Sei sulla pagina 1di 1

Created by Trial Version

Return Chilled Water from


Production

Tank
Supply chilled water to
compunding area

Note: Need to install strainer with bypass before


entering the AHU and monitoring field instruments
Created by Trial Version such as pressure and temperature gauges.

Equipment List
Centrifugal pump
Pressure gauge port
Temperature gauge port
Strainer with by pass 2
Valves 6

Supply chilled water from


york chiller Created by Trial Version
Return chilled water
from york chiller

Potrebbero piacerti anche