ANEXOS
COSTOS UNITARIOS
2.00 MANEJO ADECUADO DEL PASTOREO:
AÑO: 2011
COSTO COSTO FACTOR COSTO
UNIDAD
RUBRO CANT. UNITARIO TOTAL DE SOCIAL
MEDINA
S/. S/. CORRECCION S/.
I. COSTO DIRECTO
1.1 MANO DE OBRA 1,710.00 1,181.10
Trabajo preliminar jornal 4.00 30.00 120.00 0.91 109.20
Operario jornal 24.00 35.00 840.00 0.91 764.40
Peon jornal 25.00 30.00 750.00 0.41 307.50
1.2. MATERIALES: 3,520.00 0.66 2,323.20
Piedra m3 176.00 20.00 3,520.00 0.66 2,323.20
AÑO: 2011
COSTO COSTO FACTOR COSTO
UNIDAD UNITARIO TOTAL DE SOCIAL
RUBRO CANT.
MEDINA
S/. S/. CORRECCION S/.
I. COSTO DIRECTO
1.1 MANO DE OBRA 180.00 0.41 73.80
Preparación del terreno Jornal 2.00 30.00 60.00 0.41 24.60
Siembra Jornal 2.00 30.00 60.00 0.41 24.60
Riego Jornal 2.00 30.00 60.00 0.41 24.60
1.2. INSUMOS 1,620.00 0.41 803.60
Semillas de ray grass Italiano Kg. 8.00 35.00 280.00 0.82 229.60
Semillas de raye grass Ingles Kg. 8.00 30.00 240.00 0.82 196.80
Semillas Dactyles Kg. 8.00 35.00 280.00 0.82 229.60
Trebol blanco Kg. 6.00 30.00 180.00 0.82 147.60
MAQUINARIA 0.41 422.40
Tractor agricola HM 8.00 80.00 640.00 0.66 422.40
AÑO: 2011
COSTO COSTO FACTOR COSTO
UNIDAD
RUBRO CANT. UNITARIO TOTAL DE SOCIAL
MEDINA
S/. S/. CORRECCION S/.
I. COSTO DIRECTO
1.1 MANO DE OBRA 60.00 0.41 24.60
Peon (abonamiento y labores cultura Jornal 1.00 30.00 30.00 0.41 12.30
Riego Jornal 1.00 30.00 30.00 0.41 12.30
1.2. INSUMOS 418.70 0.41 171.67
Fertilizante Urea Kg. 65.00 2.60 169.00 0.82 138.58
Fertilizantes de fosfato di amonico Kg. 100.00 2.20 220.00 0.82 180.40
Fertilizantes de Cloruro de Potasio Kg. 16.50 1.80 29.70 0.82 24.35
AÑO: 2011
UNIDAD COSTO COSTO FACTOR COSTO
RUBRO MEDIDA CANT. UNITARIO TOTAL DE SOCIAL
S/. S/. CORRECCION S/.
I. COSTO DIRECTO
1.1 MANO DE OBRA 240.00 98.40
peon Jornal 8.00 30.00 240.00 0.41 98.40
1.2. INSUMOS 3,700.00 0.41 2,870.00
malla metalica de alambre
mll. 4.00 450.00 1,800.00 0.82 1,476.00
galvanizado: 1.20 x 100m.
Construccion de canales laterales
ml 100.00 4.00 400.00 0.41 164.00
artesanales
rollizos 4"x4" x 2.00 m. Unidad 100.00 15.00 1,500.00 0.82 1,230.00
1.3 EQUIPO Y HERRAMIENTAS 12.00 0.41 9.84
(5 % costo de Mano de Obra) % 0.05 240.00 12.00 0.82 9.84
ALTERNATIVA 2
2.20 CONSTRUCCIÓN DE CERCOS A BASE DE MALLA METALICA
Construcción de 400 ml. de muro.
AÑO: 2011
UNIDAD COSTO COSTO FACTOR COSTO
RUBRO MEDIDA CANT. UNITARIO TOTAL DE SOCIAL
S/. S/. CORRECCION S/.
I. COSTO DIRECTO
1.1 MANO DE OBRA 2,030.00 0.41 2,898.30
Trabajo preliminar jornal 2.00 30 60.00 0.41 24.60
Operario Proteccion del Cerco jornal 22.00 35 770.00 0.91 700.70
Peon Proteccion del Cerco jornal 40.00 30 1,200.00 0.41 492.00
1.2. MATERIALES: 4,100.00 0.41 1,681.00
Mallas de alambre de 1.20x100 Unidad 4.00 650.00 2,600.00 0.82 2,132.00
rollizos 4"x4" x 2.00 m. Unidad 100.00 15.00 1,500.00 0.82 1,230.00
FLETE 750.00 0.66 495.00
flete transporte de materiales Global 1.00 750.00 750.00 0.66 495.00
1.3 EQUIPO Y HERRAMIENTAS 101.50 85.26
(5 % costo de Mano de Obra) % 0.05 2,030.00 101.50 0.84 85.26
60.00
30.00 4860 14580
30.00 4860 14580
418.70 0
169.00 27378 82134
220.00 35640 106920
29.70 4811.4 14434.2
0
3.00 0
3.00 486 1458
78035.4 234106.2
Instalacion de cercos con malla metalica 01 Ha.
instalacion de pastos forrajeros
COTIZACION: Agrovet Ayala, san miqguel y los andes
Cordel para trazado Unidad 1.00 20.00 20.00
(5 % costo de Mano %
Rendimiento GLB/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : GLB 194.54
0.27 209.91
0.27 209.91 Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
2.00
2.52
6.80
6.38
8.95
21.77
91.00
81.90
59.15
39.36
49.20
36.49
43.05
43.05
34.44
22.05
31.12
4.09
5.00
12.84
7.29
4.78
8.06
28.02
399.84
0.34 MANO DE OBRA 63,308.00
63.95
HERRAMIENTAS
40280.00
HERRAMIENTAS
25 m3
22.5 m4
COSTOS UNITARIOS
5.00 ADECUADA TRANSFERENCIA DE TECNOLOGIA Y ASISTENCIA TECNICA
I. MATERIALES
Pasaje de ida Pasaje 30 225.00 6,750.00 0.82 5,535.00
Pasaje de vuelta Pasaje 30 225.00 6,750.00 0.82 5,535.00
Alimentacion diaria Persona 30 120.00 3,600.00 0.82 2,952.00
Alojamiento diario Noche 30 100.00 3,000.00 0.82 2,460.00
Facilitador Viatico 1 200.00 200.00 0.91 182.00
I. PERSONAL
Ingeniero PAT 1 2200.00 2,200.00 0.91 2,002.00
Tecnico agropecuario PAT 1 0.00 - 0.91 -
- -
II INSUMOS -
Combustible Gln 5 16.00 80.00 0.66 52.80
Lubricantes Gln 0.5 75.00 37.50 0.66 24.75
IV EQUIPO -
Data chow HM. 4.00 0.00 0.00 0.82 -
COSTO TOTAL (S/.) 1,540.00 1,334.80
IV EQUIPO -
Data chow Hs Maq. 6.00 35.00 210.00 0.82 -
COSTO TOTAL (S/.) 1,260.00 915.00
COSTOS UNITARIOS
5.00 CONOCIMIENTO EN GESTION ORGANIZACIONAL
0
FECHA : Ayacucho, Enero 2012
I. PERSONAL 910.00
Facilitador unid 1.00 800.00 800.00 0.91 728.00
Asistente unid 1.00 200.00 200.00 0.91 182.00
II INSUMOS 164.00
Almuerzo para los participantes Racion 40.00 5.00 200.00 0.82 164.00
III MATERIALES 81.18
Papel Bond A-4 de 75 grs Millar 0.50 27.00 13.50 0.82 11.07
Lapiceros Caja 1.00 18.00 18.00 0.82 14.76
Papelotes Unidad 25.00 0.50 12.50 0.82 10.25
Plumones Caja 1.00 20.00 20.00 0.82 16.40
Cinta maskintape Unid 6.00 5.00 30.00 0.82 24.60
Cartulinas Unidad 10.00 0.50 5.00 0.82 4.10
I. PERSONAL 546.00
Facilitador Evento 1.00 600.00 600.00 0.91 546.00
II INSUMOS 164.00
Almuerzo para los participantes Racion 40.00 5.00 200.00 0.82 164.00
I. PERSONAL 4,797.92
Facilitador Evento 1.00 2,200.00 2,200.00 0.91 2,002.00
Aprobación de la Minuta en la Notaria. Documento 8.00 250.00 2,000.00 0.91 1,820.00
Registrarse en la SUNARP. Documento 8.00 89.00 712.00 0.91 647.92
Registrarse en la SUNAT para obtención de RUC. Documento 8.00 0.00 0.00 0.91 -
Pasaje del comité para su formalizacion viajes 8.00 50.00 400.00 0.82 328.00
COSTO TOTAL (S/.) 5,312.00 4,797.92
AGRO RURAL - AYACUCHO
EQUIPOS
TIEMPO DE
ALQUILER /DIA EJECUCION DEL
COMPONENTES COSTO TOTAL
(S/.) PROYECTO
(dias)
5 COMPONENTES DE LA
EJECUCION DEL PROYECTO:
1. Manejo Adecuado de Pasturas
Altoandinas 2.
Forestacion y Reforestacion, 3.
Manejo adecuado de recurso S/. 250.00 396 S/. 99,000.00
hidrico 4.
Adecuda Transferencia de
tecnologia y asistencia tecnica 5.
Conocimiento en gestion
organizacional.
Bolsas de dormir
Ponchos de agua
Botas de jebe
Vestuario (busolas termicas)
Guantes termicos
P.UNIT ($)
Tractor Maseyferguson 75 HP 45,000.00
Disco Arador 8,800.00
53,800.00
COSTO TOTAL
S/. 103,680.00
S/. 115,200.00
S/. 218,880.00
COMBUSTIBLE Y OPERARIO
COMBUSTIBLE COSTO / TOTAL DE OPERARIO/ COSTO COSTO
/Ha. GALON CONSUMO Hora TOTAL /Ha. TOTAL
29.00
4698
80 maquinista 5
combustible 16
lubricantes 3
mantenimien 6
136800 50 30
alquiler de camioneta
140 11 33 50820
combsutible 96 11 33 34848
85668
31728.8889
85 443700
60 281880
725580
917,262.47
DESARROLLO DE CAPACIDADES PARA EL ESTABLECIMIENTO DE LA COBERTURA VEGETAL EN LAS ZONAS ALTO ANDINAS DE LA PROVINCIA DE HUANCASANCOS
0
: Ayacucho, Enero 2012
META FISICA DEL PROYECTO
ALTERNATIVA 01 .-
#REF!
5.00 ADECUADA TRANSFERENCIA DE TECNOLOGIA Y ASISTENCIA TECNICA 0 0.00 1,607,764.00
5.10 INTERCAMBIO DE EXPERIENCIAS A TRAVES DE PASANTIAS Viaje 3.00 62,604.00 0.50 0.50 0.50 0.50
5.20 ASISTENCIA TECNICA.
5.30 ASISTENCIA TECNICA EN MANEJO DE RECURSOS NATURALES Mes 24.00 181,440.00 6.00 6.00
5.40 EDICION DE MANUALES DEL DESARROLLO DEL PROYECTO Unidad 500.00 1,300,000.00 83.33 83.33 83.33 83.33
5.50 CURSO EN MANEJO DE RECURSOS NATURALES Evento 18.00 27,720.00 3.00 3.00 3.00 3.00
5.60 CHARLAS EN EDUCACION AMBIENTAL Charla 24.00 36,000.00 4.00 4.00 4.00 4.00
-
6.00 DESARROLLO DE CAPACIDADES EN GESTION ORGANIZACIONAL
6.10 SENSIBILIZACION Y FORTALECIMIENTO ORGANIZACIONES DE CAMPESINAS Evento 8.00 8,848.00 2.00 2.00 2.00 2.00
6.20 CONFORMACION DEL COMITÉ DE GESTION DE MICROCUENCA Evento 6.00 6,645.00 1.50 1.50
6.30 FORMALIZACION DEL COMITÉ DE GESTION DE MICROCUENCA Documento 1.00 4,560.00
- 0
- COSTO DIRECTO 0 0.00 14,058,048.87
- Gastos Generales (12 %) S/. 0.00 1,686,965.86
- Gastos de Supervisión (3 %) S/. 0.00 421,741.47
- COSTO TOTAL S/. 0.00 16,166,756.20
- 0 0 0.00 #REF!
AÑO 3 TOTAL
1° semestre 2° semestre
1.00
0.00
0.00
0.00
81.00 81.00 486.00
27.00 27.00 162.00
13.33 13.33 80.00
0.00
0.00
0.00
1.00
0.00
2,563.00
2,563.00
256.00
1,930.00
9.00
0.00
66.00
0.00
1,216.00
0.00
150.00
2,563.00
1,907.00
0.00
250.00
0.00
0.00
56.00
187.00
112.00
0.00
355.00
355.00
710.00
0.00
380.00
46.00
211,090.00
380.00
0.00
15.00
0.00
1.00
0.00
380.00
0.00
0.00
20.00
230.00
0.00
0.00
0.00
30.00 30.00 180.00
12.00
30.00 30.00 120.00
0.00
0.00
0.00
0.50 0.50 3.00
0.00
6.00 6.00 24.00
83.33 83.33 500.00
3.00 3.00 18.00
4.00 4.00 24.00
0.00
0.00
8.00
1.50 1.50 6.00
1.00 1.00
COSTO DE INVERSION (Precio de Mercado)
PRIMERA ALTERNATIVA
DESARROLLO DE CAPACIDADES PARA EL ESTABLECIMIENTO DE LA COBERTURA VEGETAL EN LAS
ZONAS ALTO ANDINAS DE LA PROVINCIA DE HUANCASANCOS
DESCRIPCION DE PROGRAMACION
PART
ACTIVIDADES UNID META P.UNITAR PRESUPUESTO
1.00 ESTUDIO DEFINITIVO 14,000.00
1.10 Expediente Técnico Unidad 1.00 14,000.00 14,000.00
-
2.00 MANEJO INTEGRADO DE ZONAS ALTOANDINAS 3,432,233.52
2.10 MÓDULOS DEMOSTRATIVOS EN MANEJO DE PASTURAS -
2.10.01 CONSTRUCCION DE POTREROS A BASE DE PIEDRA Has 486.00 5,624.20 2,733,361.20
2.10.02 INSTALACION DE PASTOS EXOTICOS (1Ha/MODULO = 162 Has) Has 162.00 1,948.16 315,601.92
2.20 MANEJO Y MEJORAMIENTO DE BOFEDALES ML. 80.00 4,790.88 383,270.40
CRONOGRAMA DE EJECUCION
1er Semestre 2do Semestre 1er Semestre Año 1er Semestre año
2do Semestre año 1 2do Semestre Año 2 1er Semestre Año 3
Año 0 Año 0 1 2
- 100 - - - - -
- - 17 17 17 17 17
- 0 39 39 8 8 4
- - 17 17 16 16 16
- - 15 15 18 18 18
- - 11 11 19 19 8
2do Semestre
Año 3
-
17
4
16
18
31
14.61
15
15
44
COSTO DE INVERSION (Precio de Mercado)
SEGUNDA ALTERNATIVA
DESCRIPCION DE PROGRAMACION
PART
ACTIVIDADES UNID META P.UNITAR
1.00 ESTUDIO DEFINITIVO
1.10 Expediente Técnico Unidad 1 14,000.00
COSTO DIRECTO 0 - -
Gastos Generales (12 %) S/. - -
Gastos de Supervisión (3 %) S/. - -
COSTO TOTAL S/. - -
DESCRIPCION DE PROGRAMACION
PART
ACTIVIDADES UNID META P.UNITAR
COSTO DIRECTO
Gastos Generales 12 % S/.
Gastos de Supervisión (3 %) S/.
COSTO TOTAL S/.
COSTO DIRECTO
Gastos Generales (12 %) S/.
Gastos de Supervisión (3 %) S/.
COSTO TOTAL S/.
BERTURA VEGETAL EN
CRONOGRAMA DE EJECUCION
PROGRAMACION AÑO 0 AÑO 1 AÑO 2
PRESUPUESTO semestre1 Semestre 2 semestre1 Semestre 2 semestre1 Semestre 2
14,000.00 - 14,000.00 - - - -
14,000.00 - 14,000.00 - - - -
- - - - - -
4,276,609.92 - - 712,768.32 712,768.32 712,768.32 712,768.32
- - - - - - -
3,577,737.60 - - 596,289.60 596,289.60 596,289.60 596,289.60
315,601.92 - - 52,600.32 52,600.32 52,600.32 52,600.32
383,270.40 - - 63,878.40 63,878.40 63,878.40 63,878.40
- - - - - -
1,068,376.03 - 510.00 533,933.02 533,933.02 - -
- - - - - - -
510.00 - 510.00 - - - -
- - - - - - -
1,896.62 - - 948.31 948.31 - -
5,510.45 - - 2,755.23 2,755.23 - -
3,072.00 - - 1,536.00 1,536.00 - -
2,644.10 - - 1,322.05 1,322.05 - -
2,830.50 - - 1,415.25 1,415.25 - -
- - - - - - -
277.20 - - 138.60 138.60 - -
- - - - - -
6,080.00 - - 3,040.00 3,040.00 - -
- - - - - -
1,864.50 - - 932.25 932.25 - -
27,757.29 - - 13,878.65 13,878.65 - -
24,333.32 - - 12,166.66 12,166.66 - -
- - - - - - -
13,465.00 - - 6,732.50 6,732.50 - -
- - - - - -
- - - - - -
56.00 - - 28.00 28.00 - -
187.00 - - 93.50 93.50 - -
112.00 - - 56.00 56.00 - -
- - - - - -
2,353.65 - - 1,176.83 1,176.83 - -
2,023.50 - - 1,011.75 1,011.75 - -
8,946.00 - - 4,473.00 4,473.00 - -
- - - - - - -
16,096.80 - - 8,048.40 8,048.40 - -
22,770.00 - - 11,385.00 11,385.00 - -
166,761.10 - - 83,380.55 83,380.55 - -
29,925.00 - - 14,962.50 14,962.50 - -
- - - - - -
15,000.00 - - 7,500.00 7,500.00 - -
- - - - - - -
340,210.00 - - 170,105.00 170,105.00 - -
- - - - - - -
267,292.00 - - 133,646.00 133,646.00 - -
- - - - - -
- - - - - - -
15,000.00 - - 7,500.00 7,500.00 - -
91,402.00 - - 45,701.00 45,701.00 - -
- - - - - -
- - - - - -
593,436.00 - - 101,826.00 101,826.00 97,446.00 97,446.00
380,556.00 - - 63,426.00 63,426.00 63,426.00 63,426.00
76,800.00 - - 38,400.00 38,400.00 - -
136,080.00 -- -- -- -- 34,020.00
- 34,020.00
-
1,607,764.00 - - 237,720.67 237,720.67 283,080.67 283,080.67
62,604.00 - - 10,434.00 10,434.00 10,434.00 10,434.00
- - - - - - -
181,440.00 - - - - 45,360.00 45,360.00
1,300,000.00 - - 216,666.67 216,666.67 216,666.67 216,666.67
27,720.00 - - 4,620.00 4,620.00 4,620.00 4,620.00
36,000.00 - - 6,000.00 6,000.00 6,000.00 6,000.00
- - - - - -
20,053.00 - - 2,212.00 2,212.00 3,873.25 3,873.25
8,848.00 - - 2,212.00 2,212.00 2,212.00 2,212.00
6,645.00 - - - - 1,661.25 1,661.25
4,560.00 - - - - - -
- - - - - -
7,580,238.95 - 14,510.00 1,588,460.00 1,588,460.00 1,097,168.24 1,097,168.24
909,628.67 - 1,741.20 190,615.20 190,615.20 131,660.19 131,660.19
227,407.17 - 435.30 47,653.80 47,653.80 32,915.05 32,915.05
8,717,274.79 - 16,686.50 1,826,729.00 1,826,729.00 1,261,743.47 1,261,743.47
14.44 14.51
14 15
14 15
43 44
COSTO DE INVERSION (Precio Social)
PRIMERA ALTERNATIVA
DESARROLLO DE CAPACIDADES PARA EL ESTABLECIMIENTO DE LA COBERTURA VEGETAL EN LAS ZONAS ALTO ANDINAS DE
LA PROVINCIA DE HUANCASANCOS
0
0.69 0.91
DESCRIPCION DE PROGRAMACION
PART
ACTIVIDADES UNID META P.UNITAR
1.00 ESTUDIO DEFINITIVO
DESCRIPCION DE PROGRAMACION
PART
ACTIVIDADES UNID META P.UNITAR
COSTO DIRECTO
Gastos Generales 12 % S/.
Gastos de Supervisión (3 %) S/.
COSTO TOTAL S/.
COSTO DIRECTO
Gastos Generales (12 %) S/.
Gastos de Supervisión (3 %) S/.
COSTO TOTAL S/.
EN LAS ZONAS ALTO ANDINAS DE
14.72 14.80
15 15
15 15
44 44
AÑO 01 AÑO 02 AÑO 03
12,740.00 0.91
-
-
-
#REF! #REF! #REF! #REF! 0.69
#REF! #REF! #REF! #REF! 0.78
#REF! #REF! #REF! #REF! 0.79
-
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.89
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.54
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.80
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.50
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.58
#REF! #REF! #REF! #REF! 0.70
#REF! #REF! #REF! #REF! 0.72
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.79
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.91
#REF! #REF! #REF! #REF! 0.78
#REF! #REF! #REF! #REF! 0.79
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.81
#REF! #REF! #REF! #REF! 0.79
#REF! #REF! #REF! #REF! 0.71
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.59
#REF! #REF! #REF! #REF! 0.62
#REF! #REF! #REF! #REF! 0.66
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.51
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.59
#REF! #REF! #REF! #REF! 0.82
#REF! #REF! #REF! #REF! 0.72
#REF! #REF! #REF! #REF! 0.83
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.63
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF! 0.43
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.68
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.81
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.74
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! 0.91
#REF! #REF! #REF! #REF! 0.60
DESARROLLO DE CAPACIDADES PARA EL ESTABLECIMIENTO DE LA COBERTURA VEGETAL EN LAS ZONAS ALTO ANDINAS DE
LA PROVINCIA DE HUANCASANCOS
0
DESCRIPCION DE PROGRAMACION
PART
ACTIVIDADES UNID META P.UNITAR PRESUPUESTO
1.00 ESTUDIO DEFINITIVO 12,740.00
1.10 Expediente Técnico Unidad 1.00 12,740.00 12,740.00
-
2.00 MANEJO INTEGRADO DE ZONAS ALTOANDINAS 3,100,394.79
2.10 MÓDULOS DEMOSTRATIVOS EN MANEJO DE PASTURAS
2.10.01 Construccion de potreros a base de malla metalica Has 486.00 5,249.88 2,551,441.68
2.10.02 INSTALACION DE PASTOS EXOTICOS (1Ha/MODULO = 162 Has) Has 162.00 1,519.56 246,169.50
2.20 MANEJO Y MEJORAMIENTO DE BOFEDALES ML. 80.00 3,784.80 302,783.62
-
3.00 FORESTACION Y REFORESTACION 728,258.49
3.10 CARTEL DE OBRA HUANCA SANCOS
3.1.10 COLOCACION DE CARTEL DE OBRA DE 3.60X 2.40M Unidad 1.00 453.90 453.90
3.20 CONSTRUCCION DE VIVEROS VOLANTES -
3.2.10 LIMPIEZA DE TERRENO MANUAL m2 2,563.00 0.32 815.55
3.2.11 TRAZO Y REPLANTEO EN TERRENO NORMAL m2 2,563.00 1.16 2,975.64
3.2.12 CORTE Y EXCAVACION EN TERRENO NORMAL m3 256.00 5.16 1,320.96
3.2.13 NIVELADO Y APISONADO m2 1,930.00 0.59 1,136.96
3.2.14 INSTALACION DE TUBERIA PVC Y ACCESORIOS Unidad 9.00 251.60 2,264.40
3.30 CONSTRUCCION DE GERMINADEROS CAMA DE ALMACIGO - -
3.31 CONSTRUCCION DE CAMAS DE ALMACIGO SOBRE EL NIVEL m2 66.00 1.81 119.20
3.40 CONSTRUCCION DE CAMAS DE REPIQUE -
3.41 CONSTRUCCION DE CAMAS DE REPIQUE m2 1,216.00 2.50 3,040.00
3.50 CONSTRUCCION DE TINGLADO - -
3.51 CONSTRUCCION DE TINGLADO PARA CAMAS DE ALMACIGO m2 150.00 7.21 1,081.41
3.52 CONSTRUCCION DE TINGLADO PARA CAMAS DE REPIQUE m2 2,563.00 7.58 19,430.10
3.53 TENDIDO DE AGROFIL m2 1,907.00 9.19 17,519.99
3.60 PROTECCION DEL PERIMETRO DEL TINGLADO 0 - -
3.61 PROTECCION DEL PERIMETRO DEL TINGLADO ML 250.00 42.55 10,637.35
3.70 ADQUISICIÓN DE PLANTONES -
3.7.10 ADQUISICIÓN DE PLANTONES -
3.7.11 ADQUISICIÓN DE PLANTONES DE COLLE MIL 56.00 0.84 47.04
3.7.12 ADQUISICIÓN DE PLANTONES DE PINO mill 187.00 0.84 157.08
3.7.13 ADQUISICIÓN DE PLANTONES DE ESPECIES NATIVAS mill 112.00 0.84 94.08
3.7.20 LABORES CULTURALES - - -
3.7.21 MANEJO Y CONTROL DE ENFERMEDADES FUNGOSAS mll 355.00 3.94 1,400.25
3.7.22 MANEJO Y CONTROL DE PLAGAS Y/O INSECTOS mll 355.00 4.69 1,663.35
3.7.23 MANEJO FITONUTRICIONAL mll 710.00 9.07 6,440.68
3.80 INSTALACION DE PLANTONES EN SILVO PASTURA
3.8.1 TRAZO Y MARCACION PARA HOYOS Ha 380.00 18.42 7,000.59
3.8.2 TRASLADO DE PLANTONES VJE 46.00 313.55 14,423.10
3.8.3 APERTURA DE HOYOS (0,40x0,40M Y PROF. 0,40M) HY 211,090.00 0.34 71,472.40
3.8.4 PLANTACION, TAPADO Y APIZONADO HA 380.00 33.94 12,897.13
3.90 MANTENIMIENTO DE VIVEROS VOLANTES
3.9.1 MANTENIMIENTO DE VIVERO mes 15.00 680.00 10,200.00
3.10 ADQUISICION DE MOVILIDAD, EQUIPOS Y OTROS
3.10.1 ADQUISICION DE EQUIPOS Y ALQUILER DE MOVILIDAD, OTROS Global 1.00 275,587.54 275,587.54
3.11 MANEJO Y MANTENIMIENTO DE LAS PLANTACIONES
3.11.1 MANEJO Y MANTENIMIENTO DE LAS PLANTACIONES ESTABLECIDAS Has. 380.00 519.97 197,588.60
3.12 FLETE TERRESTRE
3.12.1 FLETE TERRESTRE Viajes 20.00 682.50 13,650.00
3.12.2 RECALCE DE PLANTACIONES FORESTAL EN SILVOPASTURA HA 230.00 238.44 54,841.20
4.00 MANEJO ADECUADO DE RECURSO HÍDRICO - - 336,199.80
4.10 CONSTRUCCIÓN DE ZANJAS DE INFILTRACIÓN, 180 Has (maquinaria y m Ha 180.00 1,153.71 207,667.80
4.20 ZONIFICACION E INVENTARIO DE RECURSOS: (hídricos, bofedales y Suelo mes 12.00 5,824.00 69,888.00
4.30
- CONSTRUCCIÓN DE QOCHAS - 120 diques (diques de champa). Unidad 120.00 488.70 58,644.00
DESCRIPCION DE PROGRAMACION
PART
ACTIVIDADES UNID META P.UNITAR PRESUPUESTO
CRONOGRAMA DE EJECUCION
1er Semestre 2do Semestre 1er Semestre Año 1er Semestre año
2do Semestre año 1 2do Semestre Año 2 1er Semestre Año 3
Año 0 Año 0 1 2
- 12,740.00 - - - - -
- - 516,732.47 516,732.47 516,732.47 516,732.47 516,732.47
- 453.90 363,902.30 363,902.30 - - -
- - 69,555.30 69,555.30 49,272.30 49,272.30 49,272.30
- - 216,325.81 216,325.81 257,304.00 257,304.00 257,304.00
- - 1,902.32 1,902.32 3,397.45 3,397.45 1,495.13
CRONOGRAMA DE EJECUCION
1er Semestre 2do Semestre 1er Semestre Año 1er Semestre año
2do Semestre año 1 2do Semestre Año 2 1er Semestre Año 3
Año 0 Año 0 1 2
- 100 - - - - -
- - 17 17 17 17 17
- 0 50 50 - - -
- - 21 21 15 15 15
- - 15 15 18 18 18
- - 11 11 19 19 8
Semestre 2
- 12,740.00 12,740.00
- 12,740.00
-
516,732.47 3,100,394.79 3,100,394.79
- -
425,240.28 2,551,441.68
41,028.25 246,169.50
50,463.94 302,783.62
- -
- 728,258.49 728,258.49
- -
- 453.90
- -
- 815.55
- 2,975.64
- 1,320.96
- 1,136.96
- 2,264.40
- -
- 119.20
- -
- 3,040.00
- -
- 1,081.41
- 19,430.10
- 17,519.99
- -
- 10,637.35
- -
- -
- 47.04
- 157.08
- 94.08
- -
- 1,400.25
- 1,663.35
- 6,440.68
- -
- 7,000.59
- 14,423.10
- 71,472.40
- 12,897.13
- -
- 10,200.00
- -
- 275,587.54
- -
- 197,588.60
- -
- 13,650.00
- 54,841.20
49,272.30 336,199.80
34,611.30 207,667.80
- 69,888.00
14,661.00 58,644.00
- -
257,304.00 1,461,867.62
9,494.94 56,969.64
- -
40,978.19 163,912.78
197,166.67 1,183,000.00
4,204.20 25,225.20
5,460.00 32,760.00
- -
5,644.73 17,739.38
- 7,609.28
1,495.13 5,980.50
4,149.60 4,149.60
- -
828,953.49 5,657,200.08
99,474.42 678,864.01
24,868.60 169,716.00 -
953,296.52 6,505,780.10 5,657,200.08
14.65
15
15
44
PRODUCCION PECUARIA SEGÚN PRINCIPALES ESPECIES. PROVINCIA DE HUANCASANCOS.REGION AYACUCHO
2010
PRECIO PRECIO
Nº DESCRIPCIÓN UNIDAD CANTIDAD
UNITARIO TOTAL
01 GASTOS PARA LA CONTRATACCION DE PERSONAL 502,926.00
1 RESPONSABLE DEL PROYECTO MES 48 4,000.00 192000.00
2 ESSALUD DEL RESPONSABLE MES 48 360.00 17280.00
3 ASISTENTE ADMINISTRATIVO MES 48 2,200.00 105600.00
4 ESSALUD ASISTENTE ADMINISRATIVO MES 48 198.00 9504.00
5 TECNICOS AGROPECUARIOS MES 48 1,900.00 91200.00
6 ESSALUD TECNICO AGROPECUARIO MES 48 171.00 8208.00
7 VIVERISTA MES 15 1,000.00 15000.00
8 ESSALUD DEL VIVERISTA MES 15 90.00 1350.00
9 PROFESIONAL ING. AGRONOMO MES 12 3,000.00 36000.00
10 ESSALUD DEL ING. AGRONOMO MES 12 270.00 3240.00
11 TECNICO EN INVENTARIO DE RECURSOS MES 12 1,800.00 21600.00
12 ESSALUD DEL TECNICO EN INVENTARIO DE R MES 12 162.00 1944.00
02 GASTOS PARA LA COMPRA DE BIENES 126,714.90
VESTUARIO 11,150.00
36 Bota catarpilar Par 12.00 300.00 3,600.00
37 Gorras Unidad 30.00 25.00 750.00
38 Ponchos de jebe Unidad 16.00 60.00 960.00
39 Casaca impermeable Unidad 15.00 120.00 1,800.00
40 Chaleco Unidad 15.00 60.00 900.00
41 Bolsa de dormir Unidad 8.00 250.00 2,000.00
42 Escritorio melamine Unidad 2.00 220.00 440.00
43 Estante melanina Unidad 1.00 350.00 350.00
44 Modulo de melamine para computadora Unidad 1.00 350.00 350.00
REPUESTOS DE MOTOCICLETAS 3,075.00
45 Kit de arrastre para motocicleta ctx 200 Unidad 2.00 415.00 830.00
46 Rodajes pòsteriores originales Unidad 2.00 22.50 45.00
47 Inflador de pie para motocicleta Unidad 2.00 30.00 60.00
48 Camara delantera n 2.75x21 Unidad 4.00 50.00 200.00
49 Camara posterior 4.10x18 Unidad 4.00 50.00 200.00
50 Llantas delanteras Unidad 4.00 195.00 780.00
51 Llantas posteriores Unidad 4.00 225.00 900.00
52 Parche de jebe al frio Unidad 30.00 2.00 60.00
COMBUSTIBLES 48,800.00
75 Petroleo Gln 1,500.00 16.00 24,000.00
76 Gasolina de 84 octanos Gln 1,500.00 16.00 24,000.00
77 aceite multigrado Gln 4.00 80.00 320.00
78 Aceite grado 40 Gln 6.00 80.00 480.00
03 GASTOS PARA LA CONTRATACION DE SERVICIOS 33,892.58
79 Reparación de vehículos (motocicleta) Global 1.00 2,000.00 2,000.00
80 Reparación de camionetas Global 2.00 3,200.00 6,400.00
81 Recarga de cartucho de toner Servicio 8.00 60.00 480.00
82 Servicio de energia electrica de la A.A.HCOS mes 48.00 112.00 5,376.00
83 seguro del tractor agricola Global 1.00 2,800.00 2,800.00
84 Servicios de difusion y comunicación Servicio 1.00 1,000.00 1,000.00
85 soat para camioneta Servicio 1.00 350.00 350.00
86 Seguro de la camioneta Global 1.00 2,850.00 2,850.00
87 Servicio de fotocopia Unidad 15,215.80 0.10 1,521.58
88 Impresión de actas de entrega Talonario 2.00 70.00 140.00
89 Servicio de telefonia de la DRAA MES 48.00 45.00 2,160.00
90 Soat para moto Servicio 4.00 300.00 1,200.00
91 Anillado de Documentos Und 20.00 9.00 180.00
92 Legalizacion de Cuaderno de Obra Und 9.00 15.00 135.00
93 Preliquidaciones Und. 4.00 1,200.00 4,800.00
94 Liquidacion de Obra Mes 1.00 2,500.00 2,500.00
TOTAL 663,533.58
DESAGREGADO DE GASTOS GENERALES
PRECIO PRECIO
Nº DESCRIPCIÓN UNIDAD CANTIDAD
UNITARIO TOTAL
01 GASTOS PARA LA CONTRATACCION DE PERSONAL 502,926.00
### 02 GASTOS PARA LA COMPRA DE BIENES 126,714.90
03 GASTOS PARA LA CONTRATACION DE SERVICIOS 33,892.58
TOTAL 663,533.48
663533.48
-
### 0.31 5391.12
21.58
215.8
8E+05 ###
GASTOS SUPERVISION
PRECIO PRECIO
Nº DESCRIPCIÓN UNIDAD CANTIDAD
UNITARIO TOTAL
TOTAL 186,320.00
206,043.83
19,723.83
VIVEROS VOLANTES:
PAGO
Nº LOCALIDADES VIVEROS MENSUAL DEL MESES TOTAL
VIVERISTA
1 Sancos 1 600.00 15 9000.00
2 Sacsamarca 1 600.00 15 9000.00
3 Pallcca 1 600.00 15 9000.00
4 Carapo 1 600.00 15 9000.00
5 Manchiri 1 600.00 15 9000.00
6 Taulli 1 600.00 15 9000.00
7 Porta Cruz 1 600.00 15 9000.00
8 Huarcaya 1 600.00 15 9000.00
9 Lucanamarca 1 600.00 15 9000.00
TOTAL 9 5400.00 135 81000.00