POLGAHAWELA, POTHUHERA AND ALAWWA INTEGRATED WATER SUPPLY

PROJECT

Subject : HANDING OVER SYNOPSIS

To : Eng. Prasanna

Date : 13th July 2018

I am herewith forwarding you the documents of handing over synopsis indicating the Documents
and details of activities I have undertaken and same to be followed-up.

Item
Details of the Documents File No. Taken over by Signature
No
1.0 Daily Progress Reports (DPR)
1.1 Galewela Transmission (450 DI & 350 DI), 09
Galewela Distribution 280 mm (242A-437, 242A-36) 02
Galewela Distribution 225/110 mm (Town Area) 02
Galewela Distribution 110/90 mm (Matale LHS/RHS) 01
(Measurement Sheets, Level Sheets, Monthly Summary
Sheet, Tie Measurement Sheet, Pipe Laying Summery,
Pressure Testing Reports, Inspection Sheet, Check List,
Concrete Pouring Slip, Concrete Testing Reports and
Thrust Block Details))
Thalakiriyagama Reservoir 01
Bridges Details (1/81, 4/82 & 2/85) 01

2.0 Other Documents

2.1 Transmission Laying Summery Book 02

Handed over by

…………………………………………
J.A.L. Sooriyabandara
(Engineering Assistant)

1
POLGAHAWELA, POTHUHERA AND ALAWWA INTEGRATED WATER SUPPLY
PROJECT
Subject : HANDING OVER SYNOPSIS

To : Ms. D.M.C. Shalika Dissanayake

Date : 13th July 2018

I am herewith forwarding you the stationaries and other equipment used in myself.

Use Utilities

Item TAKEN OVER


ITEM NOS SIGNATURE
No BY
Desktop Computer with Mouse
1 01
and Keyboard
2 Wi-Fi Adaptor 01
Mobile Phone (Huawei) with SIM,
3 01
Charger, Hand free Set
4 Puncture 01
5 Stationary Holder 01
6 Stapler Machine 01
7 Pencil Sharpener 01
8 Safety Helmet 01

Handed over by

…………………………………………
J.A.L. Sooriyabandara
(Engineering Assistant)