Detail Engineering Design & Preparation of Tender Documents of Tamakoshi-V Hydroelectric Project
(RFP No. TK-V/01/2015-16)
DETAILED TASKS ASSIGNED Mr. Naresh Kumar will be responsible for following Task for
the Project:
WAPCOS Limited, India in association with DOLSAR Engineering Inc. Co., Turkey, Total Management Consultants Ltd, Nepal and
Sanima Hydropower Limited, Nepal
Page | 1 of 1
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
EMPLOYMENT RECORD
Employing Organization
Ref and Title / Position. Summary of Activities Performed Relevant to the
Period Country
No. Contact Information for Assignment
References
1 Year: From Employer: WAPCOS Bhutan, Planning and Design engineering for the
May, 2012 LIMITED India,
Burundi
following projects:
to Till date Position Held: Top
Level Expert Punatsangchhu-I H.E. Project (6x200 MW)
Bhutan
Employment
Contact Address of Punatsangchhu-II H.E. Project (6x165 MW),
Type: Full
Time Employer: WAPCOS Bhutan
Limited Mini Hydel Power Projects in Myanmar
76-C, Sector-18, Durgaduani Tidal Power Project (3x1.25
Institutional Area, MW), WB, India
Gurgaon, Haryana- Design engineering consultancy for Railway
122015 (INDIA) tunnels, East Central Railway, Jharkhand
Page | 2 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
3 Year: May Employer: Central India As Head of the Organization responsible for
15, 2007 to Water Commission operation & maintenance of the Farakka Barrage
June30,200 (CWC) Project for diversion of 40,000 cusec water
8 Position Held: General
through a 33 Km. long Feeder Canal and
Employment Manager (Farakka
Type: Full Barrage) execution of Anti erosion works along river
Time Contact Address of Ganga in West Bengal
Employer:
4 Year: From Employer: Central India
November, Water Commission
2003 to (CWC)
May, 2007 Position Held:Project Detailed construction designs, construction
Employment Manager /Director supervision, contract implementation and Project
Type: (Hydel Civil Designs) Management of Tehri HEP, Uttarakhand, India.
Permanent Contact Address of
Employer: Head Office
(Gurgaon,) India
5 Year: From Employer: WAPCOS India, As Head of the Hydro Power Division responsible
Nov, 2000 Ltd Bhutan, for business development, Project formulation,
to Oct, 2003 Position Held: Project Nepal, Overall Planning & Design, tender development
Employment Manager / Chief & evaluation of Hydro Electric Schemes of India,
Type:
Afghani
Engineer (Hydro) Bhutan, Nepal and Afghanistan.
Permanent Contact Address of stan Executed Projects like Purilia Pumped storage
Page | 3 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
Employer: WAPCOS project and Tala H.E. Project during this time.
Limited
76-C, Sector-18,
Institutional Area,
Gurgaon, Haryana-
122015 (INDIA)
Page | 4 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
Page | 5 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
Project : Detailed Design and Construction Supervision for Kabu-16 Hydro Electric
Project (20 MW)
Position : Team Leader/Top level Expert
Project Description : Kabu‐16 Hydro Electric Project (2x10 MW) is planned as a run‐of‐ the river
development, across Kaburantwa River in the Republic of Burundi, to
harness the hydro‐power potential of the river utilizing a gross head of
193 m. The project envisages construction of components such as
Concrete Gravity Type Diversion Dam, Power Intake, De‐silting basin,
Head Race Tunnel (D‐Shaped), surge shaft, Valve House, Penstock,
Surface Powerhouse complex, Tail Pool and Switchyard.
Location : Burundi
Time Period : 2012-14
Project Status : Under Construction (75% complete)
Activities Performed : Planning and designing of dams, Coordinate with geologists and
hydrologists for the project. Adapted in using computer and researching,
Using tools and equipment for measuring and testing Worked with the
Engineering Geologist and Dam Specialist, , based on the results from the
site geotechnical drilling/testing investigation programs and verification
of hydrological basic data, prepared Hydraulic design of the hydropower
plant, Design of required erosion protection works, Preparation of the
Hydraulic Design Report.
No of Manmonths : Total Manmonths: 12mm
Page | 6 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
Construction Supervision,
carried out studies for the up gradation of DPR,
Preparation of Tender documents
No of Manmonths : Total Manmonths: 12mm
Page | 7 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
Page | 8 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
Project Description : The proposed Tala H.E. Project which was earlier named as Chukha stage-
II Project on Wangchu river in Western Bhutan, has been conceived to
utilized available 800 m head to produce annual energy of 3692 GWh and
1020 MW of peaking power. Project consists of 92M high concrete gravity
dam a head race tunnel 22.97km. long and 6.8m dia, underground Power
House (206mx44.5x19m) to accommodate, 6 nos. generating units of 170
MW each. Coffer dam, diversion tunnel 6.8 m dia, de-silting basin 3nos.
each of size ( 250m x 13.90m x 18.50m ),Two nos. of pressure shaft of 4m
dia and 1.10 km long /penstock 2.3m dia, underground transformer
cavern ( 191m x 26.50 x 16m ), 9ailrace tunnel 7.75m dia and 3.30 km
long, switchyard.
Location : Bhutan
Time Period : 1999 to 2003
Project Status : Commissioned
Activities Performed : Team leader for Overall project management team
Review and Recommendation of detail Survey & Investigation details
of the project area.
Involve in Site Selection, Planning and design of project layout and
various project structures.
Responsible for the overall planning and detailed designs,
Management of various activities related to the Civil Design and
project Layout.
Tender preparation & evaluation,
Detailed Design of main Civil Structures Dam, HRT, TRT, Surge Shaft,
Power House
Preparation of Details Engineering Drawing of Main Civil Structures of
the Project Components.
Tender Evaluation and Recommendation
Monitoring during construction stage including coordination with
different agencies involved in various construction activities of the
project.
No of Manmonths : Total Manmonths: 24mm
Location : Bhutan
Time Period : 1995-2000
Project Status : Commissioned
Page | 9 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar
Activities Performed : Team leader of multidisciplinary team for execution of Kurichhu HEP
Review of basic designs, drawings & specifications, monitoring
programme & progress of work and to suggest remedial measures to
ensure timely completion of the project,
Detailed Engineering Design,
Construction Supervision,
No of Manmonths : Total Manmonths: 18mm
Location : Bhutan
Time Period : 1985-1988
Project Status : Commissioned
Activities Performed : Planning, Detailed Design Engineering and Preparation of
construction drawings
Verification of hydrological basic data,
Preparation of the Hydraulic Design Report.
Worked with the Engineering Geologist and Dam Specialist, deciding
on changes of the hydraulic structures of the Project.
No of Manmonths : Total Manmonths: 12mm
CERTIFICATION
I, the Undersigned, certify that to the best of my knowledge and belief, these data correctly describe me,
my qualifications and my experience.
___________________________________________________________Date:______________________
Page | 10 of 9