Sei sulla pagina 1di 9

BOQ Of State Bank of Mysore, Behala, Kolkata

SL
NO.
PARTICULARS UNIT QTY RATE AMOUNT
A INTERIOR:

1 FALSE CEILING ( Gypboard)

Providing and fixing Gypsum false ceiling as per India Gypsum specification for
ceiling with drops as per drawing including of providing and fixing G.I. Frame work as
per specification of India gypsum at a distance of 2'0" c/c both ways complete with
12.5mm board (IS-2095-1982) and all necessary perimeter channels etc. No extra
payment will be made for the cutting of light points , stain glass,cove lighting etc. The
measurement will be taken in one level , rate should include the drops also, no extra
amount will be paid for the drops. The joints to be properly mended with paper tapes
and gypsum compound all complete. The rate should include the full completion of
the ceiling. At the time of handing over the site all necessary repairing work to be
considered if required. The work to be completed as per specification ,design and
approval of the Architect.No Drop or design(if any )will be considered as extra
measurement it will be considered flat ceiling.Rate is inclusive of two coats primer
and two coats of Acrylic emulsion paint. SFT

2 PARTITION
Providing and fixing in position partition with 2"x2" finished sal wood section without
saps and joints at maximum 2'-0"C/C both ways horizontally and vertically treated
with Pentapehene pale from STP as antitermite & fire retardent from Viper to be fixed
screwed to the floor and ceiling with M.S.Cleats. The frame work will be claded with
6mm thk. BWR plywood both sides and finished with 1.0mm thk. approved shade
laminate as per design with approved adhesive.3"x1/2" white beach /white ceader
skirting with natural polish to be fixed along with the entire bottom length of partition
on both sides.Extra frame work to be fixed for fixing glass. In the glazed partition
8mm thk. Etched/Frosted glass with sand blusting/granular blasting to be provided
fixed with white beach/ white ceader moulding with natural polished 37.5mmx25mm
all complete.For the door 32mm solid core flush door with necessary hold fast fixed
to the wall /partition with 1.0mm thk. laminate (approved shade).1 1/2"x1 1/2"white
beach/white ceader moulding to be provided along the periferi of the door frame.

The work to be completed as per design,specification and approval of the Architect.

(a) PARTLY GLAZED PARTITION WITH DOOR


(i) Full Ht. Partly Glazed Partition Upton 8'-0" SFT
(ii) Low Ht. Partly Glazed Partition Upto 4'-0" & 6'-0". SFT

(b) BLOCKED PARTITION


(i) Full Blocked Partition Upto 8'-0" SFT

(c) TOUGHEND GLASS PARTITION

Page 1
Providing and fixing in position 10mm thk toughened glass at top of teller counter
front.The work to be completed in all respect as per design , direction and approval
of Architect. SFT

Page 2
3 Door Accessories
Supplying and fixing door accessories as door closure,door stoper,Floor
spring(heavy duty), hinges, locks and handle etc.The above items to be approved by
Architect
(a) PARTLY GLAZED DOOR
(i) Partly glazed door with etching & frosting (7'-0"x3'-0") NOS

(ii) Partly glazed door with out etching & frosting (7'-0"x3'-0") NOS

(iii) Low ht. Glazed door.(6'-0"x2'-6") NOS

(b) BLOCKED DOOR


(i) Full ht. Blocked door with vision panel (7'-0"x3'-0") NOS
(ii) Full ht. Blocked door without vision panel (7'-0"x3'-0") NOS

(c) MAIN ENTRANCE DOOR (3'-6"x7'-0")

Providing & fixing fully glazed pivoted door at the main entrance consists of
6"x2"seasoned hard wood section covering with white beach/white ceader beading
for bottom rail and 4"x2" seasoned hard wood section covering with white
beach/white ceader beading for top rail finished with natural polish. 12mm thk.Modi
Guard /Saint Gobain clear float glass with sand blasting/etching (as per design) and
finish handle(1'-0" long)of Neki/Hasseley make to be faxed on both sides & proper
locking arrangement in bottom rail to be done. The rate should include
lipping,moulding,beading & heavy duty floorspring.The work to be completed in all
respect as per design, direction and approval of the architect. NO

4 TABLE
Providing and fixing tables made out of 19mm thk BWR block board for top,sidis and
front of approved make cladded with 1.0mm laminate as per design in all visible
areas. All the exposed edges to be covered with white beach/white ceader wooden
lippings and mouldings with natural polish. The drawers to be made out of 19mm thk
block board for the front ,sides to be made out of 12mm BWR plywood and bottom to
be made out of 6mm BWR plywood and it should play in drawer sliding channels.
The inside of the drawer and the table to be ename painted (approved colour) . A
legrest to be provided duly polished made out of 19mm thk BWR plywood. A shutter
to be made by 19mm bwr Block board cladded with 1.0mm laminate .The necessary
locks,hinges, handles to be provided in each drawers and shutters.3" x 1/2" white
beach/White ceader wooden skiritng to be provided in all visible areas duly
polished.On top of the Chief managers/Br. Manager table 10mm thk glass to be
placed duly edge polished.The table should have black powder coated ready made
key board tray and tea traywith laminate finish.The necessary wire managers to be
provided on the tables and provision for lights to be kept if required in the front of the
table.

Page 3
Ready made CPU trolly to be provided every where with a provision of castors to be
provided. 1.0mm laminate of approved colour and bruss steel laminate to be fixed as
per design including the raised level.All the inside areas to be duly enamel
painted.For Spl. Asst. Table should have 19mm thk. granite(approved colour)with
bull nosed at front facia.1'-0"high 10mm thk.machine polished clear glass to be
provided at top of table front.The work to be completed as per design and approval
of the Architect.
(a) Br. Manager (6'-0"x2'-6") NO
(b) Officers/ staffs (4'-6"x2'-6") NOS
(c) Spl. Asst. (4'-9"x2'-6") NOS
6 WORKSTATION:
Providing & fixing top, front & sides of workstation made out of 19mm thk. BWR RFT
block board and 6mm BWR ply for back as per design cladded with 1.0mm thk.
Laminate & the all exposed edges to be finished with white beach/white ceader
moulding ( as per design), lipping with natural polish.The work station should have
individual pedestral unit having drawer & shutter pallah.The front of the drawer made
out of 19mm thk.BWP block board finished with 1.0mm thmk. laminate, sides 12mm
thk. BWP ply and bottom to be made out of 6mm plywood. The inside and sides of
the drawer to be enamel painted. The drawers and shutters to be provided with
necessary drawer sliding channels , handles,hinges,locks etc.A leg rest to be
provided made out of 19mm thk. BWP block board duly enamel painted. Inside of the
workstation to be enamel painted in the matching tone.Wire manager (approved
colour),Readymade black powder coated CPU trolly,Key board tray , Mouse pad tray
finished with 1.0mm laminate to be provided.The work should be completed as per
specification and approval of Architects.

7 CASH COUNTER / SW (4'-9"x2'-6") HT. 3'-8"

Providing and fixing top, front & sides of cash counter made out of 19mm BWR block
board as per design cladded with 1.0mm thk laminate & the edges to be finished with
necessary white beach or white ceader lippings, mouldings(as per design), etc.
Special 6" drawer to be made for the cash with dividers of 12mm BWR plywood The
front of the drawer made out of 19mm BWR block board finished with 1.0mm
laminate, sides 12mm BWR plywood and bottom to be made of 6mm BWr plywood .
The inside and sides of the drawer to be enamel painted .The drawers and shutters
to be provided with necessary drawer sliding channels,handles, hinges, locks etc. A
leg rest to be provided made out of 19mm thk BWR block board duly enamel
painted. Inside of the unit to be enamel painted in the matching tone.All visible areas
to be coverd with white beach or white ceader lippings, mouldings with natural
polish.Wire manager, legrest,Redymade black powder coated CPU trolly, keyboard
tray, tea tray finished with 1.0mm laminate to be provided. 3" x 1/2" white beach
white ceader skiriting to be provided with natural polish in all visible areas.19mm thk
Jet Black Granite with bullnosed moulding (double)

to be provided at counter top at 3' 8" lvl. the work should be completed as per
specification. The work to be completed as per specification ,design and approval of
the Architect.
RFT

8 Side and Back Unit

Page 4
Providing and fixing Side Unit/ Back unit made out of 19mm BWR block board for
top, sides,front and 6mm BWR ply for back finished with 1.0mm laminate in all
exposed areas . The drawers to be made out of 19mm BWR block board in the front
cladded with 1.0mm laminate. sides to be made out of 12mm plywood and bottom
made out of 6mm plywood duly enamel painted in matching tone and it should play
on drawer sliding channels . The Sliding shutters to be made out of 19mm block
board with 1.0mm laminate finished and should play on channels all four sides. The
necessary locks,hinges , handle etc to be provided . 3" x1/2" white beach/White
ceader wooden skiritng with natural polish to be provided as per matching tone all
along the visible areas . Inside of the unit to be enamel painted in matching tone . All
the exposed edeges of the boards/plywoods to be coverd with White beach/White
ceader lippings/mouldings with natural polished all complete.The work to be
completed as per approval and specificaion of the Architect. SFT
9 Writing Ledge

Providing and fixing writing ledge as per design made out 19mm block board with
necessary groove patterns ,1.0mm laminate to be cladded. 10mm thk bevelled glass
to be provided on top of the writing ledge.A divider made of 19mm thk.block board to
be provided. Whit beach/ White ceader lipping with natural polish to be used in all
exposed areas. Inside of writing ledge to be enamel painted.The work to be
completed as per design and approval of the architect. NO
10 Planter Box

Providing and fixing Planter Box made out of 19mm block board finished with 1.0mm
laminate as per design with a 3"x 1/2" White beach / White ceader wooden skirting
with natural polish. inside to be enamel painted .All exposed edges to be covered
with white beach/ White ceader moulding with natural polish.The work to be
completed as per design and approval of Architect. NOS

11 STORAGE

Providing and fixing storage made out of 19mm bwp block board for top,sides&
6mm BWP ply for back finished with 1.0mm laminate . The shutters to be made out
of 19mm block board with 1.0mm laminate. The necessary locks , handles, hinges
etc to be provided . 3" x1/2" white beach/White ceader wooden skiritng to be
provided duly natural polished as per matching tone. Inside of the unit to be enamel
painted in matching tone . All the exposed edeges of the boards/plywoods to be
coverd with white beach/white ceader wooden lippings/mouldings duly natural
polished all complete.For full ht. storage file divider made out of 6mm thk ply to be
provided.1.0mm thk. bruss steel laminate to be provided as per design on pallah.The
work to be completed as per approval and specificaion of the Architect.
(a) Full ht storage 7'0'' SFT
(b) Low ht storage 2'6'' SFT
12 VERTICAL BLINDS

Page 5
Providing and fixing vertical blinds of 100mm thk (Mac/Annums) of approved shade
and pattern having handrail made of high strength alluminium alloyed wall thickness
of 1.2mm thk. Headrail to have 25mm decorative insert. Control unit shall be ofderlin.
The runners are also to be a derlin with antiflixtion adeshive. Spacers should be
made of stainless steel. Fabric should be polyester viscosted/polyester yarn having
protective coating with chemicals for stain resistance & soil repalancy. The rate shall
include necessary scoch gurd treatment on both sides. The overlaping should be
uniform and adequate.Necessary operative arrangements,frames to be provided.
The work to be completed as per specification and approval of the architect. SFT

13 SYNTHETIC DOOR MAT


Providing and fixing synthetic door mats of approved shade from Birla 3M( 6mm
thk).The work to be completed as per approval of the Architect. NOS

14 SOFT BOARD / NOTICE BOARD

Providing and fixing soft board /Notice board fabricated out of 12mm BWP ply
covered with 12mm soft board padding and upholsply propylene fabric @ 80/mtr.
Edges of soft board should have white beach/whiteceader moulding with natural
polished. SFT
Note: Where pin up board is in a panelled area, the top of the pin up board should
be flushed with the panel, keeping the same level. The work should be completed as
per specification,design&approval of the Architects.
15 Lunch Counter
Providing and fixing in position Lunch counter fabricated out of 19 mm thick
BWP solid ply finished with 1.0mm thk. Laminates on top & sides.The
necessary white beach/white cedar moulding/lipping with natural polish and
necessary hardware shall be provided as per design.The work is to be
completed in all respects as per design,design and approval of the achitect. RFT

16 PAINTING

Providing and applying Acrylic emulsion/OBD paints after removing the damaged
plaster , replastering with 12mm thk cement morter after finishing with P.O.P to make
the necessary smoothness , reparing all damages . Then two coats of Primer of
approved make to be applied finished with two or more coats of acrylic emulsion
(a) paints .The work to be completed as per approval and satisfaction of the Architect. SFT

(b) TEXTURE PAINT

Providing , spraying and applying Texture pain of approved shade and colour on
walls and coloumns.The job is inclusive of scaping,leveling and preparing the
surface.Bi colour texture paint will be used. The wall surface has to duly prepared by
removing the damaged plaster and applying P.O.P to give a smooth surface as per
approval of the Architect. SFT

SYNTHETIC ENAMEL PAINT FOR WINDOW GRILL, ROLLING SHUTTER &


(c) COLLAPSEABLE GATE

Page 6
Providing and applying 2 coats synthetic enamel paint on window grill,rolling shutter
and collapsiple gate.Before putting final paint scrapping,leveling,preparing the
surface and 2 coats primer to be done.The wall to be completed as per the direction
of architect. SFT
(d) OIKAS

Providing , spraying and applying Oikas paint of approved shade and colour on walls
and coloumns.The job is inclusive of scaping,leveling and preparing the surface.Bi
colour paint will be used. The wall surface has to duly prepared by removing the
damaged plaster and applying P.O.P to give a smooth surface as per approval of the
Architect. SFT
17 SOFA

Providing and placing in position sofa made of 2"x2" hard wood section and 19mm
BWP block board for bottom,spring jute cloth,coir,8"cotton HDF,4"loose
foam,upholstery @RS.120 per mt.all complete as per drawing.3/4"x3/4" ss finish
square shape pipe to be used as legs & other areas as shown in drawing.The work
to be completed as per approval & direction of the architect. SEATS

18 SOFA SIDE TABLE, CENTRE TABLE

Providing and fixing center table fabricated out of 12mm thk. Bevelled glass on
top,3/4"dia ss stud,19mm thk. Block board finished with 1.0mm thk laminate for all
four sides and base.Bruss steel laminate to be used as per drawing.10mm thk.
Machine polished glass to be used as a shelves.The work to be completed in all
respect as per the direction of architect. NOS

19 CORNICE MOULDING
Providing and fixing pop cornice moulding along the periferi wherever the walls/
partition meeting the ceiling size 3" x 1 1/2" duly painted as per approval of the
architect. RFT

20 Plants ( artificial )
Providing and placing artificial plants & Creepers of approved colour to be provided
wherever required. The work to be completed as per approval of the Architect and
provision to be made to fix it . SETS

21 Suggestion Box

Providing and fixing suggestion box made out of 19mm block board and finished with
1.0mm thk laminate & inside to be synthetic enamel painted.A 1" high slit & small
door with key and locking arrangement to be done for dropping & taking out the
slips.The work to be completed as per design,direction & approval of the architect. NO

22 Cheque Deposit Box

Providing and fixing cheque deposit box made out of 19mm thk block board &
finished with 1.0mm thk. Laminate & inside to be synthetic enamel painted.a 1" high
slit & small door with key and locking arrangement to be done for dropping & taking
out the slips.The work to be completed as per the design,direction & approval of the
architect. NO

Page 7
23 First Aid Box

Providing & fixing in position first aid box made out of 19mm thk. BWP block board
finished with 1.0mm thk. Laminate.Inside to be enamel painted.all exposed edges to
be covered with white beach/white cedar lipping with natural polish.Necessary
hardware like multipurpose lock,box hinges and handle to be provided.The work to
be completed as per the direction & approval of the architect. NO
24 Brass Plaque with lettering

Providing & fixing in position brass plaque with lettering of Bank's name, work
timings& any other details deemed necessary by them. The item to be completed in
all respect as per the direction of the Architects. NO
25 PVC Flooring

Providing and laying 2mm thk. PVC flooring in UPS/Server and strong room of
approved colour on the existing floor with adhessive. The floor should be
clean,smooth,level,dry and free from oil, The item to be completed in all respects as
per design, direction and approval of the Architect. SFT

26 PILLAR CLADDING

Providing & fixing in position column cladding consisting of 6mm BWP


plywood,1.0mm thk. laminate with hardwood ribbing of 1 1/2"x 1" dimension. The rest
of the column is to be texture/ heritage painted.Texture/Heritage paint area as shown
in drawings.The item is to be completed in all respects as per design,direction &
approval of the architect.The rate is inclusive of dismantling,removal of existing pillar
cladding and disposal from site to municipal dumping ground. SFT

27 ROLLING SHUTTER ENCASEMENT

Providing and fixing in position rolling shutter encasement fabricated out of 19mm
thk. BWP BB finished with 1.0mm thk. laminate for top,sides, front and bottom with
necessary openable pallah at bottom, hardware including locks, hinges & handles.
The job to be completed as per approval of the Architect. SFT

28 Main Panel Encasement

Providing & Fixing main panel encasement in position fabricated out of 19mm BWP
BB with 1.0mm thk. Laminate for top,both sides&front.Encasement will be having
louver & 6mm thk. Glass for seeing the indicator in both pallahs.The exposed surface
of 19mm BWP BB will be finished with white beach/white ceader lipping & inside to
be enamel painted . The item to be completed in all respect as per design , direction
and approval of the Architects. SFT

29 Window Blocking with ply


Providing and fixing 19mm BWP BB for existing window blocking wherever required
with paint finished. The work to be completed in all respect as direction and approval
of the Architects. SFT

TOTAL

Page 8
C CIVIL WORK
SL PARTICULARS UNIT
NO.

1 IPS Flooring
Providing and laying cement concrete flooring 40mm thk. M-15,C.M laid to
proper level and slope in alternate bays including compaction filling joints
marking lines to give the appearance of tiles 30cm x30cm laid diagonally or
square finishing smooth ( with extra cement) in any colour as directed by SFT
Architect and curing complete in all respect.

2 PCC
P/E PCC OF grade 1:2:4 of desired thickness including shuttering if required.
The thk. may vary from 4" to 6" as per requirement. SFT

3 Treds & Riser of Steps


Providing and laying in required position granite slab of 25mm thk. Upto 6'-0"
in length (single piece) approved shade and colour as per design and pattern
with machine cut and machine polish in CM 1:3 for treads/ risers of steps.
The rate is inclusive of full rounded nosing for treads and 3nos groove on treads SFT
complete in all respect. Basic rate of granite Rs/- 130/sft

TOTAL

Part - D Bought out items


Chairs
i High Back with arms (DX - 718) Nos
ii Medium Back with arms ( DX - 725) Nos
iii Medium Back without arms ( DX - 722) Nos
iv Low Back without arms ( DX - 722) Nos
v Stool for pantry Nos
TOTAL

Page 9

Potrebbero piacerti anche