Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
BREWER GULF
19 June 2018
RECEIVED
Compliance Sheet Rev. 0 (Comments)
AC-618
SITE IMS INDUCTION
(Health, Safety, Environment & Quality)
Rev. 01, Date : 17th June 2018
Why we are here???
About our job & site team
Project QHSE Targets
Site access & egress
Site Security rules
Surroundings
Hazards & controls
Training requirements
Emergency arrangements
Accident and incident reporting procedure
DWB & Start of Shift briefing (SOS)
Safety culture
Environmental responsibilities
Quality system
Employees duty
Where are you now in Dubai
PROJECT DETAILS
SCOPE
Project: The Project is a new B+G+2 commercial,
leisure and office development located consisting of Client
the following: Al Futtaim Retail Park LLC
o Basement level parking with an additional 3 P O Box 152
levels of parking to the North and East sides Dubai,
of the plot. UAE
o Ground floor level retail atrium containing
The Employer’s Representative
multiple line stores, hypermarket and DIY
Brewer Smith Brewer Gulf
store.
P O Box 50667
o First floor level retail atrium containing
Dubai
multiple line stores, casual dining, food
UAE
court, cinema complex, major department
stores. Main Contractor
o IKEA retail experience including IKEA office Al Futtaim Carillion
head office headquarters and training centre. PO Box 1811
The Project is located in a mixed used Dubai
community at Jabal Ali First, Dubai. UAE
Project duration
Appointment of Main Contractor 22/04/2018
Taking over certificate 22/11/2019
Our safety culture
Eyes/Face Dust/Fumes
Full body harness
Protective colour code
Safety Glasses Gloves Cloths for
Operatives
TOILET
Mess hall
First aid
Emergency
assembly
point
Toilets Prayer
room
Smoking
area
Site access
Current hazards
Safety Labour
EMERGENCY CONTACTS
Vehicle Pass
Remember 3m Rule
NO. 001
VEHICLE PASS
Permit To Work (PTW)
Do not start any of the following tasks without a valid Work Permit
Ø Confined Space entry permit
Ø Hot Works (Welding, Cutting, Grinding, brazing, water proofing etc)
Ø Excavation
Ø Use of COSHH materials
Ø Electrical Works (Use of 220/380 Volts)
Ø Removal of Safety Controls & access to leading edges (Horizontal and Vertical Opening)
Ø Permit to access high level works
Ø Use of step ladder
Ø To work near live services
Ø Use of cartridge operated tools
Ø Access close
Ø Core cutting
Ø Pressure Testing
Ø Electrical Testing and commissioning
Ø Access to finished areas
Safe System of Work
6 Steps to Safe Working
¡ Plan the Task
¡ Identify the Hazards
¡ Assess the Risks
¡ Decide existing Control Measures are adequate
¡ Explain/brief to the Team
¡ Check that the control measures are followed
23
Don’t walk by. Take action now
It Involves the Following Steps
• The concept of the “Don’t Walk By Take Action Now” campaign is for
us to track and analyse those situations or conditions that have not
led to an accident, but if ignored, possibly could lead to an accident.
• Basically we are looking at Unsafe Conditions and Unsafe Act
reporting.
• Unsafe Conditions and Unsafe Acts are those events that, unlike
injuries or property damage, are often not seen or reported, but will
give valuable information in terms of incident trends or patterns, this
information is vital to our proactive incident prevention program.
• So if you see a unsafe act or condition Don’t Walk By- Take Action,
by either fixing it or reporting it to someone who can fix it.
Don’t walk by. Take action now 1. Identify
2. Plan
3. Act
4. Report
Observe
Unprotected
Opening
Report
Take Action
Don’t Walk By
Hindi
Arabic
SUSTAINABILITY
Waste Management
• Waste can be defined as “A substance or a material not fit to its purpose or
not put to it’s full use.”
• What we need to do:
– Never mix reusable or recyclable wastes (paper, plastic, timber,
plywood, etc.) with non reusable/ recyclable wastes (cement, concrete,
soil, etc.).
– Never mix hazardous and general waste in the same skip.
– Never overfill a skip. Keep the area around a skip tidy.
– The waste should be segregated from the source / site itself. Always
dispose waste in the correct skip according to their category. If unsure,
ask your Supervisor/ Manager.
– As a LEED (Leadership in Energy and Environment Design) project, it
is required to achieve 50% recycling in this project.
Waste Segregation & Recycling
photos
Air Quality, Soil and Ground Water Pollution
Proper Bunds/ drip trays, etc. need to be provided for all chemical/ fuel Non- potable water to be
storage, plant and equipments, etc. to avoid land and water pollution sprayed to maintain a dampened
surface
A dripping tap wastes around 2 litres of water every hour. Don’t leave the tap
Often we ignore this wasted water as it doesn't look like running
much until you realise that's 18,000 litres per year.
Waste skip colour code
IMS : Integrated Management System
Contains:
QMS Quality Management System ISO 9001
QUALITY TOOLS
• ITP – Inspection and Test Plan
• NCR – Non-Conformance Report
• KPI – Key Performance Indicator
• DWB – Don’t Walk By
• Audit
• Induction
• Toolbox Talk
• Internal/external training
Disciplinary Procedure
1 FAILURE TO WEAR PPE
· Head protection
· Safety Footwear (Min. Toe and mid sole protection)
· High Visibility Waistcoat/Jacket
· Safety gloves
· Safety glasses
· Other PPE as required -Hearing Protection
Special eye Protection (welding goggles) 3 Point Penalty
Respiratory Protection
Minimum, Short Sleeve Shirt/Tee Shirt, Long Trousers.
Note: Any other PPE required according to the risks associated with work
being done will be also come under this procedure (Safety Harness,
hearing protection, respiratory protection, etc)
2 FAILURE TO WORK SAFELY 6 Point penalty
· Interfering with Safety signage or equipment
· Smoking in prohibited areas
· Horseplay
· Failure to follow HSE Instruction
· Unauthorised servicing/repairs of plant, tools and machineries
· Disposing/draining hazardous chemicals into undesignated areas
· Any person wantonly causing damage to the environment.
· Uncontrolled disposal of chemicals
· Insufficient care to prevent spillages
· Unnecessary noise, dust or fumes.
· Incorrect storage of chemicals
Disciplinary Procedure