1 Grid
Frequency
Installed Capacity during 12th and 13th Plans (in MW)
Plan-Wise Generation Addition (Region - Wise)
Up to July Balance in XII Addition in Total (End of
2014 Plan XIII Plan XIII Plan)
(Actual) (B) (C) (D = A+B+C)
(A)
NR 64387 20929 16890 102206
WR 91847 36709 20262 148818
SR 57232 38650 23076 118958
ER 33881 12738 31195 77813
NER 2910 3511 8202 14623
Bhutan 1416 3066 2120 6602
Total 251673 115603 101745 469020
200000
200000
180000
150000
Rs. in Crs.
Private
State
100000
Central
69458
57080 Total
50000
0
X Plan XI Plan XII Plan (Proposed) XII Plan (Estimated)
Evolving Voltage Landscape
Bishwanath Bishwanath
Delhi Chariali Delhi Chariali
Agra Agra
Jaipur Jaipur
Gwalior Gwalior
Ahmadabad Ahmadabad
Mumbai Mumbai
Hyderabad Hyderabad
Thiruvananthapuram Thiruvananthapuram
ONE
Nation
Grid 5
Frequency
National Grid – Present and Envisaged
Existing
Present IR Capacity: 40,650 MW
NR
17,930MW
16,920MW 1,260MW NER
8,720MW 14,230MW
6,490MW
WR ER
12,790MW
5,720MW
3,630MW
5,820MW 3,630MW IR Power Transfer Capacity 68050
(at the end of Plan period)
SR 28000
14100
5100
Picture does not include various 132kV 2002 2007 2012 2017
lines aggregating 600 MW of IR capacity
ONE
Nation
Grid 6
Frequency
Major Transmission works
Cluster of
Concentrated
Demand
pockets
Cluster of
Generation
pockets
Other ISTS Transmission Schemes
Approved
Transmission Lines
HVDC – 1750 ckm
765 kV – 9000 ckm
400 kV – 7050 ckm
220 kV - 500 ckm
132 kV -270 ckm
Other ISTS Transmission Schemes
Approved
Substations
HVDC – 2 nos
765 kV – 8 nos.
400 kV – 8 nos.
220 kV - 1 no.
Northern Region:
o Singrauli – Anpara 400 kV S/c line
o Meerut – Muzaffarnagar 400 kV S/c line
o Ballabagarh – Badarpur 220 kV S/c line
Southern Region:
o Kolar – Hosur 400 kV D/c line
o Kaiga – Guttur 400 kV D/c line
Eastern Region:
o Maithon RB – Maithon 400 kV D/c line
o Maithon – Raghunathpur 400 kV line
o Jeypore – Jayanagar 220 kV D/c line
• Control infrastructure
One NationTotal
One transmission
Grid investment requirement in Deserts : Rs 4,50,000 Cr
Transmission requirement for Solar UMPPs
• MNRE has also formulated accelerated solar scale up targets of 100GW by 2022
• Line – 2600 ckt km, Transformation Capacity : 18,000 MA, New S/s- 6 nos.
Future Business Potential in RE
• Control infrastructure