Sei sulla pagina 1di 2

Date : 10/1/2017

General PUNCHLIST Ref. No :

Page No.: 1 of 1
Client: Pakistan Petroleum Ltd
Project: Construction of 6"-Under Ground Feeder Line Well-27, 17 , 15
Line Description 6"-Under Ground Feeder Line / WHSF Well-27,17,15 &Plant Work
Record No. 01
Item Signature
Category Description / Required Action
No. Cont: TP Client Remarks

Well-27
1 C as Built Drawings
2 C CP System Need to be functional

Well-20
3 C Gate and Fence Repair

WELL-17
Area to be Level at both side of Riser
4 C if necessary install Sleeve
5 C T type Supports (PCC Block,Fabrication,Installation) 2EA
6 C CP-Post to Be Install and Functional
WELL-15

7 C Area to be LeveL at both side of Riser


8 C as Built Drawings
9 C T type Supports (PCC Block,Fabrication,Installation) at new line 6" 2 EA

Near connection at Exsisting Line area to be Excavate leveling


10 C and Gravel laying
11 C CP-Post to Be Install and Functional
Plant Area
12 C T type Supports (PCC Block,Fabrication,Installation) 2EA
13 C as Built Drawings
AMS Power QA/QC TPI Client-PPL
ATIF ALI
QA/QC Engineer

Category:-
A to be Completed before hydrotest.
B to be completed after Test.
C to be completed after commissioning.

Documentary No: PMD/L/02-61 Rev No: 00 Rev Date:


Category:-
A to be Completed before hydrotest.
B to be completed after Test.
C to be completed after commissioning.

Documentary No: PMD/L/02-61 Rev No: 00 Rev Date:

Potrebbero piacerti anche