Ref Calculation

Design of Kalugaloya tank Sluice

DATA
Full supply level = 57.00 m MSL

High flood level = 57.23 m MSL

Bund top level = 59.09 m MSL

Capacity = 6650 Ac.ft

Sluice sill level = 48.50 m MSL

Design Discharge 60.000 Cusec


= 1.700 m3

Ref 01 Design of Main canal

d
z=
1. b
5

Mean velocity of the canal V


By manning's formula 𝑽=(𝟏/𝒏)(�^𝟐/𝟑)(𝑺^(𝟏/𝟐) A

𝑪𝑽�=𝑽/𝑽� B

CVR should be in the range 0.9-1.25

Critical velocity 𝑽�=𝟎.𝟖𝟒.𝒅^𝟎.𝟔𝟒 (In fps)


C

Ref 01 for canal discharge between 25 cfs to 300 cfs,


Velocity V = 2.500 fps
= 0.762 m/s
Ref Calculation
Rugosity
coefficient n = 0.025
z = 1.500
Canal bed slope= 0.00035 for main canal
A= (d/2)*(2b+3d)
P= b+2d*(1+z2)1/2
R= A/P
Q= AV

b (m) d(m) A(m2) P(m) R V Q (m3/s) Vc (m/s) CVR

3.000 1.500 7.875 8.408 0.937 0.716 5.641 0.710 1.009


2.500 1.000 4.000 6.106 0.655 0.564 2.258 0.548 1.031
2.750 0.850 3.421 5.815 0.588 0.525 1.798 0.494 1.065
Non Silting, Non Scouring
CANAL PARAMETERS
b= 2.750 m
d= 0.850 m
z= 1.500
So= 0.00035
V= 0.525 m/s

DETERMINATION OF SIZES & DIMENSIONS OF CONDUIT,CONTROL OPENING


AND GATES

lets, No of barrels N= 1.000


q = Q/N
1.700 m3s

d= depth of flow in canal


d1 = d= 0.850 m
d1 = depth of flow in the barrel
Ref Calculation

Ref 01 Assume , Velocity through the barrel Vb = 8.000 fps


= 2.438 m/s

B= width of barrel
Q = A.V
1.7=B x d1 x Vb

B= 0.820 m Say B = 1.000 m

Actual velocity in the barrel = Vact


Vact = Q/B.d
= 1.7/(0.975 x 0.850)
= 2.000 m/s < 2.438 m/s OK

Manning's formula
𝑽𝒂��=(𝟏/𝒏)(�^(𝟐/𝟑))(𝑺b^(𝟏/𝟐))

A = B x d1 0.850 m2
P = b + 2d 2.700 m
R= A/P = 0.315
n= 0.015
By using manning's eqn
Sb 1/2 = 0.065
Bed slope of Barrel Sb = 0.0050

Critical depth in Barrel yc = (q/B.g0.5)2/3 g= 9.810 m/s2


= (1.7/(0.975 x √9.81))2/3
yc = 0.665 m

Ref 01 here, d1 > 1.25 yc


d1/yc= 1.277 OK

Flow in the barrel is sub critical


Ref Calculation

Critical slope = Sc
Vc = (R2/3*Sc1/2)/n = (1/n)((A/P)2/3.Sc1/2)
Vc=q/(B.yc)

Vc = 2.555
A= 0.665
P= 2.331
by manning's eqn
Sc1/2 = 0.088
Sc = 0.0078
But Sb = 0.0050

here, Sb should be less than Sc (Sb<Sc)


Sb<Sc Condition is OK OK

Ref 01 H1 not less than 1.25 d1


H1=1.25 d1
H1= 1.063 Say H1= 1.250 m

1.0 m
B1= 1.000 m
d1= 0.850 m
H1= 1.250 m 1.25m

Sb= 0.005
V1 = 2.000 m/s
Size of control gate
Ref Calculation

B2= width of just upstream of sluice barrel

V2= Q/(B2*d2)
Assume
B2 = 1.750 m

Bernoullis eqn 1 & 2

Total Hydraulic Loss of head at the entrance


= Total Hydraulic head at 1 +
head at 2 of conduit

d2+V22/2g = d1+V12/2g + kc(V12/2g - V22/2g)

Ref 02 Loss coefficient for conduit entrance = 0.500

V2= q/(B2*d2)
V2= 1.7/(1.75x d2)
= 0.971 /d2

d2+1.5 x V22/2g = d1+1.5 x V12/2g

d2 = 1.202 m
LHS = 1.252
RHS = 1.156

Height of the gate opening H2


Ref 01 H2 > 1.025 d2
H2 > 1.232 m
H2= 1.250 m Say H2= 1.250 m

Control gate opening = B1 x H2 = 0.975m x 1.25m

V2 = Q/(B2.d2)
= 1.7/(1.75 x 1.202)
Ref Calculation

= 0.808 m/s

B2= 1.750 m
d2= 1.202 m
H2= 1.250 m
V2 = 0.808 m/s

sectional dimensions do not vary inside the sluice tower.So,

B3= 1.750 m
d3= 1.202 m
H3= 1.250 m
V3 = 0.808 m/s

Determination of size of intake opening


Assumed as B4 = 1.250 m
Applying Energy equation between 3 & 4 neglecting friction losses

Total Hydraulic Loss of head at the entrance


= Total Hydraulic head at 3 +
head at 4 of intake

d4+V42/2g = d3+V32/2g + kc(V42/2g - V32/2g)

Ref 02 Kc= 0.500

d4+0.5 x V42/2g = d3+0.5 x V32/2g

V4= 1.7/(B4*d4)
By trial & error d4= 1.185
LHS= 1.219
RHS= 1.219

Minimum height of intake opening


H4= 1.025 x d4
Ref Calculation

1.215 Say H4= 1.250 m

Then V4 = Q/(B4 x d4)


= 1.7/(1.250 x 1.185)
= 1.148

Minimum low Storage reservoir depth = D

Ref 01 & Head loss through Trash track


Ref 02 � �=[𝟏.𝟒𝟓−𝟎.𝟒𝟓 ( � 𝒏/� 𝒈 ) − ( � 𝒏/� 𝒈 )^𝟐 ] 〖� _� 〗 ^𝟐/𝟐𝒈

Let An/Ag = 0.800


Velocity through trash track Vt
Vt = V4/0.8 m/s
= 1.435

Vt should be less than 5 fps (1.524 m/s)


Assumed d is satisfied

ht= 0.047 ft

D=d4+ht 1.232 m

Minimum low storage reservoir level to supply design


discharge= 48.5+1.232 = 49.732 m MSL
Ref Calculation

Determination of Minimum operation level

Slope of the sluice barrel Sb = 0.0050


width of the barrel B = 1.000 m
minimum operation discharge through barrel = 2.Q/3
= 1.133 m3/s
ncanal = 0.025
nconduit = 0.015
scanal = 0.00035

bed width of the canal = 2.750


By manning's formula

b (m) d(m) A(m2) P(m) R V Q (m3/s) Vc (m/s) CVR


1.133
2.750
0.675 2.540 5.184 0.490 0.465 1.181 0.426 1.092
Non Silting, Non Scouring
flow inside the barrel (2/3 flow)
Discharge through the barrel = 1.133 m3/s
b (m) d(m) A(m2) P(m) R V Q (m3/s)
1.133
1.000
0.625 0.625 2.250 0.278 2.007 1.254

Conditions assumed in minimum low storage reservoir level are applicable in this case too

Vbarrel under MLSRL = 2.000 m/s


Vbarrel under MOL = 2.007 m/s

Vbarrel under MLSRL > Vbarrel under MOL

1 2 3 4
B 1.000 1.750 1.750 1.250
Ref Calculation

D d'4 d'3 d'2 d'1

d'1= 0.625
B1= 1.000
V'1= 2.007

Bernoullis eqn 1 & 2

Total Hydraulic Loss of head at the entrance


= Total Hydraulic head at 1 +
head at 2 of conduit

d'2+V'22/2g = d'1+V'12/2g + kc(V'12/2g - V'22/2g)

Loss coefficient for conduit entrance = 0.500

d'2+1.5 x V'22/2g = d'1+1.5 x V'12/2g


d'2 = 0.855 m
LHS = 0.899
RHS = 0.933

V'2= 0.757 m/s


d'3= 0.855 m/s
V'3= 0.757 m/s

Applying Energy equation between 3 & 4 neglecting friction losses


Total Hydraulic Loss of head at the entrance
= Total Hydraulic head at 3 +
head at 4 of intake
Ref Calculation

d'4+V'42/2g = d'3+V'32/2g + kc(V'42/2g - V'32/2g)

Kc= 0.500
d'4+0.5 x V'42/2g = d'3+0.5 x V'32/2g
d'4= 0.840
LHS= 0.870
RHS= 0.870

V'4= 1.079 m/s


An/Ag = 0.800

� �= [𝟏.𝟒𝟓−𝟎.𝟒𝟓 ( � 𝒏/� 𝒈 ) − ( � 𝒏/� 𝒈 )^𝟐 ] 〖� _� 〗 ^𝟐/𝟐𝒈

Velocity through trash track Vt


Vt = V'4/0.8
= 1.073/0.8
= 1.349

Vt should be less than 5 fps (1.524 m/s)


Assumed d is satisfied
ht= 0.042 ft
D = d4+ht = 0.882 m

Minimum low storage reservoir level to supply design


discharge= 48.5+0.882 = 49.382 m MSL
crtical depth yc = (q/B.g0.5)2/3
= (1.7/(0.975*g^0.5))^(2/3)
= 0.508 m

d1'= 0.625 > 0.508


So, Flow is sub critical.Assumptions made is satisfied

sluice barrel
Ref Calculation

H1= 1.250 m
B or B1 = 1.000 m d1= 0.850 m V1= 2.000 m/s
B2 = 1.750 m d2= 1.202 m V2= 0.808 m/s
B3 = 1.750 m d3= 1.202 m V3= 0.808 m/s
B4 = 1.250 m d4= 1.185 m V4= 1.148 m/s
ht= 0.047 m Vt= 1.435 m/s
Minimum low storage reservoir level= 49.732 m MSL
for 2/3 flow
d'1= 0.625 m V'1= 2.007 m/s
d'2= 0.855 m V'2= 0.757 m/s
d'3= 0.855 m V'3= 0.757 m/s
d'4= 0.840 m V'4= 1.079 m/s
h't= 0.042 m V't= 1.349 m/s

Minimum Operating Level 49.382 m MSL

Peak release under high flood level condition

HT H
Ref Calculation

velocity through the trash track Vt = Q/(0.8 x B4 x H4)


= 1.7/(0.8 x 1.25 x 1.25)
= 1.360 m/s

Velocity at intake opening V5 = 0.8 Vt


= 0.8 x 1.36
= 1.088 m/s

Ref 01/99 Total head HT = H+0.45 Vt2/2g+0.5 V52/2g

HT = (High flood level-Sluice sill level)

= 57.23-48.5
= 8.730 m

H= 8.73-(0.45 x 1.362+0.5 x 1.0882)/(2g)


8.657 m

water head available within the sluice tower = 8.657 m

Ref 01 let h be the gate opening and B1 be the width of the barrel
pg 99 Then ,
�= 𝐶.𝐵.ℎ √2𝑔𝐻 𝑖𝑛 𝑐𝑢𝑠𝑒𝑐𝑠

Assume as 𝐻/ℎ>6.0 then C = 0.620

60 = 0.62 x (0.975/0.3048) x h (2gH)0.5


Ref Calculation

h= 0.690 ft = 0.210 m

check, H/h = 41.174 > 6


Assumption is OK

critical depth of the flow in the barrel yc = (q/B.g0.5)2/3


= (1.7/(0.975 x 9.810.5))2/3
= 0.665 m

h<yc, flow inside the barrel is supercritical

At vena contracta, deph of flow he = 0.141 m


At vena contracta, Velocity of flow Ve= 12.067 m/s

Full supply depth of the flow in the main canal is higher than the "h". Therefore the flow which
is in super critical condition in the barrel should make a hydraulic jump to reach the flow
condition in the canal.

Formation of hydraulic jump

Hydraulic Sub critical


Super critical flow
jump

FSD

Vena contracta

FSD of the main canal = 0.850 m

At section 2, d2= 0.850 m


Assume, the hydraulic jump occurs inside the barrel,
V2 = q/(B x d2)
Ref Calculation

= 1.7/(0.975 x 0.850)
= 2.000 m/s

Conjugate depth d1 = (d2/2)((1+8 Fr22)1/2 -1)


Fr2 = V2/(g.d2)1/2

= 2.051/(9.81 x 0.85)1/2
= 0.693

d1 = (d2/2)((1+8 Fr2 ) -1)


2 1/2

= (0.85/2)x((1+8.0.712)1/2-1)
= 0.510 m

To find the position of the jump following data were used for the calculations
Area of flow A = B.y = 0.975.y
Wetted perimeter P = B+2y = 0.975+2.y
Hydraulic radious R = A/P = 0.975 y/(0.975+2y)
Bed slope of conduit So = 0.0050
Energy difference ΔE = E2-E1
Friction Slope Sf = n2.V2/(R4/3)
length of super critical
ΔX = ΔE/(So-Sf)
flow

Specific energy at vena contracta Ev= V1 /2g + he =


2
7.563 m

Friction slope at vena contracta


From manning's formula,
Ve = (R Sf )/n
2/3 1/2

where R = A/P
R = 0.127
Sf = 0.514

Determination of the length of the sluice barrel


Length of the sluice barrel= 52250 m from auto cad
Ref Calculation

Hydraulic jump occurs from the starting point of sluice barrel = 56.606 m

Therefore jump occurs outside the sluice barrel.


From table I,
depth of water at the outside edge of the barrel( L = 52,250 m) = 0.507 m

At the outside edge of the barrel


d = 0.507
V = q/B.d m/s
= 1.7/(0.975 x 0.507)
= 3.354

V1= 1.7/0.975*d1

Energy equation before hydraulic jump


V2/2g + d+D = V12/2g + d1

1.080 +D = 0.147 /d1 +d1


2 1

for hydraulic jump,


d1 = d2/2 + √(1+8Fr22) -1

Fr2 = V2/(g.d2)^(1/2)
V2 = q/B.d2
Ref Calculation

= 1.7/0.975 x d2
= 1.700 /d2

Fr2 = 0.543 /d2^(3/2)

d2 = (d1/2)( √(1+2.479/d13) -1) 2

Section @ 2
A2= 0.975 x d2
V2 = 1.700 /d2
@ canal in FSD
A3= (b+2*1.5*d+b)*d/2 = 3.421 m2
V3 = 1.7/Area = 0.497 m/s

Energy equation at the entrance to the transition and at the end of the transition

d2+ V22/2g = d3 + V32/2g + (D) + 0.5 (V22/2g-V32/2g)


d2-D+V2/4g = d3 + V32/4g
d2-D + 0.074 /d22 = 0.856 3

1,2,3
d1 = 0.394
D = 0.282
d2 = 1.070

Let's take, D= 0.500 m

1 1.580 = 0.155 /d1 +d1


2

2 d2 = (d1/2)( √(1+2.479/d13) -1)

By using above equations,


d1= 0.351
d2= 1.329
Ref Calculation

V1= 4.846 m/s


F1 = 2.612

If Froude number falls between 2.5 and 4.5


select the type IV basin
length of stilling basin L/d2 = 5.000
L= 6.646
Say L= 8.000 m
D= 0.500 m
according to D=0.50m, calculate d1 and d2

1 d1= 0.316 m
2 d2= 1.622 m

Ref 03 Trajactory of the free jetflow to minimize cavitation potential

velocity at the end of the conduit, VA = 3.354 m/s

Let LT be the length of vertical transition, Then,

�=((tan��− tan�𝑜).2ℎ𝑣 𝐶𝑜𝑠^2�𝑜 )/�𝑇 <0.5

where tan θL = Slope angle of the flow at the end of the Trajectory
Ref Calculation

tan θo = Barrel slope

hv = Velocity head at the origin of the Trajactory


tan θL = 0.500 (Limited to between 0.333 to 0.666)
tan θo = 0.0050

hv = VA /2g
2
= 0.573
K= 0.568 /Lt < 0.500
Lt > 1.135 Lt = 2.000 m

Equation of the Parabola is given by,


Y= X.tanθo + ((tan θL - tan θo).X2)/2.Lt

= X * 0.0045 + {(0.50-0.0045).X2}/ (2*2.000)


0.0050 X+ 0.124 X2

X 0.250 0.500 0.750 1.000 1.250 1.500 1.750 2.000


Y 0.009 0.033 0.073 0.129 0.200 0.286 0.388 0.505

Horizontal length of Trajectory = 2.000 m

Determination of free board of the stilling basin

Ref 03 Free Board = QV1d1/A

Q= 1.700 m3/s
d1= 0.351 m
A= 0.351
V1= 4.846

Q.V1.d1/A = 290.764

Ref 03 From Graph = 2.000 ft 0.610


102
So, Select Free Board as 0.75 m
Ref Calculation

Design Of D/S Transition

downstream transition should be connected with the stilling basin and earth canal
Ref 2
393 tan α = 1/(3F)
Ref 3
44 F= V/√(gd)

where, V= (V2 + V3)/2


((1.7/(0.975*1.329))+0.497)/2
= 0.888 m/s

d= (d2+d3)/2
(E516+E414)/2
1.090 m

F= 0.272

tan α = 1.227
α = 50.827

Angular velocity of the flow boundary taken as 35o less than the α

in canal
when the canal is overloaded,
Assume overloaded flow is equal to 1.5 times of full supply flow
Qover = 2.550 m3/s

b (m) d(m) A(m2) P(m) R V Q (m3/s)

2.750 1.026 4.401 6.449 0.682 0.580 2.552


Ref Calculation

dover = 1.026 m
D+dover= 1.526

over loaded
water depth

Lt-Length of Transition

length of transition = 1.526/tan 35


= 2.179 m Say Lt= 3.500 m

Ref 03 Design of downstream cutoff wall at the end of the transition


page 41
e Transition cutoff wall = 2.500 ft
= 0.762 m 1.000 m

minimum thickness of the concrete = 0.200 m 0.300 m

Performance of the stilling basin of heads other than design head


Ref Calculation

jump occurs outside from the barrel is (54.648-52.250) = 4.356 m

It is the depth corresponding to the maximum value of water head to form the jump just inside
the barrel

So water depth at vena contracta = 0.159 m

Height of gate opening = 0.237 m

Ref 01 Now, H = Q2/(c2.B2.h2.2g)


Pg 99 = 8.390 m

Hence, Upto 8.390 m head from the sill level of the sluice,the hydraulic jump occurs inside the
barrel

Airvent for inlet aration


Qa=Qw.α
Qa=discharge of air
Qw=discharge of water in m3/s
α=Ratio of air demand to water demand
α=0.03 (f-1)1.06 if jump forms D/S of the gate A
α=0.0066 (f-1)1.4 if jump does not form B

Air Vent

Sluice Gate

Sluice barrel

h
Ve Ye
Ref Calculation

Frvena =Ve/√(g.ye)

= 10.265

A α1 = 0.318
B α2= 0.149

Qw= 1.700 m3/s

Qa1= 0.540 m3/s


Qa2= 0.253 m3/s

Allowable air velocity Va= 45-90 m/s


Select the air velocityVa = 50.000 m/s

Qa=Va.a a=area of vent

a1= 0.011 m2 if jump forms D/S of the gate


a2= 0.005 m2 if jump does not form

Vent area is taken as 0.005 m2

π.d2/4= 0.011
d= 0.117
4.618 inches

Say 6" φ vent pipe


Ref Calculation

STRUCTURAL DESIGN

300 mm

1250 mm 1850 mm

1000 mm

1600 mm

Length of conduit = 52250 mm

internal width = 1.000 m


external width = 1.600 m
Internal height = 1.250 m
Ref Calculation

External height = 1.850 m


Thickness = 0.300 m

Loads on conduit
Dead loads (Marston theory)
a) The weight of the fill directly above the conduit
b) The frictional forces acting either upward or downward due to fill adjacent
to conduit

Vertical loads on conduit


Case 1 (Trench condition)
A conduit is placed in a narow trench excavated in comparatively compacted material and not
wider than three times the width of the conduit.

P= Cd.w.Bd
2

w= unit weight of fill material


Bd= width of trench
Cd= coefficient depending on depth of fill, width of trench and
properties of fill material

Case 2 (Embankment Condition)


A conduit is placed entirely above the natural ground surface .

P= Cc.w.Bc
2

w= unit weight of material


Bc= width of Conduit
Cc= coefficient depending on depth of fill, width of conduit and
properties of fill material
Live loads
live loads on the conduit is developed by the moving machineries and vehicles during period of
construction and operation periods

To equvate the live load, load of 9" thick earth load is considered

Loading conditions for structural design of sluice barrel


1) Loading on the barrel during construction
2) Immediately after construction with resevoir empty or at low stage
Ref Calculation

3) After construction with H.F.L and phreatic line established

Self weight of the barrel

Weight of top slab(udl)= w/L per unit length


w= total weght of top slab

Weight of vertcal walls= 2G/L per unit length


G= total weght of wall

Saturated density for earth Dsa= 20.840 kN/m3


Dry density of earth Ddry = 18.509 kN/m3
Submerged density of earth Dsub= 10.842 kN/m3
ka = Active earth pressure coefficient
friction Angle (φ) = 38.6750
ka= 0.231
ka,dry= 0.380
ka,sub= 0.550

Trench condition is taken for the design


Ref Calculation

Loading during construction


a) the udl is equal to a pressure imposed by the tracks of a D-8 crawler
tractor
b) weight of 3' thick soil mass

Operating weight = 32,250 kg


length of track = 3.125 m
width of track = 0.550 m

Pressure under track = (32,250*g)/(2*3.125*0.55*1000)


= 92.036 kN/m2

Weight of 3ft earth mass,


Pearth = ϒ.Z
= 20.833*3*0.3048
= 19.056 kN/m2

total pressure = 1.4*19.050+1.6*92.036


173.936 kN/m2

Self weight of conduit

weight of top slab (SwT) = 0.3x1.0x1.0x24

= 7.200 kN/m2
Ref Calculation

Factorized load SwT= 1.4*7.2 kN/m2


10.080 kN/m2

Weight of bottom slab Swb= 7.200 kN/m2

Factorized load Swb= 1.4*7.2 kN/m2

10.080 kN/m2

Weight of vertical walls= 1.25*0.3*1*24*2


Swv= 18.000 kN/m2

Net pressure due to self weight


on bottom of bottom slab= 7.2+7.2+18/(1+.3*2)
= 25.650 kN/m

Factorized load (SwNP)= 1.4*25.650

= 35.910 kN/m
Ref Calculation

Vertical pressure on top slab = 173.927+10.08 = V1


184.016 kN/m

Upward pressure on bottom slab= 173.927+36.16 = V2


209.846 kN/m

Horizontal pressure at Top = Ka,sat x Surcharge = H


0.231x(173.92)
40.152 kN/m

Triangular pressure = Ka,sat x Barrel height x ϒsat = P


0.55 x 1.85 x 20.83 x 1.4
12.460 kN/m

Bending moments and shear forces


Bending moments
A l1,t B

l2,t l2,t

D C
l1,t
Ref Calculation

l1= 1.275 V1 = 184.016


l2= 1.550 V2 = 209.846
H = 40.152
P = 12.460

Ref 05 Fixed End Moments


MAB= V1l1 /12
2

= (184.007*1.2^2)/12
= 22.082 kNm

MBA= V1l1 /12


2

= (184.007*1.2^2)/12
= 22.082 kNm

MAD= H.L2 /12 + Pl2 /30


2 2

= ((95.66*1.55^2)/12)+((29.672*1.55^2)/30)
= 9.037 kNm

MBC = H.L2 /12 + Pl2 /30


2 2

= ((95.66*1.55^2)/12)+((29.672*1.55^2)/30)
= 9.037 kNm

MDA= H.L2 /12 + Pl2 /20


2 2

= ((95.66*1.55^2)/12)+((29.672*1.55^2)/20)
= 9.535 kNm

MCB = H.L2 /12 + Pl2 /20


2 2

= ((95.66*1.55^2)/12)+((29.672*1.55^2)/20)
= 9.535 kNm

MDC = V2l1 /12


2
Ref Calculation

= (210.087*1.2^2)/12
= 25.181 kNm

MCD= V2l1 /12


2

= (210.087*1.2^2)/12
= 25.181 kNm

Shear force

A B

R1 R1

Ref 05 AB - Top slab


By summetrically
R1= V1*l1/2
= 184.01*1.275/2
= 117.31 kN

Shear force at A
Sx= R1 - V1X

x= 0.000 SA = 117.31 kN
Shear force at B=
Sx= R1 - V1X

x= 1.275 SB = -117.31 kN

AD or BC A
H1

H,P

H2
Ref Calculation
D

H1= 0.5*H*l2+(3/10)*(0.5)*P*l2
= 0.5*95.66*1.55+(3/10)*0.5*29.67*1.55
= 34.01 kN

H2= 0.5*H*l2+(7/10)*(0.5)*P*l2
= 0.5*95.66*1.55+(7/10)*0.5*29.67*1.55
= 37.88 kN

Shear force at A =
Sx = H.X+0.5.P/l2.X2-H1

x= 0.000 SA = -34.01 kN
Shear force at D =
Sx = H.X+0.5.P/l2.X2-H1

x= 1.550 SB = 37.88 kN

DC
R2 R2
D V2 C

R2= (V2 x l1)/2


= 210.087*1.275/2
= 133.78 kN

Shear force at C
Sx= R2 - V2X

x= 0.000 SA = 133.78 kN
Shear force at D
Sx= R2 - V2X

x= 1.275 SB = -133.78 kN
Ref Calculation

Moment distribution

Carry over factor = C.O.F = 0.500


Distribution factor = D.F
Relative stiffness K
K=I/L
KAB = KCD= b.t3/12.l1
KBC = KDA= b.t3/12.l2

KAB
DFAB=
KAB + KDA

1/1.275 0.564
DFAB= =
1/1.275+1/1.55

Distribution(AB)= -(FEMAB+FEMAD)/DFAB
= -(-21.528+22.081)/(0.564)
-0.312

Carry over (AB)= C.O.F (AB) * Distribution(BA)

= 0.5*0.312
0.156

Balance = -(Carry over (AB)+ +Carry over (AD))


= -(0.156+0.544)
= -0.700
Ref Calculation

Summary of shear force and bending moments


Member Moment Shear Dis.M X At X Max.M

AB 22.082 117.310 14.39


0.638 -23.005
BA 22.082 -117.310 -14.39
BC 9.037 -34.015 14.39
0.785 0.705
CB 9.535 37.877 -16.70
16.705
CD 25.181 -133.777 16.70
0.638 -17.460
DC 25.181 133.777 -16.70
DA 9.535 37.877 16.70
0.785 0.705
AD 9.037 117.310 -14.39

Load case 2 Immediately after construction

Ddry = 18.509 kN/m3


Ka = 0.231
φ= 38.68 o

fill height = 8.300 m

load from crawler tractor is in 45o angle

equivalent height of fill for imposd load = 1.151 m

equivalent height of fill = 9.451 m

effective depth of fill = H


width of conduit Bc

= 7.876

𝑪�={[𝒆^(𝟐�𝝁(𝑯𝒆/𝑩� )) −𝟏)/𝟐�𝝁]+ [(𝑯/𝑩� 1


−𝑯𝒆/𝑩� ). �^���(��/ �� )]}

𝒆^(𝟐�𝝁(𝑯𝒆/𝑩� )) −𝟐�𝝁 (��/�� )]= ��� γsd ρ+1


Ref Calculation
𝒆^(𝟐�𝝁(𝑯𝒆/𝑩� )) −𝟐�𝝁 (��/�� )]= ��� γsd ρ+1 2

where,
w = Weight of fill material
H= Height of fill from top of conduit
He = Height of equal settlement
μ = coefficient of internal friction

k = Rankine coefficient
γsd = Settlement deflection ratio

ρ = Projection Ratio
μ = tan φ = tan 38.68 0.801

k= (1-Sin φ)/(1+Sinφ)= 0.231

Assume, Conduit is on rigid bed


γsd = 0.500

projection ratio ρ = 1.000

using equation 1
e2*0.376*0.509*(He/Bc)-2*0.376*0.509*(He/Bc)=2*0.376*0.509*0.5*1+1
when, (He/Bc) =1.495
LHS = 1.185
RHS = 1.185

Cc= ((e^(2*0.376*0.509*1.465)-1)/(2*0.376*0.509))+(7.88-1.465)*(e^(2*0.376*0.509*1.465))
= 13.084

P'= Cc.w.Bc2
= 13.204*18.43*1.5752
= 544.89
= 547.52*4 = 762.85 kN/m

H= Ka.ϒ.h =Ka.P
= 0.376*547.52
Ref Calculation

= 125.78 kN/m
= 208.06*4 = 176.10 kN/m

V1= Swt + P'= 772.93


V2=Swnp+ P' = 798.76
H= 176.10
P= Ka.Ddry.1.85*1.4 11.07

Bending moments and shear forces

A l1 B

l2
Ref Calculation
l2

D C

MAB= V1l1 /12


2

= (776.61*1.275^2)/12
= 104.707 kNm

MBA= V1l1 /12


2

= (776.61*1.275^2)/12
= 104.707 kNm

MAD= H.L2 /12 + Pl2 /30


2 2

= ((291.28*1.55^2)/12)+((18.14*1.55^2)/30)
= 36.143 kNm

MBC = H.L2 /12 + Pl2 /30


2 2

= ((291.28*1.55^2)/12)+((18.14*1.55^2)/30)
= 36.143 kNm

MDA= H.L2 /12 + Pl2 /20


2 2

= ((291.28*1.55^2)/12)+((18.14*1.55^2)/20)
= 36.586 kNm

MCB = H.L2 /12 + Pl2 /20


2 2

= ((291.28*1.55^2)/12)+((18.14*1.55^2)/20)
= 36.586 kNm

MDC = V2l1 /12


2

= (802.69*1.275^2)/12
= 108.207 kNm

MCD= V2l1 /12


2
Ref Calculation

= (802.69*1.275^2)/12
= 108.207 kNm

Shear force

A B

R1 R1

Ref 05 AB - Top slab


By summetrically
R1= V1*l1/2
= 776.61*1.275/2
= 492.74 kN

Shear force at A
Sx= R1 - V1X

x= 0.000 SA = 492.74 kN
Shear force at B=
Sx= R1 - V1X

x= 0.000 SB = 492.74 kN

AD or BC A
H1

H,P
Ref Calculation

H2
D

H1= 0.5*H*l2+(3/10)*(0.5)*P*l2
= 0.5*291.28*1.55+(3/10)*0.5*18.14*1.55
= 139.05 kN
H2= 0.5*H*l2+(7/10)*(0.5)*P*l2
= 0.5*291.28*1.55+(7/10)*0.5*18.14*1.55
= 142.48

Shear force at A =
Sx = H.X+0.5.P/l2.X2-H1

x= 0.000 SA = -139.05
Shear force at D =
Sx = H.X+0.5.P/l2.X2-H1

x= 1.550 SB = 142.48

DC
R2 R2
D V2 C

R2= (V2 x l1)/2


= 802.69*1.275/2
= 509.21 kN

Shear force at C
Sx= R2 - V2X

x= 0.000 SA = 509.21 kN
Shear force at D
Sx= R2 - V2X

x= 1.275 SB = -509.21 kN

Moment distribution
Ref Calculation

Specimen calculation shown in load case 1


Shear force, Bending Moment

Member Moment Shear Dis.M X At X Max.M

AB 104.707 -136.476 65.66


0.638 91.400
BA 104.707 492.741 -65.66
BC 36.143 -492.741 65.66
0.763 13.317
CB 36.586 -136.476 -68.24
91.400
CD 108.207 145.052 68.24
0.638 -54.103
DC 108.207 509.208 -68.24
DA 36.586 -509.208 68.24
0.763 13.317
AD 36.143 145.052 -65.66
Load case 3

after construction with phreatic line established under high flood level

Density of water Dw = 9.81


Density of submerged earth Dsu= 10.84
Density of saturated earth Dsa = 20.84
Active pressure coefficient Ksu = Ksa= 0.23
Pressure due to self weight of top slab Swt= 10.08
Pressure due to self weight of bottom slab Swnp= 35.91

a b

B C

H.F.L A h1
h1

Phreatic
H1 line(1:4)
h2 h2 h2
Ref Calculation

under this load case two situation are possible


a) at fully submerged condition
b) phreatic line below high flood level

type a
h = H1= 7.00
Barrel height above bottom slab= 1.55 m
V1 = Dw.H1 +Dsu.h1+Swt = 212.47
V2 = Dw.H1 +Dsu.h1+Dw.1.55+Swnp = 233.76
H= Dw.H1+Ka.Su.h = 120.67
P= 1.55*Dw+1.55*Dsu.Ka = 26.72
type b

V1 = Dw.h2 +Dsu.h2+Dsa.h1+Swt
V2 = Dw.(h2+1.55)+Dsu.h2+Dsa.h1+Swnp
H= Ka(Dsa.h1+DSu.h2)+Dw.h2
P= Ka(1.55*Dsu)+1.55*Dw

Point h1 h2 V1 V2 H P
A 0.00 7.00 216.50 273.95 120.67 26.72
B 2.93 5.37 254.74 312.19 112.29 26.72
C 4.18 4.12 255.07 312.52 99.16 26.72

Bending moments and shear forces

A l1 B

l2

D C
Ref Calculation

Point A

MAB= V1l1 /12


2

= (216.97*1.275^2)/12
= 30.491 kNm

MBA= V1l1 /12


2

= (216.97*1.275^2)/12
= 30.491 kNm

MAD= H.L2 /12 + Pl2 /30


2 2

= ((154.84*1.55^2)/12)+((34.28*1.55^2)/30)
= 26.298 kNm

MBC = H.L2 /12 + Pl2 /30


2 2

= ((154.84*1.55^2)/12)+((34.28*1.55^2)/30)
= 26.298 kNm

MDA= H.L2 /12 + Pl2 /20


2 2

= ((154.84*1.55^2)/12)+((34.28*1.55^2)/20)
= 27.368 kNm

MCB = H.L2 /12 + Pl2 /20


2 2

= ((154.84*1.55^2)/12)+((34.28*1.55^2)/20)
= 27.368 kNm

MDC = V2l1 /12


2

= (274.77*1.275^2)/12
= 38.581 kNm

MCD= V2l1 /12


2

= (274.77*1.275^2)/12
= 38.581 kNm
Ref Calculation

Shear force

A B

R1 R1

Ref 05 AB - Top slab


By summetrically
R1= V1*l1/2
= 216.97*1.275/2
= 138.02 kN

Shear force at A
Sx= R1 - V1X

x= 0.000 SA = 138.02 kN
Shear force at B=
Sx= R1 - V1X

x= 0.000 SB = 138.02 kN

AD or BC A
H1

H,P

H2
D

H1= 0.5*H*l2+(3/10)*(0.5)*P*l2
= 0.5*154.84*1.55+(3/10)*0.5*34.28*1.55
= 99.73 kN
Ref Calculation

H2= 0.5*H*l2+(7/10)*(0.5)*P*l2
= 0.5*154.84*1.55+(7/10)*0.5*34.28*1.55
= 108.01
Shear force at A =
Sx = H.X+0.5.P/l2.X2-H1

x= 0.000 SA = -99.73
Shear force at D =
Sx = H.X+0.5.P/l2.X2-H1

x= 1.550 SB = 295.63

DC
R2 R2
D V2 C

R2= (V2 x l1)/2


= 274.77*1.275/2
= 178.07
Shear force at C
Sx= R2 - V2X

x= 0.000 Sc = 178.07 kN
Shear force at D
Sx= R2 - V2X

x= 1.300 Sd = -178.07 kN

Point B

MAB= V1l1 /12


2

= (255.15*1.275^2)/12
Ref Calculation

= 35.876 kNm

MBA= V1l1 /12


2

= (255.15*1.275^2)/12
= 35.876 kNm

MAD= H.L2 /12 + Pl2 /30


2 2

= ((165.77*1.55^2)/12)+((34.28*1.55^2)/30)
= 24.620 kNm

MBC = H.L2 /12 + Pl2 /30


2 2

= ((165.77*1.55^2)/12)+((34.28*1.55^2)/30)
= 24.620 kNm

MDA= H.L2 /12 + Pl2 /20


2 2

= ((165.77*1.55^2)/12)+((34.28*1.55^2)/20)
= 25.690 kNm
MCB = H.L2 /12 + Pl2 /20
2 2

= ((165.77*1.55^2)/12)+((34.28*1.55^2)/20)
= 25.690 kNm
MDC = V2l1 /12
2

= (312.95*1.275^2)/12
= 43.967 kNm

MCD= V2l1 /12


2

= (312.95*1.275^2)/12
= 43.967 kNm

Shear force
A B

R1 R1

Ref 05 AB - Top slab


Ref Calculation

By summetrically
R1= V1*l1/2
= 255.15*1.275/2
= 162.40 kN

Shear force at A
Sx= R1 - V1X

x= 0.000 SA = 162.40 kN
Shear force at B=
Sx= R1 - V1X

x= 1.300 SB = -168.77 kN

AD or BC A
H1

H,P

H2
D

H1= 0.5*H*l2+(3/10)*(0.5)*P*l2
= 0.5*165.77*1.55+(3/10)*0.5*34.28*1.55
= 93.23 kN

H2= 0.5*H*l2+(7/10)*(0.5)*P*l2
= 0.5*165.77*1.55+(7/10)*0.5*34.28*1.55
= 101.52
Ref Calculation

Shear force at A =
Sx = H.X+0.5.P/l2.X2-H1

x= 0.000 SA = -93.23
Shear force at D =
Sx = H.X+0.5.P/l2.X2-H1

x= 1.550 SB = 101.52

DC
R2 R2
D V2 C

R2= (V2 x l1)/2


= 312.95*1.275/2
= 199.02 kN

Shear force at C
Sx= R2 - V2X

x= 0.000 SA = 199.02 kN
Shear force at D
Sx= R2 - V2X

x= 1.275 SB = -199.02 kN

Point C

MAB= V1l1 /12


2

= (255.42*1.275^2)/12
= 34.554 kNm

MBA= V1l1 /12


2

= (255.42*1.275^2)/12
= 34.554 kNm
Ref Calculation

MAD= H.L2 /12 + Pl2 /30


2 2

= ((158.19*1.55^2)/12)+((34.28*1.55^2)/30)
= 21.992 kNm

MBC = H.L2 /12 + Pl2 /30


2 2

= ((158.19*1.55^2)/12)+((34.28*1.55^2)/30)
= 21.992 kNm

MDA= H.L2 /12 + Pl2 /20


2 2

= ((158.19*1.55^2)/12)+((34.28*1.55^2)/20)
= 23.062 kNm

MCB = H.L2 /12 + Pl2 /20


2 2

= ((158.19*1.55^2)/12)+((34.28*1.55^2)/20)
= 23.062 kNm

MDC = V2l1 /12


2

= (313.22*1.275^2)/12
= 44.013 kNm

MCD= V2l1 /12


2

= (313.22*1.275^2)/12
= 44.013 kNm

Shear force

A B

R1 R1

Ref 05 AB - Top slab


By summetrically
R1= V1*l1/2
Ref Calculation

= 255.42*1.275/2
= 162.61 kN

Shear force at A
Sx= R1 - V1X

x= 0.000 SA = 162.61 kN
Shear force at B=
Sx= R1 - V1X

x= 1.300 SB = -168.98 kN

AD or BC A
H1

H,P

H2
D

H1= 0.5*H*l2+(3/10)*(0.5)*P*l2
= 0.5*158.19*1.55+(3/10)*0.5*34.28*1.55
= 83.06 kN

H2= 0.5*H*l2+(7/10)*(0.5)*P*l2
= 0.5*158.19*1.55+(7/10)*0.5*34.28*1.55
= 91.34

Shear force at A =
Sx = H.X+0.5.P/l2.X2-H1

x= 0.000 SA = -83.06
Shear force at D =
Sx = H.X+0.5.P/l2.X2-H1

x= 1.550 SB = 91.34
Ref Calculation

DC
R2 R2
D V2 C

R2= (V2 x l1)/2


= 313.22*1.275/2
= 199.23 kN

Shear force at C
Sx= R2 - V2X

x= 0.000 SA = 199.23 kN
Shear force at D
Sx= R2 - V2X

x= 1.300 SB = -207.05 kN

Shear force, Bending Moment

Moment Shear
Member
Point A Point B Point C Point A Point B Point C

AB 30.491 35.876 34.554 138.02 162.40 162.61


BA 30.491 35.876 34.554 138.02 -168.77 -168.98
BC 26.298 24.620 21.992 -99.73 -93.23 -83.06
CB 27.368 25.690 23.062 295.63 101.52 91.34
CD 38.581 43.967 44.013 178.07 199.02 199.23
DC 38.581 43.967 44.013 -178.07 -199.02 -207.05
Ref Calculation

DA 27.368 25.690 23.062 295.63 101.52 91.34


AD 26.298 24.620 21.992 -99.73 -93.23 -83.06
Summary of the Moments of the barrel in all load cases after Moment distribution

Load case 3
Member Case 1 Case 2
A B C

AB 14.39 65.66 27.21 28.61 26.37


BA -14.39 -65.66 -27.21 -28.61 -26.37
BC 14.39 65.66 27.21 28.61 26.37
CB -16.70 -68.24 -33.18 -34.59 -33.31
CD 16.70 68.24 33.18 34.59 33.31
DC -16.70 -68.24 -33.18 -34.59 -33.31
DA 16.70 68.24 33.18 34.59 33.31
AD -14.39 -65.66 -27.21 -28.61 -26.37
Ref Calculation

design of reinforcement
maximum bending moment and maximum shear force occur in load case 2
design of conduit under load case 2

Member Moment Shear Dis.M X At X Max.M

AB 104.71 -136.48 65.66


0.64 91.40
BA 104.71 492.74 -65.66
BC 36.14 -492.74 65.66
0.76 13.32
CB 36.59 -136.48 -68.24
91.40
CD 108.21 145.05 68.24
0.64 -54.10
DC 108.21 509.21 -68.24
DA 36.59 -509.21 68.24
0.76 13.32
AD 36.14 145.05 -65.66

Minimum area of reinforcement


Ref 05 100.As/Ac = 0.13
As = 390 mm2
Bar φ 12 @ 250 mm Spacing
No of Bars = 4
As provided = 452 mm2

reinforcement for bending


Ref Calculation

Maximum BM= 91.4 kNm


Assume bar diameter as 12 mm

Cover = 40 mm
deff = 254 mm

k = M/(bd2.Fcu)
k = 0.047
z = 239.89
0.95 d = 241.30
z<0.95d
Z = 0.95 d
z= 241.30
As = M/(0.95.fy.z)
= 866.78
Bar φ 16 @ 200 mm
No of Bars = 5
As provided = 1005 mm2
Reinforcement Selected for
Bending
Main reinforcement
T 16 mm bars at 200mm spacing As provided = 1005 mm2
No of Bars = 5
Distribution reinforcement
T12 mm bars at 250mm spacing As provided = 452 mm2
No of Bars = 4

Design for shear

SFmax for all cases of load = 509.208


Shear stress v = SFmax/deff

511.715/244
2.005 N/mm2
Ref Calculation

0.8 √fcu = 0.8*√30


4.382 N/mm2

v < 0.8 √fcu


Status of concrete = OK

vc = 0.79*(((100*As)/(bv*d))^(1/3))*((400/d)^(1/4))*(1/1.25)
= 0.79*(((100*1005)/(1000*244))^(1/3))*((400/244)^(1/4))*(1/1.25)
= 0.520

v-vc = 2.097-0.532
= 1.485 > 0.4
So shear links to be provided

Asv ≥ bv.Sv.(V-Vc)/(0.87*fyv)
≥ 1000*1.565/(0.87*460)
Asv ≥ 3.911 *Sv

Assumed bar diameter = 10 mm


No of bars = X
Asv ≥ 3.911 *Sv
X.As(10mm) ≥ 3.911 *Sv
By trial and error method
No of Bars per meter = 4
As provided = 1256 mm2

Reinforcement details of barrels

Bar dia. No of Bars Spacing Asprov.

Main 16 5 200 1005


Ref Calculation

Distri. 12 4 250 804


Shear 10 4 250 1256

Design of stilling basin and downstream transition

Idealization of the structure and loads for analysis


Ref Calculation

P1 P1

w1 w2 2.400

w3
P2 P2
P3 P3

1.6m

it was assumed that a surcharge of 2ft thick earth mass to allow for the weights of
construction equipments
k= Active pressure coefficient
Dm = density of earth
h= height of stilling basin
w1,w2 = weights of side walls of stilling basin
w3= weight of bottom slab

Then, P1 = k.Dm.(2/3.28)
P2 = k.Dm.((2/3.28)+h)
P3 = ((w1+w2)/(1.0+t))+w3
P4 = P2 - P1

where, Dm = Dsa = 20.840 kN/m3


k = ka = 0.231
Dcon = 24.000 kN/m3
w1 = t*h*1*Dcon
= 0.3 x 2.4 x 1 x 24
= 17.280 kN
w2 = 17.280 kN

w3 = t*1*1*Dcon
.3 x 1 x 1x 24
Ref Calculation

7.200 kN

Now, Net pressure P3 = ((17.280 x 2)/1.3)+7.2


= 33.785 kN/m
factorized load = 33.785 x 1.4
47.298 kN/m

vertical P, due to surcharge, P1 = k.Dm.(2/3.28)


2.933 kN/m
Factorized P1 = 4.107
P2 = k.Dm. ((2/3.28) + 2.4)
= 14.479 kN/m

Factorized P2 = 1.4*14.479
20.271 kN/m

P4 = P2 - P1
16.164 kN/m

Ref 06 P1 A D P1
Table
24,26

x
P2 B C P2

P3 P3

MA = MD= 0.000
MB = MC= 0.5 x P1 x (DC)^2 + 1/3 (DC) . 1/2.P4 (DC)
= 27.345
Ref Calculation

DC
X4 = 9.8 x 2.4 + 0.5*38.5*2.372
29.253 =X1=X2=X3

Y4 = W2= 17.280 kN

BC
Y3 = 30.74 kN = Y2

Mx = 27.345 -29.957 X +(49.929 X^2)/2


27.345 -30.744 X+ 23.649 X2

dMx/dx = 0
i.e. 47.298 X -30.744 =0
X= 0.650
X= 0.000
M0.6 = 17.353
M0 = 27.345

design of reinforcement

Minimum area of reinforcement


3 100.As/Ac = 0.13
As = 390
Ref Calculation

Bar φ 12 @ 250 mm Spacing


No of Bars = 4
As provided = 452 mm2

reinforcement for bending


Maximum BM= 27.345
Assume bar diameter as 16 mm
As = M/(0.95.fy.z)
285.42
So Calculated area is less than the minimum reinforecement Area
provide T12 @ 250mm As provided = 452 mm2

Bending
Main reinforcement
Minimum reinforcement is selected
T 12 mm bars at 250mm spacing

Distribution reinforcement
T12 mm bars at 250mm spacing

Shear
shear reinforcement is not needed

Crack width
3.12.11.2.7
clear spacing < 3*deff or 750mm

spacing<= 200 mm

So crack width check is ok.

Design for shear


Ref Calculation

Maximum shear force = 29 kN


Shear stress = 0.116 < 0.8√fcu

Grade of concrete section is ok

Concrete shear resistance


As provided = 452
Vc = 0.400 29%

since v is 58% of vc, shear reinforcement is not needed

design of reinforcement for Trajectory and stilling basin


calculations are same as barrel
No of
Bar dia. Spacing Asprov.
Bars

Main 12 4 250 452


Distri. 12 4 250 452
Shear Not needed
Ref Calculation

Design of Unit 3 Transition

P = k.Dsa.h.Sin2β
Ref Calculation

n= 0.375
h1 = 1.188
h2 = 0.813
tanβ = 0.667
angle of inclination of the wall β= 33.723
w1' = 1.556
w2' = 0.338
w1'-w2' = 1.218
Assume base and wall thickness are assumed to be 300 mm
w1 = t*h1*Dcon
= 0.3 x 1.189x 24
= 8.554
w2 = √(h2 +w2' ) x t x Dcon
2 2

= (0.813^2+1.218^2)^(1/2) x 0.3 x 24
= 10.544
w3 = width of section x t x Dcon
= 1.575 x 0.3 x 24
= 11.340

Factorized values
w1 = 11.975 kN
w2 = 14.761 kN
w3 = 15.876 kN

Net P at bottom P5 = (2w1+2w2+w3)/1.575


= 44.031 kN/m2

P1 = k.Dsa.h
0.55*20.833*2*0.3048
Ref Calculation

2.933 kN/m2

P2 = ka.Dsa.(2*0.3048+h1)
0.231*20.84*((2*A)+1.189)
20.609 kN/m2
P3 = k.Dsa.h.Sin2β
0.231*20.84*(0.609+1.189)*(Sin33.723)^2
2.666 kN/m2

P4 = k.Dsa.h.Sin2β
0.231*20.84*(0.609+h1+h2)*(Sin33.723)^2)
3.870 kN/m2

Factorized pressures,
P1 = 4.106 kN/m2
P2 = 28.852 kN/m2
P3 = 3.732 kN/m2
P4 = 5.418 kN/m2
P5 = 44.031 kN/m2
structure should be analyzed as a continuous member supported at B,C,D and E
FEMs
MAB = 0.000 =MFE

MBA = (1/2).P1.h1 + (1/3).(1/2).(P2-P1).h1


2 2
=MEF
= 8.718 kNm

MBC = (1/12).P3.x2+(P4-P3).x2.(1/30) =MED


0.788

MCB = (1/12).P3.x2+(P4-P3).x2.(1/20) =MDE


0.848

MCD = (1/12).P5.(b')^2
9.102
Ref Calculation

Distributed moment
MAB = 0.000 0.000 =MFE
MBA = 8.718 -8.718 =MEF
MBC = -8.717 8.717 =MED
MCB = 4.425 -4.425 =MDE
MCD = -4.428 4.428 =MDC
Member forces

P1
A F

MBC MCD
x1 x8
Y1 x2 x7 E Y8
B P2
Y2
Y7

x3 x6
Y4 Mx Y5
X
Y3 x 4 x5 Y6
C P5 D

AB
A MBA -X1.h1+P1.h.h/2 + (1/2).(P2-P1).h.2h/3 = 0
X1 = 16.777

B X3 = -3.047

X2 = 9.466

CD
C Y5= 26.736
Y4 = -26.74

Mid span moment of member CD


Ref Calculation

Mx = -Y4.x +P5.(x /2)-(w3/1.575).(x /2)


2 2

= -26.74 x-x2 22.015 +x2 5.040


= -26.74 x+ 16.975 x2
dMx/dx = -26.74 +x 33.951

for points of contraflexure

dMx/dx = 0
x= 0.788
then Mmax = -10.53

Minimum area of reinforcement


Ref 05 100.As/Ac = 0.13
As = 390 mm2
Bar φ 12 @ 250 mm Spacing
No of Bars = 4
As provided = 452 mm2

reinforcement for bending


Maximum BM= 10.5 kNm
Assume bar diameter as 12 mm

Cover = 40 mm
deff = 254 mm

k = M/(bd2.Fcu)
k = 0.005
z = 252.46
0.95 d = 241.30
z>0.95d
Z = 0.95 d
z= 241.30
As = M/(0.95.fy.z)
Ref Calculation

= 99.83
So Calculated area is less than the minimum reinforecement Area

Design for shear

SFmax for all cases of load = 0.000


Shear stress v = SFmax/deff

511.715/244
0.000 N/mm2

0.8 √fcu = 0.8*√30


4.382 N/mm2

v < 0.8 √fcu


Status of concrete = Not OK

vc = 0.79*(((100*As)/(bv*d))^(1/3))*((400/d)^(1/4))*(1/1.25)
= 0.79*(((100*1005)/(1000*244))^(1/3))*((400/244)^(1/4))*(1/1.25)
= 0.398 <0.4

So shear links no need to be provided

Reinforcement Details
Bending
Main reinforcement
Minimum reinforcement is selected
T 12 mm bars at 250mm spacing

Distribution reinforcement
T12 mm bars at 250mm spacing

Shear
Ref Calculation

shear reinforcement is not needed

Crack width
3.12.11.2.7
clear spacing < 3*deff or 750mm

spacing<= 200 mm

So crack width check is ok.

design of reinforcement for Transition

No of
Bar dia. Spacing Asprov.
Bars

Main 12 4 250 452


Distri. 12 4 250 452
Shear Not needed

Design of sluice tower


2.350

2.350

t= 0.300 m
Ref Calculation

unit - 1

P1
unit - 2

P2

Unit 1
w1= (57.23-49.95)*g
w1= 71.417
FEMs
MAB= MBA= MBC= MCB= MCD= MDC= MDA= MAD= wl2/12
((57.23-49.95)*g*((2.35-0.3)^2))/12
= 25.011

Calculation of Forces and Moments

Member BC

2350

2350
Ref Calculation

l2
M1 M2

B R1 C R1
x

2R1 = W1l1
R1 = 73.2022 kN

Moment at X
Mx = +R1 x - M1 - w x2/2

Max m moment dMx/dx = 0


dMx/dx = R1 - wX X = R1/ w

X= 1.025 m
Max m M -75.032 kNm

Shear force at X
Sx = R1 - w1X

X=0 Sx R1= 73.20222 kN


X 1.025 m
Sx= 0 kN
Minimum area of reinforcement
3 100.As/Ac = 0.13
As = 390 mm2
Bar φ 12 @ 250 mm Spacing
No of Bars = 4
As provided = 452 mm2

reinforcement for bending


Maximum BM= 75.03
Assume bar diameter as 12 mm

cover= 40 mm
Ref Calculation

deff= 254

k = M/(bd2.Fcu)
k= 0.039

z= 242.54

0.95 d = 241.30

z>0.95d
804 mm2
Z = 0.95 d
z= 241.30

As = M/(0.95.fy.z)
711.56
Bar φ 16 @ 250 mm Spacing
No of Bars = 4
As provided = 804 mm2

provide 16 4 bars @ 250 mm As provided = 804


Minimum reinforcement is provided
Design for shear

Maximum shear force = 73 kN


Shear stress = 0.288 < 0.8√fcu

Grade of concrete section is ok

Concrete shear resistance


As provided = 804 mm
Vc = 0.483 60%

table 3.7 minimum links for whole length


Ref Calculation

BS 8110 Assume T10 bars within 1m,Say 5Nos (200mm interval)

Asv= 393 mm2


Asv >= 0.4*bv*Sv/(0.87.fyv) Hinter= 200 wl2/12
Sv <= 393.197 33.514

provide links at 400 mm intervals


design of reinforcement

No of
Bar dia. Spacing Asprov.
Bars
Main 16 4 250 804
Distri. 12 5 200 565
Shear 10 5 200 393

Unit 2

By neglecting verical loads,


P1= 107.46
P2= 129.97

M1 = P1l12/12+P3l12/30

= 15.165

M2= P1l12/12+P3l12/20

= 15.751

X2.l= (M2-M1+P1.l2/2+(P2-P1)/3
96.26

X1.l = M1-M2+(P1.l2/2)+(P3.l2/6)
89.229
Ref Calculation

Mx = X1.x - M1-P1/2.x62-P3.x^3/b.l
dMx/dx= X1-P1.x-3.P3.x^2/6l = 0.000

x= 0.780 m
M= 20.241

Mmax= 96.260
Minimum area of reinforcement
Ref 05 100.As/Ac = 0.13
As = 390 mm2
Bar φ 12 @ 250 mm Spacing
No of Bars = 4
As provided = 452 mm2

reinforcement for bending


Maximum BM= 96.3 kNm
Assume bar diameter as 12 mm

Cover = 40 mm
deff = 254 mm

k = M/(bd2.Fcu)
k = 0.050
z = 239.09
0.95 d = 241.30
z<0.95d
Z = 0.95 d
z= 241.30
As = M/(0.95.fy.z)
= 912.87
Bar φ 16 @ 200 mm
No of Bars = 5
Ref Calculation

As provided = 1005 mm2


Reinforcement Selected for
Bending
Main reinforcement
T 16 mm bars at 200mm spacing As provided = 1005 mm2
No of Bars = 5
Distribution reinforcement
T12 mm bars at 250mm spacing As provided = 452 mm2
No of Bars = 4
design of reinforcement
calculation same as barrel
No of
Bar dia. Spacing Asprov.
Bars
Main 16 5 200 1005
Distri. 12 4 250 452
Shear 10 5 200 393

Calculation of ultimate vertical load on a wall

1) Self weight of the deck


3.750 m 14.063 =Area

self weight of concrete slab = 14.063*0.2*24


67.500 kN
Roof weight of sluice tower = 67.500 kN

Self weight of column = (0.225^2)*3*24*4


14.580 kN
Total dead load above deck level= 67.5+G67.5+14580
149.58 kN
Ref Calculation

Ref 05 2) Live load on deck = = 100 lb/ft2


= 4.79 kN/m2
= 67.415 kN

Ref 05 3) walls around the deck = Allow 5 Tons


= 50.000 kN

4) Weight of bulk head gate & the hoist = 2.043 kN

5) Weight of Sliding gate & the hoist = 2.043 kN


8) Dead load of the tower = (59.09-49.95)*2.05*0.3*24*4
= 539.63

Factorized loads
Dead load= 1.4*((1)+(3)+(4)+(5)+(7)+(8))
= 1064.80 kN

Live load = 1.6*((2)+(6))


135.43

Total ultimate design vertical load on two walls =Dead load + Live load
Design of tower foundation

Assume that the foundation of tower as Raft foundation

when the reservoir is empty,critical condition of tower foundation occurs because of that no
cancellation to downward vertical loads due to upthrust.

Total ultimate to foundation = Total ultimate loads upto the level of 49.45m MSL
+Dead load upto 46.6m MSL from the tower

Dead load of the tower = ((0.3*(2.35+2.35))+(1.035*0.25-0.235*0.1))+(0.2*0.1))*1.25*24


48.2mMSL - 49.45mMSL = 49.958 kN

weight of the sill level slab = 0.15*24*2.35*2.35


= 19.966 kN
Ref Calculation

weight of the Raft foundation = 0.6*24*(4.55^2)


298.12 kN

weight of wall from sill level to


foundation = (4.55*4.55-3.35*3.35)*1*0.6*24
= 136.51 kN

Total factorized dead load = (38.16+135.36+19.966+64.313+230.4+363.77)*1.4


= 1295.33 kN

Total ultimate vertical load on raft foundation = 2495.56 kN

base width = 4.550 m


bearing pressure= 263.25 kN/m2
Qu= Ultimate bearing capacity
= 10.84 kN/m3
c= 5.42
Ø= 38.68
Nq=exp(ΠtanØ)tan2(45+Ø/2) = 49.0
Qu= 1.3cNc+ϒDNq+0.4ϒBNϒ

Nc= (Nq-1)CotØ = 60.0


Nϒ= 1.8 (Nq-1) tanØ = 67.0
Qu= 2062.90 kN/m2 7.836

Ultimate bearing capacity of soil is greater than the pressure given by the structure.

Assuming the raft foundation as an inverted slab supported on four edges


Cl-3.15
BS 8110 βsx = 0.055
βsy = 0.056

Msx = βsx.n.lx2 1
Msy = βsy.n.lx2 2

from 1
Ref Calculation

Msx = 0.055*140.94*2.5^2
41.437

from 2
Msy = 42.190

shear forces
Vsx = βsx.n.lx
Vsy = βsy.n.lx

βsx = 0.330
βsy = 0.330

Vsx = 99.45
Vsy = 99.45

Design of reinforcement for bending and shear of the foundation

Minimum area of reinforcement


Ref 05 100.As/Ac = 0.13
As = 780 mm2
Bar φ 16 @ 250 mm Spacing
No of Bars = 4
As provided = 804 mm2

reinforcement for bending


Maximum BM= 42.2 kNm
Assume bar diameter as 16 mm

Cover = 40 mm
deff = 252 mm

k = M/(bd2.Fcu)
Ref Calculation

k = 0.022
z = 245.64
0.95 d = 239.40
z>0.95d
Z = 0.95 d
z= 239.40
As = M/(0.95.fy.z)
= 403.28
Bar φ 16 @ 200 mm
No of Bars = 5
As provided = 1005 mm2
Reinforcement Selected for
Bending
Main reinforcement
T 16 mm bars at 200mm spacing As provided = 1005 mm2
No of Bars = 5
Distribution reinforcement
T12 mm bars at 250mm spacing As provided = 804 mm2
No of Bars = 4
design of reinforcement
calculation same as barrel
No of
Bar dia. Spacing Asprov.
Bars
Main 16 5 200 1005
Distri. 12 4 250 452
Shear 10 5 200 393
M= 42.19 kNm
Assume bar diameter = 16.00 mm
thickness = 600.00 mm
cover = 40.00 mm
d= 552.00 mm
b= 1000.0 mm

T16 @ 200.00 mm
Ref Calculation

Design for shear

Maximum shear stress = 0.07


Vc = 0.33
V/Vc = 0.22
Shear reinforcement is not needed

check for punching shear


Shear perimeter = 2*(2.35+0.75)+2*(2.55+0.75)
12.80 m

Shear area = Shear perimeter*d/1000


12.80*0.552/1000
7.07 mm2

Shear stress = 0.35 < 4.38

Safe against punching shear


check for uplift

the worst condition for uplift occurs when the reservoir is at high flood level and the
emergency gates are closed (inside the tower is empty)

Total load = 1685.81 kN

Buoyancy force
Ref Calculation
Volume of water replaced by concrete =
(hfl-48.4)*(2.35*2.35)+(48.4-48.25)* (2.55*
2.55) + (48.25-47.1)*(2.55*2.55)+(47.1-
46.5)*(4.55*4.55)
= 69.64 m3

Uplift force = 683.15 kN

F.O.S.against uplift = 3.65

check for stability against wind pressure

wind P= Wk= 0.613.Vs2

Vs = v.S1.S2.S3

v= 45.00 m/s
S1 = 1.00
S2= 0.90
S3= 1.00

Wk = 1005.5 N/m2
1.01 kN/m2

Total moment on tower in X-X direction


M= 1 x 2.35*(hfl-46.5)*(hfl-46.5)/2
136.02

The foundation stress due to wind in X-X direction=

F1= 0.08 ± 0.009

F1>0

No negative foundation stresses are developed


Ref Calculation
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output

76*0.509*1.465))
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output
Output

))+(0.2*0.1))*1.25*24
Output
Output
Output
Output
Output
Output
0.305

𝑽=(𝟏/𝒏)(�^𝟐/𝟑)(𝑺^(𝟏/𝟐
63.485

b (m) d(m) A(m2) P(m) R V V (m/s) Q (m3/s)

3.000 1.250 6.09375 7.507 0.812 0.651 0.218 1.331


2.500 0.900 3.46500 5.745 0.603 0.534 0.172 0.596
2.250 1.000 3.75000 5.856 0.640 0.556 0.160 0.601
21.210

1.250 0.900 1.12500 3.050 0.369 2.300 0.000 2.588


91.381
0.000 0.000 #DIV/0!
1.219 0.914 1.11484 3.048 0.366 2.287 0.000 1.750
61.801

#DIV/0!
0.005
1.000 2.000 3.000 4.00000 5.000 6.000

B 1.000 1.750 1.750 1.25000


d 0.850 1.202 1.202 1.18500
H 1.250 1.250 1.250 1.25000

V 2.000 0.808 0.808 1.14768

B1
2 1
5.000 6.000

0.000 0.000
0.000 0.000
0.000 0.000

0.000 0.000

0.000 0.000

0.305

1 2 3 4 5 6
1.000 1.750 1.750 1.25000 0.000 0.000
0.850 1.202 1.202 1.18500 0.000 0.000
1.250 1.250 1.250 1.25000 0.000 0.000
0.000 0.000 0.000 0.00000 0.000 0.000

2.000 0.808 0.808 1.14768 0.000 0.000


yc =
𝑽=(𝟏/𝒏)(�^𝟐/𝟑))(𝑺^(𝟏/𝟐))

� �=[𝟏.𝟒𝟓−𝟎.𝟒𝟓 ( � 𝒏/� 𝒈 ) − ( � 𝒏/� 𝒈 )^𝟐 ] 〖� _� 〗 ^𝟐/𝟐𝒈

𝐻/ℎ>6.0

37.186
38.405

1.000
�=𝐶.𝐵.ℎ √2𝑔𝐻 𝑖𝑛 𝑐𝑢𝑠𝑒𝑐𝑠

0.369
0.009

48.500
10.590
1.000

0.316
0.182 /d1 +d1
2
1.080 +D =
d2 = d1/2( √(1+2.910/d13) -1)

d2-D + 0.074 /d22 = 0.856


2.357

1.080 +D = 0.147 /d12 +d1


d2 = d1/2( √(1+2.479/d13) -1)
d2-D + 0.074 /d22 = 0.856

d2+0.077/d22=0.155/d12+d1- 0.224
m+(0.155/(m^2))-0.254 = ((m/2)*(((1+(2.479/(m^3)))^(1/2))-1)+(0.077/(((m/2)*(((1+(2.479/(m^3)))^(1/2))-
1))^2)))
d1= 0.394

LHS = 1.168
RHS = 1.139
LHS = 1.362 RHS= 1.343
0.852 0.856

0.351
RHS 1.610

V1= 4.846
F1 = 2.612
0.788
D= 0.28200
0.0050 0.12375

0.100 0.002
0.200 0.006 0.004 0.005
0.300 0.013 0.007 0.008
0.400 0.022 0.009 0.010
0.600 0.048 #REF! 0.016
0.700 0.064 0.017 0.019
0.800 0.083 0.019 0.022
0.900 0.105 0.022 0.025
1.000 0.129 0.024 0.027
1.100 0.155 0.026 0.030
1.200 0.184 0.029 0.033
1.300 0.216 0.031 0.036
1.400 0.250 0.034 0.039
1.500 0.286 0.036 0.020
1.600 0.325 0.039
1.700 0.366 0.041
1.800 0.410 0.044
1.900 0.456 0.046
2.000 0.505 0.049
1.700
2.550
1.390
3.658
18.385
3.028
6.072
g
0.231
Dry density c φ Gs w void ratio
117.500 3.020 37.77000 2.680 9.300 24.924
113.600 7.810 39.58000 2.680 13.400 35.912
115.550 5.415 38.675 2.680 11.350 30.418
16.018
18.509

0.305 32250.000

Ddry Dsat Dsub


18.822 10.648 20.81683 10.817
18.197 10.455 20.83927 10.839
18.509 10.535 20.84168 10.842
Minimum R/F
d Cover deff fcu
d Cover deff fcu No of Bars
As Bar φ As provided Assumed φ
per meter
300 50 242 30 390 12 4 452 16
40.15
12.46

No of Bars
As Bar φ As provided Assumed φ
per meter

300 50 244 30 390 12 4 452 12


0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
0.44 0.56 0.56 0.44 0.44 0.56 0.56 0.44
-21.53 22.08 -22.08 21.53 -22.72 25.21 -25.21 22.72

-0.24 -0.31 0.31 0.24 -1.09 -1.41 1.41 1.09

0.54 0.16 -0.16 -0.54 0.12 0.70 -0.70 -0.12


-0.70 -0.70 0.70 0.70 -0.82 -0.82 0.82 0.82
Minimum R/F
d Cover deff fcu No of Bars
As Bar φ As provided Assumed φ
per meter
300 50 242 30 390 12 4 452 16
40.15
12.46

No of Bars
As Bar φ As provided Assumed φ
per meter
B C

A
Minimum R/F
d Cover deff fcu No of Bars
As Bar φ As provided Assumed φ
per meter
300 50 242 30 390 12 4 452 16
40.15
12.46
No of Bars
As Bar φ As provided Assumed φ
per meter
Minimum R/F
d Cover deff fcu No of Bars
As Bar φ As provided Assumed φ
per meter
300 50 242 30 390 12 4 452 16
40.15
12.46
No of Bars
As Bar φ As provided Assumed φ
per meter
Minimum R/F
d Cover deff fcu No of Bars
As Bar φ As provided Assumed φ
per meter
300 50 242 30 390 12 4 452 16
40.15
12.46
No of Bars
As Bar φ As provided Assumed φ
per meter
𝑪�={(𝒆^𝟐�𝝁(𝑯𝒆/𝑩� )) −𝟏)/𝟐�𝝁+ (𝑯/𝑩�
−𝑯𝒆/𝑩� ). �^ � (��/��^���
(� �/ � � )) }
status of shear R/F is
Max.SF Shear stress Vc v/vc v Vs vc Bar φ
concrete need
x 4 3.911
314 250
1256 977.75
0.231
2.400

1.000
300.000
hbc = 1.464
20.840
60.000
0.500
status of shear R/F is
Max.SF Shear stress Vc v/vc v Vs vc Bar φ
concrete need
600 40 552 30 780 16 4 804 16
0.17
Vc (m/s) CVR

0.632 0.346
0.512 0.336
0.548 0.292 Non silting,
Non Scouring

0.512 0.000
Sluice barrel

water profile

d,V

D
Trajectory
R/F for bending
No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
56.143 0.0319554 233.07867607 229.9 229.9 558.8242 12 5 565
No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter

24.11 0.0134988 240.283714167 231.8 231.8 238.01391 12 3 339


R/F for bending No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
56.143 0.0319554 233.07867607 229.9 229.9 558.8242 12 5 565
No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
no comp
R/F for bending No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
56.143 0.0319554 233.07867607 229.9 229.9 558.8242 12 5 565
No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
R/F for bending No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
56.143 0.0319554 233.07867607 229.9 229.9 558.8242 12 5 565
No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
R/F for bending No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter
56.143 0.0319554 233.07867607 229.9 229.9 558.8242 12 5 565
No of
maximum As
K z 0.95d selected z As Bar φ Bars per
BM provided
meter

no comp
No of
Asv>"X" .
Bars per As provided
Sv
meter
No of
Asv>"X" .
Bars per As provided
Sv
meter
62.78 0.0068679 547.75506401 524.4 524.4 299.14486 16 2 402
ter profile Hydraulic jump d3,V3
d2,V2
3
2
canal

d1,V1 stilling basin


1
R/F for shear
No of
Shear status of shear R/F As
Max.SF Vc v/vc Bar φ Bars per
stress concrete is need provided
meter
70 0.2892562 OK 0.4412546 66%
No of
Shear status of shear R/F As
Max.SF Vc v/vc v Vs vc Bar φ Bars per
stress concrete is need provided
meter

Minimum
133.78 0.5482645 OK 0.370386 148% yes links 10
provided
R/F for shear No of
Shear status of shear R/F As
Max.SF Vc v/vc Bar φ Bars per
stress concrete is need provided
meter
70 0.2892562 OK 0.4412546 66%
No of
Shear status of shear R/F As
Max.SF Vc v/vc v Vs vc Bar φ Bars per
stress concrete is need provided
meter
R/F for shear No of
Shear status of shear R/F As
Max.SF Vc v/vc Bar φ Bars per
stress concrete is need provided
meter
70 0.2892562 OK 0.4412546 66%
No of
Shear status of shear R/F As
Max.SF Vc v/vc v Vs vc Bar φ Bars per
stress concrete is need provided
meter
R/F for shear No of
Shear status of shear R/F As
Max.SF Vc v/vc Bar φ Bars per
stress concrete is need provided
meter
70 0.2892562 OK 0.4412546 66%
No of
Shear status of shear R/F As
Max.SF Vc v/vc v Vs vc Bar φ Bars per
stress concrete is need provided
meter
R/F for shear No of
Shear status of shear R/F As
Max.SF Vc v/vc Bar φ Bars per
stress concrete is need provided
meter
70 0.2892562 OK 0.4412546 66%
No of
Shear status of shear R/F As
Max.SF Vc v/vc v Vs vc Bar φ Bars per
stress concrete is need provided
meter
14.79 0.0267935 OK 0.243506 11%
Q= 1.700 m3/s
B= 1.000 m
So = 0.0050 1.000
n= 0.015
interval = 0.010 m

h(m) V (m/s) Specific Area (m2) Perimeter Hydraulic radious Sf (friction Slope) Sf avg(friction χ (m) Xcum (m)
Energy (m) (m) slope)
�=�/(𝐵.ℎ) �=�^2/2𝑔 �=�/� �_𝑓=(𝑛^(2 ) �=(�_1−�_1)/
+ℎ �=𝐵.ℎ �=𝐵+2ℎ �^2)/�^□(64&4/3) (�_𝑓 𝑎𝑣𝑔−�_𝑜 )

0.141 12.067 7.563 0.141 1.282 0.110 0.622


0.151 11.268 6.622 0.151 1.302 0.116 0.505 0.564 1.684 1.684
0.159 10.702 5.996 0.159 1.318 0.121 0.433 0.469 1.348 3.032
0.161 10.567 5.852 0.161 1.322 0.122 0.417 0.425 0.343 3.375
0.171 9.949 5.216 0.171 1.342 0.127 0.348 0.382 1.689 5.063
0.190 8.929 4.254 0.190 1.381 0.138 0.252 0.300 3.265 8.328
0.181 9.399 4.683 0.181 1.362 0.133 0.293 0.273 -1.606 6.722
0.191 8.906 4.234 0.191 1.382 0.138 0.250 0.272 1.686 8.408
0.201 8.463 3.851 0.201 1.402 0.143 0.215 0.232 1.682 10.090
0.211 8.062 3.523 0.211 1.422 0.148 0.186 1.000 0.330 10.419
0.221 7.697 3.240 0.221 1.442 0.153 0.163 0.174 1.671 12.091
0.231 7.363 2.994 0.231 1.462 0.158 0.143 0.153 1.664 13.755
0.241 7.058 2.780 0.241 1.482 0.163 0.126 0.135 1.656 15.412
0.251 6.776 2.591 0.251 1.502 0.167 0.112 0.119 1.648 17.059
0.261 6.517 2.425 0.261 1.522 0.171 0.100 0.106 1.638 18.698
0.271 6.276 2.278 0.271 1.542 0.176 0.090 0.095 1.628 20.326
0.281 6.053 2.148 0.281 1.562 0.180 0.081 0.086 1.617 21.943
0.291 5.844 2.032 0.291 1.582 0.184 0.073 0.077 1.606 23.549
0.301 5.650 1.928 0.301 1.602 0.188 0.067 0.070 1.594 25.143
0.311 5.468 1.835 0.311 1.622 0.192 0.061 0.064 1.581 26.724
0.321 5.298 1.751 0.321 1.642 0.195 0.056 0.058 1.568 28.291
0.331 5.138 1.676 0.331 1.662 0.199 0.051 0.053 1.554 29.845
0.341 4.987 1.609 0.341 1.682 0.203 0.047 0.049 1.539 31.384
0.351 4.845 1.547 0.351 1.702 0.206 0.043 0.045 1.524 32.908
0.361 4.711 1.492 0.361 1.722 0.210 0.040 0.042 1.508 34.416
0.371 4.584 1.442 0.371 1.742 0.213 0.037 0.039 1.491 35.907
0.381 4.463 1.396 0.381 1.762 0.216 0.035 0.036 1.474 37.381
0.391 4.349 1.355 0.391 1.782 0.219 0.032 0.033 1.456 38.837
0.401 4.241 1.317 0.401 1.802 0.222 0.030 0.031 1.437 40.275
0.411 4.138 1.283 0.411 1.822 0.226 0.028 0.029 1.418 41.692
0.421 4.039 1.252 0.421 1.842 0.229 0.026 0.027 1.397 43.090
0.431 3.945 1.224 0.431 1.862 0.231 0.025 0.025 1.376 44.465
0.441 3.856 1.199 0.441 1.882 0.234 0.023 0.024 1.353 45.819
0.451 3.770 1.175 0.451 1.902 0.237 0.022 0.022 1.330 47.148
0.461 3.689 1.154 0.461 1.922 0.240 0.021 0.021 1.305 48.453
0.471 3.610 1.135 0.471 1.942 0.243 0.019 0.020 1.279 49.732
0.481 3.535 1.118 0.481 1.962 0.245 0.018 0.019 1.251 50.983
0.491 3.463 1.102 0.491 1.982 0.248 0.017 0.018 1.222 52.205
0.501 3.394 1.088 0.501 2.002 0.250 0.016 0.017 1.191 53.396
0.507 3.354 1.080 0.507 2.014 0.252 0.016 0.016 0.690 54.086
0.511 3.328 1.075 0.511 2.022 0.253 0.016 0.016 0.468 54.555
0.521 3.264 1.064 0.521 2.042 0.255 0.015 0.015 1.123 55.678
0.529 3.211 1.055 0.529 2.059 0.257 0.014 0.015 0.928 56.606
0.531 3.202 1.054 0.531 2.062 0.257 0.014 0.014 0.158 56.764
0.541 3.143 1.044 0.541 2.082 0.260 0.013 0.014 1.046 57.810
0.551 3.086 1.036 0.551 2.102 0.262 0.013 0.013 1.003 58.813
0.561 3.031 1.029 0.561 2.122 0.264 0.012 0.012 0.957 59.769
0.571 2.978 1.023 0.571 2.142 0.267 0.012 0.012 0.906 60.676

0.529 52250.000

0.510
52250

10.53
Barrels Case 1 Distr.Mom Case 2 Distr.Mom Case 3 Distr.Mom
A
V1 184.02 772.93 216.50
V2 209.85 798.76 273.95
H 40.15 176.10 120.67
P 12.46 11.07 26.72
MAB 24.93 104.71 29.33
MAD
MDA
MDC
MAD 9.04 -14.39 36.14 -65.66 26.30 -27.21
MAB 22.08 14.39 104.71 65.66 30.49 27.21
dMx/dx = R1 - V1X 0.64 0.64 0.64
Mx = +R1 X - M1 - V1 X2/2 23.00 91.40 16.79
MBA 22.08 -14.39 104.71 -65.66 30.49 -27.21
MBC 9.04 14.39 36.14 65.66 26.30 27.21
0.785 0.763 0.736
dMx/dx = -H1 + hX + 1/2(p/l1)X2 0.00 0.02 0.00
Mx = -H1X + M1+ hX2/2 + 1/6(p/l1)X3 0.71 13.32 -7.79
MCB 9.54 -16.70 36.59 -68.24 27.37 -33.18
MCD 25.18 16.70 108.21 68.24 38.58 33.18
dMx/dx = -R2 + V2X 0.64 0.64 0.64
Mx = -R2 X + M2 + V2 X2/2 -17.46 -54.10 -17.09
MDC 25.18 -16.70 108.21 -68.24 38.58 -33.18
MDA 9.54 16.70 36.59 68.24 27.37 33.18

for side
SAB 117.3099 492.741 138.0198
SBA -117.31 -492.741 -138.02
SBC -34.0146 -136.476 -93.5157
SCB 37.87721 145.0525 114.2228
SCD 133.7765 509.2076 174.644
SDC -133.777 -509.208 -174.644
SDA 37.87721 145.0525 114.2228
SAD -34.0146 -136.476 -93.5157

Minimum R/F
d Cover deff fcu
As Bar φ

600 50 542 30 780 16

300 50 244 30 390 12


Case 3 Distr.Mom Case 3 Distr.Mom
B C L1= 1.275
254.74 255.07 l2= 1.55
312.19 312.52
112.29 99.16
26.72 26.72
34.51 34.55

AB M SF
0 14.39 117.3099
24.62 -28.61 21.99 -26.37 0.64 -23.00 0
35.88 28.61 34.55 26.37 1.275 14.39 -117.31
0.64 0.64
23.15 25.46
35.88 -28.61 34.55 -26.37 150.00
24.62 28.61 21.99 26.37
100.00
0.739 0.737
0.61 0.91 50.00
-3.88 -2.18
0.00
25.69 -34.59 23.06 -33.31
0 0.2
43.97 34.59 44.01 33.31 -50.00
0.64 0.64
-100.00
-19.47 -19.49
43.97 -34.59 44.01 -33.31
-150.00
25.69 34.59 23.06 33.31

162.3983 162.608
-162.398 -162.608
-87.0209 -76.8463
107.728 97.55333
199.0225 199.2322
-199.022 -199.232
107.728 97.55333
-87.0209 -76.8463

Minimum R/F R/F for bending


No of
Bars per As provided Assumed maximum K z 0.95d selected z As
φ BM
meter

4 804 16 17.66 0.002004 540.7905 514.9 514.9 78.48495


250
4 452 12 68.24 0.038207 233.1602 231.8 231.8 673.6663
150.00

100.00

50.00

M
0.00
SF
0 0.2 0.4 0.6 0.8 1 1.2 1.4

-50.00

-100.00

-150.00
R/F for shear
No of
Bar φ As 100*As/ Shear status of shear R/F
Bars per provided Max.SF Vc v/vc
(b.d) stress concrete is need
meter

12 1 113 0.020849 133.78 0.24682 OK 0.161222 153% yes

16 4 804 509.21 2.086916 OK 0.493939 423% yes

250 60.26056 0.24697 0.24697


218.1211 0.893939 0.893939
/F for shear
No of
Bar φ Asv>"X" As
v Vs vc Bars per provided
.Sv meter
Minimum
links 10 0.9995 4 314 1.256 OK 300mm
provided
go to
other 10 3.980453 7 549.5 3.8465 Not OK 142.8571
case
Load case 1
Joint A B C D
Member AD AB BA BC CB CD DC DA
C.O.F 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
D.F 0.436 0.564 0.564 0.436 0.436 0.564 0.564 0.436
F.E.M -9.037 22.082 -22.082 9.037 -9.535 25.181 -25.181 9.535
Distri. -5.692 -7.353 7.353 5.692 -6.827 -8.819 8.819 6.827
C.O 3.414 3.676 -3.676 -3.414 2.846 4.409 -4.409 -2.846
Balance -7.090 -7.090 7.090 7.090 -7.256 -7.256 7.256 7.256
-3.094 -3.996 3.996 3.094 -3.166 -4.090 4.090 3.166
1.583 1.998 -1.998 -1.583 1.547 2.045 -2.045 -1.547
-3.581 -3.581 3.581 3.581 -3.592 -3.592 3.592 3.592
-1.563 -2.018 2.018 1.563 -1.567 -2.024 2.024 1.567
0.784 1.009 -1.009 -0.784 0.781 1.012 -1.012 -0.781
-1.793 -1.793 1.793 1.793 -1.794 -1.794 1.794 1.794
-0.782 -1.011 1.011 0.782 -0.783 -1.011 1.011 0.783
0.391 0.505 -0.505 -0.391 0.391 0.505 -0.505 -0.391
-0.897 -0.897 0.897 0.897 -0.897 -0.897 0.897 0.897
-0.391 -0.505 0.505 0.391 -0.391 -0.505 0.505 0.391
0.196 0.253 -0.253 -0.196 0.196 0.253 -0.253 -0.196
-0.448 -0.448 0.448 0.448 -0.448 -0.448 0.448 0.448
-0.196 -0.253 0.253 0.196 -0.196 -0.253 0.253 0.196
0.098 0.126 -0.126 -0.098 0.098 0.126 -0.126 -0.098
-0.224 -0.224 0.224 0.224 -0.224 -0.224 0.224 0.224
-0.098 -0.126 0.126 0.098 -0.098 -0.126 0.126 0.098
0.049 0.063 -0.063 -0.049 0.049 0.063 -0.063 -0.049
-0.112 -0.112 0.112 0.112 -0.112 -0.112 0.112 0.112
-0.049 -0.063 0.063 0.049 -0.049 -0.063 0.063 0.049
0.024 0.032 -0.032 -0.024 0.024 0.032 -0.032 -0.024
-0.056 -0.056 0.056 0.056 -0.056 -0.056 0.056 0.056
-0.024 -0.032 0.032 0.024 -0.024 -0.032 0.032 0.024
0.012 0.016 -0.016 -0.012 0.012 0.016 -0.016 -0.012
-0.028 -0.028 0.028 0.028 -0.028 -0.028 0.028 0.028
-0.012 -0.016 0.016 0.012 -0.012 -0.016 0.016 0.012
0.006 0.008 -0.008 -0.006 0.006 0.008 -0.008 -0.006
-0.014 -0.014 0.014 0.014 -0.014 -0.014 0.014 0.014
-0.006 -0.008 0.008 0.006 -0.006 -0.008 0.008 0.006
0.003 0.004 -0.004 -0.003 0.003 0.004 -0.004 -0.003
-0.007 -0.007 0.007 0.007 -0.007 -0.007 0.007 0.007
-0.003 -0.004 0.004 0.003 -0.003 -0.004 0.004 0.003
0.002 0.002 -0.002 -0.002 0.002 0.002 -0.002 -0.002
-0.004 -0.004 0.004 0.004 -0.004 -0.004 0.004 0.004
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
0.001 0.001 -0.001 -0.001 0.001 0.001 -0.001 -0.001
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
-14.387 14.388 -14.388 14.387 -16.704 16.705 -16.705 16.704
Load case 2
Joint A B C D
Member AD AB BA BC CB CD DC DA
C.O.F 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
D.F 0.436 0.564 0.564 0.436 0.436 0.564 0.564 0.436
F.E.M -36.143 104.707 -104.707 36.143 -36.586 108.207 -108.207 36.586
Distri. -29.919 -38.646 38.646 29.919 -31.253 -40.368 40.368 31.253
C.O 15.626 19.323 -19.323 -15.626 14.960 20.184 -20.184 -14.960
Balance -34.949 -34.949 34.949 34.949 -35.144 -35.144 35.144 35.144
-15.251 -19.699 19.699 15.251 -15.335 -19.808 19.808 15.335
7.668 9.849 -9.849 -7.668 7.625 9.904 -9.904 -7.625
-17.517 -17.517 17.517 17.517 -17.529 -17.529 17.529 17.529
-7.644 -9.873 9.873 7.644 -7.649 -9.880 9.880 7.649
3.825 4.937 -4.937 -3.825 3.822 4.940 -4.940 -3.822
-8.761 -8.761 8.761 8.761 -8.762 -8.762 8.762 8.762
-3.823 -4.938 4.938 3.823 -3.823 -4.939 4.939 3.823
1.912 2.469 -2.469 -1.912 1.912 2.469 -2.469 -1.912
-4.381 -4.381 4.381 4.381 -4.381 -4.381 4.381 4.381
-1.912 -2.469 2.469 1.912 -1.912 -2.469 2.469 1.912
0.956 1.235 -1.235 -0.956 0.956 1.235 -1.235 -0.956
-2.190 -2.190 2.190 2.190 -2.190 -2.190 2.190 2.190
-0.956 -1.235 1.235 0.956 -0.956 -1.235 1.235 0.956
0.478 0.617 -0.617 -0.478 0.478 0.617 -0.617 -0.478
-1.095 -1.095 1.095 1.095 -1.095 -1.095 1.095 1.095
-0.478 -0.617 0.617 0.478 -0.478 -0.617 0.617 0.478
0.239 0.309 -0.309 -0.239 0.239 0.309 -0.309 -0.239
-0.548 -0.548 0.548 0.548 -0.548 -0.548 0.548 0.548
-0.239 -0.309 0.309 0.239 -0.239 -0.309 0.309 0.239
0.119 0.154 -0.154 -0.119 0.119 0.154 -0.154 -0.119
-0.274 -0.274 0.274 0.274 -0.274 -0.274 0.274 0.274
-0.119 -0.154 0.154 0.119 -0.119 -0.154 0.154 0.119
0.060 0.077 -0.077 -0.060 0.060 0.077 -0.077 -0.060
-0.137 -0.137 0.137 0.137 -0.137 -0.137 0.137 0.137
-0.060 -0.077 0.077 0.060 -0.060 -0.077 0.077 0.060
0.030 0.039 -0.039 -0.030 0.030 0.039 -0.039 -0.030
-0.068 -0.068 0.068 0.068 -0.068 -0.068 0.068 0.068
-0.030 -0.039 0.039 0.030 -0.030 -0.039 0.039 0.030
0.015 0.019 -0.019 -0.015 0.015 0.019 -0.019 -0.015
-0.034 -0.034 0.034 0.034 -0.034 -0.034 0.034 0.034
-0.015 -0.019 0.019 0.015 -0.015 -0.019 0.019 0.015
0.007 0.010 -0.010 -0.007 0.007 0.010 -0.010 -0.007
-0.017 -0.017 0.017 0.017 -0.017 -0.017 0.017 0.017
-0.007 -0.010 0.010 0.007 -0.007 -0.010 0.010 0.007
0.004 0.005 -0.005 -0.004 0.004 0.005 -0.005 -0.004
-0.009 -0.009 0.009 0.009 -0.009 -0.009 0.009 0.009
-0.004 -0.005 0.005 0.004 -0.004 -0.005 0.005 0.004
0.002 0.002 -0.002 -0.002 0.002 0.002 -0.002 -0.002
-0.004 -0.004 0.004 0.004 -0.004 -0.004 0.004 0.004
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
0.001 0.001 -0.001 -0.001 0.001 0.001 -0.001 -0.001
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 0.001 -0.001 0.000 0.000 0.001 -0.001 0.000
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 -0.001 0.001 0.000 0.000 -0.001 0.001 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
-65.660 65.661 -65.661 65.660 -68.240 68.240 -68.240 68.240

Minimum R/F
d Cover deff fcu No of Bars As
As Bar φ Assumed φ
per meter provided
300 50 244 30 390 12 4 452 12
12116.00
6.00
104.072703246536

0.003588

0.003245
0.001451

0.24
R/F for bending
Bar φ No of Bars As
maximum BM K z 0.95d selected z As per meter provided
68.24 0.0382066 233.16019 231.8 231.8 673.66627 16 4 804
R/F for shear
Shear status of shear R/F Bar φ No of Bars As
Max.SF Vc v/vc v Vs vc
stress concrete is need per meter provided
#REF! #REF! #REF! 0.493939 #REF! #REF! #REF! 10
Load case 3A
Joint A B C D
Member AD AB BA BC CB CD DC DA
C.O.F 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
D.F 0.436 0.564 0.564 0.436 0.436 0.564 0.564 0.436
F.E.M -26.298 30.491 -30.491 26.298 -27.368 38.581 -38.581 27.368
Distri. -1.830 -2.363 2.363 1.830 -4.893 -6.320 6.320 4.893
C.O 2.447 1.182 -1.182 -2.447 0.915 3.160 -3.160 -0.915
Balance -3.628 -3.628 3.628 3.628 -4.075 -4.075 4.075 4.075
-1.583 -2.045 2.045 1.583 -1.778 -2.297 2.297 1.778
0.889 1.022 -1.022 -0.889 0.792 1.148 -1.148 -0.792
-1.912 -1.912 1.912 1.912 -1.940 -1.940 1.940 1.940
-0.834 -1.077 1.077 0.834 -0.847 -1.093 1.093 0.847
0.423 0.539 -0.539 -0.423 0.417 0.547 -0.547 -0.417
-0.962 -0.962 0.962 0.962 -0.964 -0.964 0.964 0.964
-0.420 -0.542 0.542 0.420 -0.421 -0.543 0.543 0.421
0.210 0.271 -0.271 -0.210 0.210 0.272 -0.272 -0.210
-0.481 -0.481 0.481 0.481 -0.482 -0.482 0.482 0.482
-0.210 -0.271 0.271 0.210 -0.210 -0.271 0.271 0.210
0.105 0.136 -0.136 -0.105 0.105 0.136 -0.136 -0.105
-0.241 -0.241 0.241 0.241 -0.241 -0.241 0.241 0.241
-0.105 -0.136 0.136 0.105 -0.105 -0.136 0.136 0.105
0.053 0.068 -0.068 -0.053 0.053 0.068 -0.068 -0.053
-0.120 -0.120 0.120 0.120 -0.120 -0.120 0.120 0.120
-0.053 -0.068 0.068 0.053 -0.053 -0.068 0.068 0.053
0.026 0.034 -0.034 -0.026 0.026 0.034 -0.034 -0.026
-0.060 -0.060 0.060 0.060 -0.060 -0.060 0.060 0.060
-0.026 -0.034 0.034 0.026 -0.026 -0.034 0.034 0.026
0.013 0.017 -0.017 -0.013 0.013 0.017 -0.017 -0.013
-0.030 -0.030 0.030 0.030 -0.030 -0.030 0.030 0.030
-0.013 -0.017 0.017 0.013 -0.013 -0.017 0.017 0.013
0.007 0.008 -0.008 -0.007 0.007 0.008 -0.008 -0.007
-0.015 -0.015 0.015 0.015 -0.015 -0.015 0.015 0.015
-0.007 -0.008 0.008 0.007 -0.007 -0.008 0.008 0.007
0.003 0.004 -0.004 -0.003 0.003 0.004 -0.004 -0.003
-0.008 -0.008 0.008 0.008 -0.008 -0.008 0.008 0.008
-0.003 -0.004 0.004 0.003 -0.003 -0.004 0.004 0.003
0.002 0.002 -0.002 -0.002 0.002 0.002 -0.002 -0.002
-0.004 -0.004 0.004 0.004 -0.004 -0.004 0.004 0.004
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
0.001 0.001 -0.001 -0.001 0.001 0.001 -0.001 -0.001
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 0.001 -0.001 0.000 0.000 0.001 -0.001 0.000
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 -0.001 0.001 0.000 0.000 -0.001 0.001 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
-27.205 27.206 -27.206 27.205 -33.183 33.183 -33.183 33.183
Load case 3B
Joint A B C D
Member AD AB BA BC CB CD DC DA
C.O.F 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
D.F 0.436 0.564 0.564 0.436 0.436 0.564 0.564 0.436
F.E.M -24.620 35.876 -35.876 24.620 -25.690 43.967 -43.967 25.690
Distri. -4.912 -6.344 6.344 4.912 -7.975 -10.302 10.302 7.975
C.O 3.988 3.172 -3.172 -3.988 2.456 5.151 -5.151 -2.456
Balance -7.160 -7.160 7.160 7.160 -7.607 -7.607 7.607 7.607
-3.124 -4.036 4.036 3.124 -3.319 -4.287 4.287 3.319
1.660 2.018 -2.018 -1.660 1.562 2.144 -2.144 -1.562
-3.677 -3.677 3.677 3.677 -3.706 -3.706 3.706 3.706
-1.605 -2.073 2.073 1.605 -1.617 -2.089 2.089 1.617
0.809 1.036 -1.036 -0.809 0.802 1.044 -1.044 -0.802
-1.845 -1.845 1.845 1.845 -1.847 -1.847 1.847 1.847
-0.805 -1.040 1.040 0.805 -0.806 -1.041 1.041 0.806
0.403 0.520 -0.520 -0.403 0.403 0.520 -0.520 -0.403
-0.923 -0.923 0.923 0.923 -0.923 -0.923 0.923 0.923
-0.403 -0.520 0.520 0.403 -0.403 -0.520 0.520 0.403
0.201 0.260 -0.260 -0.201 0.201 0.260 -0.260 -0.201
-0.461 -0.461 0.461 0.461 -0.461 -0.461 0.461 0.461
-0.201 -0.260 0.260 0.201 -0.201 -0.260 0.260 0.201
0.101 0.130 -0.130 -0.101 0.101 0.130 -0.130 -0.101
-0.231 -0.231 0.231 0.231 -0.231 -0.231 0.231 0.231
-0.101 -0.130 0.130 0.101 -0.101 -0.130 0.130 0.101
0.050 0.065 -0.065 -0.050 0.050 0.065 -0.065 -0.050
-0.115 -0.115 0.115 0.115 -0.115 -0.115 0.115 0.115
-0.050 -0.065 0.065 0.050 -0.050 -0.065 0.065 0.050
0.025 0.033 -0.033 -0.025 0.025 0.033 -0.033 -0.025
-0.058 -0.058 0.058 0.058 -0.058 -0.058 0.058 0.058
-0.025 -0.033 0.033 0.025 -0.025 -0.033 0.033 0.025
0.013 0.016 -0.016 -0.013 0.013 0.016 -0.016 -0.013
-0.029 -0.029 0.029 0.029 -0.029 -0.029 0.029 0.029
-0.013 -0.016 0.016 0.013 -0.013 -0.016 0.016 0.013
0.006 0.008 -0.008 -0.006 0.006 0.008 -0.008 -0.006
-0.014 -0.014 0.014 0.014 -0.014 -0.014 0.014 0.014
-0.006 -0.008 0.008 0.006 -0.006 -0.008 0.008 0.006
0.003 0.004 -0.004 -0.003 0.003 0.004 -0.004 -0.003
-0.007 -0.007 0.007 0.007 -0.007 -0.007 0.007 0.007
-0.003 -0.004 0.004 0.003 -0.003 -0.004 0.004 0.003
0.002 0.002 -0.002 -0.002 0.002 0.002 -0.002 -0.002
-0.004 -0.004 0.004 0.004 -0.004 -0.004 0.004 0.004
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
0.001 0.001 -0.001 -0.001 0.001 0.001 -0.001 -0.001
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 0.001 -0.001 0.000 0.000 0.001 -0.001 0.000
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 -0.001 0.001 0.000 0.000 -0.001 0.001 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
-28.609 28.610 -28.610 28.609 -34.587 34.588 -34.588 34.587
Load case 3C
Joint A B C D
Member AD AB BA BC CB CD DC DA
C.O.F 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
D.F 0.436 0.564 0.564 0.436 0.436 0.564 0.564 0.436
F.E.M -21.992 34.554 -34.554 21.992 -23.062 44.013 -44.013 23.062
Distri. -5.482 -7.081 7.081 5.482 -9.143 -11.809 11.809 9.143
C.O 4.571 3.540 -3.540 -4.571 2.741 5.905 -5.905 -2.741
Balance -8.112 -8.112 8.112 8.112 -8.646 -8.646 8.646 8.646
-3.540 -4.572 4.572 3.540 -3.773 -4.873 4.873 3.773
1.886 2.286 -2.286 -1.886 1.770 2.436 -2.436 -1.770
-4.172 -4.172 4.172 4.172 -4.206 -4.206 4.206 4.206
-1.821 -2.352 2.352 1.821 -1.835 -2.371 2.371 1.835
0.918 1.176 -1.176 -0.918 0.910 1.185 -1.185 -0.910
-2.094 -2.094 2.094 2.094 -2.096 -2.096 2.096 2.096
-0.914 -1.180 1.180 0.914 -0.915 -1.181 1.181 0.915
0.457 0.590 -0.590 -0.457 0.457 0.591 -0.591 -0.457
-1.047 -1.047 1.047 1.047 -1.047 -1.047 1.047 1.047
-0.457 -0.590 0.590 0.457 -0.457 -0.590 0.590 0.457
0.229 0.295 -0.295 -0.229 0.228 0.295 -0.295 -0.228
-0.524 -0.524 0.524 0.524 -0.524 -0.524 0.524 0.524
-0.229 -0.295 0.295 0.229 -0.229 -0.295 0.295 0.229
0.114 0.148 -0.148 -0.114 0.114 0.148 -0.148 -0.114
-0.262 -0.262 0.262 0.262 -0.262 -0.262 0.262 0.262
-0.114 -0.148 0.148 0.114 -0.114 -0.148 0.148 0.114
0.057 0.074 -0.074 -0.057 0.057 0.074 -0.074 -0.057
-0.131 -0.131 0.131 0.131 -0.131 -0.131 0.131 0.131
-0.057 -0.074 0.074 0.057 -0.057 -0.074 0.074 0.057
0.029 0.037 -0.037 -0.029 0.029 0.037 -0.037 -0.029
-0.065 -0.065 0.065 0.065 -0.065 -0.065 0.065 0.065
-0.029 -0.037 0.037 0.029 -0.029 -0.037 0.037 0.029
0.014 0.018 -0.018 -0.014 0.014 0.018 -0.018 -0.014
-0.033 -0.033 0.033 0.033 -0.033 -0.033 0.033 0.033
-0.014 -0.018 0.018 0.014 -0.014 -0.018 0.018 0.014
0.007 0.009 -0.009 -0.007 0.007 0.009 -0.009 -0.007
-0.016 -0.016 0.016 0.016 -0.016 -0.016 0.016 0.016
-0.007 -0.009 0.009 0.007 -0.007 -0.009 0.009 0.007
0.004 0.005 -0.005 -0.004 0.004 0.005 -0.005 -0.004
-0.008 -0.008 0.008 0.008 -0.008 -0.008 0.008 0.008
-0.004 -0.005 0.005 0.004 -0.004 -0.005 0.005 0.004
0.002 0.002 -0.002 -0.002 0.002 0.002 -0.002 -0.002
-0.004 -0.004 0.004 0.004 -0.004 -0.004 0.004 0.004
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
0.001 0.001 -0.001 -0.001 0.001 0.001 -0.001 -0.001
-0.002 -0.002 0.002 0.002 -0.002 -0.002 0.002 0.002
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 0.001 -0.001 0.000 0.000 0.001 -0.001 0.000
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 -0.001 0.001 0.000 0.000 -0.001 0.001 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
-0.001 -0.001 0.001 0.001 -0.001 -0.001 0.001 0.001
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
-26.372 26.372 -26.372 26.372 -33.306 33.306 -33.306 33.306
Joint A B C D E F
Member AB BA BC CB CD DC DE ED EF FE
C.O.F 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500 0.500
D.F 0.000 1.000 0.518 0.482 0.482 0.518 1.000 0.000
F.E.M 8.718 -0.788 0.848 -9.102 9.102 -0.848 0.788 -8.718
Distri. -7.931 4.278 3.976 -3.976 -4.278 7.931
C.O 2.139 -3.965 -1.988 1.988 3.965 -2.139
Balance -2.139 5.954 5.954 -5.954 -5.954 2.139
-2.139 3.086 2.868 -2.868 -3.086 2.139
1.543 -1.069 -1.434 1.434 1.069 -1.543
-1.543 2.503 2.503 -2.503 -2.503 1.543
-1.543 1.297 1.206 -1.206 -1.297 1.543
0.649 -0.771 -0.603 0.603 0.771 -0.649
-0.649 1.374 1.374 -1.374 -1.374 0.649
-0.649 0.712 0.662 -0.662 -0.712 0.649
0.356 -0.324 -0.331 0.331 0.324 -0.356
-0.356 0.655 0.655 -0.655 -0.655 0.356
-0.356 0.340 0.316 -0.316 -0.340 0.356
0.170 -0.178 -0.158 0.158 0.178 -0.170
-0.170 0.336 0.336 -0.336 -0.336 0.170
-0.170 0.174 0.162 -0.162 -0.174 0.170
0.087 -0.085 -0.081 0.081 0.085 -0.087
-0.087 0.166 0.166 -0.166 -0.166 0.087
-0.087 0.086 0.080 -0.080 -0.086 0.087
0.043 -0.044 -0.040 0.040 0.044 -0.043
-0.043 0.083 0.083 -0.083 -0.083 0.043
-0.043 0.043 0.040 -0.040 -0.043 0.043
0.022 -0.021 -0.020 0.020 0.021 -0.022
-0.022 0.042 0.042 -0.042 -0.042 0.022
-0.022 0.022 0.020 -0.020 -0.022 0.022
0.011 -0.011 -0.010 0.010 0.011 -0.011
-0.011 0.021 0.021 -0.021 -0.021 0.011
-0.011 0.011 0.010 -0.010 -0.011 0.011
0.005 -0.005 -0.005 0.005 0.005 -0.005
-0.005 0.010 0.010 -0.010 -0.010 0.005
-0.005 0.005 0.005 -0.005 -0.005 0.005
0.003 -0.003 -0.003 0.003 0.003 -0.003
-0.003 0.005 0.005 -0.005 -0.005 0.003
-0.003 0.003 0.003 -0.003 -0.003 0.003
0.001 -0.001 -0.001 0.001 0.001 -0.001
0.00 8.72 -8.72 4.43 -4.43 4.43 -4.43 8.72 -8.72 0.00
Structural detailing

Minimum R/F R/F for b


d Cover deff fcu No of
Bar φ Bars per As Assumed maximum
As K
provided φ BM
meter

300 50 242 30 390 12 4 452 16 56.143 0.032

200 250

5 958.66061

300 50 244 30 390 12 4 452 12 11.387 0.0064

250

300 50 242 30 390 16 2 402 16 50 0.0285

500

600 40 552 30 780 16 4 804 16 62.78 0.0069

250

8.8938
113 201 1005 8.8938 112.438

R/F for bending R/F for shear

No of
0.95d selected Bar φ Bars per As Shear status of
z As Max.SF stress Vc
z provided concrete
meter

233.08 229.9 229.9 558.82 12 13.34 1507.42 70 0.2893 OK 0.612

74.96252

0.6229

242.26 231.8 231.8 122.75 12 2 226 26.74 0.1096 OK 0.3236

500

234.09 229.9 229.9 543.44 16 3 603 26.74 0.1105 OK 0.4509

333.3333

547.76 524.4 524.4 299.14 16 2 402 14.79 0.0268 OK 0.2435

500

112.44 201

113
R/F for shear

shear No of
Bar φ Bars per As
v/vc R/F is provided
need meter

47.26% stilling
basin and
trajectory

34% Transition

25%

11%

Potrebbero piacerti anche