Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Questionnaire
Dear respondents,
We are in group eight, second year students in English Department of Cambodia International
Cooperation Institute (CICI) : we would like to conduct a survey on students about: “Construction
building”. Therefore, we expect that all of you will cooperate us to answer the questions honestly and
reasonably. We hope that the information that you give in the questionnaires won’t be used for another
object but just only the object above that we ask all of you to answer. Thank you advance that you are
cooperation with us. We trust in all of you will answer our question by your thinking.
• Personal information
A. □ male B. □ female
………...................
Group 8 Page 1
Cambodia International Cooperation Institute Listening and Speaking
10. Is it modern?
□ Yes B. □ No
• Overall question
I. Management
- Contractor
12. How many hours per week do you work for your contractor?
..............................
...............................................................................................................................................................
...............................................................................................................................................................
...............................................................................................................................................................
...............................................................................................................................................................
15. After accepting the work, do you require further instruction from the contractor in order to
A. □ Yes B. □ No
Group 8 Page 2
Cambodia International Cooperation Institute Listening and Speaking
16. Is the work scheduled and coordinated with the work of other who are hired by the contractor?
A. □ Yes B. □ No
17. Does contractor tell to you to hire others to assist with the work?
A. □ Yes B. □ No
A. □ Yes B. □ No
20. Are more than 10% (in dollars / month) of these payment that you provide to the contractor
A. □ Yes B. □ No
21. Does the contractor make decision that could affect more than 10% these payments?
A. □ Yes B. □ No
- Equipment
.....................................
.....................................
24. Are the assets (eg. equipment) brought for using in the work?
a Material A. □ Yes B. □ No
b Equipment A. □ Yes B. □ No
c Tools A. □ Yes B. □ No
d Supplies A. □ Yes B. □ No
h Other.................................. A. □ Yes B. □ No
A. □ Yes B. □ No
- Engineer
- Technology
- During of time
- worker
II. Risk
32. Are there a lot of problems when you construct the building?
- Environment:
Group 8 Page 4
Cambodia International Cooperation Institute Listening and Speaking
- Person
III. Location
A. □ Yes B. □ No
42. Is it good?
We thank all of you that cooperate with us to answers our questions by high responsibility and try to
show your idea that relate to our topic. Finally, our group would like to wish all of you to have successful,
Group 8 Page 5
Cambodia International Cooperation Institute Listening and Speaking
Group 8 Page 6