19/2018 5.00 PM Checking of Pipe laying & Jointing for 155+164 BHS 7/20/2018 2.00PM
Pipe Culvert
5 REP/NH-216/STR/074 7/19/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
155+864 BHS 7/20/2018 3.00PM
6 REP/NH-216/STR/075 7/19/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
163+056 BHS 7/20/2018 4.00PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/20/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
1 REP/NH-216/STR/076 7/20/2018 8.00 AM Checking and allow to M15 PCC leveling 163+056 BHS 7/20/2018 5.00 PM
Course for Pipe Culvert head wall
2 REP/NH-216/STR/077 7/20/2018 9.00 AM Checking and allow to M15 PCC leveling 150+940 BHS 7/20/2018 6.00 PM
Course for Pipe Culvert head wall
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/20/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
Checking and allow to M25 PCC for Pipe
1 REP/NH-216/STR/078 7/20/2018 5.00 PM culvert Head wall 1st Lif
163+056 BHS 7/21/2018 4.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/22/2018
RFI Submission RFI Inspection
Sl.No RFI NO. Description of Item Chainage Side RFI Status Remarks
Date Time Date Time
1 REP/NH-216/STR/079 7/22/2018 5.00 PM Checking and allow to M15 PCC leveling 155+864 BHS 7/23/2018 10.00 AM
Course for Pipe Culvert head wall
1 REP/NH-216/STR/088 7/25/2018 9.00 AM Check the excavation for Line Drain 160+050 160+100 RHS 7/25/2018 4.00 PM
Government of India (Ministry of Road Transport & Highways)
Through
Roads & Buildings Department ( National Highways)
Rehabilitation and upgradation of NH-67 from km 695+000 to km 741+950 (Atmakur to Nellore section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV
through Engineering, Procurement & Construction (EPC) Basis Contract
AUTHORITY ENGINEER : M/s WADIA TECHNO-ENGINEERING SERVICE LTD.
CONTRACTOR : M/s BSCPL Infrastructure Ltd Date 7/25/2018
RFI Submission Chainages RFI Inspection
Sl.No RFI NO. Description of Item Side RFI Status Remarks
Date Time From To Date Time
1 REP/NH-216/STR/089 7/25/2018 5.00 PM Check the excavation for Pipe culvert Head
wall
136+032 BHS 7/26/2018 11.00 AM
1 REP/NH-216/STR/093 7/26/2018 5.00 PM Check the excavation for Line Drain 160+000 160+050 RHS 7/27/2018 10.00 AM
1 REP/NH-216/STR/101 7/30/2018 5.00 PM Check the excavation for Line Drain 151+800 151+900 LHS 7/31/2018 10.00 AM
2 REP/NH-216/STR/102 7/30/2018 5.00 PM Check the excavation for Line Drain 159+800 160+000 RHS 7/31/2018 11.00 AM