Sei sulla pagina 1di 171

HERVE Engineering Training

BARON

Welcome to this presentation.

It is part of a suite of Engineering training modules.

It shows the activities and deliverables of the


Equipment/Mechanical discipline.

Comments are most welcome (herve.baron@gmail.com),


which I will incorporate for the benefit of all.

Please download this file so that you can see my trainer’s


notes in the top left corner – latest Acrobat Pro feature.

© 2015 – Hervé Baron


Hervé
HERVE Engineering disciplines: activities and deliverables
BARON

 PROCESS

 PLANT LAYOUT

 EQUIPMENT

 SAFETY & ENVIRONMENT

 CIVIL

 PIPING

 PIPELINE

© 2015 – Hervé Baron


 INSTRUMENTATION

 ELECTRICAL
HERVE
BARON

Process design

PFDs
H&M balance

Equipment specification
Process
data sheet
Rotating
Pressure vessels
Fired equipment

© 2015 – Hervé Baron


Heat exchangers
Packages etc.
HERVE Heat Exchangers
BARON

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

Starting from the Process Equipment list, Equipment discipline issues


documents to specify, select and order equipment.
Which documents?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

Starting from the Process Equipment list, Equipment discipline issues


documents to specify, select and order equipment.
Which documents?

© 2015 – Hervé Baron


1) THE MECHANICAL DATA SHEET
HERVE Rotating Equipment
BARON

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON
What additional information to the Process Data Sheet does the
Mechanical Data Sheet contain?

© 2015 – Hervé Baron


HERVE Process Data sheet / Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON

Pumps could be specified as per


ANSI or API code.
What are the differences?

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

ANSI API

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

ANSI API

Standard dimensions
Casing rating

Casing/ casing back-cover joint

Mounting feet

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

ANSI API

Standard dimensions YES NO


Casing rating 300 lbs at 300°F 750 lbs at 500°F

Casing/ casing back-cover joint Also holding bearing frame Independent, with metal/metal
adpator joint.
Mounting feet Bottom Center lined

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

ANSI API

Standard dimensions YES NO


Casing rating 300 lbs at 300°F 750 lbs at 500°F

Casing/ casing back-cover Also holding bearing frame Independent, with metal/metal
joint adpator joint.

Mounting feet Bottom Center lined

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

Gasket
Casing cover
Bearing frame adaptor

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

Gasket
Casing cover
Bearing frame adaptor

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

ANSI API

Standard dimensions YES NO


Casing rating 300 lbs at 300°F 750 lbs at 500°F

Casing/ casing back-cover joint Also holding bearing frame Independent, with metal/metal
adpator joint.
Mounting feet Bottom Center lined

© 2015 – Hervé Baron


HERVE API vs ANSI pumps
BARON

ANSI API

Standard dimensions YES NO


Casing rating 300 lbs at 300°F 750 lbs at 500°F

Casing/ casing back-cover joint Also holding bearing frame Independent, with metal/metal
adpator joint.
Mounting feet Bottom Center lined

Conclusion:

For which services would


you select an API vs an

© 2015 – Hervé Baron


ANSI pump ?
HERVE Process Data sheet / Mechanical Data Sheet
BARON

What are the contents of the code ?

© 2015 – Hervé Baron


HERVE Process Data sheet / Mechanical Data Sheet
BARON

What are the contents of the code ?


• Data sheet template
• The list of information to be
defined by Purchaser, e.g. cooling
medium, hazardous area
classification etc.
• Technical requirements for the
design, accessories, tolerances
etc.

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


Some data is highlighted in green while some data is highlighted in
orange. What is the difference?
HERVE Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


How and by whom are the Materials of Construction defined?
HERVE Engineering disciplines: activities and deliverables
BARON

 PROCESS

 EQUIPMENT

 SAFETY & ENVIRONMENT

 CIVIL

 PIPING LAYOUT & MATERIAL

 INSTRUMENTATION

 ELECTRICAL

Piping discipline

© 2015 – Hervé Baron


Piping
Piping Materials/corrosion,
Plant Layout Piping materials calculations
installation insulation, painting
& supports
HERVE Material selection
BARON

© 2015 – Hervé Baron


HERVE Material selection
BARON

© 2015 – Hervé Baron


HERVE Pumps data sheet
BARON

© 2015 – Hervé Baron


HERVE Pumps data sheet
BARON

© 2015 – Hervé Baron


29
HERVE Pumps data sheet
BARON

What is the MDMT?

© 2015 – Hervé Baron


30
HERVE Pump data sheet
BARON

© 2015 – Hervé Baron


Who is defining the seal type?
HERVE Pump data sheet
BARON

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON
Page 1/5 Page 2/5

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON
Page 3/5 Page 4/5

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON
Page 5/5

© 2015 – Hervé Baron


HERVE Columns and Drums
BARON

Which documents are produced to specify Pressure Vessels ?

© 2015 – Hervé Baron


HERVE Pressure vessels
BARON

Any other document ?

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


What does Mechanical design entail?
HERVE Mechanical design
BARON

The vessel wall thickness is calculated so that with all


loadings, i.e.,
• Internal pressure
• External pressure
• Weight
• Seismic
• Wind
• Other external loads, from connected pipes etc.
• Loads during transport, lifting

© 2015 – Hervé Baron


the maximum stress for the selected material is not
exceeded
HERVE Mechanical design
BARON

The vessel wall thickness is calculated so that with all


loadings, i.e.,
• Internal pressure
• External pressure
• Weight
• Seismic
• Wind
• Other external loads, from connected pipes etc.
• Loads during transport, lifting

© 2015 – Hervé Baron


the maximum stress for the selected material is not
exceeded
HERVE Mechanical design
BARON

Longitudinal stress 𝑷𝑷𝑷𝑷


𝑺𝑺 =
𝟐𝟐𝟐𝟐

𝑷𝑷𝑷𝑷
Circumferential stress 𝑺𝑺 =
𝒕𝒕

© 2015 – Hervé Baron


HERVE Mechanical design
BARON

Longitudinal stress 𝑷𝑷𝑷𝑷


𝑺𝑺 =
𝟐𝟐𝟐𝟐

𝑷𝑷𝑷𝑷
Circumferential stress 𝑺𝑺 =
𝒕𝒕

Vessel wall thickness is calculated so that circumferential


stress is below admissible material stress

© 2015 – Hervé Baron


𝑷𝑷𝑷𝑷
< 𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺𝑺 ∗ 𝒘𝒘𝒘𝒘𝒘𝒘𝒘𝒘 𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇
𝒕𝒕
HERVE Design of tall towers
BARON

Loadings that create compressive stress:

• Internal pressure
• Wind OR seismic
• Weight

© 2015 – Hervé Baron


HERVE Mechanical design
BARON

Loadings that create compressive stress:

• Internal pressure
• Wind OR seismic
• Weight

Longitudinal stress 𝑷𝑷𝑷𝑷


𝑺𝑺 =
𝟐𝟐𝟐𝟐

© 2015 – Hervé Baron


HERVE Design of tall towers
BARON
Wind load
D
Loadings that create compressive stress:

• Internal pressure
• Wind OR seismic
• Weight
F
X

M
Wind load F = Pw * X * D
Moment M = F * X/2

© 2015 – Hervé Baron


HERVE Design of tall towers
BARON
Wind load
D

Wind load F = Pw * X * D
Moment M = F * X/2 F
X
Inertia I = π R3 t
M
M*R
Stress S=
I

© 2015 – Hervé Baron


Stress S=
R2 π t
HERVE Design of tall towers
BARON
Wind load
D
Loadings that create compressive stress:

• Internal pressure
• Wind OR seismic
• Weight
F
X

M
Stress S= M
R2 π t

© 2015 – Hervé Baron


HERVE Design of tall towers
BARON

Loadings that create compressive stress:

• Internal pressure
• Wind OR seismic
• Weight

Weight W
W
Stress S=
2πRt

© 2015 – Hervé Baron


HERVE Design of tall towers
BARON

Loadings that create compressive stress:

• Internal pressure
• Wind OR seismic
• Weight X
Total stress: Algebraic Sum

P (R-0.4 t) F * X/2 W
Stress S = + -
2 Et π R2 t 2πRt

Total stress must remain below maximum

© 2015 – Hervé Baron


allowable for the material as specified in the code
HERVE Mechanical design
BARON

© 2015 – Hervé Baron


http://www.microprotol.com/demo_viewlet.htm
HERVE Mechanical design
BARON
Calculation file

© 2015 – Hervé Baron


HERVE Mechanical Design
BARON

© 2015 – Hervé Baron


HERVE Mechanical Design
BARON

© 2015 – Hervé Baron


HERVE Mechanical Design
BARON

© 2015 – Hervé Baron


HERVE Mechanical data sheet
BARON

© 2015 – Hervé Baron


HERVE Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


Look at the PDS and MDS in your exercise book. What additional
information is contained in the MDS? What does Mechanical
design entail?
HERVE Mechanical Data Sheet
BARON

Process Data Sheet: Mechanical Data Sheet:


• design conditions • design conditions & code
• skeleton drawings • scaled drawing
• material (generic type) and • material grades and thickness of
corrosion allowance all parts
• equipment dimensions • all dimensions
• definition of type of internals • drawings of internals
• nozzles list • nozzzles position and elevation
• height from ground • designed support
• weight
• loads on foundation

© 2015 – Hervé Baron


• limits of supply
HERVE Equipment ∕ Mechanical
BARON

© 2015 – Hervé Baron


1) Most frequent type of heat exchangers: shell &
tubes
HERVE Heat Exchanger
BARON
Shell & Tubes

© 2015 – Hervé Baron


HERVE Heat Exchanger thermal sizing
BARON
TEMA Data Sheet
A Thermal data
sheet is received
from Process for
shell & tubes heat
exchangers
following thermal
sizing

© 2015 – Hervé Baron


HERVE Heat Exchanger
BARON
Mechanical Design
Ref[1]: 0
N2A N2B V

N4

HLL HLL

N5 N1A UC N1B D N3

© 2015 – Hervé Baron


HERVE Heat Exchanger
BARON
Mechanical Design
Ref[1]: 0
N2A N2B V

N4

HLL HLL

N5 N1A UC N1B D N3

What additional aspect is taken into account in the mechanical design of


heat exchangers compared to that of other pressure vessels (columns,
drums)?

© 2015 – Hervé Baron


HERVE Heat Exchanger
BARON
Mechanical Design
Ref[1]: 0
N2A N2B V

N4

HLL HLL

N5 N1A UC N1B D N3

© 2015 – Hervé Baron


HERVE Heat Exchanger
BARON
Mechanical Design

© 2015 – Hervé Baron


HERVE Heat Exchanger Mechanical Data Sheet
BARON

© 2015 – Hervé Baron


HERVE Heat Exchanger
BARON

Process Process/heat exchange Equipment

Proces Data Thermal Thermal Mechanical Mechanical


Sheet sizing data sheet design data sheet

© 2015 – Hervé Baron


HERVE Heat Exchanger
BARON

Process Process/heat exchange Equipment

Proces Data Thermal Thermal Mechanical Mechanical


Sheet sizing data sheet design data sheet

© 2015 – Hervé Baron


Thermal exchange Heat transfer coefficient,
duty number of shells/passes per Overall eqipment dimensions,
shell, heat transfer surface, position of nozzles, weight etc.
number of tubes
HERVE Equipment ∕ Mechanical
BARON

© 2015 – Hervé Baron


2) Plate & Frame and other proprietary design heat exchangers
HERVE Heat Exchanger
BARON
Plate and Frame

© 2015 – Hervé Baron


How are Plate and Frame Heat Exchangers specified ?
HERVE Heat Exchanger
BARON
Plate and Frame

© 2015 – Hervé Baron


What are the advantages of the Plate and Frame HX versus the Shell
& Tube?
HERVE Heat Exchanger
BARON
Plate and Frame

© 2015 – Hervé Baron


How are Air cooled Heat Exchangers specified?
HERVE Equipment ∕ Mechanical
BARON

© 2015 – Hervé Baron


How are heaters specified ?
HERVE Equipment ∕ Mechanical
BARON

© 2015 – Hervé Baron


How are storage tanks specified ?
HERVE Storage tanks
BARON

 Flat bottom cylindrical atmospheric tanks are


designed as per API 650 « Welded storage tanks
for oil storage »

 Above a diameter of 6 meters, tanks are not be


shop but Site fabricated

© 2015 – Hervé Baron


HERVE Storage tanks Mechanical data sheet
BARON

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

© 2015 – Hervé Baron


What are the miscellaneous equipment?
HERVE Equipment ∕ Mechanical
BARON

What is a package ?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What is a package ?

Package = Set of equipment, accessories and services


 contracted or purchased to a single Vendor

 realizing a process function, with associated functional guarantees

© 2015 – Hervé Baron


 assembled on a single skid or multi skid, or shipped loose (bulk)
HERVE Equipment ∕ Mechanical
BARON

What is a package ?

What is, for Engineering, the purpose


to order as a package ?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What is a package ?

What is, for Engineering, the purpose


to order as a package ?

Purpose
 to have a better efficiency (than if it was done by the Engineer)

 to minimize site erection work

 to have ONE single functional guarantee

© 2015 – Hervé Baron


 to have a party (vendor) who is able to bring a specific know-how
HERVE Equipment ∕ Mechanical
BARON

What is a package ?

What is, for Engineering, the purpose


to order as a package ?

What is usually ordered as a package ?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What is a package ?

What is, for Engineering, the purpose


to order as a package ?

What is usually ordered as a package ?

Common types of packages


 Compressors

 Heaters, boilers, incinerators,

 Air/nitrogen generation, chemical injection

© 2015 – Hervé Baron


 Water/gas treatment

 Solid handling, conveyors, cranes etc.


HERVE Packaged Compressor
BARON

© 2015 – Hervé Baron


Picture courtersy LMF
HERVE Packages
BARON
Off-shore

Instrument air generation Air dryers skid

© 2015 – Hervé Baron


HERVE Packages
BARON
Gas Dehydration Off-shore

© 2015 – Hervé Baron


HERVE Packages
BARON
Nitrogen generation unit On-shore

Steam bath
vaporizer
Cold box
Storage tank
(25m high)

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What is a package ?

What is, for Engineering, the purpose


to order as a package ?

What is usually ordered as a package ?

Which is the responsible discipline ?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

Which is the responsible discipline ?

 Packages requiring mainly know-how for one Equipment type,


designed to ONE particular code: the concerned Equipment
discipline
 Turbo-compressor ROTATING
 Heaters, boilers, incinerators FIRED HEATER
 Desalter PRESSURE VESSELS

 Packages involving several Equipment type, the design of which is


NOT dictated by ONE particular code: the PACKAGE discipline
 Air/nitrogen generation, chemical injection PACKAGE
Water/gas treatment PACKAGE

© 2015 – Hervé Baron


 Solid handling, conveyors, cranes etc. PACKAGE


HERVE Equipment ∕ Mechanical
BARON

What are the key things to consider


when specifying a package?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What are the key things to consider


when specifying a package?

 Applicable specifications: Manufacturer standard, a few Project


specifications or all?
 Automation design: Independent control system or not ?
 Pre-assembly level / extent of site works
 Definition of limits of supply and interfaces in all disciplines, e.g. civil

© 2015 – Hervé Baron


 Involvement of Engineer: no / partial or full check ?
HERVE Equipment ∕ Mechanical
BARON

What are the key things to consider


when specifying a package?

 Applicable specifications: Manufacturer standard, a few Project


specifications or all?
 Automation design: Independent control and safety systems or not ?
 Pre-assembly level / extent of site works
 Definition of limits of supply and interfaces in all disciplines, e.g. civil

© 2015 – Hervé Baron


 Involvement of Engineer: no / partial or full check ?
HERVE Package instrumentation & control
BARON

Package with control loops and The Package with stand alone
protection system integrated with the process control and safety system
Plant control and safety systems

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What are the key things to consider


when specifying a package?

What could be the drawbacks of


ordering something as a package?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What other documents besides the Data Sheets are issued to


specify and order Equipment ?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

What other documents besides the Data Sheets are issued to


specify and order Equipment ?
2) THE SPECIFICATION

© 2015 – Hervé Baron


HERVE Data sheet / Specification
BARON

© 2015 – Hervé Baron


What is the scope of each document?
HERVE Data sheet / Specification
BARON

© 2015 – Hervé Baron


Two types of specifications are issued. What are the two types?
HERVE Specification
BARON
General

© 2015 – Hervé Baron


98
EP - 21799_a_A_ppt_01 - Eng. Mangement Part 2 - Engineering disciplines
HERVE Specification
BARON

General specification:

 It does not apply to a particular equipment (tag) but to all items of this
family of equipment, e.g. fired heaters, S&T HX etc.
 Only lists the amendments to a code
 For standard supplies, it is enough, along with the MDS
 For packages, general specifications for all equipment types within the
package must be included

© 2015 – Hervé Baron


HERVE Equipment codes & Standards
BARON
Pressure Vessels
ASME Section VIII, Division 1 Rules for Construction of pressure Vessels
ASME Section VIII, Division 2 Rules for Construction of pressure Vessels

Fired Heaters and Steam Boilers


ASME Section I Power Boilers Code
API 560 Fired heaters for refinery services

Heat Exchangers
API 660 Shell & Tube
API 661 Air-cooled HX
API 662 Plate & Frame

Rotating Equipment
API 610 Centrifugal pumps for Petroleum and Natural Gas Industries
API 617 Centrifugal compressor for general refinery service

© 2015 – Hervé Baron


API 611 General purpose turbines for refinery service

Atmospheric Storage Tanks


API 650 Welded Tanks For oil Storage
HERVE Specification
BARON
Particular

© 2015 – Hervé Baron


HERVE Specification
BARON

General specification:

 It does not apply to a particular equipment (tag) but to all items of this
family of equipment, e.g. fired heaters, S&T HX etc.
 Only lists the amendments to a code
 For standard supplies, it is enough, along with the MDS
 For packages, general specifications for all equipment types within the
package must be included

Particular specification

 Specific to a particular equipment item (Equipment Tag)


 Issued for complex and extended scope of supply, including several types
of equipment, e.g. machinery auxiliaries, and for packages
 Issued when the supply is not standard, i.e. specific requirements etc. that

© 2015 – Hervé Baron


the general specification does not cover
 It is fully comprehensive... as shown on the TOC on the next slide
HERVE (Particular) Equipment specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE (Particular) Equipment specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE (Particular) Equipment specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE (Particular) Equipment specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents
Deviations and exceptions are discussed with
 Applicable codes & standards Vendors, and incorporated in the specification
final revision IFP
 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards In all concerned disciplines (to reduce the
number of other discipline specs
 Deviations & Exceptions transmitted to the vendor)

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions


Strongly influences the amount of work on
 Design Requirements site

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Documentation
HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions

 Inspection & testing

© 2015 – Hervé Baron


 Guarantees & warranty

 Data required with the bid


HERVE Specification
BARON

 Detailed scope of supply

 Scope of services

 Reference documents

 Applicable codes & standards

 Deviations & Exceptions

 Design Requirements

 Packing, marking and shipping

 Shop assembly and delivery conditions


During bid stage (before PO)
 Inspection & testing information is required to Vendor for

© 2015 – Hervé Baron


Technical analysis. This paragraph is
 Guarantees & warranty deleted for IFP revision

 Data required with the bid


HERVE Equipment ∕ Mechanical
BARON

Which document, issued to the bidders, summarizes the inquiry?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

Which document, issued to the bidders, encapsulates all


requirements for a particular supply?
1) THE MECHANICAL DATA SHEET
2) THE SPECIFICATION

© 2015 – Hervé Baron


3) THE MATERIAL REQUISITION
HERVE Material requisition
BARON

© 2015 – Hervé Baron


HERVE Material requisition
BARON

© 2015 – Hervé Baron


HERVE Material requisition
BARON

© 2015 – Hervé Baron


HERVE Material requisition
BARON

Name the documents to be listed here…

1) For the “Centrifugal Pumps” Material Requisition

2) For the “Turbo-Compressors” Material Requisition

3) For the requisition of a package

© 2015 – Hervé Baron


HERVE Material requisition
BARON

Name the documents to be listed here…

1) For the “Centrifugal Pumps” Material Requisition

2) For the “Turbo-Compressors” Material Requisition

3) For the requisition of a package

© 2015 – Hervé Baron


HERVE Material requisition
BARON

Name the documents to be listed here…

1) For the “Centrifugal Pumps” Material Requisition


• The General Specification for centrifugal pumps
• The Mechanical Data Sheet of each pump

© 2015 – Hervé Baron


HERVE Material requisition
BARON

Name the documents to be listed here…

1) For the “Centrifugal Pumps” Material Requisition

2) For the requisition of air-coolers

3) For the requisition of a package

© 2015 – Hervé Baron


HERVE Material requisition
BARON

Name the documents to be listed here…

1) For the “Centrifugal Pumps” Material Requisition

2) For the requisition of air-coolers


• The General specification for air-coolers
• The Process Data Sheets of each air-cooler

© 2015 – Hervé Baron


HERVE Material requisition
BARON

Name the documents to be listed here…


1) For the “Centrifugal Pumps” Material Requisition
2) For the requisition of air-coolers
3) For the requisition of a package
and standards of engineering design disciplines

© 2015 – Hervé Baron


HERVE Material requisition
BARON

Name the documents to be listed here…


1) For the “Centrifugal Pumps” Material Requisition
2) For the requisition of air-coolers
3) For the requisition of a package
• The duty specification

© 2015 – Hervé Baron


• The Particular Specification
• The general specifications for all equipment part of the package
• Specifications and standards of engineering design disciplines
HERVE Material requisition
BARON

© 2015 – Hervé Baron


HERVE Material requisition
BARON

 1 PIM, attendance to all checks and test points (HOLD)

© 2015 – Hervé Baron


 2 PIM, optional attendance to checks and test points
 3 Attendance to final tests only
 4 Review of documents only
HERVE Inspection requirements
BARON

Supplier class
Very good Good Fair Bad

Very critical
Equipment Criticality

Critical

Low critical

© 2015 – Hervé Baron


Non critical
HERVE Inspection requirements
BARON

Established on the basis of previous experience


with this supplier (rating by Engineering /
Inspection / Expediting), References, audits, NCR
Defined based on operating etc.
conditions, manufacturing
difficulty, impact on Design or
overall Project Schedule.
Supplier class
Very good Good Fair Bad

Very critical
Equipment Criticality

Critical

Low critical

© 2015 – Hervé Baron


Non critical
HERVE Inspection requirements
BARON
1 PIM, attendance to all checks and test points (HOLD)
2 PIM, optional attendance to checks and test points
3 Attendance to final tests only
4 Review of documents only

Supplier class
Very good Good Fair Bad

Very critical not not


1 1
Equipment Criticality

qualified qualified
not
Critical 3 2 2 qualified

Low critical

© 2015 – Hervé Baron


4 3 2 2

Non critical 4 3 3 3
HERVE Material requisition
BARON

What are the


different types
of documents
requested from
the vendor ?

 1 PIM, attendance to all checks and test points (HOLD)


 2 PIM, optional attendance to checks and test points

© 2015 – Hervé Baron


 3 Attendance to final tests only
 4 Review of documents only
HERVE Vendor documents
BARON

 Design documents, such as mechanical calculation note etc.

 Interface documents, such as loads on foundation, Purchaser's


connections drawing etc.

 Manufacturing documents such as welding and testing procedures,


inspection and test reports,

 Installation documents, such as preservation procedure, lifting


instructions etc.

 Operating and maintenance manual, spare parts list

© 2015 – Hervé Baron


HERVE Vendor documents
BARON

 Design documents, such as mechanical calculation note etc.

 Interface documents, such as loads on foundation, Purchaser's


connections drawing etc.

 Manufacturing documents such as welding and testing procedures,


inspection and test reports,

 Installation documents, such as preservation procedure, lifting


instructions etc.

 Operating and maintenance manual, spare parts list

© 2015 – Hervé Baron


Which type of documents is the most critical for Engineering
development ?
HERVE Vendor Documents Requirements & Schedule (VDRS)
BARON

© 2015 – Hervé Baron


HERVE Vendor Documents Requirements & Schedule (VDRS)
BARON

© 2015 – Hervé Baron


What do you do to ensure these documents will be submitted on-time ?
HERVE Vendor Documents Requirements & Schedule (VDRS)
BARON

© 2015 – Hervé Baron


HERVE Vendor documents
BARON

 Design documents, such as mechanical calculation note etc.

 Interface documents, such as loads on foundation, Purchaser's


connections drawing etc.

 Manufacturing documents such as welding and testing procedures,


inspection and test reports,

 Installation documents, such as preservation procedure, lifting


instructions etc.

 Operating and maintenance manual, spare parts list

© 2015 – Hervé Baron


What are the types of Material certificates requested?
HERVE Certificate
BARON

EN 10204

 Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).

 Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.

 Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.

Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.

© 2015 – Hervé Baron


HERVE Certificate
BARON

EN 10204

 Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).

 Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.

 Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.

Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.

© 2015 – Hervé Baron


Which type of certificate is requested for what?
HERVE Certificate
BARON
Non pressure containing parts
EN 10204

 Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).

 Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.

 Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.

Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.

© 2015 – Hervé Baron


HERVE Certificate
BARON
Pressure containing parts
EN 10204

 Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).

 Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.

 Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.

Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.

© 2015 – Hervé Baron


HERVE Certificate
BARON

EN 10204

 Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).

 Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.

 Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.

© 2015 – Hervé Baron


Critical items, such as special steels, critical service etc, or in case of doubt
on the quality control system of the supplier
HERVE Certificate
BARON

What type of
certificate
is this?

© 2015 – Hervé Baron


HERVE Material requisition / Annex
BARON

© 2015 – Hervé Baron


HERVE Material requisition / Annex
BARON

© 2015 – Hervé Baron


HERVE Material Requisition / Annex
BARON

© 2015 – Hervé Baron


HERVE Vendor documents
BARON

© 2015 – Hervé Baron


HERVE Vendor documents
BARON

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON
Quiz

Give another name for each of the following type of heat


exchanger:

 Finned tube

 PFHE

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON

WRAP-UP !

Documents issued by Equipment discipline:


 Mechanical Data Sheet
 Specification (General / Particular)
 Material Requisition

Another document is issued by the Equipment discipline, which


one?

© 2015 – Hervé Baron


HERVE Equipment ∕ Mechanical
BARON

Which documents are issued to


• Specify
• Inquire
• Select

© 2015 – Hervé Baron


Equipment?
HERVE Bid technical evaluation
BARON
Requirements Supplier 1 Supplier 2

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON

What is the work of the Equipment engineer after the purchase order is
placed?

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON

What is the work of the Equipment engineer after the purchase order is
placed?
 Review of vendor documents

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON

What is the work of the Equipment engineer after the purchase order is
placed?
 Review of vendor documents

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON
Decision during a clarification meeting
Scope of supply: counter with vendor, for instance to allow
flange to be supplied by maintenance
vendor, as per contractual
specification

Comments on Instrument
numbering and
installation: Vendor P&ID
shall use the same
nomenclature than
project’s P&ID

© 2015 – Hervé Baron


Missing information: setting pressure of
PCV shall be indicated on P&ID
HERVE Equipment / Mechanical
BARON

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON

What is the work of the Equipment engineer after the purchase order is
placed?
 Review of vendor documents
 Coordination with other disciplines

© 2015 – Hervé Baron


HERVE Equipment / Mechanical
BARON

What is the work of the Equipment engineer after the purchase order is
placed?
 Review of vendor documents
 Coordination with other disciplines. There are many interfaces…

© 2015 – Hervé Baron


HERVE Interfaces
BARON
Which engineering data is
exchanged with the Vendor
of a column?

© 2015 – Hervé Baron


HERVE Interfaces
BARON
Which engineering data is exchanged
with the Vendor of a column?
Discipline Provider Receiver
Piping Nozzle elevation, Nozzle
orientation, loads exact
position
Plant layout Elevation &
position of
manholes, height
of skirt/support
Civil Platform supports Loads on
(location and load) foundation
Piping supports Pipe support
location
Instrumentation Elevation of level

© 2015 – Hervé Baron


connections
Internals vendor Internals supports
Electrical Earthing lug /
lightning lug
HERVE Equipment / Mechanical
BARON

Other Engineering disciplines /


Project functions will also be
involved….

Discipline Involvement
Materials/Corrosion Review materials,
coating, insulation
cathodic protection
Inspection Tests, NDE, RBI
Construction Reviews, site assembly,
heavy lifts
Safety Passive fire protection on
column skirt

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide
BARON

A unique synthetic overveiw of Engineering...

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

This suite of training modules


covered the discipline
chapters of the book...

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

The Guide contains much more:

The overall picture, interfaces,


methods & tools, etc.

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide
BARON
2nd edition

Order direct from the publisher:

http://www.editionstechnip.com/en/catalogu
e-detail/1111/oil-gas-engineering-guide-
the.html

© 2015 – Hervé Baron

Potrebbero piacerti anche