Sei sulla pagina 1di 28

Deviated kill sheet no.

1
Use the Kill sheets to assist you in answering the questions below
Well Data :
Hole size 8 1/2 in
Hole depth TVD 7056 f
Hole depth MD 11000 f
Kick - off point MD/TVD ( KOP ) 3000 f
Build rate is 3 deg/100f
Final inclination 80 deg/100f
End of build ( EOB ) TVD 6536 f
End of build ( EOB ) MD 8000 f
Casing ( 9 5/8 9 5/8 in ) TVD 6623 f
Casing ( 9 5/8 in ) MD 8500 f
Drill pipe 5 in capacity 0.0173 bbl/f
Heavy Wall pipe 5 in 500 f
Heavy Wall pipe capacity 0.00862 bbl/f
Capacity B.H.A. 0.0076 bbl/f
Bottom B.H.A. Bit - 6 1/2" Motor 6 1/2" MWD 250 f
Capacity open hole x B.H.A. 0.0291 bbl/f
Drilling Fluid density 10 ppg
Capacity open hole x drill pipe / HWDP 0.04582 bbl/f
Capacity casing x drill pipe 0.04889 bbl/f
Fracture fluid density at the casing shoe 14 ppg
SIDPP 690 psi
SICP 735 psi
Mud pumps displacement 0.119 bbl/strk
Slow Circulating Rate Pressure at 30 SPM 870 psi
Pit gain 19 bbl

69
Na:
me
Internati onal Wel l Control Forum
Surface
(Deviated
BO P )Kill
Well
Sheet
-API Unit s
Da:te

Cur r ent W:ell Data


Forma t ion St
: -re ngt h D a t a Mud Dat
: a
Surface
-of
Lea
f Pressure
k :- (A
) psi Weight 10 ppg

Mud W:-
eight (B
) ppg Gradient ps
/fti

Ma x imu mAllo w:-a b le Mu d We ig h t


B
() + (A
) = D e v ia t:ion D a t a
shoeT
rue Vertical
*0
.052
Depth
(C
) ppg KOP MD
14 3000
ft

Initial M=
AASP KOP TVD 3000 ft

C
[)( Current
- Mud
]x Shoe
Weight
0.T
052
VD
= x EOB MD 8000 ft

1377
psi EOB TVD6536 ft

P ump
.1Displacement
No P ump C a s ing
.2Displacement
No Shoe
: D ata

Size 9 /5
8 i nc h

0
.119 bbl
/sstrok e bbl
/sstrok M
.Depth
e 8500
ft

T
.V.Depth 6623
ft

Slow Pump Dynamic Pr essu


(PL
) r e Loss Hole :
Data
-
R ate :Data Pump.1NO Pump .2NO Size 8 /1
2 i nc h

30 spm 870 psi psi M


.Depth 11000
ft

spm psi psi T


.V.Depth 7056
ft

Pre
-Volume:Data Length Capacity Volume Pump str okes T
ime
stks
f .t
bbls
/ft bbls minutes
DP
-Surface to KOP 3000
x 0
.0 1 7=
3 52 (L) 436 stks

DP
- KOP to EOB 5000
x 0
.0 1 7=
3 87 (M) 727 stks

DP
- EOB to BHA 2250
x 0
.0 1 7=
3 39 (N
1) 327 stks

Heavy Wall Drill pipe 500


x 0
.0086
= 4 (N
2) 36 stks

Drill Collars 250


x 0
.0076
= 2 (N
3) 16 stks

Dr ill Str ing Volume (D


) 183
.5 bbl 1542 51
stks .41 min
DC x Open Hole 250
x 0
.0291
= 7
.3
/HWDP x Open Ho2250
DP le x 0
.0458
= 103
.1
Open Hole Volume (F
) 110
.4 bbl 927 stks min

DP x Casing 8500
x 0
.0489
=G
() 415
.6bbl 3492 stks min

T
otalAnnuulus Volume (F
+G) =H
(
) 525
.9 4419
.6 stks min

T
otal Well System Volume (D
+H) =I)( 709
.5 bbl 5962 stks199 min

Active Surface Volume (J


) bbl stks min

T
otalActive Fluid System (I+
J)

70
Kick Data

SIDPP 690 psi SICP 735 psi Pit Gain 19 bbls

SIDPP
Kill Mud Weight Current Mud Weight + = 11.9 ppg
TVD x 0.052
KMW

Initial Circulating
pressure Dynamic Pressure Loss + SIDPP = 1560 psi
ICP
Kill Mud Weight
Final Circulating x Dynamic Pressure Loss = 1036 psi
Current Mud Weight
pressure
FCP
Dynamic Pressure
KOP
Loss at KOP PL +
[ (FCP - PL) x
TD MD
MD
] = 916 psi

(O)

Remaining SIDPP
at KOP SIDPP - [ ( KMW - OMW ) x 0.052 x KOP TVD ] = 394 psi
(P)

Circulating Pressure
at KOP (O) + ( P) = 1310 psi
( KOP CP )
Dynamic Pressure
EOB
Loss at EOB PL +
[ (FCP - PL) x
TD MD
MD
] = 991 psi

(R)
Remaining SIDPP
at EOB SIDPP - [ ( KMW - OMW ) x 0.052 x EOB TVD] = 45 psi
(S)

Circulating Pressure
at EOP (R) + ( S) = 1036 psi
(EOB CP )

( T ) X 100
( T ) = ICP - KOP CP
psi (L)
= 57
psi/100 strokes

( U ) X 100
( U ) = KOP CP - EOB CP
psi
= 37
(M)
psi/100 strokes

( W ) X 100
( W ) = EOB CP - FCP
psi (N1+N2+N3)
= 0
psi/100 strokes

71
STROKES

STROKES PRESSURE STROKES PRESSURE STROKES PRESSURE


0 1560 436 1310 1163 1036
100 1503 500 1273 1542 1036
200 1446 600 1236
300 1389 700 1199
400 1332 800 1162
436 1310 900 1125
1000 1088
1100 1051

1163 1036

The well is killed using the driller method.

Qu. 1. At initial shut in assuming all the influx is at the bottom of the hole and is not
dispersed. What is the length of the influx?

a. 651 ft. b. 415 ft. c. 505 ft.

72
Qu. 2. If the instructions are to maintain 100 psi overbalance above formation
pressure. What would casing pressure be at the start of operations?

a, 635 psi. b. 735 psi. c. 835 psi.

The pump is started and the choke adjusted to maintain the correct casing pressure.
When the pump has reached kill rate, this situation exists.

Casing pressure 835 psi Drill pipe pressure 1660 psi

SPM 30 Total strokes 27

Qu. 3. Calculate the safety margin at the casing shoe.

A- 1583 psi. B- 542 psi.

C- 442 psi. D- 1277 psi.

Afer 400 strokes the overbalance has been removed and the situation is as follows:

Casing pressure 745 psi Drill pipe pressure 1570 psi

SPM 30 Total strokes 400

Qu. 4. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K., continue. D-Increase pump rate.

E- Decrease pump rate.

Afer 3190 strokes the situation is as follows: -

Casing pressure 1030 psi Drill pipe pressure 1560 psi

SPM 30 Total strokes 3190

73
Qu. 5. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

Afer 4500 strokes the pump was stopped and the well shut in.

Qu. 6. What is the minimum reading for each of the following?

A- Shut in drill pipe pressure …………….. psi.


B- Shut in casing pressure …………….. psi.

The stroke counter has been reset and the kill mud weight is pumping inside drill string,
afer 18 strokes the following situation exists: -

Casing pressure 700 psi Drill pipe pressure 1480 psi

SPM 27 SPM Total strokes 18 strokes

Qu. 7. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.


D- Decrease pump rate.

Afer 260 strokes the situation is as follows: -

Casing pressure 770 psi Drill pipe pressure 1500 psi

SPM 30 Total strokes 260

Qu. 8. What should you do?

A- Open the choke. B- Close the choke slightly.

74
C- Every thing is O.K. continues. D- Increase pump rate.

D- Decrease pump rate.

Afer 420 strokes the situation is as follows: -

Casing pressure 690 psi Drill pipe pressure 1325 psi

SPM 30 Total strokes 420

Qu. 9. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

Afer 570 strokes the situation is as follows: -

Casing pressure 700 psi Drill pipe pressure 1255 psi

SPM 30 Total strokes 570

Qu. 10. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

Afer 1600 strokes the situation is as follows: -

Casing pressure 1030 psi Drill pipe pressure 1620 psi

SPM 30 Total strokes 1600

75
Qu. 11. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

Afer 1900 strokes the drill pipe increased suddenly from 1040 to 1350 without any change
in the casing pressure the situation is as follows: -

Casing pressure 650 psi Drill pipe pressure 1350 psi

SPM 30 Total strokes 1900

Qu. 12. What should you do?

A- Open the choke. B- Every thing is O.K. continues.

C- Decrease pump rate. D- Continue with the new drill pipe pressure.

E- Stop pump discus and evaluate the problem.

The above problem was nozzle partially plugging and still exist. Afer 6200 strokes the
situation is as follows: -

Casing pressure 0 psi Drill pipe pressure 1350 psi

SPM 30 Total strokes 6200

Qu. 13. What should you do?

A- Open the choke.


B- Close the choke slightly.
C- Every thing is O.K. continues.
D- Increase pump rate.
E- Decrease pump rate.

76
F- Stop pump, shut the well in, check for pressure.

77
Deviated kill sheet no. 2

Use the Kill sheets to assist you in answering the questions below
Well Data :
Hole size 8 1/2 in
Hole depth TVD 5250 f
Hole depth MD 14370 f
Kick - off point MD/TVD ( KOP ) 1640 f
Build rate is 3 deg/100f
Final inclination 80 deg/100f
End of build ( EOB ) TVD 3494 f
End of build ( EOB ) MD 4265 f
Casing ( 9 5/8 9 5/8 in ) TVD 4593 f
Casing ( 9 5/8 in ) MD 10600 f
Drill pipe 5 in capacity 0.01776 bbl/f
Heavy Wall pipe 5 in 480 f
Heavy Wall pipe capacity 0.00874 bbl/f
Capacity B.H.A. 0.0077 bbl/f
1 " 1/2"
Bottom B.H.A. Bit - 6 /2 Motor 6 MWD 660 f
Capacity open hole x B.H.A. 0.0291 bbl/f
Drilling Fluid density 10.9 ppg
Capacity open hole x drill pipe / HWDP 0.0458 bbl/f
Capacity casing x drill pipe 0.0489 bbl/f
Fracture fluid density at the casing shoe 15.7 ppg
SIDPP 725 psi
SICP 785 psi
Mud pumps displacement 0.12 bbl/stroke
Slow Circulating Rate Pressure at 30 SPM 870 psi
Pit gain 19 bbl

78
Name
:
Internati onal Wel l Control 2
Forum
Surf ace
(Deviat
BO Ped)Kill
WellSheet
-API Unit s
Dat
:e

Cur r ent W:ell Data


Forma t ion St
: -re ngt h D a t a Mud Dat
: a
Surface
-of
Leak
f Pressure
:- (A
) psi Weight 10
.9 ppg

Mud W:-
eight (B
) ppg Gradient ps
/fti

Ma x imu m Allo w:-a b le Mu d We ig h t


B
() + (A
) = D e v ia t:ion D a t a
shoeT
rue Vertical
*0
.052
Depth
(C
) .7 ppg KOP MD
15 1640
ft

Initial M=
AASP KOP TVD 1640 ft

C
[)( Current
- M]x
udSWeight
hoe0
.T
052
V
=D x EOB MD 4265 ft

1146
psi EOB TVD3494 ft

P ump
.1Displacement
No P ump C a s ing Shoe
.2Displacement
No : D ata

Size 9/
58 i nc h

0
.12 bbl
/sstrok e bbl
/sstrok M
.Depth
e 10600
ft

T
.V.Depth 4593
ft

Slow Pump Dynamic Pr essu


(PL
) r e Loss Hole :
Dat
- a
R ate :D ata Pump
.1NO Pump
.2NO Size 8 /1
2 i nc h

30 spm 870 psi psi M


.Depth 14370
ft

spm psi psi T


.V.Depth 5250
ft

Pr
-V
eolume:Data Length Capacity Volume Pump str okes T
ime
stks
f .t
bbls
/ft bbls minutes
DP
-Surface to KOP 1640
x 0
.0 1 7 7
=6 29 (L) 243 stks

DP
- KOP to EOB 2625
x 0
.0 1 7 7
=6 47 (M ) 389 stks

DP
- EOB to BHA 8965
x 0
.0 1 7 7
=6 159 (N
1) 1327 stks

Heavy Wall Drill pipe 480


x 0
.0087
= 4 (N
2) 35 stks

Drill Collars 660


x 0
.0077
= 5 (N
3) 42 stks

Dr ill Str ing Volume (D


) 244
.2 bbl 2035 67
stks .85 min
DC x Open Hole 660
x 0
.0291
= 19
.2
DP 3110
/HWDP x Open Hole x 0
.0458
= 142
.4
Open Hole Volume (F
) 161
.6 bbl 1347 stks min

DP x Casing 10600
x 0
.0489
=G
() 518
.3 bbl 4320 stks min

T
otal Annuulus Volume (F
+G) =H
(
) 680
.0 5666
.5 stks min

T
otal Well System Volume (D
+H) =I)( 924
.2 bbl 7702 stks257 min

Active Surface Volume (J


) bbl stks min

T
otalActive Fluid System (I+
J)

79
Kick Data

SIDPP 725 psi SICP 785 psi Pit Gain 19 bbls

SIDPP
Kill Mud Weight Current Mud Weight + = 13.6 ppg
TVD x 0.052
KMW

Initial Circulating
pressure Dynamic Pressure Loss + SIDPP = 1595 psi
ICP
Kill Mud Weight
Final Circulating x Dynamic Pressure Loss = 1086 psi
Current Mud Weight
pressure
FCP
Dynamic Pressure
KOP
Loss at KOP PL +
[ (FCP - PL) x
TD MD
MD
] = 895 psi

(O)

Remaining SIDPP
at KOP SIDPP - [ ( KMW - OMW ) x 0.052 x KOP ]
TVD = 495 psi
(P)

Circulating Pressure
at KOP (O) + ( P) = 1390 psi
( KOP CP )
Dynamic Pressure
EOB
Loss at EOB PL +
[ (FCP - PL) x TD MD
MD
] = 935 psi

(R)
Remaining SIDPP
at EOB SIDPP - [ ( KMW - OMW ) x 0.052 x EOB TVD ] = 235 psi
(S)

Circulating Pressure
at EOP (R) + ( S) = 1170 psi
(EOB CP )

( T ) X 100
( T ) = ICP - KOP CP
psi (L)
= 84
psi/100 strokes

( U ) X 100
( U ) = KOP CP - EOB CP
psi
= 56
(M)
psi/100 strokes

( W ) X 100
( W ) = EOB CP - FCP
psi
= 5
(N1+N2+N3)
psi/100 strokes

STROKES

80
PRESSURE STROKES PRESSURE STROKES PRESSUR
E
0 1595 243 1390 632 1170
100 1511 300 1358 700 1167
200 1427 400 1302 1000 1152
243 1390 500 1246 1300 1137
600 1190 1600 1122
632 1170 1900 1107
2035 1086

The well is killed using the driller’s method.

The pump is started and the choke adjusted to maintain the correct casing pressure. The
situation is as follows: -

Casing pressure 785 psi Drill pipe pressure 1270 psi

81
SPM 24 Total strokes 15

Qu. 1. What should you do?\

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K., continue. D- Increase pump rate.

E-Decrease pump rate.

Afer 400 strokes the situation is as follows: -

Casing pressure 800 psi Drill pipe pressure 1600 psi

SPM 30 Total strokes 400

Qu. 2. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K., continue. D- Increase pump rate.

E- Decrease pump rate.

Afer 1000 strokes both drill pipe and casing pressure increased suddenly by 200 psi and
the situation is as follows: -

Casing pressure 1050 psi Drill pipe pressure 1800 psi

SPM 30 Total strokes 1000

Qu. 3. What should you do?

A- Open the choke. B. Close the choke slightly.

C. Every thing is O.K. continues.

82
D. As quickly as possible turn over to the second choke.

E. Decrease pump rate.

Qu. 4. What do you expect to the previous problem to be?

B- Choke plugging.
C- Bit nozzle plugging.
D- Every thing is O.K. continues.

The above problem was solved, afer 3600 strokes the situation is as follows: -

Casing pressure 1150 psi Drill pipe pressure 1600 psi

SPM 30 Total strokes 3600

Qu. 5. What should you do?

A. Open the choke, the MAASP has been exceeded.


B. Close the choke slightly.
C. Every thing is O.K., continue.
D. Increase pump rate.
E. Decrease pump rate.

Afer 4200 strokes casing pressure start to fluctuate and decreasing, the situation is as
follows: -

Casing pressure 1800 psi and decreasing.

Drill pipe pressure 1600 psi

SPM 30 Total strokes 4200

Qu. 6. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues.

83
D- Increase pump rate. E- Decrease pump rate.

Afer 5800 strokes the pump stopped and the well was shut in correctly.

Qu. 7. Write down the minimum pressure could be recorded at the following gauges.

Casing pressure ------ psi Drill pipe pressure --------- psi

SPM 0 Total strokes 5800

The first circulation was completed successfully, and the stroke counter was reset afer the
kill mud weight has reached the top drive. The situation is as follows: -

Casing pressure 875 psi Drill pipe pressure 1600 psi

SPM 30 Total strokes 180

Qu. 8. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

Afer 230 stroke the situation is as follows: -

Casing pressure 825 psi Drill pipe pressure 1500 psi

SPM 30 Total strokes 230

Qu. 9. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K., continue. D- Increase pump rate.

84
E-Decrease pump rate.

Afer 570 stroke the situation is as follows: -

Casing pressure 730 psi Drill pipe pressure 1210 psi

SPM 30 Total strokes 570

Qu. 10. What should you do?

A- Open the choke. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

Afer 2200 stroke, the company representative asked to increase the pump rate to 35, the
correct way to keep BHP constant was followed.

Qu. 11. What do you expect to casing and drill pipe pressures to be?

Casing pressure -------- psi Drill pipe pressure -------- psi

SPM 35 Total strokes 2200

After 8000 strokes the choke is fully open and the situation is as follows: -

May be a small back pressure by the choke.

Casing pressure 20 psi Drill pipe pressure 1500 psi

SPM 35 Total strokes 8000

Qu. 12. What should you do?

A- Open the choke. B-Every thing is O.K. continues.

85
C- Shut pump down, shut the well in, and check for pressures.

E. Decrease pump rate.

Deviated kill sheet no. 3

Use the Kill sheets to assist you in answering the questions below
Well Data :
Hole size 8 3/4 in
Hole depth TVD 7220 f

86
Hole depth MD 15234 f
Kick - off point MD/TVD ( KOP ) 4500 f
Build rate is 3.5 deg/100f
Final inclination 91 deg
End of build ( EOB ) TVD 6137 f
End of build ( EOB ) MD 7100 f
Casing ( 9 5/8 9 5/8 in ) TVD 7150 f
Casing ( 9 5/8 in ) MD 8200 f
Drill pipe 5 in capacity 0.0176 bbl/f
Heavy Wall pipe 5 in 0 f
Heavy Wall pipe capacity 0 bbl/f
Capacity B.H.A. 0.0065 bbl/f
Bottom B.H.A. 8 3/4" Bit - 6" Motor 6" MWD 60 f
Capacity open hole x B.H.A. 0.0301 bbl/f
Drilling Fluid density 12.3 ppg
Capacity open hole x drill pipe / HWDP 0.0501 bbl/f
Capacity casing x drill pipe 0.0518 bbl/f
Fracture fluid density at the casing shoe 15 ppg
SIDPP 485 psi
SICP 500 psi
Mud pumps displacement 0.0995 bbl/strk
Slow Circulating Rate Pressure at 25 SPM 430 psi
Pit gain 7 bbl

87
Na:me
Internati onal Wel l Control Forum
Surf ace
(Deviat
BOP ed
)Kill
W Sheet
ell
-API UnitDa
s: te

Cur r ent W
: ell Data
Forma t ion :St
- re ngt h D a t a Mud Da
: ta
Surface
-ofL
Pr
ea
ekssu
:- re (A
) psi Weight 12
.3 ppg

Mud W
:-eight (B
) ppg Gradient ps
/fti

Ma x imu mAllo :-
w a b le Mu d We ig h t
B
() + (A
) = D e v ia :
t ion D a t a
shoeT
rue Vertical
*0.052Depth
(C
) ppg KOP MD
15 4500
ft

Initial M
=AASP KOP TVD4500 ft

C
[)(Current
- M
]xud
Shoe
Weight
0.052
T=VD xEOB MD7100 ft

1003
psi EOB TVD
6137 ft

P ump
.1Di
No splacementP ump
.2Di
No C a s ing:Shoe
splacement D ata

Size 9 /5
8 i nc h

0
.0995 bbl
/s s
trok e bbl trokM
/s s .
Depth
e 8200
ft

T
.V
.Depth 7150
ft

Slow PumpDynamic Pr e
(PL
s)sur e LosHo
s le:-
Data
R ate: D ataPump
.1NO Pump
.2NO Size 8 /4
3 i nc h

25 spm 430 psi psi M


.Depth 15234
ft

spm psi psi T


.V
.Depth 7220
ft

Pre
-Volume
: Data Length Capacity VolumePump str okes T
ime
stks
f .t
bb/
ls
ft bbls minutes
DP
-Surface to KOP 4500
x 0
.0 1 7
=6 79 (L
) 796 stks

DP
- KOP to EOB 2600
x 0
.0 1 7
=6 46 (M) 460 stks

DP
- EOB to BHA 8074
x 0
.0 1 7
=6 142(N
1) 1428 stks

Heavy Wall Drill pipe 0x 0 = 0 (N


2) 0 stks

Drill Collars 60
x 0
.0065
= 0 (N
3) 4 stks

Dr ill Str ing Volume (D


) 267
.5 bbl 2688 stks
107
.52 min
DC x Open Hole 60
x 0
.0301
= 1
.8
DP 6974
/HWDP x Open Holex 0
.0501
= 349
.4
Open Hole Volume (F
) 351
.2 bbl 3530 stks min

DP x Casing 8200
x 0
.0518
=G
() 424
.8bbl 4269 stks min

T
otalAnnuulus Volume (F
+G)=H)
( 776
.0 7798
.6 stks min

T
otal Well System Volume (D
+H)=I)( 1043
.4 bbl 10487stks419min
Active Surface Volume (J
) bbl stks min

T
otalActive Fluid System (I+
J)

88
Kick Data

SIDPP 485 psi SICP 500 psi Pit Gain 7 bbls

SIDPP
Kill Mud Weight Current Mud Weight + = 13.6 ppg
TVD x 0.052
KMW

Initial Circulating
pressure Dynamic Pressure Loss + SIDPP = 915 psi
ICP
Kill Mud Weight
Final Circulating x Dynamic Pressure Loss = 476 psi
Current Mud Weight
pressure
FCP
Dynamic Pressure
KOP
Loss at KOP PL +
[
(FCP - PL) x
TD MD
MD
] = 444 psi

(O )

Remaining SIDPP
at KOP SIDPP - [ ( KMW - OMW ) x 0.052 x KOP TVD ] = 181 psi
(P )

Circulating Pressure
at KOP (O) + ( P) = 625 psi
( KOP CP )
Dynamic Pressure
EOB
Loss at EOB PL +
[
(FCP - PL) x
TD MD
MD
] = 452 psi

(R)
Remaining SIDPP
at EOB SIDPP - [ ( KMW - OMW ) x 0.052 x EOB TVD] = 71 psi
(S )

Circulating Pressure
at EOP (R) + ( S) = 523 psi
(EOB CP )

( T ) X 100
( T ) = ICP - KOP CP
psi
= 36
(L)
psi/100 strokes

( U ) X 100
( U ) = KOP CP - EOB CP
psi
= 22
(M)
psi/100 strokes

( W ) X 100
( W ) = EOB CP - FCP
psi (N1+N2+N3)
= 3
psi/100 strokes

STROKES

89
STROKE PRESSURE STROKES PRESSURE STROKES PRESSURE
S
0 915 796 625 1256 523
100 879 800 625
200 843 900 603 1500 516
300 807 1000 581
400 771 1100 559 2000 501
500 735 1200 537
600 699 1256 523 2688 476
700 663
796 625

The well is killed using the driller’s method.

The pump is started with the original mud weight. Afer 2 minutes the situation is as
follows: -

Drill pipe pressure 990 psi Casing pressure 575 psi

90
SPM 27 Total strokes 50

Qu. 1. What should you do?

A- Increase the choke opening. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

F- Stop the kill, evaluate and discuss what to do next.

Afer 450 stroke the situation is as follows: -

Drill pipe pressure 920 psi Casing pressure 515 psi

SPM 25 Total strokes 450

Qu. 2. What should you do?

A- Increase the choke opening. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

F- Stop the kill, evaluate and discuss what to do next.

Afer 625 strokes the drill pipe pressure suddenly increased without any increase in casing
pressure and the situation is as follows: -

Drill pipe pressure 1420 psi Casing pressure 515 psi

SPM 25 Total strokes 625

91
Qu. 3. What should you do?

A- Increase the choke opening. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Decrease pump rate.

E- Stop the kill, evaluate and discuss what to do next.

Afer 2000 strokes the situation is as follows: -

Drill pipe pressure 1420 psi Casing pressure 520 psi

SPM 25 Total strokes 2000

Qu. 4. What should you do?

A Increase the choke opening. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

F- Stop the kill, evaluate and discuss what to do next.

Afer 3800 strokes the situation is as follows: -

Drill pipe pressure 1420 psi Casing pressure 920 psi

SPM 25 Total strokes 3800

Qu. 5. What should you do?

A- Increase the choke opening. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

92
Afer 4000 strokes the situation is as follows: -

Drill pipe pressure 1300 psi Casing pressure 810 psi

SPM 25 Total strokes 4000

Qu. 6. What should you do?

A- Increase the choke opening. B- Close the choke slightly.

C- Every thing is O.K. continues. D- Increase pump rate.

E- Decrease pump rate.

F- Stop the kill, evaluate and discuss what to do next.

Qu. 7. What is the effect of the previous observation with respect to circulating BHP.

A- BHP Increased.

B- BHP decreased.

C-BHPstays without change.

Afer 7900 strokes the situation is as follows: -

Drill pipe pressure 1420 psi Casing pressure 500 psi

SPM 25 Total strokes 7900

Qu. 8. What do you expect to casing and drill pipe pressures when the pump

stopped and the well shut in?

A- SIDP --------------------------------- psi

B- SICP --------------------------------- psi

93
The 2nd circulation with kill mud started and the stroke counter has been reset as kill mud
reached the top of the drill string.

Qu. 9. What do you expect to the following pressures assuming that the bit is

still partly blocked?

A- ICP @ 25 SPM --------------- psi


B- Initial circulating casing pressure ---------------- psi

C- Final circulating [pressure @ 25 SPM ---------------- psi

Afer having pumped 800 stroke of kill mud inside the drill string,the pump stopped and
the well shut in.

Qu. 10. What do you expect to the following pressures?

A- SIDP --------------------- psi


B- SICP --------------------- psi

Deviated kill sheet ANSWERS

KILL SHEET NO 1 KILL SHEET NO 2

1 C 1 D
2 C 2 C
3 B 3 D

94
4 C 4 A
5 C 5 C

6a 690 6 C

6b 690 7 725 & 725

7 E 8 A
8 A 9 A
9 C 10 C
10 C 11 725 & 1479
11 A 12 E
12 G
13 F

KILL SHEET NO 3 KILL SHEET NO 4

1 E 1 D

2 C 2 E

3 C 3 B

4 C 4 C

5 C 5 D

6 B 6 C

7 B 7a 875

8a 485 7b 875

8b 500 8 C

9a 1420 9a 118

95
9b 500 9b 875

9c 1034 10a 1075

10a 181 10b 875

10b +/- 500

KILL SHEET NO 5

1 D
2 C
3 E
4 C
5 F
6 E
7 A
8 B
9
10 B&A
11 D

96

Potrebbero piacerti anche