WORKINGHOURS
DATE TRAVELINGHOURS SITE NAME DEVICE PROPLEM ACTION TAKEN Colleague Ability(%)
FROM TO
2/7/2018 10:00AM 3:00PM 45minutes Cairo Mammography Image transfer to CDand Tomography study. Overview on the Mammography Eng.Ahmed
3/7/2018 11:00AM 3:00PM 45minutes Cairo FCR console Prima Poor Image Quality on the Monitor Overview and explanation on image quality Adjustment. Eng Ahmed
4/7/2018 9:30AM 03:00PM 35 minutes Head Office Printer --- Overview Theory of Printers (Drypix 4000 and 6000). Eng. Ayman
5/7/2018 9:40PM 03:00PM 34 minutes Head Office Readers --- Overview Theory of Readers(Prima T, Prima T2 and Capsula) Eng. Ayman
The Gear in the first stages of the conveyor unit was made
8/7/2018 11:30AM 3:00PM 34 minutes Tanta Drypix 6000 Printer Continual Film Jam in Conveyor Unit Eng. Ayman
loose to allow free film movement.
Preventive Maintenance (PM) and IP lock system in Preventive Maintenance was done, ( Erasure unit cleaned, IP
9/7/2018 10:00AM 3:00PM 1:45 Minutes Karf El-Shaikh Capsula XLII Eng. Ayman
the Cassettes were damaged cleaning Rollers were cleaned ). Cassette lock system replaced
Preventive Maintenance (PM). Error codes while Preventive Maintenance was done (Cleaning of the Erasure unit)
10/7/2018 9:00AM 4:00PM 3 Hours Mansoura Reader Prima T Eng. Shawki
reading the IP. . Suction cup arm gear was replaced
Console advance and Step by Step guide was done on how to install windows and
11/7/2018 10:30AM 3:00PM --- Hotel Reader software --- console advance software. Also step by step guide was done Eng. Ayman
Installation. on how to install Reader software.