Sei sulla pagina 1di 1

ARCHITECTURAL INSPECTION CHECKLIST

- WATERPROOFING TO WET AREAS

Project Date & Time Start


PROPOSED NEW ERECTION OF 2 UNITS OF 2-STOREY DETACHED DWELLING
HOUSES EACH WITH BASEMENT, ATTIC AND SWIMMING POOL ON LOTS 7018T &
7023K MK04 AT 60 GREENLEAF ROAD AND 66B GREENLEAF VIEW
(BUKIT TIMAH PLANNING AREA).
Location (Please refer attached part plans) Date & Time End

Conform to Date of
Non-
Specs & Corrective
Description Conformance (to
Stds Action Taken &
list the items)
Yes No Signature
A) LOCATION:

B) WATER PROOFING APPLICATION WORKS


START DATE
DATE OF WATER PROOFING APPLIED

WATER TIGHTNESS TEST


START DATE

WATER FLOODING
END DATE

WATER TIGHTNESS INSPECTION INSPECTION DATE


REMARKS

Conform to
Date of
Specs & Non-
Corrective
Stds Conformance (to
Action Taken &
list the items)
Yes No Signature

PHOTOS

Checked By: PROJECT MANAGER / EDC REPRESENTATIVE Verified By: DEVELOPER REPRESENTATIVE
Name: Name:
Designation: Designation:
Signature: Signature:
Date : Date :

Potrebbero piacerti anche