Alcatel BSS

DC Indoor Evolution A9100 BTS

Installation manual

3BK 17226 0001 RJZZA Ed.07


BLANK PAGE BREAK

Status RELEASED

Short title INS


All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization from Alcatel/Evolium.

2 / 62 3BK 17226 0001 RJZZA Ed.07


Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.1 Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.1 Rack Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.2 Weight and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.2 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.3 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.6 Operating Principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.7 Time Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.8 Information Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2 Preliminary Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
2.1 Before Leaving for the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.2 Before Starting (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
3 Installing the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3.1 Rack Transportation on Final Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
3.2 Rack Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
3.3 Reversing the Rack Door (If Necessary On Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
3.4 Positioning the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
3.5 OPTION: Fixing on Concrete Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
3.5.1 Drilling the Concrete Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
3.5.2 Fixing to the Concrete Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
3.6 OPTION : Fixing to the Raised Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
3.6.1 Drilling the Raised Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
3.6.2 Fixing to the Raised Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
3.7 OPTION : Fixing to the Wall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
3.7.1 Wall Drilling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
3.7.2 Fixing to the Wall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
3.8 Preparing the Site Cable Tray and the Metal Sheath . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
4 Installing the Power Supply Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
4.1 General Cabling View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
4.2 Installing the Cables in the Cable Tray . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
4.3 Protective Earth Cable Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
4.4 Rack Side Power Cable Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
4.5 Site Side Power Cable Connections (48 V) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
4.6 Power Supply Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
5 Installing the PCM Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
5.1 Installing Cable in Cable Tray . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
5.2 Rack Side Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
5.2.1 Prepare the PCM Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
5.2.2 Connect the Cables to the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
5.2.3 L907/ 4 120 - Ohm Cable (Alcatel Kits) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
5.2.4 FLEX3 / 4 - 75 Ohm Coaxial Cable (Alcatel Kits) . . . . . . . . . . . . . . . . . . . . . . . . . . 40
6 Installing the Antenna Jumpers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
6.1 Antenna General Scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
6.2 Connection to the Feeder Terminaton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
6.3 Connection to the BTS Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
7 Installing the Alarm Cables (Options) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
7.1 Installing the Cables (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
7.2 Rack Side Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

3BK 17226 0001 RJZZA Ed.07 3 / 62


Contents

8 Installing the Synchronization Cables (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49


8.1 Configuration of Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
8.2 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
9 Finishing Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
9.1 Finishing Installation of the Metallic Sheath . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
9.2 Finishing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Appendix A : Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Appendix B : List of Kits and Consumable Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Appendix C : List of Documents and Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

4 / 62 3BK 17226 0001 RJZZA Ed.07


Preface

Preface
Purpose This document describes how to Install on site an Evolium® DC indoor A9100
BTS of the ALCATEL BSS.

Audience This document is intended for:

Installers

Site administrators
Supervisors

Project managers

Field service technicians

Occasional users.

Assumed Knowledge You must have a basic understanding of the following:

Basic knowledge of Alcatel BSS equipment

Experience of electrical installation and wiring.

3BK 17226 0001 RJZZA Ed.07 5 / 62


Preface

History
Date Edition Comments

000211 01 Creation

000630 02 Update after experimentation

000811 03 New PCM rack side cabling (TX/ RX)


New information about alarm cabling
Craning restriction removed

010129 04 English correction

020129 05 Update for metallic sheath installation

030504 06 Update for IO catalogue

040112 07 Update for product platforms naming

6 / 62 3BK 17226 0001 RJZZA Ed.07


1 General Information

1 General Information

This chapter provides general information on the principles of the operation and
the requirements of the procedure:

Hardware description

Prerequisites
Restrictions

Initial state

Final state

Task sequences

Time schedule
Information required.

3BK 17226 0001 RJZZA Ed.07 7 / 62


1 General Information

1.1 Hardware Description


1.1.1 Rack Configuration

Connection Area

Radio subrack

FAN FAN FAN

Radio subrack

DUMMY PANEL

Radio subrack

Connection Area
FAN FAN FAN

Radio subrack Radio subrack

DUMMY PANEL

Radio subrack
Radio subrack

FAN FAN FAN


FAN FAN FAN

Figure 1: Example of Mini DC Indoor A9100 BTS (Left) and Medi DC A9100 BTS (Right)

8 / 62 3BK 17226 0001 RJZZA Ed.07


1 General Information

1.1.2 Weight and Dimensions

Mini Medi

Dimensions - -
Width 600 mm 600 mm
Depth 450 mm 450 mm
Height (with 20 mm adjustable feet) 915 mm 1940 mm

Weight of rack 45 kg empty 100 kg empty

115 kg in maximum 270 kg in maximum


configuration configuration

Weight of batteries BU 101 = 120 kg BU 101 = 120 kg

BATS 14 kg BATS 14 kg

Installation options Back to back Back to back


Back to wall Back to wall
Wall fixation Wall fixation
In rows In rows

1.2 Restrictions
None.

1.3 Prerequisites
The site must comply with the ” Safety rules ” of the General Wiring
Handbook ”
The site must be ready to receive the racks, according to SPP 34

The equipment is delivered packed on site with associatedkits

The antenna feeders need not to be installed before starting.

1.4 Initial State


The rack and installation kits are packed and delivered on site.

3BK 17226 0001 RJZZA Ed.07 9 / 62


1 General Information

1.5 Final State


The rack is ready for commissioning
The rack is not powered up.

Antennas
Antenna
PCM + alarm cables jumpers

1234
1234
1
11
11 Metal sheath
TX
123
112
12
122
RX
123
Earth plate

Alarm
DDF

V A

BTS DC Power cabinet

Figure 2: Example of DC Indoor BTS Environment

10 / 62 3BK 17226 0001 RJZZA Ed.07


1 General Information

1.6 Operating Principle


Preparation before leaving for the site LEGEND

.......... To be done by Alcatel


installation team
On arrival at the site
Delivery .......... Can be done by the customer.
Unpack the equipment If not, it is carried out by the
installation team
Option: Drill the rack fixing OPTION: According to customer
reqiurements, can be
provided or not
Option: Fix the rack

Install the site DDF

Install PCM cables in cable tray

Install power cables in cable tray

Option:Install alarm cables in cable tray

Option:Install synchronization cables in cable tray

Connect all cables to the rack and to the site

Test the wiring

Connect the metallic sheath

Finish installation

3BK 17226 0001 RJZZA Ed.07 11 / 62


1 General Information

1.7 Time Schedule

Task Time (mn) Time (mn)


1st person 2nd person

Preliminary tasks on site 60 60

Unwrapping packages
General checks

Transportation of rack to final location (3)

Rack preparation

Drilling cable tray 30 -

Running cable in cable tray (1) (with length of cables 5 30 30


meters (2))

PCM cables

Power supply cables

Connecting cables on the site side 60 -

PCM cables

Power supply cables

Antenna cables

Connecting cables on BTS side - 60

PCM cables

Power supply cables

Antenna cables

Finishing installation 60 60

TOTAL 240 210

(1) : Tasks where two persons are mandatory for execution


(2) : 15 mn + 2 mn per meter of cable tray to be installed
(3) : Transportation time to final location depending on the site

The times given are based on:


Basic installation without options (alarm, synchronization, fixing, etc)

Technical requirements, not taking into account safety considerations.

12 / 62 3BK 17226 0001 RJZZA Ed.07


1 General Information

1.8 Information Required


Site

Location of grounding plate

Location of power supply cabinet

Location of breakers in power box


Antenna feeder connections and information (AZIMUTH, Sectors, etc)

Precise location of BTS rack

Location of PCM terminal block

PCM terminal block connection drawing

Number of alarms to be connected


Location of alarm terminal block.

BTS Rack
Type of BTS rack to be installed (MINI, MEDI)

Door opening direction (left or right)

Rack fixing (wall, raised floor, concrete foundation).

Kits

PCM cable impedance (120 ohm, 75 ohm)

Synchronization configuration.

3BK 17226 0001 RJZZA Ed.07 13 / 62


1 General Information

14 / 62 3BK 17226 0001 RJZZA Ed.07


2 Preliminary Checks

2 Preliminary Checks

This chapter describes the preparation of the operation in two steps:

At base

On arrival at the site

3BK 17226 0001 RJZZA Ed.07 15 / 62


2 Preliminary Checks

2.1 Before Leaving for the Site

Check that the prerequisites are satisfied See Prerequisites (Section 1.3) .

Check availability of information required See Information Required (Section 1.8) .

Check availability of documentation See List of Necessary Documents (in appendix C) .

Check availability of tools See List of Necessary Tools (in appendix C), refer to the
” Tools catalogue ” for content checking.

Check availability of supplies See Consumable Supplies (in appendix B) .

2.2 Before Starting (On Arrival at the Site)

Check applicable notification list and Refer to ITL “Applicable notifications list” for checking if
Operation Instructions notifications have to applied during the operation.
Refer to IO “Applicable operation instructions list” for
checking if operation instructions have to applied.

Check that safety instructions are applied Refer to “ General Wiring Handbook “ for checking that
safety precautions have been taken into accordance with
safety instructions.

Read instructions to be applied in case of Refer to “ General Wiring Handbook “ for instructions.
anomaly

Fulfill premises inspection form and Refer to CEL “ Premises inspection form “.
completion check list
Complete the header field of the CCL
The CCL is completed as each installation instruction is
carried out.

Check availability of Alcatel kits See Installation Kits (in appendix B).

16 / 62 3BK 17226 0001 RJZZA Ed.07


3 Installing the Rack

3 Installing the Rack

This chapter describes how to:

Move the BTS rack to its final location

Unpack the BTS rack

Prepare the BTS rack

Position the BTS rack


Level the BTS rack

Prepare the site cable tray

Prepare the site drilling

Fix the BTS rack (option).

3BK 17226 0001 RJZZA Ed.07 17 / 62


3 Installing the Rack

3.1 Rack Transportation on Final Location

Figure 3: Pallet Transportation

Figure 4: Lifting by Crane

Figure 5: Craning Set OUT 008 3BK 25539 AA ( The Two Sackles Must Be
Passed Through Top Front Side Holes in the MBI )

18 / 62 3BK 17226 0001 RJZZA Ed.07


3 Installing the Rack

3.2 Rack Unpacking


Procedure 1. Unpack the rack
2. Check the delivery
3. Verify the type of rack and serial number of the rack
4. Report any damage to the equipment on the carrier delivery note.

3.3 Reversing the Rack Door (If Necessary On Site)

The BTS door is factory-fitted on the right (i. e. the door opens from left to right).

1
3

2 4

Figure 6: Reversing Rack Door. Door Closing From the Left or From the Right

Procedure 1. Remove the door (1) with its hinges (2) (See Figure 6)
2. Remove the two bars (4), (6) and the part (3)
3. Reverse the latch (5) and fix the two bars (4), (6) in the right place
4. Fix the door to the left side of the rack
5. Connect the earth link to the door and to the top left of the rack
6. Remove the reversed labelling (no Alcatel labels) (See Figure 6)
7. Remove the orange line label.

3BK 17226 0001 RJZZA Ed.07 19 / 62


3 Installing the Rack

3.4 Positioning the Rack

1234567
1234567
12345671
111
12345
Figure 7: Fit the Feet and Level the Rack

Procedure 1. According to Information Required (Section 1.8) , mark out the rack’s
position on the floor
2. Position the rack
3. Adjust the height of the feet with a 20 mm open-ended wrench
4. Level the rack.

3.5 OPTION: Fixing on Concrete Floor


3.5.1 Drilling the Concrete Floor

Nr Materials Reference Kit

1 Drilling template 3BK 15289 AAAA 3BK 087997 AAAB (FKG3I)

Figure 8: Mark the Floor and Drill

The two holes in the centre of the template are used only for earthquake fixing.

20 / 62 3BK 17226 0001 RJZZA Ed.07


3 Installing the Rack

3.5.2 Fixing to the Concrete Floor


Back
123456
123456 1234567
BTS rack 1234567
Door
123456
123456 1234567
1234567
123456
123456
1212
1234567
1234567123456789
123456789
12345678901
12345678901
Fixing bracket
12345678901
1212
12345678901
Door
12345678901
12345678901234567
12345678901234567
1 Wall plug Square 20mm x 20mm

Figure 9: Brackets Positioning and Fixing detail

Nr Materials Reference Kit

1 Floor fixing bracket 3BK 25399 AAAA 3BK 087997 AAAB

2 Wall plugs 1AD 01666 0001 (FKG3I)

3 Screws 1AD 00215 0042

4 Washers 1AD 00087 0149

Procedure 1. Fix the brackets to the fet of the rack


2. Position the plugs in the holes in the concrete floor
3. Insert the crews with washers in the plugs
4. Position the rack and tighten the screws into the ground.

3BK 17226 0001 RJZZA Ed.07 21 / 62


3 Installing the Rack

3.6 OPTION : Fixing to the Raised Floor


3.6.1 Drilling the Raised Floor

1234
1234
1234 1234567890
1234
1234567890123
1234
123
1234
1234
1234
1234567890123
1234

1234567890
1234567890123
1234567890
1234567890123
1234567890
1234567890123
1234567890
1234567890123
1234567890
1234567890123
Figure 10: Raised Floor

Procedure 1. Mark the tile with the template (See Figure 8)


2. Drill the tile ∅ 10 mm
3. Mark the floor with the template
4. Drill the tile ∅ 8 mm.

3.6.2 Fixing to the Raised Floor

Figure 11: Bracket (3BK 25399 AAAA)

22 / 62 3BK 17226 0001 RJZZA Ed.07


3 Installing the Rack

12345678901234567890
12345678901234567890
12345678901234567890
2

12345678901234567890
3 1212 12
12345678901234567890
12345678901234567890
1234
12341234567890 12
123456789012345678901234
1234567890
1234
1234123456789012345678901234
4

5 7

6 8

1212
1234567890123 1234567890123
1234567890123
121
11234
1
12
11
12345
12345 23
2
1 12
2
1
123 1234567890123
11234
1211
2234
1123
123412232
9 123
123 12
12 80
123
123 12
12312
123412
Figure 12: Fixing to the Raised Floor

Nr Materials Reference Kit

1 Screw ∅ 8 mm x 80 mm 1AD 00215 0092 3BK 087997 AAAB

2 Washer ∅ 8 mm 1AD 00087 0149 (FKG3I)

3 Floor fixing bracket 3BK 25399 AAAA +

4 Raised floor support 3BK 08094 AA 3BK 04548 AA

5 Coupling nut ∅ 8 mm 1AD 01655 0001 (FBFF)

6 Threaded rod ∅ 8 mm 1AD 01660 0003

7 Hexagon nut ∅ 8 mm 1AD 00197 0006

8 Washer ∅ 8 mm 1AD 00087 0149

9 Wall plug ∅ 8 mm 1AD 01666 0001

Procedure 1. Insert the expanding plug 9 in the concrete floor (See Figure 12)
2. Screw in threaded rod 6 with washer 8 and nut 7
3. Screw coupling nut 5 as the figure shows
4. Screw in screw 1 with washer 2
5. Position bracket 3.

3BK 17226 0001 RJZZA Ed.07 23 / 62


3 Installing the Rack

3.7 OPTION : Fixing to the Wall


3.7.1 Wall Drilling
Perform the following steps to fix the BTS to the wall.
123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901 Adjust the height of the feet

123456789012345678901
123456789012345678901
123456789012345678901
123456789012345678901
2
123456789012345678901
123456789012345678901 1
123456789012345678901

1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456
1234567890123456 123456789012345678901
123456789012345678901
1234567890123456
1234567890123456 123456789012345678901
123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456 123456789012345678901
1234567890123456
1234567890123456 3 123456789012345678901
123456789012345678901 4
1234567890123456 123456789012345678901
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890
12345678901234567890 1234567890123456789012
1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890
12345678901234567890 1234567890123456789012
1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 1234567890123456789012
12345678901234567890 5 1234567890123456789012 6
12345678901234567890 1234567890123456789012

24 / 62 3BK 17226 0001 RJZZA Ed.07


3 Installing the Rack

3.7.2 Fixing to the Wall

This procedure can be applied if there is no access to the sides of the BTS.

Figure 13: Fixing Holes on Top of the BTS

Nr Materials Reference Kit

1 Screws, washers, wall plugs - 1AD 02845 0001 (FKR)

Procedure 1. Fix the two front feet of the equipment with brackets as described for
concrete floor (See Figure 13)
2. Fix the BTS to the wall by the two holes (1) at the top of the rack.

3BK 17226 0001 RJZZA Ed.07 25 / 62


3 Installing the Rack

3.8 Preparing the Site Cable Tray and the Metal Sheath

Figure 14: Prepare Metal Sheath

Figure 15: Fix the Metal Sheath

Nr Materials Reference Kit

1 Edge protection 1AD 01782 0001 3BK 08028 AB


(BKG3I)
2 Metallic sheath 1AB 06084 0017

Procedure 1. Make a cut-out in the cable way for the cables with metal sheath (See
Figure 14)
2. Make a cut-out in the cable way for the antenna jumpers
3. Edge the cut-outs with edge protection
4. Fix provisory the metal sheath to the cable way (See Figure 15).

26 / 62 3BK 17226 0001 RJZZA Ed.07


4 Installing the Power Supply Cables

4 Installing the Power Supply Cables

This chapter describes the procedure to:

Install power cables in the cable tray

Connect the earth cable to the site side

Connect power cables on the BTS side


Connect DC power cables on the site side.

Before making any electrical connections to the BTS, ensure that the safety
instructions are followed.
It is essential that:

The electrical power supply is disconnected. Ensure that all switches or


fuses devoted to the new BTS in the site connectin box are switched OFF

The protective EARTH must be connected to the equipment before DC


power cables are connected.

3BK 17226 0001 RJZZA Ed.07 27 / 62


4 Installing the Power Supply Cables

4.1 General Cabling View

123456
123
1234
12345
123
1234
12345
123456
123
1234
12345
123456
123
1234
12345
123456
123
1234
12345
123456

Figure 16: Example of Cabling With Options (Alarm, Synchronization, External Batteries)

28 / 62 3BK 17226 0001 RJZZA Ed.07


4 Installing the Power Supply Cables

4.2 Installing the Cables in the Cable Tray

1 2

1m

3 4

1. Install yellow/ green cable


2. Install power cable
3. Attach cable
4. Cut the cable at good length
5. Crimp a wire terminal:Terminals on the rack side:

GND : ∅ 8 mm

BAT A : ∅ 6 mm
BAT B : ∅ 6 mm

BATRET : 6 mm

Terminals on the power box :


∅ depending on site

3BK 17226 0001 RJZZA Ed.07 29 / 62


4 Installing the Power Supply Cables

4.3 Protective Earth Cable Connection


Æ8 (yellow/green)

Rack side Power box


side
Figure 17: Yellow / Green Cable

1
1

3
4

Crimp wire terminal


123456789012345678
123456789012345678
123456789012345678
123456789012345678
12 12
123456789012345678
12 12
5
123456789012345678
12
1212
123456789012345678
12
123456789012345678
123456789012345678
123456789012345678 6
123456789012345678
123456789012345678
1. Crimp an adapted wire terminal at site extremity
2. Connect the protective earth cable to the site earth plate
3. Pass the cables to the metal sheath
4. Connect earth cable at rack’s top
5. Crimp a ∅ 8 mm wire terminal at BTS extremity of earth cable
6. Connect the GND cable to the stud top rack on the rack (M8)

30 / 62 3BK 17226 0001 RJZZA Ed.07


4 Installing the Power Supply Cables

Nr Materials Reference Kit

1 Set of wire terminals - Consumable supplies

2 Cable ties with adhesive blocks -

3 Rubber sleeves -

4 Metal sheath, 1.80 m - 3BK 028 AB (BKG3I)


2
5 Yellow / green cable, 16 mm 3BK 08957 Bx -

Procedure 1. Prepare the metal sheath and fix it temporary to the cable way with a cable tie
2. Pass the GND cable through the metal sheath
3. Crimp an M8 wire terminal on the GND cable
4. Fit a rubber sleeve on the wire terminal
5. Connect the GND cable to the stud of the BTS (See Step 2)
6. At the site side, cut the cable and crimp a wire terminal on the GND cable
(diameter depending on site) (See Step 3)
7. Fit a rubber sleeveon the wire terminal
8. Connect the GND cable to the site earth plate (See Step 6).

4.4 Rack Side Power Cable Connections


6
(b lue)

6
(black)

Figure 18: Power Cables

3BK 17226 0001 RJZZA Ed.07 31 / 62


4 Installing the Power Supply Cables

1
2

−48V 0V
3
4

Procedure 1. Pass the 48 V power cables through the metal sheath


2. Remove the rubber caps from the power supply terminals on the rack
3. Pass the cables into the rubber caps (See Steps 1 to 4)
4. Crimp M6 terminals on the cables
5. Fit a rubber sleeve on the wire terminal
6. Connect the 48 V cables to the studs of the BTS:
Black insulated conductor to the 0 V terminal

Blue insulated conductor to the - 48 V terminal

7. Fit the rubber caps on the power terminals.

32 / 62 3BK 17226 0001 RJZZA Ed.07


4 Installing the Power Supply Cables

4.5 Site Side Power Cable Connections (48 V)

Figure 19: Site Connection

Nr Materials Reference Kit

1 Set of wire terminals - Consumable supplies

2 Cable ties with adhesive blocks -

3 Rubber sleeves -

Procedure 1. On the site side, cut the 48 V cables and crimp on a lug (diameter depending
on site)
2. Fit a rubber sleeve on the terminal lug
3. Connect the 48 V cable to the site breakers
4. Label the 48 V cables and the site power box.

3BK 17226 0001 RJZZA Ed.07 33 / 62


4 Installing the Power Supply Cables

4.6 Power Supply Testing

Figure 20: Testing Power Supply

Procedure 1. Check that all the rack breakers are switched off
2. At the rack, test for short circuit between 0 V and - 48 V
3. At power box, switch on the fuse breakers (See Figure 20)
4. At the rack, test the voltage polarity (See Figure 20)
5. At the power box, switch off the fuse breakers.

34 / 62 3BK 17226 0001 RJZZA Ed.07


5 Installing the PCM Cables

5 Installing the PCM Cables

This chapter describes the procedure to:

Install PCM cables in the site cable tray

Connect PCM cables to the connection area of the rack.

To install and connect the site DDF and terminal blocks, see ” Installation
method for BSS equipment “.

3BK 17226 0001 RJZZA Ed.07 35 / 62


5 Installing the PCM Cables

5.1 Installing Cable in Cable Tray


1m

1
2

s2
Abi

1
Abis

3 4

1. Install cables in PCM compartment of cable tray


2. Attach cables with plastic cable ties
3. Label the cables with labels supplied
4. Pass the PCM cables through the metal sheath.

Nr Materials Reference Kit

1 Label 3BK 08062 3BK 08028 AB (BKG3I)

2 PCM cables (choice): - -

120 ohm / 4 pairs 3BK 08942 Ax

75 ohm / 4 coax 3BK 08940 Ax

Procedure 1. Refer to Information Required (Section 1.8) for the number of PCM cables
to install
2. Perform steps 1 to 4.

36 / 62 3BK 17226 0001 RJZZA Ed.07


5 Installing the PCM Cables

5.2 Rack Side Connection


5.2.1 Prepare the PCM Cables

For characteristics and information about PCM cables, see document


”Installation method of DDF for BSS equipment”.

PCM Power
cables cables
Stripped

−48V 0V

Sheath fixing point


on BTS top

Figure 21: Strip 2 cm of Insulation Near the Sheath Fixing Point

Procedure 1. Remove 2 cm of outer insulation near the metal sheath fixing point on
each PCM cable (See Figure 21)
(the specific tie wrap with metallic part will be fixed during sheath fixing at
the end of this document)
2. Prepare the cable termination
(See document ” Installation method of DDF for BSS equipment”)
3. Fit a rubber sleeve (4) (See Figure 22)
4. Label the cables (See Figure 22).

5.2.2 Connect the Cables to the Rack

Nr Materials Reference Kit

1 Label 3BK 08062 xx 3BK 08028 AB (BKG3I)

2 75 - ohm adapter SP2M 3BK 08949 AA -

3 Adhesive tie block - Consumable supplies

4 Rubber sleeve -

3BK 17226 0001 RJZZA Ed.07 37 / 62


5 Installing the PCM Cables

6 5
3

12
1212
1212
12112
12
12
12
12
12
121
12
12
112
12
12
12
12
12
12
12

2
Figure 22: Example With L907 / 4 120 Ohm Cable (Abis1 and Abis2 in the
Same Cable)

123456
12345
12345 123456
12345
12345
12345
1234567890123
12345
12345678
123456
12345
12345678
1234567890123
12345678901234
12345
123456
12345
1234567890123
12345678901234
12345
123456
12345
12345
12345678901234
12345
12345
12345
12345
12345
12345
Figure 23: Adhesive Tie Block for Cable Tie

38 / 62 3BK 17226 0001 RJZZA Ed.07


5 Installing the PCM Cables

5.2.3 L907/ 4 120 - Ohm Cable (Alcatel Kits)


Only one cable is used to cary Abis1 and Abis2 signals.
High level signals must be in the same quad.

Colour KRONE inserting Signal


position

Quad 1 white 8 Abis1/ TX


(output high level signal going to
grey 8 Abis1/ TX
BSC)
blue 6 Abis2/ TX

violet 6 Abis2/ TX

Quad 2 yellow 7 Abis1/ RX


(input low level signal coming from
grey 7 Abis1/ RX
BSC)
brown 5 Abis2/ RX

violet 5 Abis2/ RX

B M
L

123
123
123 10 mm
D L9 07
1 AC 0 1 3 2 8 0 0 0 4

100 mm
E

G
A : String
B : Cable drain (GND)
D : Cable
E : Cable braid
F : Transparent film
G : Aluminium foil
Figure 24: L907 / 4 Cable and Preparing Cable Termination

Procedure 1. Remove the lightning protection block (2 in Figure 22)

3BK 17226 0001 RJZZA Ed.07 39 / 62


5 Installing the PCM Cables

2. Insert the wires in the terminal block (1 in Figure 22)(to avoid cutting
problems os short circuits, take the wire with the first hand and insert it
with the other hand)
3. Fit the lightning protection block
4. Tie the cables to the rack (with adhesive tie blocks).

5.2.4 FLEX3 / 4 - 75 Ohm Coaxial Cable (Alcatel Kits)

ABIS 1 TX Coaxial 1

ABIS 2 TX Coaxial 2

ABIS 1 TX Coaxial 3

ABIS 2 TX Coaxial 4

7 8
RX TX
KRONE
1 11
connector
11
11 11
11
Abis 1
Figure 25: 75 Ohm Cable Wiring

Procedure 1. Remove the lightning protection block (2 in Figure 22)


2. Insert the wires in the terminal block (1 in Figure 22)(to avoid cutting
problems or short circuits, take the wire with the first hand and insert it
with the other hand)
3. Fit the lightning protection block
4. Tie the cables to the rack (with adhesive tie blocks).
5. Fit SP2M 75 - ohm adapters to sub - D connectors (positions 4 and 5
in Figure 22) .

Figure 26: SP2M 75 - Ohm Adapter

40 / 62 3BK 17226 0001 RJZZA Ed.07


6 Installing the Antenna Jumpers

6 Installing the Antenna Jumpers

This chapter describes how to connect the antenna jumpers between feedeers
and BTS rack.

3BK 17226 0001 RJZZA Ed.07 41 / 62


6 Installing the Antenna Jumpers

6.1 Antenna General Scheme


NORTH 45

Ant A
Ant B

Ant A 90
Ant B

Ant B
Ant A

230
A B A B A B
Label:
ANT B
AZIMUTH
125
Label:
SECT: N
ANT A A B A B A B

A A A
B B B
N P Q
ANX ANX ANX
MBS

Figure 27: Example of Coaxial Cabling and Labelling, System With Three Sectors

42 / 62 3BK 17226 0001 RJZZA Ed.07


6 Installing the Antenna Jumpers

6.2 Connection to the Feeder Terminaton

If the feeders are not labelled:

Inform the customer


Do not connect the jumpers

Complete the CCL.

Feeder Jumper

Figure 28: Label Cables and Connect Jumpers to Feeders

Nr Materials Reference Kit

1 Labels 3BK 08062 3BK 08028 AB (BKG3I)

Procedure 1. Refer to Information Required (Section 1.8) 1 for cable connections


2. Label the antenna jumpers at each end (See Figure 27)
3. Connect the antenna jumpers to the feeders (See Figure 28).

3BK 17226 0001 RJZZA Ed.07 43 / 62


6 Installing the Antenna Jumpers

6.3 Connection to the BTS Rack

Q : antenna A N : antenna A
Q : antenna B N : antenna B
not used P : antenna A
not used P : antenna B

Figure 29: Sectors Position

Nr Materials Reference Kit

1 Cable ties - Consumable supplies

Procedure 1. Lead the jumpers through the cut-outs in the cable tray
2. Ensure that hte bending radius of each cable is at least 3 cm
3. Use the plastic ties to bundle the cables together
4. Tighten with special tightening tool (See Tools catalogue).

44 / 62 3BK 17226 0001 RJZZA Ed.07


7 Installing the Alarm Cables (Options)

7 Installing the Alarm Cables (Options)

This chapter describes how to:

Install alarm cables in the cable tray

Connect alarm cables to the rack.

To install and connect site DFF and terminal blocks, see ” Installation method of
DDF for BSS equipment “.

3BK 17226 0001 RJZZA Ed.07 45 / 62


7 Installing the Alarm Cables (Options)

7.1 Installing the Cables (Option)

Nr Materials Reference Kit

1 Labels 3BK 08062 3BK 08028 AB (BKG3I)

2 8 pair cable L907 / 8 3BK 08965 Ax -

1m

1
2

m
Alar
8
1−

3 4

Figure 30: Install the Alarm Cables

1. Install the alarm cables in special compartment of cable tray (See


Information Required (Section 1.8) for the number of alarms to be installed)
2. Attach cables with plastic cable ties
3. Label the cables
4. Pass the alarm cables through the metal sheath
5. Fit a rubber sleeve on wire terminations.

46 / 62 3BK 17226 0001 RJZZA Ed.07


7 Installing the Alarm Cables (Options)

7.2 Rack Side Connection

Inputs

Outputs

Figure 31: General View With All Alarm Cables

2
1 2 3 4 5 6 7 8

4
Figure 32: Connection Area of the Rack

Wire 1 of pair Wire 2 of pair

QUAD 1 Pair 1 white (XI 1) grey (XGND)

Pair 2 blue purple

QUAD 2 Pair 3 yellow grey

Pair 4 brown purple

QUAD 3 Pair 5 black grey

3BK 17226 0001 RJZZA Ed.07 47 / 62


7 Installing the Alarm Cables (Options)

Wire 1 of pair Wire 2 of pair

Pair 6 red purple

QUAD 4 Pair 7 green grey

Pair 8 white (XI 8) purple (XGND)

X GND
X GND
X GND
X GND
X GND
X GND
X GND
X GND
XI8
XI6
XI4

XI7
XI2
XI3

XI5
XI1
QUARTE 1 1 2 2 3 3 4 4
PAIR 1 2 3 4 5 6 7 8
Figure 33: Detail of Input Alarm Terminal Block (Example Alarm 1 to 8
Connector)

Procedure 1. Refer to Information Required (Section 1.8) in chapter 1 for the cable
connections and the quantity of alarms to be connected
2. From the end of the sheathing, bundle the cables together and attach
them with cable ties
3. Fit a rubber sleeve on wire terminations
4. Insert the wires into the connectors:

Connector (1) = input alarms 1 to 8 (See Figures 32 and 33)


Connector (2) = input alarms 9 to 16

Connector (3) = input alarms 17 to 24

Connector (4) = output alarms (not used)

5. Tie the cables to the rack.

48 / 62 3BK 17226 0001 RJZZA Ed.07


8 Installing the Synchronization Cables (Option)

8 Installing the Synchronization Cables (Option)

This chapter describes how to install and connect the synchronization cables
between the new rack and other BTSs on site (option).

3BK 17226 0001 RJZZA Ed.07 49 / 62


8 Installing the Synchronization Cables (Option)

8.1 Configuration of Cabling

2 x SCM x/3 G3
G1 in1
in/out 2
Slave
Master
2 x SCM x/3 in1 G3
in/out 2

Slave
Figure 34: G1 BTS Master - A9100 BTS Slave

Cable ref. in case of Mark1 :SCM2/3= 3BK 08103


Cable ref. in case of MARK2 :SCM1/3=3BK 08102

2 x SCG2/3 G3
G2 in1
in/out 2
Slave
Master
G3
2 x SCG2/3 in1
in/out 2

Slave
Figure 35: G2 BTS Master - A9100 BTS Slave

Cable ref. :SCG2/3=3BK 08101

G3 SCG3 G3
out 1 in1
in/out 2 in/out 2

Master Slave
Figure 36: A9100 BTS Master - A9100 BTS Slave in Star Configuration

Cable ref. :SCG3=3BK 07950

50 / 62 3BK 17226 0001 RJZZA Ed.07


8 Installing the Synchronization Cables (Option)

G3 SCG3 G3
out 1 in1
in/out 2 in/out 2

Master Slave
Figure 37: A9100 BTS Master - A9100 BTS Slave in Daisychain Configuration

Cable ref. :SCG3=3BK 07950

3BK 17226 0001 RJZZA Ed.07 51 / 62


8 Installing the Synchronization Cables (Option)

8.2 Installation

1 2 3 4 5 6 7 8

1 2 3

Figure 38: Clock Synchronization Connectors

Nr Materials Reference Kit

1 Kit label 3BK 08062 ACAA 3BK 08028 AB

2 Cable for clock synchronization - (BKG3I)

A9100(M)/A9100(S) (3 m) 3BK 07950 AA

A9100(M)/A9100(S) (10 m) 3BK 08303 AC

A9100(M)/G2-BTS(S) (3 m) 3BK 08101 AA

A9100(M)/G2-BTS(S) (10 m) 3BK 08101 AB

G2-BTS(M)/A9100(S)/ (10 m) 3BK 08225 AA

G1-BTS MK1(M)/A9100(S) (10 m) 3BK 08102 AA

G1-BTS MK2(M)/A9100(S) (10 m) 3BK 08103 AA

Procedure 1. Choose the right configuration (See Figures 34 to 37)


2. Run the synchronization cables in the site cable tray
3. Pass the cables through the metal sheath
4. Label the cables with labels supplied
5. Connect cables to sockets 1, 2, 3 in the connection area (See Figure 38)
6. Fasten the connectors with knurled screws
7. Connect the cables to the site BTSs (*1).
(*1) With G2 - BTS use Part 17 volume 17 CDD document.

52 / 62 3BK 17226 0001 RJZZA Ed.07


9 Finishing Installation

9 Finishing Installation

This chapter describes:

Finishing installation of metallic sheath

Labelling the BTS rack.

3BK 17226 0001 RJZZA Ed.07 53 / 62


9 Finishing Installation

9.1 Finishing Installation of the Metallic Sheath

12345
1234
12345
1234
12345
1234
123
123
123
123
123
Metallic sheath

123
123
Figure 39: Metallic Sheath Connection (To Upper CableTray)

Metallic sheath
Metallic sheath
Tie wrap
Washer O 8
metallic
Hex nut M8 Cables (stripped 2 cm)
Power cables
(not stripped)

Screw HM 8x14

Figure 40: Metallic Sheath Connection to the Rack and Stripped Cables Fixation

54 / 62 3BK 17226 0001 RJZZA Ed.07


9 Finishing Installation

Nr Materials Reference Kit

1 6.5 mm stove screwl - Consumable supplies

2 Wire terminal -

3 Cable tie with braid 1AD 00689 0001 3BK 08028 AB


(BKG3I)
4 Screw HM 8 x 14 -

5 Washer ∅ 8 -

6 Hex nut M8 -

Procedure 1. Strech the metallic sheath between the vertical cutout in the cable tray
and the BTS rack (See Figure 39)
2. Fix the metallic sheath to the cable tray with one stove screw (See Figure 39)
3. Cut the metalic sheath to the right length (*1)
4. Fix a lug to the metallic sheath if necessary
5. Connect the metallic sheath tot he rack (See Figure 40)
6. Tighten the stripped PCM cable shielding to the sheath using the metallic tie
wrap provided in the kit (See Figure 40).

(*1) : when cutting the metal sheath, take care to avoid dropping small scraps
of copper into the rack.

3BK 17226 0001 RJZZA Ed.07 55 / 62


9 Finishing Installation

9.2 Finishing
BTS STATION 2

Procedure 1. Affix the “ BTS STATION “ and “ N “ labels to the door of the BTS
2. Clear away packaging
3. Leave the site tidy
4. Leave the BTS door key
5. Clean the site.

56 / 62 3BK 17226 0001 RJZZA Ed.07


Appendix A : Abbreviations

Appendix A: Abbreviations
Abis Link between BTS and BSC

BSC Base Station Controller

BSS Base Station Subsystem

BTS Base Transceiver Station

CCL Completion Check List

CEL Premise inspection form

DC Direct Current

DDF Digital Distribution Frame

FRD Failure Report

GND Ground (earth)

GSM Global System for Mobile communication

ITL-PRO Procedure Technical and support information

IO Instruction Operation

MODEM MODulator - DEModulator

PCM Pulse Code Modulation

3BK 17226 0001 RJZZA Ed.07 57 / 62


Appendix A : Abbreviations

58 / 62 3BK 17226 0001 RJZZA Ed.07


Appendix B : List of Kits and Consumable Supplies

Appendix B: List of Kits and Consumable Supplies


Installation Kits The following table is used to check, on site, the mandatory or optional delivery
item kits.
The used symbols are:

• mandatory kit
∇ technical choice kit

◊ customer option kit

Mandatory kits Mnemo Reference Qty

• Basic kit BKG3I 3BK 08028 AB 1

• Antenna jumpers cables: - -

∇1m BLF 1 3BK 05360 BA

∇2m BLF 2 3BK 05360 CA

∇3m BLF3 3BK 05360 DA

∇5m BLF 5 3BK 05360 EL

◊ 2 Mbits cables: - -

120 ohm - 4 pairs - L907/ 4 (roll 100 m) CA120S4 3BK 08942 AA

120 ohm - 4 pairs - L907/ 4 (roll 250 m) CA120S4 3BK 08942 AA

75 ohm - 4 coax FLEX3/ 4 (roll 100 m) CACOAX4 3BK 08940 AA

75 ohm - 4 coax FLEX3/ 4 (roll 250 m) CACOAX4 3BK 08940 AB

◊ DC Power cables (100 m reel): - - -


2
Y / G ground cable 1 x 16 mm PCG16YG1 3BK 08957 AA 1

∇ blue 1 x 16 mm2(- 48 V) PC16BL1 3BK 08955 AA 1

∇ black 1 x 16 mm2( 0 V) PC16B1 3BK 08956 AA 1

◊ ∇ Alarm cable 8 pairs - L907/ 8 (roll 100 m) CA120S8 3BK 08965 AA


∇ Alarm cable 8 pairs - L907/ 8 (roll 250 m) CA120S8 3BK 08965 AB

◊ Mechanical part for 24 terminal blocks MP24 1AD 02843 0001 1

◊ Label for 24 terminal blocks LAB 1AD 02854 0001 1

◊ Alcatel IDC terminal block 120 / 75 ohm JS10 1AD 06634 0011 4

◊ DDF fixing kit for wall FKW 1AD 02844 0001 1

◊ Fixing kit for concrete foundation FKG3I 3BK 08797 AA 1

◊ Complementary fixing kit for raised floor FBFF 3BK 04458 AA 1

◊ Rack fixing kit for wall FKR 1AD 02845 0001

3BK 17226 0001 RJZZA Ed.07 59 / 62


Appendix B : List of Kits and Consumable Supplies

Mandatory kits Mnemo Reference Qty

◊ 75 ohm adapter for 75 ohm Abis link SP2M 3BK 08949 AA 2

◊ Cable for clock synchronization: - - -

∇ A9100(M)/ A9100(S)(3 m) SCG3 3BK 07950 AA 1

∇ A9100(M)/ A9100(S) (10 m) SCG3 3BK 08303 AC 1

A9100(M)/ G2-BTS(S)(3 m) SCG2/3 3BK 08101AA 2

∇ A9100(M)/ G2-BTS(S) (10 m) SCG2/3 3BK 08101 AB 2

∇ G2-BTS(M)/ A9100(S) (10 m) SC23 3BK 08225 AA 2

∇ G1-BTS MK1(M)/ A9100(S) (10 m) SCM1/3 3BK 08102 AA 2

∇ G1-BTS MK2(M)/ A9100(S) (10 m) SCM2/3 3BK 08103 AA 2

◊ Jumpers to DDF: - -

∇ 120 ohm 1 pair (roll 100 m) CA120S 3BK 08941AA

∇ 120 ohm 1 pair (roll 250 m) CA120S 3BK 08941AB

∇ 75 ohm 1 coax FLEX3 (roll 100 m) CACOAX1 3BK 08939 AA

∇ 75 ohm 1 coax FLEX3 (roll 250 m) CACOAX1 3BK 08939 AB

Consumable Supplies The following table is used to check, at base, the availability of the installer’s
consumable supplies (not included in Alcatel kits).

Item Qty

Indelible marker 1

Set of rubber sleeves for all cables 1

5 mm x 300 mm cable ties 100

Adhesive block for cable tie 10


2
Wire terminal ∅ 8 mm for 16 mm cable 4

Wire terminal ∅ 6mm for 16 mm2 cable 5

60 / 62 3BK 17226 0001 RJZZA Ed.07


Appendix C : List of Documents and Tools

Appendix C: List of Documents and Tools


List of Necessary The following table is used to check, at base, the availability of the necessary
Documents documents.

Applicable notification list (ITL-PRO) 3DF 00462 0004 AAAGA

Applicable operation instructions (IO) 3DF 00300 0004 UAZZA

General wiring handbook 3BK 17160 0001 RJZZA

Tools catalogue for field activity 3BK 20458 0001 RJZZA

Site premises inspection form (CEL) 8BL 00704 0015 DRBRA

Completion Check List (generic) (CCL) 3BK 17200 0002 QZZZA

Specification for site preparation (SPP40) 8BL 00704 0058 DRZZA

BSS site premises inspection, post handover 8BL 00704 0016 DRBRA

Installation method of DDF for BSS equipment 3DF 00435 0033 RJZZA

Part 17 Volume 17 CDD 3DF 00424 0021 ADBRQ

List of Necessary Tools The following table is used to check, at base, the availability of the necessary
tools (See ” Tools catalogue ” for content checking).

Kit name Reference Calibration

Basic kit OUT 001 no

BTS specific tools OUT 003 no

G4 indoor BTS specific tools OUT 008 no

3BK 17226 0001 RJZZA Ed.07 61 / 62


Appendix C : List of Documents and Tools

BLANK PAGE BREAK

62 / 62 3BK 17226 0001 RJZZA Ed.07