Date: 23-Jul-18
Project: Designed by: RDPB
Checked by:
SIMPLIFIED COMPUTATION OF DEVELOPMENT LENGTH (DEFORMED BARS IN TENSION) ACI 318-08 12.2
No. 19 and
Spacing and cover smaller bars and No. 22 and larger
deformed wires bars
Other cases
( f ψ √ψ )
y
1. 4 λ f'c
t e
db ( f ψ √ψ )
y t
1 .1 λ f'c
e
db
Reinforcement location factor, Ψt = 1.30 -for horizontal reinforcement placed more than 300mm above fresh concrete
Reinforcement coating factor, Ψe = 1.00 -for uncoated and zic-coated (galvanized) bars
Modification factor, λ = 1.00 -for normalweight concrete
0.24
e fy d
¿
8d b
l
150mm
(whichever is greater)
dh f' c b
¿
¿
¿
¿ {¿ ¿ ¿
¿
0.24fy
| db
ldc =¿ λ √ f'c (whichever is greater)
|
|0.043fyd
Development length factors
Page 1 of 5
Job Number:
Date: 23-Jul-18
Project: Designed by: RDPB
Checked by:
NOTE: Ld is the development length of deformed bar in tension but without the minimum of 300mm development length and
the modification factor for the excess reinforcement.
TENSION COMPRESSION
Ø10 300 150 300 300 300 300 375 125 200
Ø12 300 150 300 350 350 350 450 150 250
Ø16 375 200 375 475 475 475 600 200 325
Ø20 450 225 450 600 600 600 750 250 400
Ø25 700 300 700 900 900 900 1175 300 500
Ø28 775 325 775 1000 1000 1000 1300 350 550
Ø32 875 375 875 1150 1150 1150 1500 400 625
Page 2 of 5
Job Number:
Date: 23-Jul-18
Project: Designed by: RDPB
Checked by:
Ψt 1.00 -for horizontal reinforcement placed more than 300mm above fresh concrete
Ld 683.581
Ψe 1.00 -for uncoated and zic-coated (galvanized) bars
λ 1.00 -for normalweight concrete
Min. Ld 300
ΨtΨe 1 should not be greater than 1.7
Class B
Splice 900
For 180-degree hooks of No. 36 and smaller bars that are enclosed within ties or
stirrups perpendicular to the bar being developed, spaced not greater than 3db along
ldh 1.00
Splice 500
Length
Page 3 of 5
Job Number:
Date: 23-Jul-18
Project: Designed by: RDPB
Checked by:
Splice
Length 500
Page 4 of 5
268
12 4 121.6182
5 123.8622
6 126.1062
7 128.3502