Technical Proposal for Providing Consultancy Services for

Detail Engineering Design & Preparation of Tender Documents of Tamakoshi-V Hydroelectric Project
(RFP No. TK-V/01/2015-16)

3F. CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF


1.Team Leader

PROPOSED POSITION Team Leader


NAME OF CONSULTANT WAPCOS Ltd.
NAME OF EXPERT Naresh Kumar Gupta
PROFESSION Top Level Expert
DATE OF BIRTH 20th April 1951
YEARS WITH CONSULTANT/ENTITY: 4YRS Nationality: Indian
FULL-TIME / PART-TIME STAFF Full Time Employee

MEMBERS IN PROFESSIONAL SOCIETIES Member of Indian Geo-technical Society (IGS).


Member of Indian society of Rock Mechanics &
Tunnelling Technology (ISRMTT)
He has published more than 20 numbers of technical
papers in different national and international Journals
/ seminars, and having in his credit more than 100 nos.
of technical reports/documents.
He has received a number of Merit Certificates and
awards for his contribution for the development of
Hydropower projects in India & Bhutan.

DETAILED TASKS ASSIGNED Mr. Naresh Kumar will be responsible for following Task for
the Project:

Review of hydraulic design of dam/weir, energy


dissipation, power intake, and TRT
Optimize different project components.
Advising on construction aspects for the components of
the dam and hydraulic structures, including schedules
and plant/labor/materials requirements,
Worked with the Engineering Geologist and Dam
Specialist, deciding on changes of the hydraulic
structures of the Project, Hydraulic design of the
hydropower plant,

WAPCOS Limited, India in association with DOLSAR Engineering Inc. Co., Turkey, Total Management Consultants Ltd, Nepal and
Sanima Hydropower Limited, Nepal

Page | 1 of 1
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

Design of erosion protection works for the dam,


planning and designing of dams, Coordinate with
geologists and hydrologists for the project.
Review of design/ drawings/analysis/calculations
submitted by the EPC contractor during construction
stage
Review transient analysis of surge chamber/gallery and
subsequently optimize their sizes.
Monitoring and follow up of the progress of activities
related to project construction and implementation.
Review of all reports/submittals in respect of hydraulic
design and related aspects submitted by the EPC
contractor to the client.
KEY QUALIFICATIONS He has more than 42 years of experience in detailed
engineering design of main civil structures such as Dam,
Head Race tunnel, tail Race Tunnel, Power house, Spillway,
Desilting chambers, canal etc. He has discharged duties as
Team leader for many Hydropower Projects like Tala H.E.
Project, Purulia H.E. Project, Myntdu Leshka Hydro Electric
Project, Salma H.E. Project, etc.
EDUCATION Post Graduate Diploma in -Project Management from
Amity University, Uttar Pradesh, 1988.
Post Graduate Diploma (Hydro Power Development)
from Norwegian Technical University (NTU),
Trondheim, Norway 1984.
Master of Technology Rock Mechanics (Civil
Engineering) Department of Civil Engineering, Indian
Institute of Technology 1981
Bachelor of Science (Civil Engineering) from Delhi
College of Engineering New Delhi 1972.

EMPLOYMENT RECORD
Employing Organization
Ref and Title / Position. Summary of Activities Performed Relevant to the
Period Country
No. Contact Information for Assignment
References
1 Year: From Employer: WAPCOS Bhutan, Planning and Design engineering for the
May, 2012 LIMITED India,
Burundi
following projects:
to Till date Position Held: Top
Level Expert  Punatsangchhu-I H.E. Project (6x200 MW)
Bhutan
Employment
Contact Address of  Punatsangchhu-II H.E. Project (6x165 MW),
Type: Full
Time Employer: WAPCOS Bhutan
Limited  Mini Hydel Power Projects in Myanmar
76-C, Sector-18,  Durgaduani Tidal Power Project (3x1.25
Institutional Area, MW), WB, India
Gurgaon, Haryana-  Design engineering consultancy for Railway
122015 (INDIA) tunnels, East Central Railway, Jharkhand

Page | 2 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

 Rupsiabagar Khasiabara H.E. Project (2X130


MW)
 Design engineering consultancy for tailings
dam, UCIL, Jaduguda, Bihar
 Design engineering consultancy for slime
dam, Joda, Orissa, Tata Steel
 Kabu-16 Hydro Electric Project (20 MW)
2 Year: From Employer: Central India Team lead of design team, responsible for
July, 2009 Water Commission Planning, Design, Project Formulation, Tender
to April, (CWC) Development & Evaluation and techno-
2011 Position Held: Chief
economic clearances for Myntdu Leshka Hydro
Engineer
Employment Electric Project in Meghalaya. Head of
Type: Full Interdisciplinary team responsible for tender
Time document preparation & evaluation of 6X200
MW Punatsangchhu – I H.E Project, Bhutan and
preparation of DPR of 6X 165 MW
Punatsangchhu – II H.E Project, Bhutan. Detailed
Design Engineering for Koteshwar H.E. Project.
Responsible for issue of construction drawing
for Punatsangchhu – I H.E Project, Myntdu
Leshka Hydro Electric Project and other projects
currently under construction in N.E Indian
States of Manipur, Meghalaya, Mizoram, Assam,
Arunachal Pradesh and Nagaland.

3 Year: May Employer: Central India As Head of the Organization responsible for
15, 2007 to Water Commission operation & maintenance of the Farakka Barrage
June30,200 (CWC) Project for diversion of 40,000 cusec water
8 Position Held: General
through a 33 Km. long Feeder Canal and
Employment Manager (Farakka
Type: Full Barrage) execution of Anti erosion works along river
Time Contact Address of Ganga in West Bengal
Employer:
4 Year: From Employer: Central India
November, Water Commission
2003 to (CWC)
May, 2007 Position Held:Project Detailed construction designs, construction
Employment Manager /Director supervision, contract implementation and Project
Type: (Hydel Civil Designs) Management of Tehri HEP, Uttarakhand, India.
Permanent Contact Address of
Employer: Head Office
(Gurgaon,) India
5 Year: From Employer: WAPCOS India, As Head of the Hydro Power Division responsible
Nov, 2000 Ltd Bhutan, for business development, Project formulation,
to Oct, 2003 Position Held: Project Nepal, Overall Planning & Design, tender development
Employment Manager / Chief & evaluation of Hydro Electric Schemes of India,
Type:
Afghani
Engineer (Hydro) Bhutan, Nepal and Afghanistan.
Permanent Contact Address of stan Executed Projects like Purilia Pumped storage

Page | 3 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

Employer: WAPCOS project and Tala H.E. Project during this time.
Limited
76-C, Sector-18,
Institutional Area,
Gurgaon, Haryana-
122015 (INDIA)

6 Year: From Employer: Tala Bhutan


Jan,1999 to Hydroelectric Project
Nov 2000 Authority (THPA) Engineer-in-Charge for the Construction of 92 m
Employment Position Held: high concrete dam, 3 underground Desilting
Type: Superintending chambers & 6 km length of Tunnel with total cost
Permanent Engineer of Rs.750 crores
Contact Address of
Employer:
7 Year: From Employer: Central India, Overall Planning & Design, Project formulation,
Jan,1995 to Water Commission Nepal, tender development & evaluation and techno-
Dec, 1999 (CWC) Bhutan economic evaluation for Hydro Power
Employment Position Held: Director
Afghani Development Projects of India, Nepal and
Type: Contact Address of
Permanent stan Afghanistan
Employer:
8 Year: From Employer: Central India
Aug 1981 to Water Commission Planning & Design and techno-economic
Dec 1994 (CWC) evaluation of Project reports of Hydro-Power
Employment Position Held: Deputy
Development Schemes like Sardar Sarovar
Type: Director
Permanent Project, India, Chukha H.E. Project, Bhutan
Contact Address of
Employer:
9 Year: From Employer: Central India,
April 1976 Water Commission Afghani
to July 1981 (CWC) stan Hydraulic and Structural Design of various
Employment Position Held: Asstt.
components of Hydro-Power Projects of India
Type: Director
Permanent and Afghanistan
Contact Address of
Employer:

PROJECTS THAT BEST DESCRIBE THE CAPABILITY TO HANDLE THE ASSIGNMENT

Project : Turga Pumped Storage Project (4 x 250 MW)


Position : Top Level Expert
Project Description : Peak operating duration 6 hours
UPPER RESERVOIR LOWER RESERVOIR
FRL 495.00 m 320 m
MDDL 474.00 m 285 m
Pondage at FRL 25.71 MCM 19.49 MCM
Pondage at MDDL 11.4 MCM 5.49 MCM
Live Pondage 14.31 MCM 14.00 MCM

Page | 4 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

UPPER DAM LOWER DAM


Type Rockfill with central Earthfill with central
impervious core impervious core
Length of Dam at top 796.00 m 502.00 m
Max. Height of Dam 79 m (from Bed level) 69 m (from Bed level)
Project Status : Ongoing
Time Period 2011-2014
Activities Performed : Topographical Survey
Geotechnical & Geophysical Investigations,
Hydrological and Power Potential Studies
Design of Project components
Construction Schedule
Environmental Aspects
Cost Estimation and Financial Analysis
Pre-Feasibility Report and Detail Project Report completed
No of Manmonths : Total Manmonths: 8mm

Project : Punatsagchhu-II Hydro Electric Project (1020 MW)


Position : Top Level Expert
Project Description : 86m high concrete Dam; Energy dissipation arrangement; De-silting
Chambers; Headrace Tunnel; Surge Shaft; 5.5m diameter 997m long
Three Pressure Shafts; Underground Power Station, 236m x 23m x 51m;
11m diameter 3.3km long Tailrace Tunnel
Project Status : Under Construction (75% complete)
Time Period 2011-2014
Activities Performed : Involved in Site Selection, Planning and design of project layout and
various project structures.
Preparation of DPR designs, drawings and reports
Tender documents/specifications preparation
Preparation of Bids and Bid evaluation
Detailed design and drawings for main Dam and their associated
Structures
Site inspection and monitoring during construction including coordination
with different agencies involved in construction activities.
No of Manmonths : Total Manmonths: 12mm

Project : Punatsangchhu-I Hydro Electric Project (1200 MW)


Position : Top Level Expert
Project Description : 130 m high Concrete Gravity Dam; HRT; Surge Shaft; Pressure Shafts,
Underground Power House Complex, with 6 units of 200MW capacity
each, Tailrace Tunnel, 10m diameter 1.3km long.
Project Status : Under Construction (75% complete)
Time Period : 2010-2012
Activities Performed : Involved in Site Selection, Planning and design of project layout and
various project structures.

Page | 5 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

Preparation of DPR designs, drawings and reports


Tender documents/specifications preparation
Preparation of Bids and Bid evaluation
Detailed design and drawings for main Dam and their associated
Structures
Site inspection and monitoring during construction including coordination
with different agencies involved in construction activities.
No of Manmonths : Total Manmonths: 12mm

Project : Detailed Design and Construction Supervision for Kabu-16 Hydro Electric
Project (20 MW)
Position : Team Leader/Top level Expert
Project Description : Kabu‐16 Hydro Electric Project (2x10 MW) is planned as a run‐of‐ the river
development, across Kaburantwa River in the Republic of Burundi, to
harness the hydro‐power potential of the river utilizing a gross head of
193 m. The project envisages construction of components such as
Concrete Gravity Type Diversion Dam, Power Intake, De‐silting basin,
Head Race Tunnel (D‐Shaped), surge shaft, Valve House, Penstock,
Surface Powerhouse complex, Tail Pool and Switchyard.
Location : Burundi
Time Period : 2012-14
Project Status : Under Construction (75% complete)
Activities Performed : Planning and designing of dams, Coordinate with geologists and
hydrologists for the project. Adapted in using computer and researching,
Using tools and equipment for measuring and testing Worked with the
Engineering Geologist and Dam Specialist, , based on the results from the
site geotechnical drilling/testing investigation programs and verification
of hydrological basic data, prepared Hydraulic design of the hydropower
plant, Design of required erosion protection works, Preparation of the
Hydraulic Design Report.
No of Manmonths : Total Manmonths: 12mm

Project : Salma Dam Project, Afghanistan (3X14 MW)


Position : Team Leader/Chief Engineer
Project Description : The Salma dam project is located near Chist-e-Sharif in Herat Province in
Afghanistan. It is a multi-purpose project on river Hari-rud. The project
envisages hydropower generation with an installed capacity of 42 MW
(three units of 14 MW each) and irrigation of 75,000 hectares. A 107.5 m
earth and rock fill dam would be constructed to divert flow towards
powerhouse located on the right bank downstream of dam.
Location : Afghanistan
Time Period : 2012-2014
Project Status : Reservoir Impounding started (95% complete)
Activities Performed : Team leader of multidisciplinary team for Designing of the Rock-fill
Dam and Chute Spillway and other headwork structures

Page | 6 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

Construction Supervision,
carried out studies for the up gradation of DPR,
Preparation of Tender documents
No of Manmonths : Total Manmonths: 12mm

Project : MYNTDU LESHKA HYDRO ELECTRIC PROJECT (2X42+1X42)MEGAWATTS


Position : Team Leader / Chief Engineer
Project Description : The Myntdu Leshka Hydro Electric Project (2 x 42 + 1 x 42) MW is a Run
Off River (ROR) Scheme, located at the Jaintia Hills District of the State of
Meghalaya. The project envisages construction of the 63 meters’ height
dam across the Myntdu River, just below the tri junction of its two other
tributaries, the Lamu and the Umshariang. The impounded water is to be
conducted to the Power House through a 3313.46 meters’ long and 3.4
meters’ diameter HRT, a 314 meters’ long HPT and 731.25 meters long
Penstock.

Location : Meghalaya, India

Time Period : 2008-2011

Project Status : Commissioned


Activities Performed : Team Leader of Multi-disciplinary team for execution of project
Planning and designing of dams, Coordination with geologists and
hydrologists for the project.
Adapted in using computer and researching, Using tools and
equipment for measuring and testing
Verification of hydrological basic data,
Preparation of the Hydraulic Design Report.
Design of required erosion protection works, Preparation of the
Hydraulic Design Report.
No of Manmonths : Total Manmonths: 12mm

Project : Koteshwar H.E Project (400 MW)


Position : Team Leader / Chief Engineer (CWC)
Project Description : Koteshwar Hydro-Electric Project (400 MW), located 22 km downstream
of Tehri; Concrete Dam 97m high, 4 nos Power Intake, Pressure Shaft and
Power House with four units of 100 MW each.
Location : Uttarakhand, India
Time Period : 2008-2012
Project Status : Commissioned
Activities Performed : Team Leader of multi-disciplinary team for carrying out detailed
design engineering
Verification of hydrological basic data and other site data
Preparation of the Design Reports.

Page | 7 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

No of Manmonths : Total Manmonths: 12mm

Project : Tehri Hydro Power Project (1000 MW)


Position : Director (CWC)
Project Description : Rockfill Dam; Overflow Spillway with stilling basin; Power intake; Head
Race Tunnel (HRT); Pressure Shaft; Underground Power House and Tail
Race Tunnel; 4 units of 250 MW
Location : Uttarakhand, India
Time Period : 2003-2007
Project Status : Commissioned
Activities Performed : Involved in detailed design of civil components
Verification of hydrological basic data and other site data
Preparation of the Design Reports.
No of Manmonths : Total Manmonths: 18mm

Project : Purulia Pumped Storage Project (900 MW)


Position : Team Leader/Chief Engineer (WAPCOS Ltd.)
Project Description : Installed capacity of 4X225MW; 71m high rock-fill dam (upper) and 95 m
high rock-fill dam (lower); Two head intake tunnel of 7.7m diameter; Two
tailrace of 8.7m diameter and four tailrace of 5.6m diameter; Power
house with four Francis type pump turbine
Location : West Bengal, India
Time Period : 2000-2003
Project Status : Commissioned
Activities Performed : Team Leader of Multi-disciplinary team for execution of project
Overall project management
Detailed Design of main Civil Structures Dam, HRT, TRT, Surge Shaft,
Power House
Review and Recommendation of detail Survey & Investigation details
of the project area.
Preparation of Details Engineering Drawing of Main Civil Structures of
the Project Components.
Tender Evaluation and Recommendation
Responsible for the overall planning and detailed designs,
Management of various activities related to the Civil Design and
project Layout.
Involve in Site Selection, Planning and design of project layout and
various project structures.
Monitoring during construction stage including coordination with
different agencies involved in various construction activities of the
project.
No of Manmonths : Total Manmonths: 12mm

Project : TALA HYDRO ELECTRIC PROJECT (1200 MW)


Position : Chief Engineer / Superintending Engineer(Team Leader)

Page | 8 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

Project Description : The proposed Tala H.E. Project which was earlier named as Chukha stage-
II Project on Wangchu river in Western Bhutan, has been conceived to
utilized available 800 m head to produce annual energy of 3692 GWh and
1020 MW of peaking power. Project consists of 92M high concrete gravity
dam a head race tunnel 22.97km. long and 6.8m dia, underground Power
House (206mx44.5x19m) to accommodate, 6 nos. generating units of 170
MW each. Coffer dam, diversion tunnel 6.8 m dia, de-silting basin 3nos.
each of size ( 250m x 13.90m x 18.50m ),Two nos. of pressure shaft of 4m
dia and 1.10 km long /penstock 2.3m dia, underground transformer
cavern ( 191m x 26.50 x 16m ), 9ailrace tunnel 7.75m dia and 3.30 km
long, switchyard.
Location : Bhutan
Time Period : 1999 to 2003
Project Status : Commissioned
Activities Performed : Team leader for Overall project management team
Review and Recommendation of detail Survey & Investigation details
of the project area.
Involve in Site Selection, Planning and design of project layout and
various project structures.
Responsible for the overall planning and detailed designs,
Management of various activities related to the Civil Design and
project Layout.
Tender preparation & evaluation,
Detailed Design of main Civil Structures Dam, HRT, TRT, Surge Shaft,
Power House
Preparation of Details Engineering Drawing of Main Civil Structures of
the Project Components.
Tender Evaluation and Recommendation
Monitoring during construction stage including coordination with
different agencies involved in various construction activities of the
project.
No of Manmonths : Total Manmonths: 24mm

Project : Detailed Design and Construction Supervision of Kurichhu H.E. Project (4


X 15 MW)
Position : Team Leader
Project Description : Kurichhu H.E. Project is located across river Kurichhu near Gyelpozhing in
Distt. Mongar. The project consists of 55 m straight gravity concrete Dam,
with 5 Nos. radial gates of 10.5 x 14 m size, 4 Nos. penstocks of 4 m dia
for generating units, a surface power house on the left bank with an
installed capacity of 4 units of 15 MW.

Location : Bhutan
Time Period : 1995-2000
Project Status : Commissioned

Page | 9 of 9
3F -Curriculum Vitae (CV) 1. Team Leader- Naresh Kumar

Activities Performed : Team leader of multidisciplinary team for execution of Kurichhu HEP
Review of basic designs, drawings & specifications, monitoring
programme & progress of work and to suggest remedial measures to
ensure timely completion of the project,
Detailed Engineering Design,
Construction Supervision,
No of Manmonths : Total Manmonths: 18mm

Project : Chukha H.E Project Bhutan (350MW)


Position : Deputy Director (Civil Design)
Project Description : Project comprises a 40 m high gravity type diversion dam, a headrace
tunnel 6.5 km long and 4.9 m equivalent dia, surge shaft 12 m dia, 2
pressure shafts of 3 m dia each, underground power station with increased
capacity of 350MW, operating under a head of 466 m, access and tailrace
tunnels besides 66 KV transmission lines

Location : Bhutan
Time Period : 1985-1988
Project Status : Commissioned
Activities Performed : Planning, Detailed Design Engineering and Preparation of
construction drawings
Verification of hydrological basic data,
Preparation of the Hydraulic Design Report.
Worked with the Engineering Geologist and Dam Specialist, deciding
on changes of the hydraulic structures of the Project.
No of Manmonths : Total Manmonths: 12mm

LANGUAGES : Speaking Reading Writing


Hindi Excellent Excellent Excellent
English Excellent Excellent Excellent

CERTIFICATION
I, the Undersigned, certify that to the best of my knowledge and belief, these data correctly describe me,
my qualifications and my experience.

___________________________________________________________Date:______________________

Full name of staff member: Mr. Naresh Kumar


Full name of Authorized Representative: Mr. Dilip Sutradhar

Page | 10 of 9

Potrebbero piacerti anche