Sei sulla pagina 1di 7

PROPOSED POSITION : TEAM LEADER

NAME OF CONSULTANCY : ENVIRO-TECH CONSULT (P) LTD

NAME OF STAFF : Dwarika Phuyal

PROFESSION : Environmental Studies

DATE OF BIRTH : May 19, 1971

YEAR WITH THE CONSULTANCY : 10 yrs

NATIONALITY : Nepali

MEMBERSHIP IN PROFESSIONAL SOCIETIES:


 Member, Nepal Engineering Council; Membership No.: 2672 "Civil, A"
 Member, Nepal Engineers' Association

Detail Task Assigned:


- Carrying out feasibility study of waste water management projects,
- Overall Project working team management
- Carrying feasibility survey and conceptual Design

KEY QUALIFICATION:
Mr. Phuyal has been working as a Sewerage Design and Environmental Expert since last 15
years has accumulated significant experience in carrying out feasibility study, Preparation of DPR
of wastewater and water supply projects, detail design and estimate of various rural water supply
and sanitation schemes. Similarly he has also involved in carrying out feasibility and IEE studies
of various urban water supply and sanitation projects. He has also experience in Preparation of
Road and Sewer network plan and Physical Development Plan. He has also involved in carrying
out Environmental study IEE of different roads and water supply projects. He has also involved
in Feasibility (Alignment) Study, Detailed Engineering Survey, Design, Cost Estimate, Economic
Analysis Environmental Study, and Data entry and data analysis of various road, drainage and
water supply projects.

TRAININGS:

 A Ten day training to engineers and overseers on small rural infrastructures


management for GTZ/PASRA districts implemented by GTZ (as a Trainer) March,
2009
 A Ten day training to DDC engineers, overseers and staffs on IEE organized by
DDC Palpa, January 2006 (as a trainer)
 A Fifteen day Supervisory Training to Technical Human Resources
(Overseer/Sub-overseer) of Community Based rural Infrastructure Projects of
Plan International Bara, Rautahat, Banke, Bajhang, Morang, Sunsari districts ,
2001 organized by PLAN Nepal

Training Taken/Workshop Seminar Attended


 One Month Training on Construction site management, Resettlement,
Environmental management, IEE, Social mobilization etc. by DRILP/DoLIDAR,
(ADB funded green road projects), September 2007.
 3 days Orientation training on Pre-Feasibility Site Appraisal, Environmental
Screening, Monitoring and Evaluation of rural water supply projects 25 th -27th
Feb., 2005, organized by RWSSFDB.
 National Seminar on “ Environment Engineering Challenge and Opportunities”,
June 5th 2002 on the occasion of World Environment Day 2002 jointly organized
by environmental Engineering Program Department of Civil Engineering IOE
Pulchowk and Society of Health Engineering Nepal.
 Workshop on Health and Research Methodology 21 st–25th July 2003 organized
by National Health Research Council Kathmandu.
EDUCATION
 Master’s of Science in Environmental Engineering; TU/2002
 Bachelor in Civil Engineering; TU/1999

EMPLOYMENT RECORDS
FROM Jan, 2013 : TO Date (Intermittent)
EMPLOYER : Enviro-Tech Consult (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES : Environmental Expert

Involved as a environmental expert in Preparation of Land Use Map, Land Capability Map, Soil
Map, VDC Profile of 4 VDCs of Kailali District.
Involved as a environmental expert in preparation of land use map, land capability map, soil map
and VDC profiles of 5 VDCs of Saptari District.
As a environmental expert in Preparation of Physical Development Plan of Bindraseni town
development Committee, Dailekh
As a environmental expert in Preparation of GIS based Urban Mapping of Baglung Municipality
Involved in carrying Initial Environmental Examination(IEE) of Kathmandu Fun Park at Palanse,
Bhaktapur and Jugal Multiple College building, Sindhupalchowk.

EMPLOYMENT RECORDS
FROM Nov, 2017 : TO Date (Intermittent)
EMPLOYER : BDA (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES : Water Supply cum Environmental Safeguard Expert

Involved in Preparation of DPR and IEE study reports of Ratnanagar, Parsa and Khalanga Co-
financing Water Supply and Sanitation Projects Chitwan and Jajarkot.

FROM April, 2016 : To January, 2018 (Intermittent)


EMPLOYER : BDA Nepal(P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES : Environmental Safeguard Expert

Involved in Construction Supervision and environmental monitoring of Gautam Buddha


International Airport Upgrading Project Bhairahawa.
Assist the PIU in monitoring compliance with the EIA/ IEE and Resettlement Plans and any
environmental and social development issues identified during supervision phase in co-ordination
with PIU, PCO, NGOs and other stakeholders; Assist the PIU in updating and implementing the
Environment Management Plan (EMP) and establishing a system and training staff to monitor the
project's environmental indicators.

FROM Sept., 2017 : To Mar., 2018


EMPLOYER : GOEC Nepal Pvt. Ltd
POSITION HELD : Sewerage Design Engineer cum Environmental Expert
DESCRIPTION OF DUTIES: Responsible for carrying detailed survey, design, and preparation
of Bid Documents for Preparation of Integrated Water Supply and Waste Water management
Project including Prteparation of DPR of surface drainage, sewerage systems and treatment
plant:
1. Karyabinayak Lalitpur,2. Narayan Municipality Dailekh, 3 Bardiwas Municipality Mahottari,
Byas Municipality Tanahu.
Feasibility Study of Intergrated Water Supply and Waste Water management projects:
1.Kamalamai, Sindhuli, 2. Ramgram, Nawalparasi, 3. Beni, Myagdi,4. Chainpur,
Sankhuwasabha, 5. Golbazaar Siraha, 6. Letang, Bhokteni, Morang,7. Chandrapur, Rauthat.

FROM Dec, 2015 : TOJuly, 2017 (Intermittent 5 Months)


EMPLOYER : RAAS Engineering Consultancy (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES : Environmental Expert
Involved in Land Pooling project of Basantapur New Town Project project (about 600 ropanies of
land) and Khurkot New Town Project (about 500 ropanies of Land).
Involved in field visit and collection of environmental baseline information and prepare
Environmental Profile of the projects.

FROM Oct., 2015 : To July., 2016


EMPLOYER : GOEC Nepal Pvt. Ltd
POSITION HELD : Sewerage Design Engineer cum Environmental Expert
DESCRIPTION OF DUTIES: Responsible for carrying detailed survey, design, environmental
study and preparation of Bid Documents for Preparation of a detailed master Plan and DPR of
surface drainage, sewerage systems and treatment plant of Itahari Sub-Metropolitan City.
Design of surface sewerage system and sanitary sewerage system (Screening, Grit Chamber,
Oxidation Pond)

FROM Oct., 2015 : To July., 2016


EMPLOYER : Bright Future International Pvt. Ltd
POSITION HELD : Team Leader/Sanitary cum Environmental Expert
Carrying out Initial Environmental Examination (IEE) Study of 3 Sewerage Systems and Waste
Water; Treatment Plants
(Hastinapur, Kathmandu, Betini, Nuwakot, Manthali, Ramechhap); Carrying out Initial
Environmental Examination (IEE) Study of 2
Water Supply and Sanitation Projects; (Sundar Water Supply and Sanitation Project, Khairahani,
Chitwan and Manthali Water
Supply and Sanitation Project, Manthali, Ramechhap) implemented by Department of Water
Supply and Sewerage, Panipokhari;
Collect Physical, Baseline information; Conducted public consultation meeting; Identify, Evaluate
and assessment of impacts;
Prepare EMP; Prepare detail IEE Reports and present in Ministry.
Review of Design and Feasibility reports of those projects.

FROM Jul, 2007 : TO May, 2013 (Intermittent)


EMPLOYER : RAAS Engineering Consultancy (P) Ltd.
POSITION HELD AND
DESCRIPTION OF DUTIES : Environmental Expert/Senior Civil Engineer

 As a environmental Expert in Survey and Preparation of Present Land Use Maps,


Land Capability Maps,Soil Maps, Land Use Zoning Maps and Preparation of Village
Profiles of 5 VDCs of Chitwan district.
 As Environmental Expert in Survey and Preparation of Present Land Use Maps,
Land Capability Maps,Soil Maps, Land Use Zoning Maps and Preparation of Village
profiles of Panchkhal VDC of Kavre Palanchok district. July 2010
 Preparation of Physical Development Plan of Bindraseni Town Development
Project, Dailekh.
 Hazard Map preparation of Rapti River Basin 2063
 Civil Engineer Re-adjustment Plan Preparation of Manohara Land Pooling Project
Kathmandu Metropolitan City and Madhayapur Thimi Municipality 2011-2012
 Civil Engineer Re-adjustment Plan Preparation of Waterpark Land Pooling Project
Nepalgunj, Bake 2012
 Civil Engineer Kathmandu Metropolitan City Chamati Land Pooling Project
Kathmandu District including physical development plan, existing infrastructure plan
etc
 Civil Engineer in Preparation of Road, Sewer and Storm water Drainage Network Plan
of Dasrathchand Municipality 2065
 Preparation of Road, Sewer and Storm water Drainage Network Plan of Gorkha
Municipality 2065
 Feasibility study of integrated compact settlement at Pyuthan District,2065.
 Preparation of Physical Development Plan of Rolpa District Thwang village 2064
 Preparation of Physical Development Plan of Khalanga Darchula District 2066
 Preparation of Physical Development Plan of Biratchowck Morang District 2065
 Preparation of Road, Sewer and Storm water Drainage Network Plan of
Dasrathchand Municipality 2065
 Chamati Land Pooling Project Kathmandu Metropolitan City 2007

FROM May 2008 : TO May.2010


EMPLOYER : DA Nepal (P) Ltd
POSITION HELD : Sewerage and Drainage Design Engineer
DESCRIPTION OF DUTIES: Responsible for Feasibility study and designed with separate
system using RCC Hume pipe and discharged on natural water course after treated on horizontal
flow reed bed treatment of sewerage project in Hile/Dhankuta, Katunje/Bhaktapur and sewerage
project in Okhaldhunga.

FROM Oct 2006 : TO Dec.2007


EMPLOYER : IDRS (P) Ltd
POSITION HELD : Team Leader/ Civil cum Environmental engineer
DESCRIPTION OF DUTIES: Responsible for
Socio- Economic study, feasibility Initial Environmental Examination and Detail Engineering
Design and Estimate and construction supervision of Khalanga-Rimna Road, Jajarkot
DRILP/DoLIDAR ADB Funded Project, conducted training to social and technical group of the
project.
Overall social and Technical Team Management
Overall project management

FROM Jan 2005 : TO Novemeber.2005


EMPLOYER : BDA/GOEC (JV)
POSITION HELD : Water Supply and Sanitary Engineer (DY Team Leader)
DESCRIPTION OF DUTIES: Responsible for
Socio- Economic study and Detail Engineering Design and Estimate of Tansen Water Supply and
Sanitation Project Palpa

FROM Oct 2004 : TO Sept 2007 (Intermittent)


EMPLOYER : Enviro- Tech Consult (P) Ltd Kathmandu
POSITION HELD : Team Leader /Environmental Engineer
DESCRIPTION OF DUTIES: Responsible for
 Initial Environmental Examination of Khangsang- Khurkot Road (40 Km) Sindhuli
 Initial Environmental Examination of Musikot- Chaurjahari District Agricultural Road (45
Km) Rukum
 Initial Environmental Examination of Musikot- Chunban District Agricultural Road (35 Km)
Rukum
 Design and Estimates of various Rural Water Supply Schemes of Rukum & Sindhuli
District.
 Bhalakhcha Water Supply Project ( 2 Schemes) Rukum.
 Jare Water Supply Project (5 schemes) Rukum.
 Saakh Water Supply Project ( 6 Schemes) Rukum
 Preparation of Road, Drain and Sewer Network Plan and Land use Plan of Mangalsen
VDC, Achham
 Preparation of Road, Drain and Sewer Network Plan and Land use Plan of Martadi VDC,
Bajura
 Detail Survey, Design and Estimate of Internal Roads and Sewers Network of Attaria
Chowk of Kailali District.
 Detail Survey, Design and Estimate of Internal Roads and Sewers Network of Attaria
Chowk of Kailali District.
 Preparation of Physical Development Plan of Dullu VDC of Dailekh District.

FROM April 1999 : TO Sept. 2005 (Intermittent)


EMPLOYER : ETA Consult/ RWSSFDB/WB, Kathmandu
POSITION HELD : Water supply and Sanitation Engineer
DESCRIPTION OF DUTIES: Responsible for;
 Process and Compliance Monitoring and Evaluation of Development Phase Batch V
Schemes (19 Nos. Rural water Supply and Sanitation Schemes )
 Monitoring and Evaluation of Supporting Organisation (5 nos of SOs)
 Monitoring of Social and Technical team of small WSS projects
 Pre-Feasibility Site Appraisal with Environmental Screening of Batch VI Schemes (small
rural water supply and sanitation schemes).
FIRDO-Pyuthan (3schemes)
MAYUS-Pyuthan (3schemes)
MSS- Surkhet (3 schemes)
4-S – Jumla (3 schemes)
 Design and Estimate Finalization of Batch V Schemes
MRMG Arghakhachi (3 schemes)
Diyalo Sindhuli (4schemes)
 Carried out Impact study, design, monitoring and evaluation, training, pre- feasibility site
appraisal, NGO assessment of Drinking Water Supply and Sanitation Projects of CECI
with CBED and CHI Projects at Baitadi, Jumla and Dadeldhura
 WSS Engineer for impact study Project of implemented water supply and sanitation
Projects in Bara, Rautahat Districts for PLAN Nepal, Bara / Rautahat Program in 2001.
 WSS Engineer for Tube well Installation, Development and Conduct Hygiene and
Sanitation Education (HSE) and Water Quality Assessment, Conduct CBO Training on
Water and Sanitation and Masonry Training to Community Members with Manual
Preparation of Bara/Rautahat supported by Plan Nepal, Bara/Rautahat Program in 1999.

LANGUAGE & DEGREE


OF PROFICIENCY :
Reading Spoken Written

English - Excellent Excellent Excellent


Nepali - Excellent Excellent Excellent
Newari - Excellent Excellent Excellent
Hindi - Good Good Good

COUNTRIES OF WORK EXPERIENCE : Nepal

CERTIFICATION:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly
describe me, my qualification, and my experience.

Signature of Signature of authorized Day/Month/Year


Staff member representative of the Consultant
Full Name of the staff member : Dwarika Phuyal
Full name of authorized representative :

Potrebbero piacerti anche