Sei sulla pagina 1di 2

Pipeline Headquarters, PO.

Udayan Vihar
f| sfriTEfeqrfdft2s
YI
Guwahati-781 1 7'1, Assam, lndia
qr{rdrfl 5@flq'r.T,
glth' : TE{l;l t{6R
1 71, er{IEI,
qrcl
Iqr6ra-zat
Td / (tr{Itt : 0361 - 26576 1 8, 2643725, 26401 45
Fax : 036'1- 2643686
Conquering Newer Horizons E-mail / { i-d : oil-pipeline@oilindia.in
0s.04.2018
riEsie/ Ref No. : PL-P&c/10-2(c)/2018/013 ffiiq. i Date

To
Prof. Nani GoPal Das
Co-ordinator
Summer Training Programme
Trident AcademY Of TechnologY
Bhubaneswar'751024

Sub: Summer Training

STUDENTSNAME:Ms.UpasanaDas(CodeST02)&Mr.RiturajBhuyan(ST03)
4"d Semester.
Teiecommunication Engineeri g
;f,;;r;;i;;t
students of B.rech.

Dear Sir,
students of your lnstitution
pleased to inform you that the above
with reference to the above, we are & Telecommunication
can be accommoout.J-roi 15 days
su**t' Training on ElectronicsOIL INDIA LIMITED'
Engineering fro.n 0i.00.2018 to
15.06;0it at Pipeline Headquarters'
Guwahati, Assam.

be governed by the following terms


& conditions:
However, the training/project work
will
transportation' fooding
a) The students will be required to-arrange their. own accommodation '
etc. and .;i;;;J *iiL U. paid during training/project work' to the students after
b) ""
oil India t-imited will be uno., nolui[;ii;;
any employment
tJprouio.
-/
completion of training/project work' the time
way' if any accident occurs during
c) oil India Limited is aLso not responsiule in any
companv as applicable'
to rouow au rules & regulations orthe
d) ifllXf.-JiJl;liilllli;ired
carry two nos.of recent purrfon size photograph at the time of^
e) The students should
rePorting.
0studentsarerequestedtoreportatollofficeatT,30AMpositively.
the student.
will be useful in the future endeavors of
We hope, the training/project work

With kind regards.


Yours faithfullY,
otL INDIA LIMIT

C.M.Borah
GM (P&C) PL
(PL-Services)
For Chief General Manager

An ISO 900l,ISO 14001 & OHSAS 18001 Certified Department


Mat. Code :91-77-4499
P.O. No. 7003309/GSS
Pipeline Headquarters, PO. Udayan Vihar
BfiTd €leqr fdFl}g Guwahati-781 1 71, Assam, lndia
( qrffr{(fiRisTqmruw) qrEqf,rfl 5@lCIzT, srm : s(crq fu6n
Oil lndio limited {qrorf-zg t 1 71, 3r{[EI,
gr{fl
(A Government of lndia Enterprise) Tel / ({r{I{ : 0361 - 26576 18, 26437 25, 26401 45
Fax . 0361 - 2643686
Conquering Newer Horizons E-mail /{ t-d : oil-pipeline@oilindia.in
05.04.2018
PL-P&c/l 0-2(C)/20 1 8/0 13 fu{iq. i Date
€q{e/ Ref. No. :

To
Prof. Nani GoPal Das
Co-ordinator
Summer Training Programme
Trident AcademY Of TechnologY
Bhubaneswar'751024

Sub: Summer Training

STUDENTSNAME:Ms.UpasanaDas(CodeSry2)&Mr.RiturajBhuyan(ST03)
Engineering
Semester. ;[;;r;;i;s & Teiecommunication
Students of B.Tech.4"d

Dear Sir,
of your Institution
to inform you that the above students
with reference to the above, we are pleased Training on Electronics & Telecommunication
can be accommodated for 15 days sur*.,at Pipelin--e Headquarters' oIL INDIA LIMITED'
Engineering r.o* or.oo.zors to
15.06:;iii8
Guwahati, Assam'

will be governed by the following terms


& conditions:
However, the training/project work

be required to.arrange their own


accommodation ' transportation' fooding
a) The students will
etc. and tti;;;J *iir ut paid during training/project work' to the students after
b) ""
oil tndia r-imiteo wil be ,rno.. noliii;;ii;; to"provide any employment
-/
completion of training/project work' the time
way, if any accident occurs during
c) oil India Limited is also not responsiute in any
companv as applic.able'
to rouow au rules & regulations orthe
d) +i:l',:T"YiJllfffllli;ired
carry two nos.of recent passport size photograph at the time of^
e) The students should
rePorting.
0studentsarerequestedtoreportatoll-officeatT.30AMpositively'
be useful in the future endeavors
of the student'
we hope, the training/project work will

With kind regards.


Yours faithfullY,
OIL INDIA LIMIT

C.M.Borah
GM (P&C) PL

An ISO 9001.ISO 14001 & OHSAS 18001 Certified Department


Mat. Code :91-77-4499
P.O. No. 7003309/GSS

Potrebbero piacerti anche