DISPOSED 0
ON-GOING 2
NOT YET STARTED 7
CANCELLED 2
TOTAL NON-FUNCTIONAL 27
NON-FUNCTIONAL EQUIPMENTS
DONE 2017-08-03
DONE 2017-09-04
DONE 2017-10-21
DONE 2017-08-31
NOT YET STARTED
DONE 2017-11-23
DONE 2017-11-16
DONE 2017-08-31
DONE 2017-08-18
NOT YET STARTED
ON-GOING
REPAIR SHAFT DONE 2017-07-13
42ND NON-FUNCTIONAL EQUIPMENT ACTIVITY PLAN AND PROGRESS
Approved by
Y. Inaba
PLAN
WIRE DRAWING
ACTUAL
PLAN
HOPPER DRYER
ACTUAL
PLAN
CRUSHER
ACTUAL
PLAN
STRANDING
ACTUAL
PLAN
COILING MACHINE
ACTUAL
PLAN
DIE CAST M/C
ACTUAL
PLAN
MTC
ACTUAL
PLAN
5.5 PPM
ACTUAL
PLAN
CHILLER
ACTUAL
PLAN
CONVEYOR
ACTUAL
GRESS
Approved by Approved by
PLAN
2 HOPPER DRYER CDE-0908 FUNCTIONAL
ACTUAL
CRUSHER PLAN
3
(CR-20) CDE-0945 FUNCTIONAL
ACTUAL
CRUSHER PLAN
4
(CR-19) CDE-0694 FUNCTIONAL
ACTUAL
CRUSHER PLAN
5
(CR-05) CDE-0680
ACTUAL
CRUSHER PLAN
6 CDE-0681 FUNCTIONAL
ACTUAL
CRUSHER PLAN
7 CDE-0683 FUNCTIONAL
ACTUAL
STRANDING PLAN
8 CDE-0226 ON-GOING
(ST-199) ACTUAL
STRANDING PLAN
9 CDE-0221 FUNCTIONAL
(ST-194) ACTUAL
STRANDING PLAN
10 CDE-0222 ON-GOING
(ST-195) ACTUAL
STRANDING PLAN
11 CDE-0219 FUNCTIONAL
(ST-192) ACTUAL
STRANDING PLAN
12 CDE-0047 FUNCTIONAL
(ST-20) ACTUAL
COILING PLAN
13
MACHINE CDE-0310 FUNCTIONAL
ACTUAL
PLAN
16 MTC CDE-0648 FUNCTIONAL
ACTUAL
PLAN
17 MTC CDE-0633 FUNCTIONAL
ACTUAL
PLAN
18 5.5 TONS PPM CDE-0280 FUNCTIONAL
ACTUAL
PLAN
19 CHILLER CDE-0738
ACTUAL
INJECTION PLAN
22
MACHINE CDE-0664 FOR DISPOSAL
ACTUAL
INJECTION PLAN
23
MACHINE CDE-0662
ACTUAL
24
DIES REPAIR CDE-0247
PLAN
FUNCTIONAL
MACHINE
ACTUAL
REMARKS
DONE(2017-10-21)
DONE(2017-07-10)
DONE(2017-07-05)
DONE(2017-07-11)
DONE(2017-07-31)
DONE(2017-11-22)
OVERHAUL ON-GOING;
DONE(2017-08-31)
DONE(2017-07-13)
DONE(2017-08-03)
DONE(2017-09-04)
DONE(2017-06-30)
DONE(2017-08-23)
DONE(2017-10-13)
DONE(2017-08-31)
FOR CHECK UP
DONE(2017-11-16)
DONE(2017-11-23)
HEATER DAMAGE
PLC PROBLEM
REVISED PLAN FO
NEW TARGET
TARGET DATE OF COMPLETION 2017-08-18
2017-09-14
PLAN
MOTOR PUMP INSTALLATION
ACTUAL
PLAN
FEEDING OIL PIPING INSTALLATION
ACTUAL
PLAN
WATER PIPING INSTALLATION
ACTUAL
PLAN
HEAT EXCHANGER INSTALLATION
ACTUAL
PLAN
OVERHAULING
SHAFTING
(BEARING SET) ACTUAL
PLAN
DRAWING OIL SPRINKLER FABRICATION
DRAWING OIL SPRINKLER FABRICATION
ACTUAL
PLAN
CAPSTAN PURCHASE
ACTUAL
PLAN
CLUTCH PURCHASE
ACTUAL
PLAN
CROWN FABRICATION
ACTUAL
PLAN
PULLEY FABRICATION
ACTUAL
MECHANICAL
PLAN
BELTS PURCHASE
ACTUAL
PLAN
PULLEYS FABRICATION
ACTUAL
PLAN
DRIVER TRAVERSE MOTOR PURCHASE
ACTUAL
PLAN
MACHINE WIRING INSTALLATION
ACTUAL
PLAN
SENSORS INSTALLATION
ACTUAL
AUTOMATION
PLC PLAN
PROGRAMMING
PROGRAMMING
ACTUAL
HMI PLAN
PROGRAMMING
PROGRAMMING
ACTUAL
PLAN
BOBBIN HOLDER FABRICATION
ACTUAL
PLAN
PULLEY FABRICATION
ACTUAL
PLAN
IQ / OQ
ACTUAL
PLAN
PQ
PQ
ACTUAL
EVISED PLAN FOR WIRE DRAWING # 10 (HM2OV TYPE)
NEW TARGET
Approved by Approved by Checked by Prepared by
Y. Inaba Arnold Malingin Kenneth Jumadla / Iven Aberion Jose Melier Singson
SEPTEMBER
STATUS REMARKS
6 7 8 11 12 13 14 15 16
DONE 2017-06-26
DONE 2017-08-08
DONE 2017-08-08
DONE 2017-06-15
DONE 2017-05-29
DONE 2017-05-23
DONE 2017-07-13
DONE 2017-07-13
OK *CLUTCH IS AVAILABLE
DONE 2017-07-13
DONE 2017-07-13
DONE 2017-07-13
OK *MOTOR IS AVAILABLE
DONE 2017-07-17
DONE 2017-07-28
DONE 2017-07-31
DONE 2017-06-19
DONE 2017-09-01
DONE 2017-09-01
DONE 2017-07-13
OK *HOLDER IS AVAILABLE
OK *PULLEY IS AVAILABLE
ON-GOING
REVISED PLAN FOR WIRE STRANDING #199
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
FEEDING
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
DRAWING
DRAWING
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
MECHANICAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
DRIVER
ACTUAL
PLAN
ACTUAL
ELECTRICAL
DRIVER
ELECTRICAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
AUTOMATION
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
OUTPUT
ACTUAL
PLAN
ACTUAL
WIRE STRANDING #199
Y. Inaba Arnold Malingin Kenneth Jumadla / Iven Aberion Jose Melier Singson
OCTOBER
STATUS REMARKS
18 19 20 21 23 24 25 26 27 28 30