BARON
PROCESS
PLANT LAYOUT
EQUIPMENT
CIVIL
PIPING
PIPELINE
ELECTRICAL
HERVE
BARON
Process design
PFDs
H&M balance
Equipment specification
Process
data sheet
Rotating
Pressure vessels
Fired equipment
ANSI API
ANSI API
Standard dimensions
Casing rating
Mounting feet
ANSI API
Casing/ casing back-cover joint Also holding bearing frame Independent, with metal/metal
adpator joint.
Mounting feet Bottom Center lined
ANSI API
Casing/ casing back-cover Also holding bearing frame Independent, with metal/metal
joint adpator joint.
Gasket
Casing cover
Bearing frame adaptor
Gasket
Casing cover
Bearing frame adaptor
ANSI API
Casing/ casing back-cover joint Also holding bearing frame Independent, with metal/metal
adpator joint.
Mounting feet Bottom Center lined
ANSI API
Casing/ casing back-cover joint Also holding bearing frame Independent, with metal/metal
adpator joint.
Mounting feet Bottom Center lined
Conclusion:
PROCESS
EQUIPMENT
CIVIL
INSTRUMENTATION
ELECTRICAL
Piping discipline
𝑷𝑷𝑷𝑷
Circumferential stress 𝑺𝑺 =
𝒕𝒕
𝑷𝑷𝑷𝑷
Circumferential stress 𝑺𝑺 =
𝒕𝒕
• Internal pressure
• Wind OR seismic
• Weight
• Internal pressure
• Wind OR seismic
• Weight
• Internal pressure
• Wind OR seismic
• Weight
F
X
M
Wind load F = Pw * X * D
Moment M = F * X/2
Wind load F = Pw * X * D
Moment M = F * X/2 F
X
Inertia I = π R3 t
M
M*R
Stress S=
I
• Internal pressure
• Wind OR seismic
• Weight
F
X
M
Stress S= M
R2 π t
• Internal pressure
• Wind OR seismic
• Weight
Weight W
W
Stress S=
2πRt
• Internal pressure
• Wind OR seismic
• Weight X
Total stress: Algebraic Sum
P (R-0.4 t) F * X/2 W
Stress S = + -
2 Et π R2 t 2πRt
N4
HLL HLL
N5 N1A UC N1B D N3
N4
HLL HLL
N5 N1A UC N1B D N3
N4
HLL HLL
N5 N1A UC N1B D N3
What is a package ?
What is a package ?
What is a package ?
What is a package ?
Purpose
to have a better efficiency (than if it was done by the Engineer)
What is a package ?
What is a package ?
Steam bath
vaporizer
Cold box
Storage tank
(25m high)
What is a package ?
Package with control loops and The Package with stand alone
protection system integrated with the process control and safety system
Plant control and safety systems
General specification:
It does not apply to a particular equipment (tag) but to all items of this
family of equipment, e.g. fired heaters, S&T HX etc.
Only lists the amendments to a code
For standard supplies, it is enough, along with the MDS
For packages, general specifications for all equipment types within the
package must be included
Heat Exchangers
API 660 Shell & Tube
API 661 Air-cooled HX
API 662 Plate & Frame
Rotating Equipment
API 610 Centrifugal pumps for Petroleum and Natural Gas Industries
API 617 Centrifugal compressor for general refinery service
General specification:
It does not apply to a particular equipment (tag) but to all items of this
family of equipment, e.g. fired heaters, S&T HX etc.
Only lists the amendments to a code
For standard supplies, it is enough, along with the MDS
For packages, general specifications for all equipment types within the
package must be included
Particular specification
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Deviations and exceptions are discussed with
Applicable codes & standards Vendors, and incorporated in the specification
final revision IFP
Deviations & Exceptions
Design Requirements
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Applicable codes & standards In all concerned disciplines (to reduce the
number of other discipline specs
Deviations & Exceptions transmitted to the vendor)
Design Requirements
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Documentation
HERVE Specification
BARON
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Design Requirements
Scope of services
Reference documents
Design Requirements
Supplier class
Very good Good Fair Bad
Very critical
Equipment Criticality
Critical
Low critical
Very critical
Equipment Criticality
Critical
Low critical
Supplier class
Very good Good Fair Bad
qualified qualified
not
Critical 3 2 2 qualified
Low critical
Non critical 4 3 3 3
HERVE Material requisition
BARON
EN 10204
Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).
Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.
Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.
Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.
EN 10204
Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).
Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.
Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.
Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.
Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).
Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.
Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.
Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.
Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).
Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.
Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.
Type 3.1 (and 3.2) must contain PO/work order number, batch/lot number etc.
EN 10204
Type 2.1: Declaration of conformity. Issued by the Supplier. Certifies that the product
complies with the requirements of the order. Does not contain any test results (2.1) or
contains non-specific test results (2.2).
Type 3.1: Material test certificate. Issued by the Supplier. Contains specific test results.
Tests are done on the material itself or a sample of it. The tests have been done by an
organization independent from the supplier.
Type 3.2: Witnessed Material Test Certificate. Same as 3.1 but tests, including sampling
and traceability of sample, have been witnessed by a recognized certification agency.
The items shall be stamped with the symbol of the certification agency.
What type of
certificate
is this?
Finned tube
PFHE
WRAP-UP !
What is the work of the Equipment engineer after the purchase order is
placed?
What is the work of the Equipment engineer after the purchase order is
placed?
Review of vendor documents
What is the work of the Equipment engineer after the purchase order is
placed?
Review of vendor documents
Comments on Instrument
numbering and
installation: Vendor P&ID
shall use the same
nomenclature than
project’s P&ID
What is the work of the Equipment engineer after the purchase order is
placed?
Review of vendor documents
Coordination with other disciplines
What is the work of the Equipment engineer after the purchase order is
placed?
Review of vendor documents
Coordination with other disciplines. There are many interfaces…
Discipline Involvement
Materials/Corrosion Review materials,
coating, insulation
cathodic protection
Inspection Tests, NDE, RBI
Construction Reviews, site assembly,
heavy lifts
Safety Passive fire protection on
column skirt
http://www.editionstechnip.com/en/catalogu