Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1
Use the Kill sheets to assist you in answering the questions below
Well Data :
Hole size 8 1/2 in
Hole depth TVD 7056 f
Hole depth MD 11000 f
Kick - off point MD/TVD ( KOP ) 3000 f
Build rate is 3 deg/100f
Final inclination 80 deg/100f
End of build ( EOB ) TVD 6536 f
End of build ( EOB ) MD 8000 f
Casing ( 9 5/8 9 5/8 in ) TVD 6623 f
Casing ( 9 5/8 in ) MD 8500 f
Drill pipe 5 in capacity 0.0173 bbl/f
Heavy Wall pipe 5 in 500 f
Heavy Wall pipe capacity 0.00862 bbl/f
Capacity B.H.A. 0.0076 bbl/f
Bottom B.H.A. Bit - 6 1/2" Motor 6 1/2" MWD 250 f
Capacity open hole x B.H.A. 0.0291 bbl/f
Drilling Fluid density 10 ppg
Capacity open hole x drill pipe / HWDP 0.04582 bbl/f
Capacity casing x drill pipe 0.04889 bbl/f
Fracture fluid density at the casing shoe 14 ppg
SIDPP 690 psi
SICP 735 psi
Mud pumps displacement 0.119 bbl/strk
Slow Circulating Rate Pressure at 30 SPM 870 psi
Pit gain 19 bbl
69
Na:
me
Internati onal Wel l Control Forum
Surface
(Deviated
BO P )Kill
Well
Sheet
-API Unit s
Da:te
Mud W:-
eight (B
) ppg Gradient ps
/fti
Initial M=
AASP KOP TVD 3000 ft
C
[)( Current
- Mud
]x Shoe
Weight
0.T
052
VD
= x EOB MD 8000 ft
1377
psi EOB TVD6536 ft
P ump
.1Displacement
No P ump C a s ing
.2Displacement
No Shoe
: D ata
Size 9 /5
8 i nc h
0
.119 bbl
/sstrok e bbl
/sstrok M
.Depth
e 8500
ft
T
.V.Depth 6623
ft
Pre
-Volume:Data Length Capacity Volume Pump str okes T
ime
stks
f .t
bbls
/ft bbls minutes
DP
-Surface to KOP 3000
x 0
.0 1 7=
3 52 (L) 436 stks
DP
- KOP to EOB 5000
x 0
.0 1 7=
3 87 (M) 727 stks
DP
- EOB to BHA 2250
x 0
.0 1 7=
3 39 (N
1) 327 stks
DP x Casing 8500
x 0
.0489
=G
() 415
.6bbl 3492 stks min
T
otalAnnuulus Volume (F
+G) =H
(
) 525
.9 4419
.6 stks min
T
otal Well System Volume (D
+H) =I)( 709
.5 bbl 5962 stks199 min
T
otalActive Fluid System (I+
J)
70
Kick Data
SIDPP
Kill Mud Weight Current Mud Weight + = 11.9 ppg
TVD x 0.052
KMW
Initial Circulating
pressure Dynamic Pressure Loss + SIDPP = 1560 psi
ICP
Kill Mud Weight
Final Circulating x Dynamic Pressure Loss = 1036 psi
Current Mud Weight
pressure
FCP
Dynamic Pressure
KOP
Loss at KOP PL +
[ (FCP - PL) x
TD MD
MD
] = 916 psi
(O)
Remaining SIDPP
at KOP SIDPP - [ ( KMW - OMW ) x 0.052 x KOP TVD ] = 394 psi
(P)
Circulating Pressure
at KOP (O) + ( P) = 1310 psi
( KOP CP )
Dynamic Pressure
EOB
Loss at EOB PL +
[ (FCP - PL) x
TD MD
MD
] = 991 psi
(R)
Remaining SIDPP
at EOB SIDPP - [ ( KMW - OMW ) x 0.052 x EOB TVD] = 45 psi
(S)
Circulating Pressure
at EOP (R) + ( S) = 1036 psi
(EOB CP )
( T ) X 100
( T ) = ICP - KOP CP
psi (L)
= 57
psi/100 strokes
( U ) X 100
( U ) = KOP CP - EOB CP
psi
= 37
(M)
psi/100 strokes
( W ) X 100
( W ) = EOB CP - FCP
psi (N1+N2+N3)
= 0
psi/100 strokes
71
STROKES
1163 1036
Qu. 1. At initial shut in assuming all the influx is at the bottom of the hole and is not
dispersed. What is the length of the influx?
72
Qu. 2. If the instructions are to maintain 100 psi overbalance above formation
pressure. What would casing pressure be at the start of operations?
The pump is started and the choke adjusted to maintain the correct casing pressure.
When the pump has reached kill rate, this situation exists.
Afer 400 strokes the overbalance has been removed and the situation is as follows:
73
Qu. 5. What should you do?
Afer 4500 strokes the pump was stopped and the well shut in.
The stroke counter has been reset and the kill mud weight is pumping inside drill string,
afer 18 strokes the following situation exists: -
74
C- Every thing is O.K. continues. D- Increase pump rate.
75
Qu. 11. What should you do?
Afer 1900 strokes the drill pipe increased suddenly from 1040 to 1350 without any change
in the casing pressure the situation is as follows: -
C- Decrease pump rate. D- Continue with the new drill pipe pressure.
The above problem was nozzle partially plugging and still exist. Afer 6200 strokes the
situation is as follows: -
76
F- Stop pump, shut the well in, check for pressure.
77
Deviated kill sheet no. 2
Use the Kill sheets to assist you in answering the questions below
Well Data :
Hole size 8 1/2 in
Hole depth TVD 5250 f
Hole depth MD 14370 f
Kick - off point MD/TVD ( KOP ) 1640 f
Build rate is 3 deg/100f
Final inclination 80 deg/100f
End of build ( EOB ) TVD 3494 f
End of build ( EOB ) MD 4265 f
Casing ( 9 5/8 9 5/8 in ) TVD 4593 f
Casing ( 9 5/8 in ) MD 10600 f
Drill pipe 5 in capacity 0.01776 bbl/f
Heavy Wall pipe 5 in 480 f
Heavy Wall pipe capacity 0.00874 bbl/f
Capacity B.H.A. 0.0077 bbl/f
1 " 1/2"
Bottom B.H.A. Bit - 6 /2 Motor 6 MWD 660 f
Capacity open hole x B.H.A. 0.0291 bbl/f
Drilling Fluid density 10.9 ppg
Capacity open hole x drill pipe / HWDP 0.0458 bbl/f
Capacity casing x drill pipe 0.0489 bbl/f
Fracture fluid density at the casing shoe 15.7 ppg
SIDPP 725 psi
SICP 785 psi
Mud pumps displacement 0.12 bbl/stroke
Slow Circulating Rate Pressure at 30 SPM 870 psi
Pit gain 19 bbl
78
Name
:
Internati onal Wel l Control 2
Forum
Surf ace
(Deviat
BO Ped)Kill
WellSheet
-API Unit s
Dat
:e
Mud W:-
eight (B
) ppg Gradient ps
/fti
Initial M=
AASP KOP TVD 1640 ft
C
[)( Current
- M]x
udSWeight
hoe0
.T
052
V
=D x EOB MD 4265 ft
1146
psi EOB TVD3494 ft
P ump
.1Displacement
No P ump C a s ing Shoe
.2Displacement
No : D ata
Size 9/
58 i nc h
0
.12 bbl
/sstrok e bbl
/sstrok M
.Depth
e 10600
ft
T
.V.Depth 4593
ft
Pr
-V
eolume:Data Length Capacity Volume Pump str okes T
ime
stks
f .t
bbls
/ft bbls minutes
DP
-Surface to KOP 1640
x 0
.0 1 7 7
=6 29 (L) 243 stks
DP
- KOP to EOB 2625
x 0
.0 1 7 7
=6 47 (M ) 389 stks
DP
- EOB to BHA 8965
x 0
.0 1 7 7
=6 159 (N
1) 1327 stks
DP x Casing 10600
x 0
.0489
=G
() 518
.3 bbl 4320 stks min
T
otal Annuulus Volume (F
+G) =H
(
) 680
.0 5666
.5 stks min
T
otal Well System Volume (D
+H) =I)( 924
.2 bbl 7702 stks257 min
T
otalActive Fluid System (I+
J)
79
Kick Data
SIDPP
Kill Mud Weight Current Mud Weight + = 13.6 ppg
TVD x 0.052
KMW
Initial Circulating
pressure Dynamic Pressure Loss + SIDPP = 1595 psi
ICP
Kill Mud Weight
Final Circulating x Dynamic Pressure Loss = 1086 psi
Current Mud Weight
pressure
FCP
Dynamic Pressure
KOP
Loss at KOP PL +
[ (FCP - PL) x
TD MD
MD
] = 895 psi
(O)
Remaining SIDPP
at KOP SIDPP - [ ( KMW - OMW ) x 0.052 x KOP ]
TVD = 495 psi
(P)
Circulating Pressure
at KOP (O) + ( P) = 1390 psi
( KOP CP )
Dynamic Pressure
EOB
Loss at EOB PL +
[ (FCP - PL) x TD MD
MD
] = 935 psi
(R)
Remaining SIDPP
at EOB SIDPP - [ ( KMW - OMW ) x 0.052 x EOB TVD ] = 235 psi
(S)
Circulating Pressure
at EOP (R) + ( S) = 1170 psi
(EOB CP )
( T ) X 100
( T ) = ICP - KOP CP
psi (L)
= 84
psi/100 strokes
( U ) X 100
( U ) = KOP CP - EOB CP
psi
= 56
(M)
psi/100 strokes
( W ) X 100
( W ) = EOB CP - FCP
psi
= 5
(N1+N2+N3)
psi/100 strokes
STROKES
80
PRESSURE STROKES PRESSURE STROKES PRESSUR
E
0 1595 243 1390 632 1170
100 1511 300 1358 700 1167
200 1427 400 1302 1000 1152
243 1390 500 1246 1300 1137
600 1190 1600 1122
632 1170 1900 1107
2035 1086
The pump is started and the choke adjusted to maintain the correct casing pressure. The
situation is as follows: -
81
SPM 24 Total strokes 15
Afer 1000 strokes both drill pipe and casing pressure increased suddenly by 200 psi and
the situation is as follows: -
82
D. As quickly as possible turn over to the second choke.
B- Choke plugging.
C- Bit nozzle plugging.
D- Every thing is O.K. continues.
The above problem was solved, afer 3600 strokes the situation is as follows: -
Afer 4200 strokes casing pressure start to fluctuate and decreasing, the situation is as
follows: -
83
D- Increase pump rate. E- Decrease pump rate.
Afer 5800 strokes the pump stopped and the well was shut in correctly.
Qu. 7. Write down the minimum pressure could be recorded at the following gauges.
The first circulation was completed successfully, and the stroke counter was reset afer the
kill mud weight has reached the top drive. The situation is as follows: -
84
E-Decrease pump rate.
Afer 2200 stroke, the company representative asked to increase the pump rate to 35, the
correct way to keep BHP constant was followed.
Qu. 11. What do you expect to casing and drill pipe pressures to be?
After 8000 strokes the choke is fully open and the situation is as follows: -
85
C- Shut pump down, shut the well in, and check for pressures.
Use the Kill sheets to assist you in answering the questions below
Well Data :
Hole size 8 3/4 in
Hole depth TVD 7220 f
86
Hole depth MD 15234 f
Kick - off point MD/TVD ( KOP ) 4500 f
Build rate is 3.5 deg/100f
Final inclination 91 deg
End of build ( EOB ) TVD 6137 f
End of build ( EOB ) MD 7100 f
Casing ( 9 5/8 9 5/8 in ) TVD 7150 f
Casing ( 9 5/8 in ) MD 8200 f
Drill pipe 5 in capacity 0.0176 bbl/f
Heavy Wall pipe 5 in 0 f
Heavy Wall pipe capacity 0 bbl/f
Capacity B.H.A. 0.0065 bbl/f
Bottom B.H.A. 8 3/4" Bit - 6" Motor 6" MWD 60 f
Capacity open hole x B.H.A. 0.0301 bbl/f
Drilling Fluid density 12.3 ppg
Capacity open hole x drill pipe / HWDP 0.0501 bbl/f
Capacity casing x drill pipe 0.0518 bbl/f
Fracture fluid density at the casing shoe 15 ppg
SIDPP 485 psi
SICP 500 psi
Mud pumps displacement 0.0995 bbl/strk
Slow Circulating Rate Pressure at 25 SPM 430 psi
Pit gain 7 bbl
87
Na:me
Internati onal Wel l Control Forum
Surf ace
(Deviat
BOP ed
)Kill
W Sheet
ell
-API UnitDa
s: te
Cur r ent W
: ell Data
Forma t ion :St
- re ngt h D a t a Mud Da
: ta
Surface
-ofL
Pr
ea
ekssu
:- re (A
) psi Weight 12
.3 ppg
Mud W
:-eight (B
) ppg Gradient ps
/fti
Ma x imu mAllo :-
w a b le Mu d We ig h t
B
() + (A
) = D e v ia :
t ion D a t a
shoeT
rue Vertical
*0.052Depth
(C
) ppg KOP MD
15 4500
ft
Initial M
=AASP KOP TVD4500 ft
C
[)(Current
- M
]xud
Shoe
Weight
0.052
T=VD xEOB MD7100 ft
1003
psi EOB TVD
6137 ft
P ump
.1Di
No splacementP ump
.2Di
No C a s ing:Shoe
splacement D ata
Size 9 /5
8 i nc h
0
.0995 bbl
/s s
trok e bbl trokM
/s s .
Depth
e 8200
ft
T
.V
.Depth 7150
ft
Slow PumpDynamic Pr e
(PL
s)sur e LosHo
s le:-
Data
R ate: D ataPump
.1NO Pump
.2NO Size 8 /4
3 i nc h
Pre
-Volume
: Data Length Capacity VolumePump str okes T
ime
stks
f .t
bb/
ls
ft bbls minutes
DP
-Surface to KOP 4500
x 0
.0 1 7
=6 79 (L
) 796 stks
DP
- KOP to EOB 2600
x 0
.0 1 7
=6 46 (M) 460 stks
DP
- EOB to BHA 8074
x 0
.0 1 7
=6 142(N
1) 1428 stks
Drill Collars 60
x 0
.0065
= 0 (N
3) 4 stks
DP x Casing 8200
x 0
.0518
=G
() 424
.8bbl 4269 stks min
T
otalAnnuulus Volume (F
+G)=H)
( 776
.0 7798
.6 stks min
T
otal Well System Volume (D
+H)=I)( 1043
.4 bbl 10487stks419min
Active Surface Volume (J
) bbl stks min
T
otalActive Fluid System (I+
J)
88
Kick Data
SIDPP
Kill Mud Weight Current Mud Weight + = 13.6 ppg
TVD x 0.052
KMW
Initial Circulating
pressure Dynamic Pressure Loss + SIDPP = 915 psi
ICP
Kill Mud Weight
Final Circulating x Dynamic Pressure Loss = 476 psi
Current Mud Weight
pressure
FCP
Dynamic Pressure
KOP
Loss at KOP PL +
[
(FCP - PL) x
TD MD
MD
] = 444 psi
(O )
Remaining SIDPP
at KOP SIDPP - [ ( KMW - OMW ) x 0.052 x KOP TVD ] = 181 psi
(P )
Circulating Pressure
at KOP (O) + ( P) = 625 psi
( KOP CP )
Dynamic Pressure
EOB
Loss at EOB PL +
[
(FCP - PL) x
TD MD
MD
] = 452 psi
(R)
Remaining SIDPP
at EOB SIDPP - [ ( KMW - OMW ) x 0.052 x EOB TVD] = 71 psi
(S )
Circulating Pressure
at EOP (R) + ( S) = 523 psi
(EOB CP )
( T ) X 100
( T ) = ICP - KOP CP
psi
= 36
(L)
psi/100 strokes
( U ) X 100
( U ) = KOP CP - EOB CP
psi
= 22
(M)
psi/100 strokes
( W ) X 100
( W ) = EOB CP - FCP
psi (N1+N2+N3)
= 3
psi/100 strokes
STROKES
89
STROKE PRESSURE STROKES PRESSURE STROKES PRESSURE
S
0 915 796 625 1256 523
100 879 800 625
200 843 900 603 1500 516
300 807 1000 581
400 771 1100 559 2000 501
500 735 1200 537
600 699 1256 523 2688 476
700 663
796 625
The pump is started with the original mud weight. Afer 2 minutes the situation is as
follows: -
90
SPM 27 Total strokes 50
Afer 625 strokes the drill pipe pressure suddenly increased without any increase in casing
pressure and the situation is as follows: -
91
Qu. 3. What should you do?
92
Afer 4000 strokes the situation is as follows: -
Qu. 7. What is the effect of the previous observation with respect to circulating BHP.
A- BHP Increased.
B- BHP decreased.
Qu. 8. What do you expect to casing and drill pipe pressures when the pump
93
The 2nd circulation with kill mud started and the stroke counter has been reset as kill mud
reached the top of the drill string.
Qu. 9. What do you expect to the following pressures assuming that the bit is
Afer having pumped 800 stroke of kill mud inside the drill string,the pump stopped and
the well shut in.
1 C 1 D
2 C 2 C
3 B 3 D
94
4 C 4 A
5 C 5 C
6a 690 6 C
7 E 8 A
8 A 9 A
9 C 10 C
10 C 11 725 & 1479
11 A 12 E
12 G
13 F
1 E 1 D
2 C 2 E
3 C 3 B
4 C 4 C
5 C 5 D
6 B 6 C
7 B 7a 875
8a 485 7b 875
8b 500 8 C
9a 1420 9a 118
95
9b 500 9b 875
KILL SHEET NO 5
1 D
2 C
3 E
4 C
5 F
6 E
7 A
8 B
9
10 B&A
11 D
96