TN/ENP/2236
MODIFICATION OF BULK LPG
HANDLING FACILITY
AT JEBEL ALI
_____________________________________________________________________________________________
Dear Sir,
We undertake, if our Tender is accepted, to commence work within days from the date
of being given written instructions to proceed and to complete the whole of the works comprised
in the Contract within calendar days calculated from the date of commencement.
We agree to abide by this Tender for a period of 120 days from the date fixed for receiving the
same, and it shall remain binding upon us and may be accepted at any time before the
expiration of that period.
Unless and until a formal Agreement is prepared and executed, this Tender together with your
written acceptance thereof, shall constitute a binding Contract between both the parties.
We understand that you are not bound to accept the lowest or any Tender you may receive, nor
will you be responsible for, or pay for, expenses or losses which may have been incurred by us
in preparation of this Tender.
Yours faithfully,
* Within 7 days from the date of award of Contract but before start of Works at site.
Successful Contractor to replace Bid Bond with Performance Bond.
The Corporation reserves the right to delete any part of the work contained in this Cost
Breakdown at any stage and adjust the price accordingly. The price in the list shall include one-
year warranty period.
The tenderer is to detail any additional items (with quantities and rates), not included in the cost
breakdown form and necessary for the successful completion of the whole job. Should be
Contractor fail to insert any items, it will be deemed that his lump sum price for the tender
includes all items and no claim for any additional items will be entertained.
Kerbing Work
L.m …………..
G Carry out heel kerbing Work in evaporation
bond area , Apply traffic edge (yellow) lanes
along the edges of kerbing, directional arrows
and yellow/ black paint on the kerbing as
traffic warning sign all as shown on the
drawing and as specified (Refer to
drw.No.195/LPG /00/S01)
M Demolition Work
Carry out, all civil work required for the
demolition work in office electrical room 1 Item …………..
including but not limited to remove the
existing window and closing the opening with
block wall to match the existing finish, remove
the existing AC (to be delivered to Emarat
CWS) and installing a decorative wall
mounted split unit (condensing unit to be
installed on the roof ) all as shown on the
drawing and as specified
plain concrete
A Blinding 50 mm thick ,Grade: 20 N/mm2 m3 …………...
m3
B Blinding 100 mm thick ,Grade: 20 N/mm2 for …………...
New 150 M.T. Propane tank foundation
m3 …………...
D Tie beams GB1 (200mm (L) x 450 mm (D))
with Non – shrinkable 25 mm thk. Grout
E Columns (C1) (400mm x 400mm) m3 …………...
Block wall
O 100 mm block work wall all around the m2 …………...
foundation
3.8 3” liquid return line with back pressure control LS Item …………...
valve from propane pumps discharge header to
4” liquid return header.
3.12 3” liquid return line with back pressure control LS Item …………...
valve from LPG pumps discharge header to 4”
liquid return header.
3.23 3” liquid return line with back pressure control LS Item …………...
valve from LPG pumps discharge header to 4”
liquid return header.
3.25 Fire water sprinkler system for new propane LS Item …………...
storage Tank with civil/structural supports and
hook up with existing system
3.26 Fire water sprinkler system for new pump LS Item …………...
house & extended shelter for new LPG
compressor
3.28 Supply of 2 nos CO2 & 2 NOS Dry Powder LS Item …………...
extinguishers (10 lb each)
4. ELECTRICAL WORKS
5.1 Allow for submitting three sets of “As built Item …………...
drawings” to Emarat (both native files in CD
and hard copies) and O& M Manuals
Item
5.2 Construction of Manholes for UG cabling …………...
system as per conduit layout.
Item
5.3 Supply and installation of 100 mm Dia …………...
conduits
Item
5.4 Supply and installation of 50 mm Dia conduits …………...
TOTAL COST
(TO BE CARRIED TO FORM OF TENDER)
* ADDITIONAL ITEMS: The Tenderer is to detail here any additional item (with quantities and
rates), and not previously included to complete the build-up of the Lump Sum Tender Price for
this section of the Works, necessary for the successful completion of the Tender. Should the
Contractor fail to insert any items here, it will be deemed that his Lump Sum Price for the
Tender includes all items and no claim for any additional items will be entertained.
Rates to include supply of all labor, supervision, plant, equipment, transport, materials, consumables, overheads,
profit etc. For details of each item refer to relevant drawings and specifications. (As per Instruction to Tender
Pricing and Schedule of Rates).
These rates shall be used to calculate () variations. The rates not included in this schedule shall be worked out in
the light of rates mentioned in the schedule.
1. Materials:
1.1 Grit blasting to SA 2.5, prime and apply 3 coats of paint on m2 ………….
pipes and structurals as per specifications.
1.2 Supply and Laying of running length of 6" N.B., Schedule 80, m ………….
pipeline on supports including cutting, beveling and welding.
1.3 Ditto but 4" NB pipeline ditto m ………….
1.4 Ditto but 3" NB pipeline ditto m ………….
1.5 Ditto but 2" NB ditto m ………….
1.7 Installation only of 6" valve in flanged pipeline including No. ………….
supply of all new bolts, nuts, washers, gaskets, etc
1.8 Ditto but 4" NB valve ditto No. ………….
1.17 Supply and installation of blind Flange 6” #300 A 105 as per No. ………….
Specification complete with cadmium plated fasteners and
gasket
1.18 Supply and installation of blind Flange 4” #300 A 105 as per No. ………….
Specification complete with cadmium plated fasteners and
gasket
1.19 Supply and installation of blind Flange 3” #300 A 105 as per No. ………….
Specification complete with cadmium plated fasteners and
gasket
1.20 Supply and installation of blind Flange 2” #300 A 105 as per No. ………….
Specification complete with cadmium plated fasteners and
gasket
1.21 Welding only of 6" NB Flange, Bend/Elbow, Tee, Reducer etc. Per Joint ………….
to Schedule 40 Pipeline. (Rate to be per joint, which will be
calculated: 1 for Flange, 2 for Bend, 3 for Tee) including edge
preparation and fit-up of the joint
1.26 Supply of 4” Ball valves as per standard of materials as per No. ………….
Specification
1.27 Supply of 3” Ball valves as per standard of materials as per No. ………….
Specification
1.28 Supply of 2” ball valves as per standard of materials as per No. ………….
Specification
1.29 Supply of 1” ball valves as per standard of materials as per No. ………….
Specification
1.30 Supply of 4” NB Non Return valve as per standard as per No. ………….
Specification
1.31 Supply of 3” NB Non Return valve as per standard as per No. ………….
Specification
1.33 Supply and installation of 3” Emergency Shut Down Valve No. ………….
1.34 Supply and installation of 2” Emergency Shut Down Valve No. ………….
1.35 Supply of 2x 18W Fluorescent LED GRP explosion proof light no ………….
fitting with mounting accessories.
1.36 Supply of 100 W LED explosion proof flood light fitting with no ………….
mounting accessories.
1.37 Supply of 150 W LED explosion proof flood light fitting with no
mounting accessories.
1.43 Supply and install 32A, 4pole isolator (EEx e/d rated) no ………….
1.44 Supply and install 6A, 2 Pole isolator for lighting circuit (EEx No. ………….
e/d rated)
1.45 Supply and install GI conduit with bends and mounting m ………….
accessories for routing cables above ground
1.46 Supply & installation of ENP spray nozzles (Brass Material) No. ………….
3.3 Chipping Gun pneumatically driven complete with attachment Per Hour ………….
3.4 Welding set, diesel/petrol driven including welding cable, Per Hour ………….
tools, electrodes, etc.
3.5 Gas cutting equipment including tools, cutting torch, etc. Per Hour ………….
Rates stated herein above shall be the rates used in arriving at Cost Breakdown given in the Appendix 2
to Form of Tender.
Date: Signature:
Name:
Designation:
Name of Firm :
Address :
Telephone No. Fax No.