ACKNOWLEDGEMENT
I have great pleasure in acknowledging the help from all those who favored me with
giving shape to the present project.
Heartiest Thanks goes to my Project leader and guide Mr. VINEET CORNELIUS(IT)for
his help and support throughout the project.
I wish to express my grateful thanks toMr Vineet Cornelius Manager(IT), for
permitting me to do this project in their organization.
The perfection of a man lies on her depth of gratitude. It’s not only my duty but
a matter of joy and pleasure to once again convey my thanks to all.
Training in NTPC, Badarpur Division during the period 18 JUNE 2018 to 28 JULY 2018 and
has performed his task in stipulated time during his training under our supervision and guidance.
Date : 28/07/2018
Mr. VINEET CORNELIUS
MANAGER IT
NTPC Limited, BTPS
Badarpur, New Delhi-110044.
ABOUT NTPC
NTPC Limited is the largest thermal power generating company of India. A public sector company, it
was incorporated in the year 1975 to accelerate power development in the country as a wholly owned
company of the Government of India. NTPC ranked 317th in the ‘2009 Forbes Global 2000’ ranking of
the world’s biggest companies. Within a span of 34 years, NTPC has emerged as a truly national power
company, with power generating facilities in all the major regions of the country. With a current
generating capacity of 30,644 MW, NTPC has embarked on plans to become a 75,000 MW company
by 2017.
As laid down by the NTPC foundation, it’s vision is “A world class integrated power major, powering
India’s growth, with increasing global presence”.
ROLE IN NATIONBUILDING
NTPC is the largest power generating entity in the country. Apart from power generation from coal
and gas, it has also diversified into hydro power, coal mining, power equipment manufacturing, oil and
gas exploration, consultancy in the area of power plant constructions and power generation, power
trading and distribution in the form of joint ventures with various other entities in India and abroad.
POWER GENERATION
Currently NTPC owns 15 Coal Based Power Plants with a generating capacity of 24,395 MW, and 7
Gas/Liquid Fuel Based Power Plants with a generating capacity of 3,955 MW.
Apart from this it has 4 other Coal and Gas Based Power Plants with power generating capacity of
2,294 MW as joint ventures with other organizations.
Regional spread of Generating Facilities
NTPC has increased thrust on hydro development for a balanced portfolio for long term sustainability.
The first step in this direction was taken by initiating investment in Koldam Hydro Electric Power
Project (800 MW capacity) located on Satluj river in Bilaspur district of Himachal Pradesh. Two other
hydro projects under construction are TapovanVishnugad (600 MW capacity) and Loharinag Pala (520
MW capacity) in Uttarakhand. On all these projects construction activities are in full swing.
Performance
In terms of operations, NTPC has always been considerably above the national average. The
availability factor for coal based power stations has increased from 89.32% in 1998-99 to 92.47% in
2008-09, which compares favourably with international standards. The PLF has increased from 76.6%
in 1998-99 to 91.14% during the year 2008-09.
BTPS IT VISION
At BTPS, Information Technology has been used extensively for effective management
of various business processes and resources.
Major Innovation in this direction has been, in house Development & Implementation of
an Integrated Suite of Online ApplicationsBCOMITon Oracledatabase, to manage
following business processes;
1 Operations
Important & critical parameters of Power Plant operation are monitored online to enable effective
control on operation of various equipments and reduce down time. Online load analysis & Generation
values are monitored to have optimum load balance of various units. Auxiliary power consumption
monitored and controlled. Meritorial operation practicing enabled.
2 Maintenance
Better control over maintenance cost by way of online information available through the system.Based
on failure analysis and equipment history, modified maintenance strategy of Preventive, Predictive and
Risk Based maintenance is implemented. Equipment spares planning are streamlined by way of Annual
requirement, Vendor wise, linked to Equipment. Standardization of defects and repair codes for easy
filling of Work Order Card, for future analysis.
3 Materials
Material Planning and Procurement system streamlined, resulting in reduction in Administrative lead
Time. Further, procurement on Annual Rate Contract basis enabled through the system. Ordering on
actual need basis (just in time). This further reduces lead time and Inventory carrying.
Detection of duplicate and obsolete items, standardization of material description and specification.
Cleaning and Weeding of redundant data, resulting in overall system improvement and functionalities.
Availability of coal stock status online, reduction in demurrages paid to railways.
2. Application Development
Design and development of New Applications, was taken up in house. This involved understanding
various business processes, interaction with user groups of various department, defining computerization
needs, development and trial of the applications, considering company policies and procedures.
3. Procurement of Hardware & Software.
Intel LAN Server with Oracle 9i RDBMS software and Pentium IV Computers were procured and
deployed in various departments of BTPS to provide appropriate IT Infrastructure. All PCs were
connected in Plant wide Local area Network using cost effective technology.
4. Implementation of Applications
Various Online Applications as mentioned above were developed tested and implemented in phased
manner over a period of time. Any innovation involves major change over and disturbance during
transition phase. This was managed with support of management, commitment and expertise of IT team
and cooperation of users.
5. Training
For effective implementation and utilization of new IT Applications, major thrust was given on training
and retraining. Everybody from Operator to General Manager was covered. Young Computer
Professionals were deployed for short period to provide on the table training to users on need basis to
supplement IT department efforts.
6. Data Migration
Data Migration from old legacy systems of various departments was a major exercise for effective
implementation of new systems. Old historical data is valuable for reporting, analysis and decision
support system. It was handled effectively by IT team in association with users.
Badarpur has achieved unique distinction of being, First site in NTPC, with
independent initiative of Development & Implementation of new Oracle based
integrated online Applications, with in house effort. This has been appreciated by
NTPC higher management.
BTPS Received Golden Peacock award for IT Innovation in 2004.
Adoption of Best Practices :BTPS IT strives to provide value added services and
features thru best practices, to support management initiatives &usersreqmt.
Conclusion: The BTPS IT has come a long way to leading position in IT enablement
among NTPC power stations. IT Vision realized, making BTPS highly Information
enabled Plant.
Success Factor
In house development using latest technology, effective change management, training &
using synergized force of People of BTPS (Management, IT Team & Users).
Saga of IT Turnaround at BTPS
Realization of IT vision of making BTPS
highly IT enabled Plant with Online up to
date information and transaction ability.
Cost effective I T Infrastructure.
Adopting latest technology &skills.
Developed by dedicated & motivated IT Team
in house.
Continuous learning thru training,
workshops, Internet.
Continuous improvements thru user feedback
& Innovations.
On the Desk User training from operator to
senior executives.
IT Evolution as People’s Movement.
Synergized force of BTPS (Management, IT
Team & Users ).
Effective Change Management.
User friendly Applications & Services.