Sei sulla pagina 1di 32

Consultancy services for Authority’s Engineer for supervision of four

laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of


NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) in
the State of Telangana under Bharatmala Pariyojna on EPC Mode
Technical Proposal
APPENDIX B-6: FORMAT OF CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF

Proposed Position : Senior Pavement Specialist


Name of Firm : Aarvee Associates Architects Engineers & Consultants
Pvt. Ltd.
Name of Staff : Bala Subramanyam Bandili
Profession : Civil Engineering
Date of Birth : 29th June, 1980
Years with Firm/Entity : 1 year & 10 months Nationality: Indian
Membership of
Professional Societies : -
Address : 8-2-5, Ravula Residency, Srinagar Colony, Hyderabad – 500 082,
Andhra Pradesh
Phone Number : 040 – 23737633

Detailed tasks assigned :


• Continuously interact with the Concessionaire for the review of Highway designs and drawings using
sophisticated computer software and also construction and O&M works.
• Ensure life cycle cost effectiveness and viable design of pavement.
• Ensure appropriate rehabilitation / strengthening of distressed existing two lane pavement.
• Ensure complete adherence to maintenance standards during construction and operation period.
• Understanding of international 'best practices' in the field of Design, Construction and maintenance of
flexible / rigid type of pavements including latest codal stipulations and specifications.

Curriculum Vitae of Mr. Bala Subramanyam Bandili


2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

VIEW CONSULTANT DETAILS

Last Modified Basic Details on: 24/01/2018


Last Accepted Details on: 02/02/2018

BASIC DETAILS

Photo

Name B BALASUBRAMANYAM

DOB 29/06/1980

Mother Name Bhushanamma Bandili

Email bujji.bandili@gmail.com

Current State ANDHRA PRADESH

Current District Sri Potti Sriramulu Nellore District

Current Address Yekollu village, Doravari Satram Mandal & Post, Nellore Dist Pin: 524123

Permanent State ANDHRA PRADESH

Permanent District Sri Potti Sriramulu Nellore District

Permanent Address Yekollu village, Doravari Satram Mandal & Post, Nellore Dist Pin: 524123

PAN Number ALVPB4805E

Passport Number R2819313

Mobile 9494754615

Alternate Mobile 9493546901

Landline Number 9494754615

ID Proof View || Supporting Documents

Knowledge of Modern
Computer Based Method of No
Surveying

QUALIFICATION DETAILS

Topic
Qualification Year Of Certificate Certificate Supporting
Level of the College University/Board Percentage
Level Passing Details Uploaded Documents
Subject

Board of
APSW Res
Secondary
10th Matric School for 1996 80.83 -- View View
Education, Andhra
Boys Kota
Pradesh

BE/B.Tech
/B.Sc.
Sri
(Engineering)/ Sri Venkateswara
Graduate/Degree Venkateswara 2003 58.6 -- View View
AMIE in CIVIL University
University
Engineering or
equivalent

M.Tech/ M E Jawaharlal
Jawaharlal Nehru
in Nehru
Technological
Post Graduate Transportation Technological 2017 68 -- View View
University,
Engineering or University,
Hyderabad
equivalent Hyderabad

http://infracon.nic.in/m_preview7S.asp?kp_id=26380&EncHid=92304.54019 1/5
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India
COMPANIES DETAILS

Number of Projects
Sno Company Name From Year To Year
Completed

1 Madhucon Binapuri 07/05/2002 16/09/2003 1

2 TDM INFRASTRUCTURE PRIVATE LIMITED 17/09/2003 27/04/2006 1

Roughton International in JV with Consulting Engineers


3 05/05/2006 26/07/2007 1
Group Ltd.

4 Span Consultants Private Limited 30/07/2007 10/01/2008 1

Scott Wilson Ltd. UK in JV with Scott Wilson India Pvt.


5 18/01/2008 23/04/2011 1
Ltd.

6 Feedback Infra Private Limited 24/04/2011 15/01/2014 1

7 Simhapuri Expressway Limited 16/01/2014 15/04/2016 1

Aarvee Associates Architects Engineers & Consultants


8 25/04/2016 1
Pvt. Ltd.

DETAILED WORK DETAILS

Project
Completion Supporting
Sno Work Name Client Designation Cost Start Date Country Details
Date Documents
(Cr)

Construction
for
Strengthening
and Widening
to 4 lane of
Tada –
Nayudupeta National
section from Highways
1 Site Engineer 300.00 07/05/2002 16/09/2003 India View View
Km. 54.383 to Authority of
Km. 111.600 India
of length
57.217 kms
on NH-5, in
the state of
Tamil Nadu,
on BOT basis.

ADB Funded
– Western
Transport
Corridor
Project –
Construction
for
Rehabilitation
and
Upgradation
to 4/6 lane of
Chitradurga
National
– Sira
Highways
2 section from Site Engineer 304.00 17/09/2003 27/04/2006 India View View
Authority of
Km. 189.000
India
to Km.
122.300 of
length 66.7
kms on NH-4,
in the state of
Karnataka,
under NHDP
Phase-I,
executed
under FIDIC
Conditions of
Contract.

3 Construction National Field 260.93 05/05/2006 26/07/2007 India View View


Supervision Highways Engineer
for 4 laning of Authority of
Haveri – India
Hubli section
from Km.
340.000 to
Km. 404.000
of length 64
http://infracon.nic.in/m_preview7S.asp?kp_id=26380&EncHid=92304.54019 2/5
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India
kms on NH-4,
in the state of
Karnataka,
under NHDP
Phase-I,
executed
under FIDIC
Conditions of
Contract.

Construction
Supervision
for 4 laning of
P. V.
Narasimha
Rao elevated
expressway
connecting
Hyderabad
Hyderabad
International Field
Urban
4 Airport to Engineer 600.00 30/07/2007 10/01/2008 India View View
Development
Mehadipatnam (Highway)
Authority
from Km.
0.000 to Km.
11.460 of
length 11.460
kms in
Hyderabad, in
the state of
Andhra
Pradesh.

Independent
Engineer
Services for
construction
of 8 lane
Access
Controlled
Expressway as
Outer Ring
Road to
Hyderabad
City of
Hyderabad
Narsingi – Asst.
Growth
5 Kollur section Highway 329.00 18/01/2008 23/04/2011 India View View
Corridor
from Km. Engineer
Limited
0.000 to
12.000 of
length 12
kms, in the
state of
Andhra
Pradesh,
under Phase-
IIA, on BOT
(Annuity)
basis (PPP
Project).

6 Project Simhapuri Highway 1,535.00 24/04/2011 15/01/2014 India View View


Management Expressway Engineer
Consultancy Limited
Services for 6
laning of
Chilakaluripet
– Nellore
section from
Km. 1182.802
to Km.
1366.547 of
length 183.52
kms on NH-5,
in the state of
Andhra
Pradesh,
under NHDP
Phase-V, on
BOT (Toll)
basis through
DBFOT
Pattern (PPP
http://infracon.nic.in/m_preview7S.asp?kp_id=26380&EncHid=92304.54019 3/5
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India
Project) - This
Project was
implemented
using
innovative /
non-
traditional
technology
following
guidelines of
IRC:37-2012.
Innovative
material such
as Recycled
Asphalt
Pavement has
been used in
this Project.

Construction
for 6 laning of
Chilakaluripet
– Nellore
section from
Km. 1182.802
to Km.
1366.547 of
length 183.52
kms on NH-16
(old NH-5), in
the state of
Andhra
Pradesh,
under NHDP
Phase-V, on
BOT (Toll)
basis through National
DBFOT Highways Highway
7 1,535.00 16/01/2014 15/04/2016 India View View
Pattern (PPP Authority of Engineer
Project) - This India
Project was
implemented
using
innovative /
non-
traditional
technology
following
guidelines of
IRC:37-2012.
Innovative
material such
as Recycled
Asphalt
Pavement has
been used in
this Project.

8 Authority’s Ministry of Highway 1,694.00 25/04/2016 30/06/2017 India View View


Engineer for Road Engineer
Supervision of Transport &
2/4 lane of Highways
NH(O) works
of total length
558.8 kms, in
the states of
Andhra
Pradesh and
Telangana, on
EPC mode -
This Project
was
implemented
using
innovative /
non-
traditional
technology
following
guidelines of
IRC:37-2012

http://infracon.nic.in/m_preview7S.asp?kp_id=26380&EncHid=92304.54019 4/5
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India
and
machinery
such as
Sensor Paver.

Construction
Supervision
for
Rehabilitation
and
Upgradation
to 2 lane with
paved
shoulders of
Multai –
Chhindwara
– Seoni
section on
NH-69A and
Narsinghpur
–
Amarawara
– National
Asst.
Chhindwara Highways
9 Highway 1,411.36 03/10/2017 India View View
– Saoner Authority of
Engineer
section on India
NH-26B
including Ring
Road and
connecting
roads in
Chhindwara
Town of total
length 419
kms, in the
states of
Madhya
Pradesh and
Maharashtra,
executed
under FIDIC
Conditions of
Contract.

http://infracon.nic.in/m_preview7S.asp?kp_id=26380&EncHid=92304.54019 5/5
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

Construction for Strengthening and Widening to 4 lane of Tada – Nayudupeta section from Km.
Name of Work
54.383 to Km. 111.600 of length 57.217 kms on NH-5, in the state of Tamil Nadu, on BOT basis.

Country India

State ANDHRA PRADESH

Employer
Madhucon Binapuri
Name

Employer Madhucon Binapuri, Madhucon House, Plot No.1129/A, Road No. 36, Hitec City Road, Jubilee Hills,
Address Hyderabad - 500033

Client National Highways Authority of India

Client Address National Highways Authority of India, G-5 & 6, Sector-10, Dwarka, New Delhi – 110 075, India

Start Date 07/05/2002

Completion
16/09/2003
Date:

Project Cost 300.00

Whether EPC
or PPP or
PPP
Hybrid
Annuity Model

Designation Site Engineer

Fixing of alignment and cross-sections; Monitor the progress of Highway work; Monitor the
Description of
construction work for conformity with the project requirement; Calculate quantities of work done;
Duties
Prepare weekly and monthly progress report.

Nature of
Execution
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

0 KM 57.21 KM 0 KM

Lane Tpye Rigid Lane Tpye Flexi Lane Tpye Rigid

Terrain Tpye

Hill/Mountainous 0 KM Hill/Mountainous 0 KM Hill/Mountainous 0 KM

Plain/ Rolling 0 KM Plain/ Rolling 57.21 KM Plain/ Rolling 0 KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

No No No

Attached
Document

http://infracon.nic.in/k_expDet.asp?dwk_id=146060 1/1
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

ADB Funded – Western Transport Corridor Project – Construction for Rehabilitation and
Upgradation to 4/6 lane of Chitradurga – Sira section from Km. 189.000 to Km. 122.300 of
Name of Work
length 66.7 kms on NH-4, in the state of Karnataka, under NHDP Phase-I, executed under FIDIC
Conditions of Contract.

Country India

State KARNATAKA

Employer
TDM Infrastructure Private Limited
Name

Employer TDM Infrastructure Private Limited, 401/2, Swastic Manandi Arcade, T5, Subedar Chatram Road,
Address Sehadripuram, Bangalore 560020

Client National Highways Authority of India

Client Address National Highways Authority of India, G-5 & 6, Sector-10, Dwarka, New Delhi – 110 075, India

Start Date 17/09/2003

Completion
27/04/2006
Date:

Project Cost 304.00

Whether EPC
or PPP or
EPC
Hybrid
Annuity Model

Designation Site Engineer

He was Site Engineer for the section from Km. 174.000 to Km. 189.000. Fixing of alignment and
cross-sections; Execution of works such as earthwork, embankment, sub-grade, WMM etc., as per
technical specifications and standards of IRC, BIS, MoRT&H etc.; Installation of Hot Mix Plant and
Description of
Aggregate Crushing Plant; Prepare construction methodology and work programme; Record
Duties
measurements of completed works; Prepare bills for payment; Monitor timely completion of
works; Prepare “As-built” drawings; Prepare daily, monthly and quarterly progress reports.
The work included 4/6 laning.

Nature of
Execution
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

0 KM 66.7 KM 0 KM

Lane Tpye Rigid Lane Tpye Flexi Lane Tpye Rigid

Terrain Tpye

Hill/Mountainous 0 KM Hill/Mountainous 0 KM Hill/Mountainous 0 KM

Plain/ Rolling 0 KM Plain/ Rolling 66.7 KM Plain/ Rolling 0 KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

No No No

Attached
http://infracon.nic.in/k_expDet.asp?dwk_id=146063 1/2
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

Construction Supervision for 4 laning of Haveri – Hubli section from Km. 340.000 to Km.
Name of Work 404.000 of length 64 kms on NH-4, in the state of Karnataka, under NHDP Phase-I, executed
under FIDIC Conditions of Contract.

Country India

State KARNATAKA

Employer
Roughton International (JV) Consulting Engineers Group Ltd.
Name

Employer
Roughton International (JV) Consulting Engineers Group Ltd.,
Address

Client National Highways Authority of India

Client Address National Highways Authority of India, G-5 & 6, Sector-10, Dwarka, New Delhi – 110 075, India

Start Date 05/05/2006

Completion
26/07/2007
Date:

Project Cost 260.93

Whether EPC
or PPP or
EPC
Hybrid
Annuity Model

Designation Field Engineer

Supervise setting out of alignment and cross-sections; Supervise execution of works such as
Description of earthwork, embankment, sub-grade, WMM etc., as per technical specifications and standards of
Duties IRC, BIS, MoRT&H etc.; Supervise operation of Hot Mix Plant and Aggregate Crushing Plant;
Review measurements of completed works; Assist in verification of bills for payment.

Nature of
Supervision(EPC)
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

0 KM 64 KM 0 KM

Lane Tpye Rigid Lane Tpye Flexi Lane Tpye Rigid

Terrain Tpye

Hill/Mountainous 0 KM Hill/Mountainous 0 KM Hill/Mountainous 0 KM

Plain/ Rolling 0 KM Plain/ Rolling 64 KM Plain/ Rolling 0 KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

No No No

Attached
Document

http://infracon.nic.in/k_expDet.asp?dwk_id=146069 1/1
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project Bridge Project
Activities

Construction Supervision for 4 laning of P. V. Narasimha Rao elevated expressway connecting


Name of Work Hyderabad International Airport to Mehadipatnam from Km. 0.000 to Km. 11.460 of length
11.460 kms in Hyderabad, in the state of Andhra Pradesh.

Country India

State ANDHRA PRADESH

Employer
Span Consultants Private Limited
Name

Employer Span Consultants Private Limited, SPAN House, 92-C, Gurudwara Road, Madangir, New Delhi -
Address 110062

Client Hyderabad Urban Development Authority

Client Address Hyderabad Urban Development Authority, Tarnaka, Hyderabad, Andhra Pradesh.

Start Date 30/07/2007

Completion
10/01/2008
Date:

Project Cost 600.00

Whether EPC
or PPP or
EPC
Hybrid
Annuity Model

Designation Field Engineer (Highway)

Position Held: Supervisor (Highways) The project also comprised of A Twin Box concrete structure
Underpass of length 62 m to accommodate two lane carriageway in each cell at Aramgarh
Description of Junction towards Chandrayanagutta. Trumpet interchange near the International
Duties Airport.Supervise setting out of alignment and cross-sections. Supervise installation and operation
of Hot Mix Plant and Aggregate Crushing Plant; Review measurements of completed works; Assist
in verification of bills for payment.

Nature of
Supervision(EPC)
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

0 KM 11.46 KM 0 KM

Lane Tpye Rigid Lane Tpye Both Lane Tpye Rigid

Terrain Tpye

Hill/Mountainous 0 KM Hill/Mountainous 0 KM Hill/Mountainous 0 KM

Plain/ Rolling 0 KM Plain/ Rolling 11.46 KM Plain/ Rolling 0 KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

No No No

Number of Bridges

http://infracon.nic.in/k_expDet.asp?dwk_id=146075 1/2
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Greater than 6m Greater than 60m and Greater than Greater than 500m Greater
and Upto 60m Upto 200m 200m and Upto and Upto 1000m than
500m 1000m

0 0 0 0 1

Max. Individual Total Length of


Max. Individual Length
span of Bridge: 65 Bridges: 11460
of Bridges: 11460 Mtr
Mtr Mtr

No. Of Major Bridges with Pile/Well foundation: 0

No. Of Bridges where Rehabilitation and repair work was done: 0

No. Of Bridges Constructed with modern technology i.e Balanced Cantilever method /span by span
method/incremental launching or push out method/progressive placement method/cable stayed
bridge :1

Attached
Document

http://infracon.nic.in/k_expDet.asp?dwk_id=146075 2/2
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

Independent Engineer Services for construction of 8 lane Access Controlled Expressway as Outer
Name of Work Ring Road to Hyderabad City of Narsingi – Kollur section from Km. 0.000 to 12.000 of length 12
kms, in the state of Andhra Pradesh, under Phase-IIA, on BOT (Annuity) basis (PPP Project).

Country India

State ANDHRA PRADESH

Employer
Scott Wilson Ltd., UK (JV) Scott Wilson India Pvt. Ltd.
Name

Employer
Scott Wilson Ltd., UK (JV) Scott Wilson India Pvt. Ltd.
Address

Client Hyderabad Growth Corridor Limited

Client Address Hyderabad Growth Corridor Limited

Start Date 18/01/2008

Completion
23/04/2011
Date:

Project Cost 329.00

Whether EPC
or PPP or
PPP
Hybrid
Annuity Model

Designation Asst. Highway Engineer

Assist for approval of Good for Construction drawings, preparation of plan & profiles and review of
Description of
variation in quantities etc.; Monitor day to day activities at site; Maintain all necessary records
Duties
and data related to the work; Assist in correspondence with Client and Concessionaire.

Nature of
Supervision(PPP)
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

0 KM 0 KM 12 KM

Lane Tpye Rigid Lane Tpye Rigid Lane Tpye Both

Terrain Tpye

Hill/Mountainous 0 KM Hill/Mountainous 0 KM Hill/Mountainous 0 KM

Plain/ Rolling 0 KM Plain/ Rolling 0 KM Plain/ Rolling 12 KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

No No No

Attached
Document

http://infracon.nic.in/k_expDet.asp?dwk_id=146077 1/1
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

Project Management Consultancy Services for 6 laning of Chilakaluripet – Nellore section from
Km. 1182.802 to Km. 1366.547 of length 183.52 kms on NH-5, in the state of Andhra Pradesh,
Name of Work under NHDP Phase-V, on BOT (Toll) basis through DBFOT Pattern (PPP Project) - This Project was
implemented using innovative / non-traditional technology following guidelines of IRC:37-2012.
Innovative material such as Recycled Asphalt Pavement has been used in this Project.

Country India

State ANDHRA PRADESH

Employer
Feedback Infra Private Limited
Name

Employer Feedback Infra Private Limited, 311, 3rd Floor, Vardhaman Plaza, Pocket 7, Plot No. 6, Sector 12,
Address Dwarka, New Dlehi - 110075

Client Simhapuri Expressway Limited

Simhapuri Expressway Limited, Door No. 37-1-406 (4A), IInd Lane, Bhagya Nagar, Ongole,
Client Address
Prakasam - 523001

Start Date 24/04/2011

Completion
15/01/2014
Date:

Project Cost 1,535.00

Whether EPC
or PPP or
PPP
Hybrid
Annuity Model

Designation Highway Engineer

Supervise setting out of alignment and cross-sections; Supervise execution of works such as
earthwork, embankment, sub-grade, WMM etc., as per technical specifications and standards of
IRC, BIS, MoRT&H etc.; Supervise installation of Hot Mix Plant and Aggregate Crushing Plant;
Description of Review construction methodology and work programme; Review measurements of completed
Duties works; Prepare monthly and quarterly progress reports; Ensure timely completion of works;
Review “As-built” drawings; Ensure implementation of works using innovative / non-
traditional technology following guidelines of IRC:37-2012. Innovative material such as Recycled
Asphalt Pavement has been used in this Project.

Nature of
Supervision(PPP)
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

0 KM 0 KM 183.52 KM

Lane Tpye Rigid Lane Tpye Rigid Lane Tpye Both

Terrain Tpye

Hill/Mountainous 0 KM Hill/Mountainous 0 KM Hill/Mountainous 0 KM

Plain/ Rolling 0 KM Plain/ Rolling 0 KM Plain/ Rolling 183.52 KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

http://infracon.nic.in/k_expDet.asp?dwk_id=146079 1/2
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

Construction for 6 laning of Chilakaluripet – Nellore section from Km. 1182.802 to Km.
1366.547 of length 183.52 kms on NH-16 (old NH-5), in the state of Andhra Pradesh, under NHDP
Name of Work Phase-V, on BOT (Toll) basis through DBFOT Pattern (PPP Project) - This Project was implemented
using innovative / non-traditional technology following guidelines of IRC:37-2012. Innovative
material such as Recycled Asphalt Pavement has been used in this Project.

Country India

State ANDHRA PRADESH

Employer
Simhapuri Expressway Limited
Name

Employer Simhapuri Expressway Limited, Door No. 37-1-406 (4A), IInd Lane, bhagya Nagar, Ongole,
Address Prakasam - 523001

Client National Highways Authority of India

Client Address National Highways Authority of India, G-5 & 6, Sector-10, Dwarka, New Delhi – 110 075, India

Start Date 16/01/2014

Completion
15/04/2016
Date:

Project Cost 1,535.00

Whether EPC
or PPP or
PPP
Hybrid
Annuity Model

Designation Highway Engineer

Position Held: Senior Manager (Highway Engineer) Fixing of alignment and cross-sections;
Execution of works such as earthwork, embankment, sub-grade, WMM etc., as per technical
specifications and standards of IRC, BIS, MoRT&H etc.; Installation of Hot Mix Plant and
Description of Aggregate Crushing Plant; Prepare construction methodology and work programme; Record
Duties measurements of completed works; Prepare bills for payment; Monitor timely completion of
works; Prepare “As-built” drawings. Implementation of works using innovative / non-
traditional technology following guidelines of IRC:37-2012. Innovative material such as Recycled
Asphalt Pavement has been used in this project.

Nature of
Execution
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

0 KM 0 KM 183.52 KM

Lane Tpye Rigid Lane Tpye Rigid Lane Tpye Both

Terrain Tpye

Hill/Mountainous 0 KM Hill/Mountainous 0 KM Hill/Mountainous 0 KM

Plain/ Rolling 0 KM Plain/ Rolling 0 KM Plain/ Rolling 183.52 KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

No No No

http://infracon.nic.in/k_expDet.asp?dwk_id=146083 1/2
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

Authority’s Engineer for Supervision of 2/4 lane of NH(O) works of total length 558.8 kms, in
the states of Andhra Pradesh and Telangana, on EPC mode - This Project was implemented using
Name of Work
innovative / non-traditional technology following guidelines of IRC:37-2012 and machinery such
as Sensor Paver.

Country India

State ANDHRA PRADESH,TELANGANA

Employer
Aarvee Associates Architects Engineers and Consultants Pvt. Ltd.
Name

Employer Aarvee Associates Architects Engineers and Consultants Pvt. Ltd., Ravula Residency, Srinagar
Address Colony Main Road, Hyderabad – 500082

Client Ministry of Road Transport & Highways

Client Address Ministry of Road Transport & Highways

Start Date 25/04/2016

Completion
30/06/2017
Date:

Project Cost 1,694.00

Whether EPC
or PPP or
EPC
Hybrid
Annuity Model

Designation Highway Engineer

He was Highway Engineer for Palamaneru – Krishnagiri section from Km. 58.600 to Km.
140.680. Supervise setting out of alignment and cross-sections; Supervise execution of works
such as earthwork, embankment, sub-grade, WMM etc., as per technical specifications and
Description of standards of IRC, BIS, MoRT&H etc.; Supervise installation of Hot Mix Plant and Aggregate
Duties Crushing Plant; Review construction methodology and work programme; Review measurements of
completed works; Approve bills for payment; Ensure timely completion of works; Review and
compile “As-built” drawings; Ensure implementation of works using innovative / non-
traditional technology following guidelines of IRC:37-2012 and machinery such as Sensor Paver.

Nature of
Supervision(EPC)
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

542.08 KM 16.72 KM 0 KM

Lane Tpye Flexi Lane Tpye Flexi Lane Tpye Rigid

Terrain Tpye

Hill/Mountainous 0 KM
Hill/Mountainous 0 KM Hill/Mountainous 0 KM
Plain/ Rolling 542.08
Plain/ Rolling 16.72 KM Plain/ Rolling 0 KM
KM

Did you achieve financial closure of this EIA of Infrastructre of


Arbitration case handled
project project

No No No

http://infracon.nic.in/k_expDet.asp?dwk_id=146087 1/2
2/2/2018 INFRACON, Ministry of Road Transport & consultant_highways, Government of India

Experience Details

Major
Highway Project
Activities

Construction Supervision for Rehabilitation and Upgradation to 2 lane with paved shoulders of
Multai – Chhindwara – Seoni section on NH-69A and Narsinghpur – Amarawara –
Name of Work Chhindwara – Saoner section on NH-26B including Ring Road and connecting roads in
Chhindwara Town of total length 419 kms, in the states of Madhya Pradesh and Maharashtra,
executed under FIDIC Conditions of Contract.

Country India

State MADHYA PRADESH,MAHARASHTRA

Employer
Aarvee Associates Architects Engineers and Consultants Pvt. Ltd.
Name

Employer Aarvee Associates Architects Engineers and Consultants Pvt. Ltd., Ravula Residency, Srinagar
Address Colony Main Road, Hyderabad – 500082

Client National Highways Authority of India

Client Address National Highways Authority of India, G-5 & 6, Sector-10, Dwarka, New Delhi – 110 075, India

Start Date 03/10/2017

Completion
Date:

Project Cost 1,411.36

Whether EPC
or PPP or
EPC
Hybrid
Annuity Model

Designation Asst. Highway Engineer

Supervise setting out of alignment and cross-sections; Supervise execution of works such as
earthwork, embankment, sub-grade, WMM etc., as per technical specifications and standards of
Description of IRC, BIS, MoRT&H etc.; Supervise installation and operation of Hot Mix Plant and Aggregate
Duties Crushing Plant; Assist in review of construction methodology and work programme; Review
measurements of completed works; Assist in approval of bills for payment; Ensure timely
completion of works; Assist in compiling “As-built” drawings.

Nature of
Supervision(EPC)
Assignment

Highway

2 Lane 4 Lane 6 Lane & Above

387 KM 32 KM 0 KM

Lane Tpye Flexi Lane Tpye Flexi Lane Tpye Rigid

Terrain Tpye

Hill/Mountainous 0 KM
Hill/Mountainous 0 KM Hill/Mountainous 0 KM
Plain/ Rolling 387
Plain/ Rolling 32 KM Plain/ Rolling 0 KM
KM

Arbitration case Did you achieve financial closure of this EIA of Infrastructre of
handled project project

No No No

http://infracon.nic.in/k_expDet.asp?dwk_id=146119 1/2
Consultancy services for Authority’s Engineer for supervision of four
laning of NH-161 from Kandi (Design Km 0.000) (Km 498.250 of
NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757) in
the State of Telangana under Bharatmala Pariyojna on EPC Mode
Technical Proposal
Certification by the Candidate:

I, the undersigned, Bala Subramanyam Bandili, 8-2-5, Ravula Residency, Srinagar Colony Main Road,
Hyderabad – 500 082, Telangana, India, undertake that this CV correctly describes myself, my qualifications and
my experience and Employer would be at liberty to debar me if any information given in the CV, in particular the
Summary of Qualification & Experience vis-àvis the requirements as per TOR is found incorrect. I further
undertake that I have neither been debarred by NHAI or any other central/stage government organization nor left
any assignment with the consultants engaged by Employer / contracting firm (firm to be supervised now) for any
continuing work of Employer without completing my assignment. I will be available for the entire duration of the
current project (Consultancy services for Authority’s Engineer for supervision of four laning of NH-161 from
Kandi (Design Km 0.000) (Km 498.250 of NH-65) to Ramsanpalle (Design Km 39.980/Existing Km 44.757)
(Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojna on EPC Mode). If I leave
this assignment in the middle of the work, Employer would be at liberty to debar me from taking any assignment
in any of the Employer works for an appropriate period of time to be decided by the Employer. I have no
objection if my services are extended by the Employer for this work in future.

I further undertake that my CV is being proposed for this project by Aarvee Associates Architects Engineers &
Consultants Pvt. Ltd. and I have not given consent to any other consultant(s) to propose my CV for any
position for this project.

I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to
which consultant’s firm is forced to seek replacement. In such unavoidable circumstances, I shall not
undertake any employment in Employer projects during the period of assignment of this project and Employer
shall consider my CV invalid till such time.

I undertake that I have no objection in uploading/hosting of my credentials by Employer in public domain.

I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date
for submission of proposal) including those for which LOA has been received by the firm and the inputs in
these assignments shall not effect the work of the current assignment.

Name of Assignment Client Date of LOA Likely start Likely end Total input of the
(Month/Year) (Month/Year) person (man-months)
- NIL -

________________________________________________________________Date:___________________
(Signature of Key Personnel) (Day/Month/Year)

Certification by the firm:

The undersigned on behalf of Aarvee Associates Architects Engineers & Consultants Pvt. Ltd., certify that
Shri. Bala Subramanyam Bandili, to the best of our knowledge has neither been debarred by NHAI or any
other Central/State Government organization nor left his assignment with any other consulting firm
engaged by the Employer / Contracting firm (firm to be supervised now) for the ongoing projects. We
understand that if the information about leaving the past assignment is known to the Employer, Employer
would be at liberty to remove the personnel from the present assignment and debar him for an
appropriate period to be decided by the Employer.

________________________________________________________________Date:__________________
[Signature of authorized representative of the Firm] (Day/Month/Year)

Curriculum Vitae of Mr. Bala Subramanyam Bandili


Senior Pavement Specialist (Maximum age limit 65 years on Bid due date)

Marks given by the bidder


in self evaluation
Sr. Max.
Description
No. Points

Bandili Balasubramanyam

Criteria

1 General Qualification 25
I) Graduate in Civil Engineering 21 21
II) Post Graduation in Transportation/Highway Engineering/Pavement engineering or equivalent 4 4
2 Adequacy for the Project 70
Professional Experience

Total Professional Experience of Pavement Design/Construction and Maintenance of


Highways/Roads/Air Field Runway
i) 20 20
< 10 years -0
10 years -15
Add one mark extra for each additional year of experience subject to maximum 5 (five) marks.

Experience in Similar capacity in Construction/Construction Supervision of 2/4/6-laning** of major


Highway Projects (similar configuration (2/4/6 laning**) and above)
ii) 20 20
< 5 years -0
5 years -15
Add one mark extra for each additional year of experience subject to maximum 5 (five) marks.

Experience in similar capacity as Pavement/Geo-technical Engineer in construction/ construction


supervision of Major Highway projects (of length 40% of project length or more of similar
configuration (2/4/6 laning**) and above)
iii) 20 20
< 2 nos -0
2 nos -16
Add 2 marks extra for each additional project subject to maximum 4 marks.

Experience in similar capacity on major Highway projects (of length 40% of project length or more
of similar configuration (2/4/6 laning**) and above) in innovative/non traditional technology and
design
iv) 5 5
1 Project -4
2 or more -5

Experience in similar capacity on PPP Projects (of length 40% of project length or more of similar
configuration (2/4/6 laning**) and above)
v) 5 5
2.5 marks for each project subject to maximum 5 (five) marks

Employment with the Firm

3 < 1 year -0 5 3
1 year -3
Add 0.5 marks for each subsequent year subject to maximum 2 marks

Total 100 98

Note:
(1) Similar Capacity includes the following positions
i) On behalf of Consultant/Contractor: Pavement Specialist/ Pavement Engineer/ Pavement Expert/Highway Engineer
ii) On behalf of Government: Executive Engineer
In case of experience on behalf of Consultant or Contractor, the experience shall be duly endorsed by the respective Government agency. In case of
non-availability of endorsement from Govt. Agency, the experience uploaded on Infracon Portal will be taken into consideration. However, the key
personnel/ bidder will be solely responsible for any fake information/ CV, which may result in debarment.
(2) Only those projects (in numbers) will be considered for evaluation above, where the input of the personnel is not < 6 months

Note: If a key personnel has worked in next lower category to the similar capacity, the marks allotted to key personnel in the category ‘experience in similar capacity’ shall
be reduced to two thirds of marks in this category. This shall be applicable for evaluation of all key personnel.
**Similar projects means 2/4/6 lane as applicable for the project for which RFP is invited. For 2-lane projects experience of 4/6 lane also to be considered with a
multiplication factor of 1.5. Experience of 4/6 lane shall be considered interchangeably for 4/6 laning projects. For 4/6 laning projects, experience of 2 lane will be
considered with a multiplication factor of 0.4.

Potrebbero piacerti anche