Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation for material received as per the above said packing list(s) and delivery note are
as below .
1. During materials receiving NSH QC was observed the cable trays Damage during the transportation.
2. Delivery note : 878881047
3. Receiving date : 18/06/2016
4.Quantity of damage : 04 Number Damage.
Please clarify:
Name : Signature :
RATION
T (#EPC-9)
Date:21/06/16
Report no:0001
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation for material received as per the above said packing list(s) and delivery note are
as below .
1. During materials receiving NSH QC was observed the cable trays Damage, Bends & Dents and cannot
confirm label during the transportation.
2. Delivery note : 878891710
3. Receiving date : 18/06/2016
4.Quantity of damage : 06 Number Damage,02 Number Bends and Dents, And 26 Number with
no label
Please clarify:
Name : Signature :
RATION
T (#EPC-9)
Date:21/06/16
Report no:0002
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation for material received as per the above said packing list(s) and delivery note are
as below .
1. During material receiving, NSH QC observed that handrails delivered for LP Flare do not have end cove
as required by Aramco Standard, 12-SAMSS-007
2. Delivery Note : 156215
3. SKEC PO No. : 12170D-PO-ME-ME700-01 Rev.01
4. Receiving Date : 04/ 08/ 2016
5. Quantity Affected : 99 pcs
Please clarify:
Name : Signature :
RATION
T (#EPC-9)
Date:08/08/16
Report no:0003
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
DR NO: Site Equipment Inspection of Canting Winch for HP and Acid Gas
Flare Area.
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0007
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0011
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0012
de )
the fuel gas piping flange face ( 1/2"
mperfection ( pls. see attached photos ).
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
DR NO: Site Equipment Inspection of Riser for Acid Gas Flare Spare
Trunk 03 ( R-321/2-2 )
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0016
de )
the fuel gas piping flange face ( 1/2"
imperfection ( pls. see attached photos ).
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0017
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0018
de )
the ignition gas piping flange face ( 1"
mperfection ( pls. see attached photos ).
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation on Riser pipe main flange & ignition gas piping flange ( top side )
1. During flange face serration Inspection, NSH QC observed that the main flange face ( 48" flange ) &
ignition gas piping ( 1" - 1 no. )- top side of riser pipe were found with imperfection exceeding allowable
tolerance ( pls. see attached photos ).
2. Shipment no. : JZR & TP - RISER - 048 ( 02 ) 03 of 017
3. SK EC PO no. : 12170D-PO-ME-ME700-01
4. Receiving Date : 10 March. 2017
5. Qty. Affected : 2 nos.
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:00
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation on Riser pipe ignition gas piping flange ( Bottom side )
1. During flange face serration Inspection, NSH QC observed that the ignition gas piping flange face ( 1"
Flange N11c/3 - bottom side of riser pipe ) was found with surface imperfection ( pls. see attached pho
).
2. Shipment no. : JZR & TP - RISER - 021
3. SK EC PO no. : 12170D-PO-ME-ME700-01
4. Receiving Date : 19 Jan. 2017
5. Qty. Affected : 1 no.
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0022
ottom side )
the ignition gas piping flange face ( 1"
ce imperfection ( pls. see attached photos
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation on Riser pipe ignition gas piping flange ( Top side )
1. During flange face serration Inspection, NSH QC observed that the ignition gas piping flange face ( 1"
Flange N10b/4 - Top side of riser pipe ) was found with surface imperfection ( pls. see attached photos )
2. Shipment no. : JZR & TP - RISER - 048 (02) 014 of 017
3. SK EC PO no. : 12170D-PO-ME-ME700-01
4. Receiving Date : 10 March. 2017
5. Qty. Affected : 1 no.
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0023
op side )
the ignition gas piping flange face ( 1"
mperfection ( pls. see attached photos ).
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0025
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0028
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0037
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0038
nection )
the Pipe spool connection flange face
olerance ( pls. see attached photos ).
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0039
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation on Riser pipe steam piping flange ( Pipe spool connection )
1. During flange face serration Inspection, NSH QC observed that the main flange face ( 8" flange - Pipe
spool connection of riser pipe ) was found with imperfection exceeding allowable tolerance ( pls. see
attached photos ).
2. Shipment no. : JZR & TP - RISER - 048(02) 001 of 017
3. SK EC PO no. : 12170D-PO-ME-ME700-01
4. Receiving Date : 09 March 2017
5. Qty. Affected : 1 no.
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0040
ool connection )
the main flange face ( 8" flange - Pipe
eding allowable tolerance ( pls. see
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Subject : Observation on Riser pipe steam piping flange ( Pipe spool connection )
1. During Site Inspection, NSH QC observed that the Roller of riser pipe was found ( pls. see attached
photos ).
2. Shipment no. : JZR & TP - RISER - 048(02) 001 of 017
3. SK EC PO no. : 12170D-PO-ME-ME700-01
4. Receiving Date : 09 March 2017
5. Qty. Affected : 1 no.
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:00
ool connection )
r pipe was found ( pls. see attached
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
DR NO: Site Equipment Inspection of Riser for Acid Flare Spare Trunk
01 ( R-321/1 )
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0042
nection )
the main flange face ( 56" dia. flange -
on and unacceptable imperfection ( pls.
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0043
nection )
the main flange face ( 72.5" dia. flange -
exceeding allowable tolerance ( pls. see
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0044
nection )
the main flange face ( 72.5" dia. flange -
exceeding allowable tolerance ( pls. see
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0045
nection )
bly of riser pipe were found out with
.
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0046
nection )
bly of riser pipe were found out with
.
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:0047
nection )
bly of riser pipe were found out with
.
servation.
Date :
Date :
Date :
Date :
NASSER S. AL-HAJRI CORPORATION
JAZAN REFINERY TERMINAL PROJECT (#EPC-9)
DISCREPANCY REPORT
Please clarify: What further action needed regarding the said observation.
Name : Signature :
RATION
(#EPC-9)
Report no:00
servation.
Date :
Date :
Date :
Date :