Project: Example ETAP Page: 1

7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard
3-Phase Fault Currents

Swing V-Control Load Total


Number of Buses: 1 1 14 16

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 7 1 0 5 0 0 13

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 1 1 2 7 4 15

System Frequency: 60 Hz

Unit System: English

Project Filename: EXAMPLE-ANSI

Output Filename: C:\ETAP 700\Example-ANSI\Untitled.SA1


Project: Example ETAP Page: 2
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: Example ETAP Page: 3
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 Load 0.480 0.480 1 100.00 0.00

Bus2 Load 0.480 0.480 1 100.00 0.00

Bus6 Load 13.800 13.800 1 100.00 0.00

Bus7 Load 13.800 13.800 1 100.00 0.00

Bus9 Load 4.160 4.160 1 100.00 0.00

Bus23A Load 0.480 0.492 1 101.45 -1.23

LVBus Load 0.480 0.480 1 97.09 -3.49

Main Bus SWNG 34.500 34.500 1 100.00 0.00

MCC1 Load 0.480 0.492 1 97.94 -3.10

Sub2A Load 13.800 13.800 1 101.52 -1.20

Sub2B Gen. 13.800 13.800 1 100.00 1.40

Sub 3 Load 4.160 4.160 1 99.81 -0.50

Sub3 Swgr Load 4.160 4.160 1 99.59 -0.50

Sub22 Load 3.450 3.450 1 100.00 0.00

Sub23 Load 3.450 3.450 1 100.00 0.00

T1~ Load 34.500 34.500 0 100.00 0.00

16 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: Example ETAP Page: 4
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Line/Cable Input Data

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable2 5.0MCUS3 750 222.0 0 1 75 0.02230 0.03640 0.0000000

Cable14 1.0MCUN3 250 430.0 0 2 75 0.05520 0.03790 0.0000000

Cable22 15MCUS3 350 410.1 0 1 75 0.03815 0.04500 0.0000000

Cable23 15MCUS3 350 410.1 0 1 75 0.03815 0.03600 0.0000000

Line4 210 5280.0 0 1 75 0.05125 0.12758 0.0000012

Line / Cable resistances are listed at the specified temperatures.


Project: Example ETAP Page: 5
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z

T2 10.000 34.500 13.800 6.90 23.00 -1.50 2.10 0 0 0 6.9000

T3 0.750 4.160 0.480 5.75 18.00 0 0 0 0 0 5.7500

T4 1.500 4.160 0.480 5.75 7.10 0 0 0 0 0 5.7500

T5 0.750 3.450 0.480 5.75 5.79 0 0 0 -2.500 0 5.7500

T22 5.000 13.800 3.450 6.50 12.14 0 0 0 0 0 6.5000

T23 5.000 13.800 3.450 6.50 12.14 0 0 0 0 0 6.5000

XFMR 3 1.000 4.160 0.480 7.20 28.00 0 0 0 -2.500 0 7.2000

3-Winding Transformer Input Data

Transformer Rating Tap Impedance Z Variation


ID Winding MVA kV % %Z X/R MVAb % Tol. + 5% - 5%

T1 Primary: 15.000 34.500 0 Zps = 7.10 39.00 15.000 0 0 0

Secondary: 10.000 13.800 0 Zpt = 7.20 40.00 15.000 0

Tertiary: 5.000 4.160 0 Zst = 14.10 38.00 15.000 0


Project: Example ETAP Page: 6
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T2 2W XFMR Main Bus Sub2A 3.00 68.93 69.00

T3 2W XFMR Sub3 Swgr LVBus 42.53 765.49 766.67

T4 2W XFMR Sub 3 Bus1 53.46 379.59 383.33

T5 2W XFMR Sub23 Bus23A 124.04 718.18 728.81

T22 2W XFMR Bus7 Sub22 10.67 129.56 130.00

T23 2W XFMR Bus6 Sub23 10.67 129.56 130.00

XFMR 3 2W XFMR Sub3 Swgr MCC1 24.43 684.01 684.45

T1 3W Xfmr Main Bus T1~ -0.03 0.67 0.67

3W Xfmr Sub2B T1~ 1.24 46.65 46.67

3W Xfmr Sub 3 T1~ 1.23 47.32 47.33

Cable2 Cable Sub 3 Sub3 Swgr 2.86 4.67 5.48

Cable14 Cable Bus1 Bus2 515.10 353.67 624.83

Cable22 Cable Sub2A Bus7 0.82 0.97 1.27

Cable23 Cable Sub2B Bus6 0.82 0.78 1.13

Line4 Line Sub3 Swgr Bus9 156.36 389.25 419.48


Project: Example ETAP Page: 7
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base
ID ID MVASC kV X/R R X

Utility Main Bus 1200.000 34.500 45.00 0.18514 8.33128

Total Connected Power Grids (= 1 ): 1200.000 MVA

Synchronous Generator Input Data


% Impedance in Machine Base
Synchronous Generator Connected Bus Rating X/R Ratio Xd"

ID Type ID MVA kV RPM X"/R X'/R R Adj. Tol. Xd'

Gen1 Turbo Sub2B 8.824 13.800 1800 48.00 48.00 0.250 12.00 0.0 23.00

Total Connected Synchronous Generators ( = 1 ): 8.824 MVA


Project: Example ETAP Page: 8
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Synchronous Motor Input Data


% Impedance in Machine Base
Synchronous Motor Connected Bus Rating X/R Ratio Xd"

ID Type Qty ID kVA kV RPM X"/R X'/R R Adj. Tol. Xd'

Syn1 Motor 1 Sub2A 1170.4 13.200 1800 27.00 27.00 0.570 15.38 0.0 23.08

Syn2 Motor 1 LVBus 134.2 0.460 1800 11.00 11.00 1.818 20.00 0.0 30.00

Total Connected Synchronous Machines ( = 2 ): 1304.6 kVA

Induction Machine Input Data

% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'

Motors
Mtr2 1 Sub2B 2500.00 2060.05 13.200 1800 24.99 24.99 0.83 20.79 31.19

Pump 1 1 Sub3 Swgr 500.00 446.99 4.000 1800 4.82 4.82 3.88 18.68 28.02

Mtr1 1 Bus23A 100.00 118.05 0.380 1800 9.02 9.02 2.22 20.00 50.00

Mtr6 2 MCC1 60.00 53.74 0.460 1800 6.03 6.03 3.32 20.00 50.00

Mtr4 1 MCC1 125.00 110.12 0.460 1800 8.71 8.71 2.30 20.00 50.00

Mtr3 1 MCC1 75.00 66.20 0.460 1800 6.74 6.74 2.97 20.00 50.00

Mtr5 1 MCC1 50.00 45.32 0.460 1800 5.51 5.51 3.63 20.00 50.00

Total Connected Induction Motors ( = 8 ): 2954.2 kVA


Project: Example ETAP Page: 9
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Lumped Load Input Data

Lumped Load Motor Loads Static Loads


Lumped Load Connected Bus Rating % Load Loading X/R Ratio % Imp. (Machine Base) Loading
ID ID kVA kV MTR STAT kW kvar X"/R X'/R R X" X' kW kvar

LUMP1 LVBus 220.0 0.460 70 30 134.0 75.9 2.38 2.38 8.403 20.00 50.00 62.52 35.43

LUMP2 Sub22 3500.0 3.300 60 40 1785.0 1106.2 10.00 10.00 1.538 15.38 23.08 1300.64 806.06

LUMP4 Bus23A 500.0 0.400 70 30 297.5 184.4 2.38 2.38 10.050 23.92 9999.00 183.60 113.79

LUMP6 Bus9 500.0 4.160 60 40 255.0 158.0 6.67 6.67 2.307 15.38 23.08 170.00 105.36

Total Connected Lumped Loads ( = 4 ): 4720.0 kVA


Project: Example ETAP Page: 10
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

SHORT-CIRCUIT REPORT

3-phase fault at bus: LVBus

Prefault voltage = 0.490 = 102.00 % of nominal bus kV ( 0.480 kV)


= 102.00 % of base ( 0.480 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

LVBus Total 0.00 1.292 -16.609 12.9 16.659

Sub3 Swgr LVBus 94.78 0.844 -14.845 17.6 14.869

Syn2 LVBus 106.43 0.081 -0.889 11.0 0.893

LUMP1 LVBus 106.43 0.367 -0.874 2.4 0.948

Sub 3 Sub3 Swgr 95.35 0.088 -1.654 18.8 1.656

Bus9 Sub3 Swgr 95.30 0.003 -0.018 6.7 0.018

MCC1 Sub3 Swgr 98.04 0.002 -0.016 8.5 0.017

Pump 1 Sub3 Swgr 106.08 0.005 -0.025 5.3 0.025

Bus1 Sub 3 95.35 0.000 0.000 999.9 0.000

# T1~ Sub 3 101.00 0.088 -1.654 18.8 1.656

LUMP6 Bus9 102.00 0.003 -0.018 6.7 0.018

Mtr6 MCC1 109.16 0.006 -0.045 7.4 0.046

Mtr4 MCC1 109.16 0.004 -0.047 11.8 0.047

Mtr3 MCC1 109.16 0.003 -0.028 8.5 0.028

Mtr5 MCC1 109.16 0.003 -0.019 6.6 0.019

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project: Example ETAP Page: 11
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: Main Bus

Prefault voltage = 35.190 = 102.00 % of nominal bus kV ( 34.500 kV)


= 102.00 % of base ( 34.500 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Main Bus Total 0.00 0.528 -21.953 41.6 21.959 0.00 0.508 -21.771 42.9 21.777

Sub2A Main Bus 12.76 0.022 -0.309 14.3 0.310 9.16 0.016 -0.222 13.9 0.222

# T1~ Main Bus 0.47 0.051 -1.166 22.7 1.167 0.43 0.037 -1.071 29.3 1.072

Utility Main Bus 102.00 0.455 -20.478 45.0 20.483 102.00 0.455 -20.478 45.0 20.483

Bus7 Sub2A 12.88 0.044 -0.462 10.6 0.464 9.24 0.032 -0.339 10.4 0.340

Syn1 Sub2A 106.64 0.010 -0.310 30.0 0.310 106.64 0.007 -0.215 29.2 0.215

# Sub2B T1~ 29.70 0.030 -1.048 34.8 1.048 28.32 0.024 -1.000 42.3 1.000

# Sub 3 T1~ 3.85 0.021 -0.118 5.5 0.120 2.48 0.013 -0.071 5.5 0.072

Sub22 Bus7 27.29 0.044 -0.462 10.6 0.464 19.81 0.032 -0.339 10.4 0.340

Bus6 Sub2B 29.72 0.020 -0.070 3.6 0.072 28.32 0.001 -0.012 8.6 0.012

Gen1 Sub2B 102.00 0.043 -2.223 51.5 2.224 102.00 0.049 -2.266 46.5 2.266

Mtr2 Sub2B 106.64 0.013 -0.327 25.9 0.327 106.64 0.009 -0.222 24.6 0.222

Sub3 Swgr Sub 3 4.19 0.177 -0.976 5.5 0.992 2.69 0.107 -0.592 5.5 0.601

Bus1 Sub 3 3.85 0.000 0.000 999.9 0.000 2.48 0.000 0.000 999.9 0.000

NACD Ratio = 0.96

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project: Example ETAP Page: 12
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: MCC1

Prefault voltage = 0.490 = 102.00 % of nominal bus kV ( 0.480 kV)


= 99.45 % of base ( 0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

MCC1 Total 0.00 0.925 -17.836 19.3 17.860

Sub3 Swgr MCC1 91.62 0.608 -15.686 25.8 15.698

Mtr6 MCC1 106.43 0.116 -0.699 6.0 0.708

Mtr4 MCC1 106.43 0.083 -0.726 8.7 0.731

Mtr3 MCC1 106.43 0.064 -0.433 6.7 0.437

Mtr5 MCC1 106.43 0.053 -0.293 5.5 0.298

Sub 3 Sub3 Swgr 92.23 0.062 -1.796 29.0 1.797

Bus9 Sub3 Swgr 92.19 0.003 -0.019 7.6 0.019

LVBus Sub3 Swgr 92.41 0.003 -0.014 5.1 0.015

Pump 1 Sub3 Swgr 103.43 0.005 -0.027 5.9 0.028

Bus1 Sub 3 92.23 0.000 0.000 999.9 0.000

# T1~ Sub 3 98.36 0.062 -1.796 29.0 1.797

LUMP6 Bus9 99.45 0.003 -0.019 7.6 0.019

Syn2 LVBus 103.77 0.002 -0.062 28.3 0.062

LUMP1 LVBus 103.77 0.022 -0.062 2.8 0.066

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project: Example ETAP Page: 13
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: Sub 3

Prefault voltage = 4.243 = 102.00 % of nominal bus kV ( 4.160 kV)


= 102.00 % of base ( 4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Sub 3 Total 0.00 0.820 -26.398 32.2 26.411 0.00 0.740 -25.967 35.1 25.978

Sub3 Swgr Sub 3 0.41 0.190 -1.013 5.3 1.030 0.24 0.112 -0.606 5.4 0.616

Bus1 Sub 3 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

# T1~ Sub 3 86.60 0.631 -25.385 40.3 25.393 86.52 0.628 -25.362 40.4 25.369

Bus9 Sub3 Swgr 8.02 0.042 -0.249 5.9 0.252 5.46 0.028 -0.170 6.1 0.173

LVBus Sub3 Swgr 10.74 0.043 -0.183 4.3 0.188 6.00 0.021 -0.103 4.9 0.105

MCC1 Sub3 Swgr 12.17 0.031 -0.231 7.4 0.233 5.29 0.014 -0.099 7.0 0.100

Pump 1 Sub3 Swgr 106.08 0.073 -0.350 4.8 0.357 106.08 0.049 -0.234 4.8 0.239

Bus2 Bus1 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

# Main Bus T1~ 87.76 0.070 -2.902 41.2 2.903 87.68 0.071 -2.906 40.9 2.907

# Sub2B T1~ 91.04 0.006 -0.159 28.1 0.159 90.77 0.005 -0.152 32.5 0.152

LUMP6 Bus9 102.00 0.042 -0.249 5.9 0.252 102.00 0.028 -0.170 6.1 0.173

Syn2 LVBus 106.43 0.058 -0.798 13.8 0.800 106.43 0.046 -0.559 12.1 0.561

LUMP1 LVBus 106.43 0.315 -0.789 2.5 0.850 106.43 0.136 -0.330 2.4 0.357

Mtr6 MCC1 109.16 0.098 -0.635 6.5 0.642 109.16 0.044 -0.272 6.2 0.276

Mtr4 MCC1 109.16 0.068 -0.659 9.6 0.663 109.16 0.031 -0.283 9.1 0.285

Mtr3 MCC1 109.16 0.054 -0.393 7.3 0.397 109.16 0.024 -0.169 7.0 0.170

Mtr5 MCC1 109.16 0.045 -0.266 5.9 0.270 109.16 0.020 -0.114 5.7 0.116

Sub2A Main Bus 89.54 0.003 -0.043 14.1 0.043 88.97 0.002 -0.031 13.6 0.031

Utility Main Bus 102.00 0.067 -2.859 42.5 2.860 102.00 0.069 -2.875 41.8 2.876

Bus6 Sub2B 91.04 0.003 -0.011 3.5 0.011 90.77 0.000 -0.002 8.1 0.002

Gen1 Sub2B 102.00 0.009 -0.337 38.1 0.337 102.00 0.010 -0.345 34.9 0.345

Mtr2 Sub2B 106.64 0.002 -0.050 22.0 0.050 106.64 0.002 -0.034 20.9 0.034

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project: Example ETAP Page: 14
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

3-phase fault at bus: Sub3 Swgr

Prefault voltage = 4.243 = 102.00 % of nominal bus kV ( 4.160 kV)


= 102.00 % of base ( 4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

Sub3 Swgr Total 0.00 1.828 -24.339 13.3 24.407 0.00 1.747 -23.909 13.7 23.973

Sub 3 Sub3 Swgr 9.22 1.639 -23.322 14.2 23.379 9.22 1.635 -23.302 14.2 23.360

Bus9 Sub3 Swgr 7.65 0.042 -0.250 6.0 0.253 5.23 0.028 -0.171 6.2 0.173

LVBus Sub3 Swgr 10.43 0.043 -0.184 4.3 0.189 5.80 0.021 -0.103 4.9 0.105

MCC1 Sub3 Swgr 11.84 0.031 -0.232 7.4 0.234 5.08 0.014 -0.099 7.1 0.100

Pump 1 Sub3 Swgr 106.08 0.073 -0.351 4.8 0.359 106.08 0.049 -0.234 4.8 0.239

Bus1 Sub 3 9.22 0.000 0.000 999.9 0.000 9.22 0.000 0.000 999.9 0.000

# T1~ Sub 3 87.85 1.639 -23.322 14.2 23.379 87.77 1.635 -23.302 14.2 23.360

LUMP6 Bus9 102.00 0.042 -0.250 6.0 0.253 102.00 0.028 -0.171 6.2 0.173

Syn2 LVBus 106.43 0.057 -0.801 14.1 0.803 106.43 0.046 -0.560 12.2 0.562

LUMP1 LVBus 106.43 0.315 -0.793 2.5 0.853 106.43 0.136 -0.331 2.4 0.358

Mtr6 MCC1 109.16 0.097 -0.637 6.5 0.645 109.16 0.044 -0.273 6.2 0.277

Mtr4 MCC1 109.16 0.068 -0.662 9.8 0.665 109.16 0.031 -0.284 9.1 0.285

Mtr3 MCC1 109.16 0.053 -0.394 7.4 0.398 109.16 0.024 -0.169 7.0 0.171

Mtr5 MCC1 109.16 0.045 -0.267 5.9 0.271 109.16 0.020 -0.115 5.7 0.116

Bus2 Bus1 9.22 0.000 0.000 999.9 0.000 9.22 0.000 0.000 999.9 0.000

# Main Bus T1~ 88.91 0.186 -2.666 14.3 2.673 88.83 0.187 -2.670 14.3 2.676

# Sub2B T1~ 91.92 0.012 -0.146 12.3 0.146 91.68 0.011 -0.140 13.1 0.140

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project: Example ETAP Page: 15
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Momentary Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 102 % of the Bus Nominal Voltage)

Bus Device Momentary Duty Device Capability


Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

LVBus 0.480 LVBus MCC 16.659 16.4 1.537 25.602 43.000

Main Bus 34.500 Main Bus MCC 21.959 44.3 1.654 36.318 59.982 64.000 108.000

34.500 CB2 5 cy Sym CB 21.959 44.3 1.654 36.318 59.982 64.000 108.000

34.500 CB10 5 cy Sym CB 21.959 44.3 1.654 36.318 59.982 64.000 108.000

34.500 CB1 5 cy Sym CB 21.959 44.3 1.654 36.318 59.982 64.000 108.000

MCC1 0.480 MCC1 MCC 17.860 23.6 1.592 28.425 47.371

Sub 3 4.160 Sub 3 MCC 26.411 39.1 1.644 43.421 71.815

4.160 CB8 5 cy Sym CB 26.411 39.1 1.644 43.421 71.815 78.000 132.300

4.160 CB9 5 cy Sym CB 26.411 39.1 1.644 43.421 71.815 58.000 97.000

4.160 CB18 5 cy Sym CB 26.411 39.1 1.644 43.421 71.815 58.000 97.200

4.160 CB19 5 cy Sym CB 26.411 39.1 1.644 43.421 71.815 78.000 132.300

Sub3 Swgr 4.160 Sub3 Swgr Switchgear 24.407 13.9 1.508 36.794 62.051 39.000 65.810

4.160 CB14 5 cy Sym CB 24.407 13.9 1.508 36.794 62.051 78.400 132.300

4.160 CB13 5 cy Sym CB 24.407 13.9 1.508 36.794 62.051 78.400 132.300

4.160 CB3 5 cy Sym CB 24.407 13.9 1.508 36.794 62.051 66.000 110.700

Method: IEEE - X/R is calculated from separate R & X networks.


Protective device duty is calculated based on total fault current.
The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.
* Indicates a device with momentary duty exceeding the device capability
Project: Example ETAP Page: 16
7.0.0T
Location: Irvine, California Date: 08-28-2009
Contract: OTI-12345678 SN: ETAPTRAING
Engineer: Operation Technology, Inc. Revision: Base
Study Case: ANSI - LG
Filename: EXAMPLE-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "ANSI - LG" study case.

Interrupting Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 102 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.

LVBus 0.480 16.659 16.4

Main Bus 34.500 CB2 5 cy Sym CB 3.0 21.777 44.5 1.230 26.790 38.000 40.000 40.000

Fuse1 Fuse 21.959 44.3 1.087 23.866 38.000 6.65 10.000 10.000 *

CB10 5 cy Sym CB 3.0 21.777 44.5 1.230 26.790 38.000 40.000 40.000

CB1 5 cy Sym CB 3.0 21.777 44.5 1.230 26.790 38.000 40.000 40.000

MCC1 0.480 Fuse3 Fuse 17.860 23.6 1.047 18.696 5.500 6.70 50.000 50.000

CB17 Molded Case 17.860 23.6 1.276 22.797 0.600 20.00 25.000 25.000

CB15 Molded Case 17.860 23.6 1.276 22.797 0.600 20.00 22.000 22.000 *

CB7 Molded Case 17.860 23.6 1.276 22.797 0.480 20.00 30.000 30.000

Fuse2 Fuse 17.860 23.6 1.196 21.359 0.600 15.00 200.000 200.000

Sub 3 4.160 CB8 5 cy Sym CB 3.0 25.978 39.6 1.207 31.357 4.800 41.000 47.308

CB9 5 cy Sym CB 3.0 25.978 39.6 1.207 31.357 4.800 29.000 33.462

CB18 5 cy Sym CB 3.0 25.978 39.6 1.207 31.357 4.800 29.000 33.462

CB19 5 cy Sym CB 3.0 25.978 39.6 1.207 31.357 4.800 41.000 47.308

Sub3 Swgr 4.160 CB14 5 cy Sym CB 3.0 23.973 14.0 1.000 23.973 4.800 41.000 47.308

CB13 5 cy Sym CB 3.0 23.973 14.0 1.000 23.973 4.800 41.000 47.308

CB3 5 cy Sym CB 3.0 23.973 14.0 1.000 23.973 8.300 33.000 41.000

Method: IEEE - X/R is calculated from separate R & X networks.


HV CB interrupting capability is adjusted based on bus nominal voltage
Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current.
Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.
* Indicates a device with interrupting duty exceeding the device capability
** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.