Sei sulla pagina 1di 140

MR VALENZUELA BUILDING 3

Maysan Road Corner I, Miranda Street, Valenzuela City

BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
SUMMARY

ITEM CODE DESCRIPTION TOTAL AMOUNT

Section 1 GENERAL AND PRELIMINARIES

Section 2 MAINWORKS

04000 Masonry Works


05000 Miscellaneous Metals

07000 Thermal & Moisture Protection


08000 Doors & Windows
08100 Metal Doors & Frames
A. Steel Doors & Frames
B. Aluminum Glass Doors & Windows 11,539,
08200
A. Wood Doors & Jambs

09000 Finishes
A. Ceiling Finishes
B. Wall Finishes
C. Floor Finishes
D. Exterior Finishes
09900 Painting Works
A. BaseBoard

10000 Specialty Works


SUB-TOTAL (Section 2 - MAINWORKS)

TOTAL AMOUNT (Section 1 & 2) P

ATMCI-F-CTL-02 02c Revision 01 Page 1 of 140


MR VALENZUELA BUILDING 3
an Road Corner I, Miranda Street, Valenzuela City

BILL OF QUANTITIES
RAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
SUMMARY
Date: 01 September 2015

TOTAL AMOUNT

5,857,158.30
1,163,764.36

405,202.20
27,525,714.56

1,165,142.86
11,539,378.56

14,821,193.14

28,392,322.87
1,705,231.95
10,562,001.40
11,677,031.91
4,448,057.61
207,561.90
207,561.90

4,778,380.77
68,330,104.95

ATMCI-F-CTL-02 02c Revision 01 Page 2 of 140


BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 3 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 04000 - Masonry Works

CODE UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Provide all cost of materials & labor


including supervision and
other incidentals necessary to complete
the work as per plan and specifications.

04100 CONCRETE MASONRY UNITS

1.0 Ground Floor

a. 150 mm CHB m² 263.66 720.00 200.00


b. 100 mm CHB m² 286.34 530.00 150.00
c. GYPSUM BOARD DRYWALL HIGH m² 205.30 725.00 420.50
PARTITION(FLOOR SOFFIT)
d. GYPSUM BOARD DRYWALL LOW m² 34.05 725.00 420.50
PARTITION(HT=2300mm)

2.0 Second Floor

a. 150 mm CHB m² 259.25 720.00 200.00


b. 100 mm CHB m² 300.20 530.00 150.00
c. GYPSUM BOARD DRYWALL HIGH m² 213.68 725.00 420.50
PARTITION(FLOOR SOFFIT)
d. GYPSUM BOARD DRYWALL LOW m² 34.05 725.00 420.50
PARTITION(HT=2300mm)

1.0 Typical 3rd - to 8th Floor

a. 150 mm CHB m² 1,536.57 720.00 200.00


b. 100 mm CHB m² 1,708.56 530.00 150.00
c. GYPSUM BOARD DRYWALL HIGH m² 1,287.25 725.00 420.50

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 4 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 04000 - Masonry Works

CODE UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

PARTITION(FLOOR SOFFIT)
d. GYPSUM BOARD DRYWALL LOW m² 205.76 725.00 420.50
PARTITION(HT=2300mm)

4.0 Roof Deck

a. 150 mm CHB m² 56.51 720.00 200.00


b. 100 mm CHB m² 119.98 530.00 150.00

Page 2 / 04000 / 1 of 1
Page 2 / 09000 / 26 of 26 TO SUMMARY (Masonry Works)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
ADE WORKS NATANIEL
(ARCHITECTURAL WORKS)
Page 5 of 140

Date: 01 September 2015 30-Dec-99

TOTAL UNIT COST TOTAL


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

920.00 242,567.20 m² 202.65 720.00 340.00 1,060.00 214,809.00


680.00 194,711.20 m² 246.75 530.00 340.00 870.00 214,672.50
1,145.50 235,171.15 m² 163.80 850.00 325.00 1,175.00 192,465.00

1,145.50 39,004.28 m² 17.85 850.00 260.00 1,110.00 19,813.50

m² 132.30 1,150.00 390.00 1,540.00 203,742.00

920.00 238,510.00 m² 203.70 720.00 340.00 1,060.00 215,922.00


680.00 204,136.00 m² 236.25 530.00 340.00 870.00 205,537.50
1,145.50 244,770.44 m² 191.10 850.00 325.00 1,175.00 224,542.50

1,145.50 39,004.28 m² 17.85 850.00 260.00 1,110.00 19,813.50

m² 139.65 1,150.00 390.00 1,540.00 215,061.00

920.00 1,413,644.40 m² 1,115.10 720.00 340.00 1,060.00 1,182,006.00


680.00 1,161,820.80 m² 1,432.20 530.00 340.00 870.00 1,246,014.00
1,145.50 1,474,544.88 m² 1,146.60 850.00 350.00 1,200.00 1,375,920.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
ADE WORKS NATANIEL
(ARCHITECTURAL WORKS)
Page 6 of 140

Date: 01 September 2015 30-Dec-99

TOTAL UNIT COST TOTAL


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

1,145.50 235,698.08 m² 107.10 850.00 300.00 1,150.00 123,165.00

m² 837.90 1,150.00 390.00 1,540.00 1,290,366.00

920.00 51,989.20 m² 55.65 720.00 340.00 1,060.00 58,989.00


680.00 81,586.40 m² 22.05 530.00 340.00 870.00 19,183.50

5,857,158.30 TO SUMMARY (Masonry Works) 7,022,022.00

5,857,158.30

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
ONE OMEGA
(ARCHITECTURAL WORKS)
Page 7 of 140

Date: 01 September 2015

UNIT COST TOTAL


UNIT QTY Material Labor & Total AMOUNT
Other Cost

m² 251.16 494.00 221.00 715.00 179,579.400


m² 323.30 468.00 208.00 676.00 218,552.152
m² 214.52 455.00 286.00 741.00 158,955.615
1.3
m² 21.25 455.00 286.00 741.00 15,746.991
1.3
m² 267.67 2,340.00 1,040.00 3,380.00 904,723.755
1.3
1.3
1.3
m² 211.59 494.00 221.00 715.00 151,286.850
m² 252.99 468.00 208.00 676.00 171,021.240
m² 242.71 455.00 286.00 741.00 179,844.405
1.3
m² 21.90 455.00 286.00 741.00 16,224.195
1.3
m² 262.00 2,340.00 1,040.00 3,380.00 885,560.000
1.3
1.3
1.3
m² 1,278.00 494.00 221.00 715.00 913,770.000
m² 1,515.96 468.00 208.00 676.00 1,024,788.960
m² 1,456.26 455.00 286.00 741.00 1,079,088.660

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
ONE OMEGA
(ARCHITECTURAL WORKS)
Page 8 of 140

Date: 01 September 2015

UNIT COST TOTAL


UNIT QTY Material Labor & Total AMOUNT
Other Cost

1.3
m² 131.40 455.00 286.00 741.00 97,367.400
1.3
m² 1,572.00 2,340.00 1,040.00 3,380.00 5,313,360.000

1.3
1.3
1.3
m² 52.46 494.00 221.00 715.00 37,511.76
m² 92.39 468.00 208.00 676.00 62,456.32
m² 130.31 832.00 390.00 1,222.00 159,236.38
1.3
TO SUMMARY (Masonry Works) 11,569,074.08
1.3
1.3

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 9 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

04100 MISCELLANEOUS METALS

1.0 38 mm Dia. B.I. Pipe steel (Handrail) with


38mm x 38mm B.I. Pipe Vertical & 25mm Horizontal
Railings on EPOXY Primer with two (2) coatings
of Enamel Paint (Submit sample for Architecs Approval)

2.0 FIRE EXIT - 1

a. Ground Floor
38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 19.9 971.148 291.34

b. Ground Floor
25 mm Dia. G.I. Pipe steel (Horizontal) lm. 16 294 88.20

c. Typical 2nd-8th Floor


38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 97.8 971.148 291.34

d. Typical 2nd-8th Floor


25 mm Dia. G.I. Pipe steel (Horizontal) lm. 84.8 294 88.20

3.0 FIRE EXIT - 2

a. Ground Floor

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 10 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 19.9 971.148 291.34

b. Ground Floor
25 mm Dia. G.I. Pipe steel (Horizontal) lm. 16 294 88.20

c. Typical 2nd-8th Floor


38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 97.8 971.148 291.34

d. Typical 2nd-8th Floor


25 mm Dia. G.I. Pipe steel (Horizontal) lm. 84.8 294 88.20

Page 2 / 04000 / 1 of 1

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 11 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

04100 MISCELLANEOUS METALS

4.0 38mm x 38mm x 6mm thk angle bar


Checkered Plate Stair Nosing

a. Ground Floor to 8th floor ( Stair 1 ) lm. 489.6 224.27 53.82


Ground Floor to 8th floor ( Stair 2 ) lm. 396.1 224.27 53.82

5.0 Drying cages

Metal Drying Cages lot 22 -

a. Mail Box lot 120 -

b. Ramp Railing

38mm Ø G.I. pipe sched. 40 primed w/ lm. 70.455 971.148 291.34


at least 3 coats of enamel paint
or approved equivalent

6.0 Stair machine room

a. 38mm Ø B.I. pipe steel (handrail & lm. 5.9 971.148 291.34

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 12 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Vertical Post)

b. 25mm Ø B.I. pipe lm. 7.5 187.5 56.25


Steel (horizontal member) on
Epoxy primer with two (2)
Coatings of enamel paint submit
Sample for architect's approval

Page 2 / 04000 / 1 of 1

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

04100 MISCELLANEOUS METALS

6.0 Acu Legde cage


25mm x 25mm x 3mm
a. tubularized primed w/ at lm. 483.63 390 117.00
least 3 coats of enamel
paint by: davies or
approved equivalent

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 13 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

b. 50mm x 4mm Flat Bar lm. 57.12 150 45.00

c. Expansion shield bolt ( verify size) pcs. 208 450 135.00

d. 75mm x 100mm square tube lm. 170 705.00 211.50

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 14 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Page 2 / 04000 / 1 of 1
Page 2 / 09000 / 26 of 26 TO SUMMARY (Metals Works)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
E WORKS 0
(ARCHITECTURAL WORKS)

Page 15 of 140

Date: 01 September 2015 30-Dec-99

IT COST UNIT COST


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

1,262.49 25,123.60 lm. 12.00 450.00 300.00 750.00 9,000.00

382.20 6,115.20 lm. 5.00 450.00 300.00 750.00 3,750.00

1,262.49 123,471.76 lm. 90.00 450.00 300.00 750.00 67,500.00

382.20 32,410.56 lm. 72.00 450.00 300.00 750.00 54,000.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
E WORKS 0
(ARCHITECTURAL WORKS)

Page 16 of 140

Date: 01 September 2015 30-Dec-99

IT COST UNIT COST


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

1,262.49 25,123.60 lm. 10.00 450.00 300.00 750.00 7,500.00

382.20 6,115.20 lm. 4.50 450.00 300.00 750.00 3,375.00

1,262.49 123,471.76 lm. 93.00 450.00 300.00 750.00 69,750.00

382.20 32,410.56 lm. 76.00 450.00 300.00 750.00 57,000.00

6,578.77 374,242.23

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
E WORKS 0
(ARCHITECTURAL WORKS)

Page 17 of 140

Date: 01 September 2015 30-Dec-99

IT COST UNIT COST


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

278.09 136,152.94 lm. 194.00 200.00 75.00 275.00 53,350.00


53.82 21,319.65 lm. 194.00 200.00 75.00 275.00 53,350.00

- lm. 118.52 1,150.00 350.00 1,500.00 177,780.00

- lm. 2.40 BY OTHERS -

1,262.49 88,948.90 lm. 23.00 1,150.00 550.00 1,700.00 39,100.00

1,262.49 7,448.71 lm. 45.00 550.00 300.00 850.00 38,250.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
E WORKS 0
(ARCHITECTURAL WORKS)

Page 18 of 140

Date: 01 September 2015 30-Dec-99

IT COST UNIT COST


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

243.75 1,828.13 lm. 5.00 1,150.00 550.00 1,700.00 8,500.00

units 260.00 2,000.00 700.00 2,700.00 702,000.00

lm. 28.68 3,500.00 1,050.00 4,550.00 130,494.00

3,100.65 255,698.32 1,474,699.00

507.00 245,200.41

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
E WORKS 0
(ARCHITECTURAL WORKS)

Page 19 of 140

Date: 01 September 2015 30-Dec-99

IT COST UNIT COST


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

195.00 11,138.40

585.00 121,680.00

916.50 155,805.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
E WORKS 0
(ARCHITECTURAL WORKS)

Page 20 of 140

Date: 01 September 2015 30-Dec-99

IT COST UNIT COST


Total AMOUNT UNIT QTY Material Labor & Total AMOUNT
Other Cost

2,203.50 533,823.81

1,163,764.36

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
0
(ARCHITECTURAL WORKS)
Page 21 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

04100 MISCELLANEOUS METALS

1.0 38 mm Dia. B.I. Pipe steel (Handrail) with


38mm x 38mm B.I. Pipe Vertical & 25mm Horizontal
a. Railings on EPOXY Primer with two (2) coatings
b. of Enamel Paint (Submit sample for Architecs Approval)

2.0 FIRE EXIT - 1

a. Ground Floor
38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 36.46 260.00 117.00

b. Ground Floor
25 mm Dia. G.I. Pipe steel (Horizontal) lm. 17.46 195.00 117.00

c. Typical 2nd-8th Floor


38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 190.46 260.00 117.00

d. Typical 2nd-8th Floor


25 mm Dia. G.I. Pipe steel (Horizontal) lm. 204.8832 195.00 117.00

3.0 FIRE EXIT - 2

a. Ground Floor

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
0
(ARCHITECTURAL WORKS)
Page 22 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 36.2 260.00 117.00

b. Ground Floor
25 mm Dia. G.I. Pipe steel (Horizontal) lm. 17.15 195.00 117.00

c. Typical 2nd-8th Floor


38 mm Dia. G.I. Pipe steel (Handrail and vertical) lm. 190.46 260.00 117.00

d. Typical 2nd-8th Floor


25 mm Dia. G.I. Pipe steel (Horizontal) lm. 204.8832 195.00 117.00

TO SUMMARY (Miscellaneous Metals)


Page 2 / 04000 / 1 of 3

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
0
(ARCHITECTURAL WORKS)
Page 23 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

04100 MISCELLANEOUS METALS

4.0 38mm x 38mm x 6mm thk angle bar


Checkered Plate Stair Nosing

a. Ground Floor to 8th floor ( Stair 1 ) lm. 180.7 143.00 64.35


Ground Floor to 8th floor ( Stair 2 ) lm. 176.8 143.00 64.35

5.0 Drying cages


Metal Drying Cages lot 1 366,912.00 128,419.20

a. Mail Box lot 1 357,435.00 160,845.75

b. Ramp Railing

38mm Ø G.I. pipe sched. 40 primed w/ lm. 71.7 910.00 364.00


at least 3 coats of enamel paint
or approved equivalent

6.0 Stair machine room

a. 38mm Ø B.I. pipe steel (handrail & lm. 6.6 260.00 117.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
0
(ARCHITECTURAL WORKS)
Page 24 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Vertical Post)

b. 25mm Ø B.I. pipe lm. 7 195.00 117.00


Steel (horizontal member) on
Epoxy primer with two (2)
Coatings of enamel paint submit
Sample for architect's approval

TO SUMMARY (Miscellaneous Metals)


Page 2 / 04000 / 2 of 3

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

04100 MISCELLANEOUS METALS

6.0 Acu Legde cage

a. lm. 1885.475 442.00 156.00


25mm x 25mm x 3mm tubularized primed w/ at
least 3 coats of enamel paint by: davies or
approved equivalent

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
0
(ARCHITECTURAL WORKS)
Page 25 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

b. 50mm x 4mm Flat Bar lm. 146.4 204.10 71.44

c. Expansion shield bolt ( verify size) pcs. 1098 36.40 9.10

d. 75mm x 100mm square tube lm. 4300.5 286.00 85.80

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
0
(ARCHITECTURAL WORKS)
Page 26 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 05000 - MISCELLANEOUS METALS

ITEM UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

TO SUMMARY (Miscellaneous Metals)


Page 2 / 04000 / 3 of 3

Page 2 / 09000 / 26 of 26 TO SUMMARY (Metals Works)

ATMCI-F-CTL-02/02e Revision 01
OF QUANTITIES
0
ECTURAL WORKS)
Page 27 of 140

Date: 01 September 2015

UNIT COST
Total AMOUNT

377.00 13,745.420

312.00 5,447.520

377.00 71,803.420

312.00 63,923.558

ATMCI-F-CTL-02/02e Revision 01
OF QUANTITIES
0
ECTURAL WORKS)
Page 28 of 140

Date: 01 September 2015

UNIT COST
Total AMOUNT

377.00 13,647.400

312.00 5,350.800

377.00 71,803.420

312.00 63,923.558

309,645.10

ATMCI-F-CTL-02/02e Revision 01
OF QUANTITIES
0
ECTURAL WORKS)
Page 29 of 140

Date: 01 September 2015

UNIT COST
Total AMOUNT

207.35 37,468.145
207.35 36,659.480

495,331.20 495,331.200

518,280.75 518,280.750

1,274.00 91,345.800

377.00 2,488.200

ATMCI-F-CTL-02/02e Revision 01
OF QUANTITIES
0
ECTURAL WORKS)
Page 30 of 140

Date: 01 September 2015

UNIT COST
Total AMOUNT

312.00 2,184.000

1,183,757.58

598.00 1,127,514.050

ATMCI-F-CTL-02/02e Revision 01
OF QUANTITIES
0
ECTURAL WORKS)
Page 31 of 140

Date: 01 September 2015

UNIT COST
Total AMOUNT

275.54 40,339.056

45.50 49,959.000

371.80 1,598,925.900

ATMCI-F-CTL-02/02e Revision 01
OF QUANTITIES
0
ECTURAL WORKS)
Page 32 of 140

Date: 01 September 2015

UNIT COST
Total AMOUNT

2,816,738.01

4,310,140.68

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORK
(ARCHITECTURAL WORKS)
Page 33 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 07000 - Thermal & Moisture Protection

CODE UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

07100 WATERPROOFING WORKS

1.0 Polyester Reinforced Waterproofing Membrane

1.1 Ground Floor


a. 2 - Bedroom Unit (10 Units)

a.1 TU - 5 : Toilet and Bath m² 47.60 300.00 90.00

b. 1- Bedroom Unit (4 Units)

b.1 TU - 5 : Toilet and Bath m² 17.44 300.00 90.00

1.2 Second Floor


a. 2 - Bedroom Unit (11 Units)

a.1 TU - 5 : Toilet and Bath m² 52.36 300.00 90.00

b. 1- Bedroom Unit (3 Units)

b.1 TU - 5 : Toilet and Bath m² 13.08 300.00 90.00

1.3 Typical - 3rd up to 8th floor


a. 2 - Bedroom Unit (11 Units)

a.1 TU - 5 : Toilet and Bath m² 314.16 300.00 90.00

b. 1- Bedroom Unit (3 Units)

b.1 TU - 5 : Toilet and Bath m² 78.48 300.00 90.00

1.4 Roof Deck Level

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORK
(ARCHITECTURAL WORKS)
Page 34 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section No. MAIN WORKS


Bill No. 07000 - Thermal & Moisture Protection

CODE UNIT COST


NO. DESCRIPTION UNIT QTY Material Labor &
Other Cost
a. Roof Deck Slab m² 492.16 300.00 90.00
b. Pump Room Roof Slab m² 4.5 300.00 90.00
c. Machine Room & Electrical Roof Slab m² 19.2 300.00 90.00

1.0 Others (Pls. Specify)

Page 2 / 07000 / 1 of 2
Page 2 / 09000 / 26 of 26 TO SUMMARY (Water Proofing Works)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 35 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

390.00 18,564.00

390.00 6,801.60

390.00 20,420.40

390.00 5,101.20

390.00 122,522.40

390.00 30,607.20

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 36 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

390.00 191,942.40
390.00 1,755.00
390.00 7,488.00

405,202.20

405,202.20

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 37 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08110 Aluminum Glass Doors , Windows & Frames

1.0 Double Swing Door Type - 10 mm Thk tempered


Glass on Aluminum Powder Coated FD100 Section
(Submit Sample for Architects Approval)

Mark : D-4
Type: Swing Door
Dimensions:
Door : 1.80m x 2.15m
Location:
• Main Lobby Entry Door set 1.00 63,504.00 27,285.12

2.0 8mm Thk. Annealed glass


Sliding window on Aluminum
powdered white coated finish.
(submit sample for Architect Approval)

Mark : W-#
Type: Sliding window
Dimensions:

Window w-1 1.10m x 1.20m set 28.00 22,176.00 15,713.28


Window w-2 1.10m x 1.00m set 8.00 18,480.00 13,094.40
Window w-3 .60m x .60m set 4.00 6,048.00 4,285.44
Location:
• Ground floor

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 38 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 39 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08110 Aluminum Glass Doors , Windows & Frames

3.0 8mm Thk. Annealed glass


Sliding window on Aluminum
powdered white coated finish.
(submit sample for Architect Approval)

Mark : W-#
Type: Sliding window
Dimensions:

w-1 1.10m x 1.20m set 28.00 22,176.00 15,713.28


w-2 1.10m x 1.00m set 9.00 18,480.00 13,094.40
Location:
• Second floor

8mm Thk. Annealed glass awning window


on aluminum powdered white coated finish

Mark : Window
Type: awning window
Dimensions:

w-3 .60m x .60m set 4.00 6,048.00 4,285.44


Location:
• Second floor

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 40 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08110 Aluminum Glass Doors , Windows & Frames

3.0 8mm Thk. Annealed glass


Sliding window on Aluminum
powdered white coated finish.
(submit sample for Architect Approval)

Mark : W-#
Type: Sliding window
Dimensions:
w-1 1.10m x 1.20m set 168.00 22,176.00 15,713.28
w-2 1.10m x 1.00m set 54.00 18,480.00 13,094.40

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 41 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
w-4 .40m x 1.50m set 12.00 35,280.00 17,798.40
Location:
• 3rd floor to 8th floor

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 42 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

08210 WOOD DOORS & JAMBS

1.0 45mm Thk. Single Swing Panel Door w/ Tanguile


K.D Jamb (50mm x 100mm) w/ 6mm Grooves in
Paper Laminate Finish

Mark : D -1
Type: Swing Panel Door
Dimensions:

Door .90m x 2.10m set 112.00 23,171.43 14,408.00

Location:
• Ground Floor to 8th floor
(unit entry rooms)

2.0 45mm Thk. Single Swing Hollow Core Flush


Door w/ 6mm Groove Cut w/ Tanguile K.D.
Jamb (75mm x 150mm) on HP Laminate Finish

Mark : D -2
Type: Swing Hollow Core Flush Door
Dimensions:
Door .80m x 2.10m set 199.00 20,800.00 13,744.00
Location:
• Ground Floor to 8th floor
(unit entry rooms)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 43 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08210 WOOD DOORS & JAMBS

3.0 50 mm Thk. Single Swing PVC Door


with Louver on Rabbeted PVC Jamb
(submit sample for Architect Approval)

Mark : D -3
Type: Single Swing PVC Door
Dimensions:
Door .60m x 2.10m set 112.00 19,614.29 13,412.00
Location:
• Ground Floor to 8th floor
(unit entry rooms)

4.0 10 mm Thk. Double Leaf Tempered Glass


Door on powder coated FD100 frame
(submit sample for Architect Approval)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 44 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
Mark : D-4
Type: Swing Hollow Core Flush Door
Dimensions:
Door 1.00m x 2.10m set 1.00 24,357.14 14,740.00
Location:
• Ground Floor (main entry)

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

8310 STEEL DOORS & JAMBS

3.0 G.A. #18 Mild Steel Door W/ 2 Hrs Fire rating

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 45 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
on G.A. #14 Tubular frame single rabbet jamb
& header; provide epoxy primer on lacquer paint
finish w/ passage panic device
(submit sample for Architect Approval)
Mark : D -5
Type: Single Swing mild steel Door
Dimensions:
Door .60m x 2.10m set 20.00 22,285.71 14,160.00
Location:
• Ground Floor to 8th floor (fire exit)
4.0 Single swing G.A. #18 mild steel door w/ louver
on G.A. #14 tubular frame w/ single rabbet jamb
& header on epoxy lacquer paint finish
(submit sample for Architect Approval)

Mark : D -6
Type: Swing Hollow Core Flush Door
Dimensions:
Door 1.00m x 2.10m set 10.00 27,892.86 15,730.00
Location:
• Second Floor to roof deck

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 46 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8
Page 2 / 09000 / 26 of 26 TO SUMMARY (Doors & Windows)

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 47 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

90,789.12 90,789.12

37,889.28 1,060,899.84
31,574.40 252,595.20
10,333.44 41,333.76

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 48 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

1,445,617.92

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 49 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

37,889.28 1,060,899.84
31,574.40 284,169.60

10,333.44 41,333.76

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 50 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

1,386,403.20

37,889.28 6,365,399.04
31,574.40 1,705,017.60

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 51 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

53,078.40 636,940.80

8,707,357.44

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 52 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

37,579.43 4,208,896.00

34,544.00 6,874,256.00

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 53 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

11,083,152.00

33,026.29 3,698,944.00

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 54 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

39,097.14 39,097.14

3,738,041.14

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 55 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

36,445.71 728,914.29

43,622.86 436,228.57

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 56 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

1,165,142.86

27,525,714.56

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 57 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09500 CEILING FINISHES

1.0 Slab Soffit (Straight to Finish)

1.1 Ground Floor

2 - Bedroom Unit (10 Units)

a. TU - 1 : Living / Dining/kitchen m² 137.00 216.59 171.30


b. TU - 2 : Bedroom 1&2 m² 123.00 216.59 171.30

1 - Bedroom Unit (4 Units)

a. TU - 1 : Living / Dining/kitchen m² 48.70 216.59 171.30


b. TU - 2 : Bedroom 1&2 m² 22.30 216.59 171.30

STAIR 1 & 2 ( FIRE EXIT)


TF - 3 : Stairs 1 & 2 m² 33.10 216.59 171.30

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 58 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09500 CEILING FINISHES

1.0 Slab Soffit (Straight to Finish)

1.2 Second Floor

2 - Bedroom Unit (11 Units)

a. TU - 1 : Living / Dining/kitchen m² 148.10 216.59 171.30


b. TU - 2 : Bedroom 1&2 m² 129.00 216.59 171.30

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 59 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

1 - Bedroom Unit (3 Units)

a. TU - 1 : Living / Dining m² 35.20 216.59 171.30


b. TU - 2 : Kitchen m² 15.90

STAIR 1 & 2 ( FIRE EXIT)


TF - 3 : Stairs 1 & 2 m² 31.90 216.59 171.30

1.3 Typical 3rd - 8th Floor

2 - Bedroom Unit (3 Units)

a. TU - 1 : Living / Dining/kitchen m² 211.80 216.59 171.30


b. TU - 2 : Bedroom 1 m² 579.60 216.59 171.30

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 60 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

09500 CEILING FINISHES

1.0 Slab Soffit (Straight to Finish)

1 - Bedroom Unit (11 Units)

a. TU - 1 : Living / Dining/kitchen m² 893.40 216.59 171.30


b. TU - 2 : Bedroom 1 m² 789.00 216.59 171.30

STAIR 1 & 2 ( FIRE EXIT)


TF - 3 : Stairs 1 & 2 m² 183.00 216.59 171.30

1.5 Roof Deck

R - 01 : Machine Room m² 9.90 216.59 171.30

R - 03 : Pump Room m² 3.30 216.59 171.30

R - 03 : EE Room m² 3.40 216.59 171.30

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 61 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09500 CEILING FINISHES

2.0 6mm Moisture Resistance Gypsum Board


on Metal Furring

2.1 Ground Floor

2 - Bedroom Unit (10 Units)


a. TU - 3 : Toilet & Bath m² 31.20 479.38 290.19

1 - Bedroom Unit (4 Units)


a. TU - 3 : Toilet & Bath m² 12.00 479.38 290.19

2.2 Second Floor

2 - Bedroom Unit (11 Units)


a. TU - 3 : Toilet & Bath m² 32.70 479.38 290.19

1 - Bedroom Unit (3 Units)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 62 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

a. TU - 3 : Toilet & Bath m² 8.60 479.38 290.19

2.3 Typical 3rd - 8th Floor

2 - Bedroom Unit (3 Units)


a. TU - 3 : Toilet & Bath m² 52.20 479.38 290.19

1 - Bedroom Unit (11 Units)


a. TU - 3 : Toilet & Bath m² 199.80 479.38 290.19

Page 2 / 09000 / 26 of 26

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 63 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09500 CEILING FINISHES

3.0 6mm Fiber cement board


on Metal Furring

3.1 Ground Floor

a. Porch m² 14.30 479.38 290.19

b. Hallway m² 73.92 479.38 290.19

c. Lobby m² 12.69 479.38 290.19

3.2 2nd to 8th Floor

a. Hallway m² 73.92 479.38 290.19

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 64 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09600 WALL FINISHES

1.0 Plastered Plain cement(Paint Finished)

1.1 Ground Floor

2 - Bedroom Unit (10 Units)

a. TU - 1 : Living / Dining/kitchen m² 431.20 420.00 251.00


b. TU - 2 : Bedroom 1 m² 191.40 420.00 251.00
c. TU - 3 : Bedroom 2 m² 143.52 420.00 251.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 65 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

d. TU - 4 : Toilet & Bath(Paint) m² 133.92 420.00 251.00


e. TU - 5 : Toilet & Bath(Tiles)
300mm x 300mm x 6mm Ceramic Tiles m² 146.70

1 - Bedroom Unit (4 Units)

a. TU - 1 : Living / Dining/kitchen m² 173.80 420.00 251.00


b. TU - 2 : Bedroom 1 m² 103.40 420.00 251.00
c. TU - 3 : Toilet & Bath m² 52.56 420.00 251.00

STAIR 1 & 2 ( FIRE EXIT)

TF - 3 : Stairs 1 & 2 m² 49.50 420.00 251.00

Page 2 / 09000 / 26 of 26

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 66 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09600 WALL FINISHES

2.0 Plastered Plain cement(Paint Finished)

2.2 Secon Floor

2 - Bedroom Unit (11 Units)

a. TU - 1 : Living / Dining/kitchen m² 468.00 420.00 251.00


b. TU - 2 : Bedroom 1 m² 608.02 420.00 251.00
c. TU - 3 : Bedroom 2 m² 77.55 420.00 251.00
d. TU - 4 : Toilet & Bath(Paint) m² 140.58 420.00 251.00
e. TU - 5 : Toilet & Bath(Tiles)
300mm x 300mm x 6mm Ceramic Tiles m² 146.70 1,424.40 251.00

1 - Bedroom Unit (3 Units)

a. TU - 1 : Living / Dining /kitchen m² 129.52 420.00 251.00


b. TU - 2 : Bedroom 1 m² 77.55 420.00 251.00
c. TU - 3 : Toilet & Bath m² 38.34 1,424.40 251.00

STAIR 1 & 2 ( FIRE EXIT)


TF - 3 : Stairs 1 & 2 m² 49.50 420.00 251.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 67 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09600 WALL FINISHES

2.0 Plastered Plain cement(Paint Finished)

2.3 Typical 3rd - 8th Floor

2 - Bedroom Unit (11 Units)

a. TU - 1 : Living / Dining/kitchen m² 2,613.60 420.00 251.00


b. TU - 2 : Bedroom 1 m² 2,086.92 420.00 251.00
c. TU - 3 : Bedroom 2 m² 1,560.90 420.00 251.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 68 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

d. TU - 4 : Toilet & Bath(Paint) m² 1,306.80 420.00 251.00


e. TU - 5 : Toilet & Bath(Tiles)
300mm x 300mm x 6mm Ceramic Tiles m² 1,173.60 1,424.40

1 - Bedroom Unit (3 Units)

a. TU - 1 : Living / Dining /kitchen m² 782.10 420.00 251.00


b. TU - 2 : Bedroom 1 m² 465.30 420.00 251.00
c. TU - 3 : Toilet & Bath
300mm x 300mm x 6mm Ceramic Tiles m² 356.40 1,424.40
STAIR 1 & 2 ( FIRE EXIT)
TF - 3 : Stairs 1 & 2 m² 297.00 420.00 251.00

2.3 Roof Deck

a. R - 01 : Machine Room m² 49.14 420.00 251.00


b. R - 03 : Pump Room m² 19.50 420.00 251.00
c. R - 03 : EE Room m² 19.50 420.00 251.00

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 69 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

09600 FLOOR FINISHES

1.0 300mm x 300mm x Polished Homogenous


Tiles

1.1 Ground Floor

2 - Bedroom Unit (10 Units)

a. TU - 1 : Living / Dining/kitchen m² 156.00 1,424.40 2,480.63

1 - Bedroom Unit (4 Units)

a. TU - 1 : Living / Dining /kitchen m² 49.20 1,424.40 2,480.63

1.2 Second Floor

2 - Bedroom Unit (11 Units)

a. TU - 1 : Living / Dining/kitchen m² 171.60 1,424.40 2,480.63

1 - Bedroom Unit (3 Units)

a. TU - 1 : Living / Dining/kitchen m² 36.90 1,424.40 2,480.63

1.3 Typical 3rd - 8th Floor

2 - Bedroom Unit (4 Units)

a. TU - 1 : Living / Dining/kitchen m² 1,029.60 1,424.40 2,480.63

1 - Bedroom Unit (12 Units)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 70 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

a. TU - 1 : Living / Dining/kitchen m² 221.40 1,424.40 2,480.63

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09600 FLOOR FINISHES

2.0 300mm x 300mm x Unpolished Homogenous


Tiles

2.1 Ground Floor

2 - Bedroom Unit (10 Units)

a. TU - 1 : Toilet & Bath m² 33.00 1,424.40 2,480.63

1 - Bedroom Unit (4 Units)

a. TU - 1 : Toilet & Bath m² 12.00 1,424.40 2,480.63

2.2 Second Floor

2 - Bedroom Unit (11 Units)

a. TU - 1 : Toilet & Bath m² 36.30 1,424.40 2,480.63

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 71 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

1 - Bedroom Unit (3 Units)

a. TU - 1 : Toilet & Bath m² 9.00 1,424.40 2,480.63

2.3 Typical 3rd - 8th Floor

2 - Bedroom Unit (4 Units)

a. TU - 1 : Toilet & Bath m² 217.80 1,424.40 2,480.63

1 - Bedroom Unit (12 Units)

a. TU - 1 : Toilet & Bath m² 54.00 1,424.40 2,480.63

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

I. INTERIOR FINISHES

09600 FLOOR FINISHES

3.0 2mm THK. Vinyl Planks

3.1 Ground Floor

2 - Bedroom Unit (10 Units)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 72 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

a. TU - 1 : Bedroom 1&2 m² 122.00 945.46 548.36

1 - Bedroom Unit (4 Units)

a. TU - 1 : Bedroom 1&2 m² 21.20 945.46 548.37

3.2 Second Floor

2 - Bedroom Unit (11 Units)

a. TU - 1 : Bedroom 1&2 m² 134.20 945.46 548.37

1 - Bedroom Unit (3 Units)

a. TU - 1 : Bedroom 1&2 m² 15.90 945.46 548.37

3.3 Typical 3rd - 8th Floor

2 - Bedroom Unit (4 Units)

a. TU - 1 : Bedroom 1&2 m² 805.20 945.46 548.37

1 - Bedroom Unit (12 Units)

a. TU - 1 : Bedroom 1&2 m² 275.40 945.46 548.37

Page 2 / 09000 / 26 of 26

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 73 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

specifications .

I. INTERIOR FINISHES

09600 FLOOR FINISHES

4.0 Epoxy Paint Finish

4.1 Ground Floor

STAIR 1 & 2 ( FIRE EXIT)


TF - 1 : Stairs 1 & 2 m² 44.64 368.50 213.73
.
4.2 Second Floor

STAIR 1 & 2 ( FIRE EXIT)


TF - 1 : Stairs 1 & 2 m² 39.84 368.50 213.73

4.3 Typical 3rd - 8th Floor

STAIR 1 & 2 ( FIRE EXIT)


TF - 3 : Stairs 1 & 2 m² 214.56 368.50 213.73

5.0 600mm x 600mm Polished Homogenous


Floor Tiles

5.1 Ground Floor

a. Porch m² 10.70 1,424.40 2,480.63

b. Hallway m² 49.90 1,424.40 2,480.63

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 74 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

c. Lobby m² 21.20 1,424.40 2,480.63

5.1 Second Floor

a. Hallway m² 311.50 1,424.40 2,480.63

Page 2 / 09000 / 26 of 26
II Provide all cost of materials & labor including
supervision and other incidentals necessary
to complete the work as per plan and
specifications .

II. EXTERIOR FINISHES

09600 WALL FINISHES

1.0 100 mm x 100mm Horizontal concrete ledge on


textured acrytex paint finish, roller applied, prime
putted with least three coats of finishing paint
(submit color sample for Architect's / Owner
approval).

1.1 Ground Floor to 8th floor Lm 170.20

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 75 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Page 2 / 09000 / 26 of 26
II Provide all cost of materials & labor including
supervision and other incidentals necessary
to complete the work as per plan and
specifications .

II. EXTERIOR FINISHES

09600 WALL FINISHES

1.0 PLASTERED PLAIN CEMENT Wall FINISHED

a. Front sideElevation m² 1,161.00 561.10 168.33

b. Right Side Elevation m² 572.00 561.10 168.33

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 76 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

c. Left Side Elevation m² 572.00 561.10 168.33

d. Rear Side Elevation m² 1,161.00 561.10 168.33

2.0 100mm x 100 mm Concrete Window Framing on


textured acrytex paint finish, roller applied, prime
putted with least three coats of finishing paint
(submit color sample for Architect's / Owner

5.1 Ground Floor

a.1 2 - Bedroom Unit (4 Units) Lm 70.04 561.10 168.33

b.1 1- Bedroom unit (12 Units) Lm 17.64 561.10 168.33

5.2 Second Floor


a.1 2 - Bedroom Unit (4 Units) Lm 70.04 561.10 168.33

b.1 1- Bedroom unit (12 Units) Lm 19.85 561.10 168.33

5.3 Typical 3rd - 8th Floor

a.1 2 - Bedroom Unit (4 Units) Lm 70.04 561.10 168.33

b.1 1- Bedroom unit (12 Units) Lm 19.85 561.10 168.33

Page 2 / 09000 / 26 of 26

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 77 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

II Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

II. EXTERIOR FINISHES

09600 WALL FINISHES

6.0 350 mm x 100mm Concrte Ledge for AC on


textured acrytex paint finish, roller applied, prime
putted with least three coats of finishing paint
(submit color sample for Architect's / Owner
approval).

6.1 Ground Floor

a.1 2 - Bedroom Unit (4 Units) sq.m. 7.89 920.00 276.00

b.1 1- Bedroom unit (12 Units) sq.m. 14.49 920.00 276.00

6.2 Second Floor


a.1
2 - Bedroom Unit (4 Units) sq.m. 17.09 920.00 276.00
b.1
1- Bedroom unit (12 Units) sq.m. 3.69 920.00 276.00

6.3 Typical 3rd - 8th Floor

a.1 2 - Bedroom Unit (4 Units) sq.m. 82.89 920.00 276.00

b.1 1- Bedroom unit (12 Units) sq.m. 18.29 920.00 276.00

7.0 25 mm x 25 mm Grove ln.m. 1,621.76 50.00 15.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 78 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

Page 2 / 09000 / 26 of 26
II Provide all cost of materials & labor including
supervision and other incidentals necessary
to complete the work as per plan and
specifications .

II. EXTERIOR FINISHES

09600 WALL FINISHES

7.0 textured acrytex paint finish, roller applied, prime


putted with least three coats of finishing paint
(submit color sample for Architect's / Owner
approval).

7.1 Ground Floor

a.1 2 - Bedroom Unit (4 Units) sq.m. 249.30 420.00 126.00

b.1 1- Bedroom unit (12 Units) sq.m. 81.92 420.00 126.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 79 of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 09000 - Finishes

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material
Labor & Other
Cost

7.2 Second Floor

a.1 2 - Bedroom Unit (4 Units) sq.m. 249.30 420.00 126.00

b.1 1- Bedroom unit (12 Units) sq.m. 81.92 420.00 126.00

7.3 Typical 3rd - 8th Floor

a.1 2 - Bedroom Unit (4 Units) sq.m. 1,495.80 420.00 126.00

b.1 1- Bedroom unit (12 Units) sq.m. 491.52 420.00 126.00

Page 2 / 09000 / 26 of 26
Page 2 / 09000 / 26 of 26 TO SUMMARY (Painting Works)

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 80 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

387.89 53,140.52
387.89 47,710.47

387.89 18,890.24
387.89 8,649.95

387.89 12,839.16

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 81 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

141,230.34

387.89 57,446.51
387.89 50,037.81

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 82 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

387.89 13,653.73

387.89 12,373.69

387.89 82,155.10
387.89 224,821.04

440,487.88

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 83 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

387.89 346,540.93
387.89 306,045.21

387.89 70,983.87

387.89 3,840.11

387.89 1,280.04

387.89 1,318.83

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 84 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

730,008.98

769.57 24,010.43

769.57 9,234.78

769.57 25,164.78

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 85 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

769.57 6,618.26

769.57 40,171.29

769.57 153,759.09

258,958.62

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 86 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

769.57 11,004.78

769.57 56,886.24

769.57 9,768.86

769.57 56,886.24

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 87 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

134,546.13

671.00 289,335.20
671.00 128,429.40
671.00 96,301.92

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 88 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

671.00 89,860.32

671.00 116,619.80
671.00 69,381.40
671.00 35,267.76

671.00 33,214.50

858,410.30

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 89 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

671.00 314,028.00
671.00 407,981.42
671.00 52,036.05
671.00 94,329.18

1,675.40 245,781.18

671.00 86,907.92
671.00 52,036.05
1,675.40 64,234.84

671.00 33,214.50

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 90 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

1,350,549.14

671.00 1,753,725.60
671.00 1,400,323.32
671.00 1,047,363.90

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 91 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

671.00 876,862.80

1,424.40 1,671,675.84

671.00 524,789.10
671.00 312,216.30

1,424.40 507,656.16

671.00 199,287.00

671.00 32,972.94
671.00 13,084.50
671.00 13,084.50

8,353,041.96

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 92 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

3,905.03 609,184.10

3,905.03 192,127.29

3,905.03 670,102.51

3,905.03 144,095.47

3,905.03 4,020,615.09

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 93 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

3,905.03 864,572.83
6,500,697.30

3,905.03 128,865.87

3,905.03 46,860.32

3,905.03 141,752.46

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 94 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

3,905.03 35,145.24

3,905.03 850,514.73

3,905.03 210,871.42
1,414,010.03

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 95 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

1,493.82 182,245.91

1,493.83 31,669.13

1,493.83 200,471.56

1,493.83 23,751.85

1,493.83 1,202,829.34

1,493.83 411,399.90
2,052,367.68

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 96 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

582.23 25,990.75

582.23 23,196.04

582.23 124,923.27

3,905.03 41,783.78

3,905.03 194,860.81

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 97 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

3,905.03 82,786.56

3,905.03 1,216,415.70

1,709,956.91

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 98 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

729.43 846,868.23

729.43 417,233.96

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 99 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

729.43 417,233.96

729.43 846,868.23

729.43 51,085.63

729.43 12,867.15

729.43 51,085.63

729.43 14,475.54

729.43 51,085.63

729.43 14,475.54

2,723,279.49

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 100 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

1,196.00 9,430.46

1,196.00 17,324.06

1,196.00 20,433.66

1,196.00 4,407.26

1,196.00 99,130.46

1,196.00 21,868.86

65.00 105,414.40

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 101 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

278,009.16

546.00 136,117.80

546.00 44,728.32

ATMCI-F-CTL-02/02e Revision 01
ILL OF QUANTITIES
CONSTRUCTION AND TRADE WORKS
CHITECTURAL WORKS)
Page 102 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

546.00 136,117.80

546.00 44,728.32

546.00 816,706.80

546.00 268,369.92

1,446,768.96

28,392,322.87

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 103 of 140
Project : MR VALENZUELA BUILDING 3

Location : Maysan Road Corner I, Miranda Street, Valenzuela City

Section 2 MAIN WORKS


Bill No. 09900 - Painting Date: 01 Se

CODE QTY UNIT COST


UNIT
NO. DESCRIPTION Material Labor & Total
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

1.0 100mm High Basepaint

a. Ground Floor

a.1 2 - Bedroom Unit (10 Units) lm. 200.70 42.00 12.60 54.60
a.2 1- Bedroom Unit (4 Units) lm. 37.90 42.00 12.60 54.60
a.3 Living Room lm. 219.70 42.00 12.60 54.60

b. Second Floor

b.1 2 - Bedroom Unit (11 Units) lm. 218.90 42.00 12.60 54.60
b.2 1- Bedroom Unit (3 Units) lm. 28.40 42.00 12.60 54.60
b.3 Living Room lm. 226.70 42.00 12.60 54.60

c. Typical - 3rd to 8th floor

c.1 2 - Bedroom Unit (66 Units) lm. 1315.8 42.00 12.60 54.60
c.2 1- Bedroom Unit (18 Units) lm. 170.4 42.00 12.60 54.60
c.3 Living Room lm. 1383 42.00 12.60 54.60

ATMCI-F-CTL-02/02e Revision 01
Page 104 of 140

Page 2 / 06000 / 1 of 1
Page 2 / 09000 / 26 of 26 TO SUMMARY (Painting Works)

ATMCI-F-CTL-02/02e Revision 01
L OF QUANTITIES
NSTRUCTION AND TRADE WORKS
TECTURAL WORKS)
Page 105 of 140

Date: 01 September 2015

TOTAL
AMOUNT

10,958.22
2,069.34
11,995.62

11,951.94
1,550.64
12,377.82

71,842.68
9,303.84
75,511.80

ATMCI-F-CTL-02/02e Revision 01
Page 106 of 140

207,561.90

207,561.90

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 107of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 10000 - SPECIALTIES

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

10000 SPECIALTIES

1.0 Bedroom Cabinets

1.1 19mm thk Base Cabinet on Medium Density


Fiber Board w/ Laminated Finish
(1400mm x 650mm)

a. Ground Floor

a.1 2 - Bedroom Unit (3 Unit) sets 20.00 35,400.00


a.2 1 - Bedroom Unit (2 Units) sets 1.00 35,400.00

b. Second Floor

b.1 2 - Bedroom Unit (3 Unit) sets 22.00 35,400.00


b.2 1 - Bedroom Unit (2 Units) sets 3.00 35,400.00

c. Typical 3nd-8th Floor

c.1 2 - Bedroom Unit (3 Unit) sets 22.00 35,400.00


c.2 1 - Bedroom Unit (2 Units) sets 3.00 35,400.00

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 108of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 10000 - SPECIALTIES

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 10000 / 1 of 4

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

10000 SPECIALTIES

1.0 Kitchen Cabinets / Accessories (with 5% Attendance Fee)

1.1 19mm thk Base Cabinet on Medium Density


Fiber Board w/ Laminated Finish
(1400mm x 650mm)

a. Ground Floor

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 109of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 10000 - SPECIALTIES

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
a.1 2 - Bedroom Unit (3 Unit) sets 10.00 35,400.00
a.2 1 - Bedroom Unit (2 Units) sets 1.00 35,400.00

b. Second Floor

b.1 2 - Bedroom Unit (3 Unit) sets 11.00 35,400.00


b.2 1 - Bedroom Unit (2 Units) sets 3.00 35,400.00

c. Typical 3nd-8th Floor

c.1 2 - Bedroom Unit (3 Unit) sets 11.00 35,400.00


c.2 1 - Bedroom Unit (2 Units) sets 3.00 35,400.00

Page 2 / 10000 / 1 of 4

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 110of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 10000 - SPECIALTIES

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
Provide all cost of materials & labor including
supervision and other incidentals necessary
to complete the work as per plan and
specifications .

10000 SPECIALTIES

2.0 Kitchen Countertop

2.1 Synthetic Granite Countertop w/ Splashboard

b. Ground Floor

a.1 2 - Bedroom Unit (3 Units)

Counter top = 600mm x 1600mm m² 9.01 1,424.00 894.00


Splashboard = 100mm x 1600mm m² 6.01 1,424.00 894.00

b.2 1 - Bedroom Unit (2 Units)

Counter top = 600mm x 1600mm m² 2.90 1,424.00 894.00


Splashboard = 100mm x 1600mm m² 1.93 1,424.00 894.00

b. Second Floor

b.1 2 - Bedroom Unit (3 Units)

Counter top = 600mm x 1600mm m² 10.14 1,424.00 894.00


Splashboard = 100mm x 1600mm m² 6.76 1,424.00 894.00

b.2 1 - Bedroom Unit (2 Units)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 111of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 10000 - SPECIALTIES

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
Counter top = 600mm x 1600mm m² 2.21 1,424.00 894.00
Splashboard = 100mm x 1600mm m² 1.47 1,424.00 894.00

c. Typical 3rd to 8th Floor

c.1 2 - Bedroom Unit (4 Units)

Counter top = 600mm x 1600mm m² 10.14 1,424.00 894.00


Splashboard = 100mm x 1600mm m² 6.76 1,424.00 894.00

c.2 1 - Bedroom Unit (2 Units)

Counter top = 600mm x 1600mm m² 1.47 1,424.00 894.00


Splashboard = 100mm x 1600mm m² 2.21 1,424.00 894.00

Page 2 / 10000 / 2 of 4

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 112of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 10000 - SPECIALTIES

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
Provide all cost of materials & labor including
supervision and other incidentals necessary
to complete the work as per plan and
specifications .

10000 SPECIALTIES

3.0 500mm x 800 mm x 6mm thk. Facial Mirror pcs. 112.00 1,200.00 696.00

6.0 Others (Pls. Specify)

ATMCI-F-CTL-02/02e Revision 01
BILL OF QUANTITIES
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Page 113of 140
Project : MR VALENZUELA BUILDING 3
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 10000 - SPECIALTIES

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

TO SUMMARY (Specialties)
Page 2 / 10000 / 4 of 4
Page 2 / 09000 / 26 of 26 TO SUMMARY (Specialty Works)

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 114of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

35,400.00 708,000.00
35,400.00 35,400.00

35,400.00 778,800.00
35,400.00 106,200.00

35,400.00 778,800.00
35,400.00 106,200.00

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 115of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

2,513,400.00

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 116of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

35,400.00 354,000.00
35,400.00 35,400.00

35,400.00 389,400.00
35,400.00 106,200.00

35,400.00 389,400.00
35,400.00 106,200.00

1,380,600.00

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 117of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

2,318.00 20,882.86
2,318.00 13,921.91

2,318.00 6,717.56
2,318.00 4,478.38

2,318.00 23,511.47
2,318.00 15,674.32

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 118of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

2,318.00 5,111.19
2,318.00 3,407.46

2,318.00 23,511.47
2,318.00 15,674.32

2,318.00 3,407.46
2,318.00 5,111.19

141,409.59

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 119of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

1,896.00 212,352.00

ATMCI-F-CTL-02/02e Revision 01
LL OF QUANTITIES
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 120of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

3,256,371.18

4,778,380.77

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 121 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08110 Aluminum Glass Doors , Windows & Frames

1.0 Double Swing Door Type - 10 mm Thk tempered


Glass on Aluminum Powder Coated FD100 Section
(Submit Sample for Architects Approval)

Mark : D-4
Type: Swing Door
Dimensions:
Door : 1.80m x 2.15m
Location:
• Main Lobby Entry Door set 1.00

2.0 8mm Thk. Annealed glass


Sliding window on Aluminum
powdered white coated finish.
(submit sample for Architect Approval)

Mark : W-#
Type: Sliding window
Dimensions:

Window w-1 1.10m x 1.20m set 28.00


Window w-2 1.10m x 1.00m set 8.00
Window w-3 .60m x .60m set 4.00
Location:
• Ground floor

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 122 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 123 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08110 Aluminum Glass Doors , Windows & Frames

3.0 8mm Thk. Annealed glass


Sliding window on Aluminum
powdered white coated finish.
(submit sample for Architect Approval)

Mark : W-#
Type: Sliding window
Dimensions:

w-1 1.10m x 1.20m set 28.00


w-2 1.10m x 1.00m set 9.00
Location:
• Second floor

8mm Thk. Annealed glass awning window


on aluminum powdered white coated finish

Mark : Window
Type: awning window
Dimensions:

w-3 .60m x .60m set 4.00


Location:
• Second floor

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 124 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08110 Aluminum Glass Doors , Windows & Frames

3.0 8mm Thk. Annealed glass


Sliding window on Aluminum
powdered white coated finish.
(submit sample for Architect Approval)

Mark : W-#
Type: Sliding window
Dimensions:
w-1 1.10m x 1.20m set 168.00
w-2 1.10m x 1.00m set 54.00

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 125 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
w-4 .40m x 1.50m set 12.00
Location:
• 3rd floor to 8th floor

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 126 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

08210 WOOD DOORS & JAMBS

1.0 45mm Thk. Single Swing Panel Door w/ Tanguile


K.D Jamb (50mm x 100mm) w/ 6mm Grooves in
Paper Laminate Finish

Mark : D -1
Type: Swing Panel Door
Dimensions:

Door .90m x 2.10m set 112.00

Location:
• Ground Floor to 8th floor
(unit entry rooms)

2.0 45mm Thk. Single Swing Hollow Core Flush


Door w/ 6mm Groove Cut w/ Tanguile K.D.
Jamb (75mm x 150mm) on HP Laminate Finish

Mark : D -2
Type: Swing Hollow Core Flush Door
Dimensions:
Door .80m x 2.10m set 199.00
Location:
• Ground Floor to 8th floor
(unit entry rooms)

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 127 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

08210 WOOD DOORS & JAMBS

3.0 50 mm Thk. Single Swing PVC Door


with Louver on Rabbeted PVC Jamb
(submit sample for Architect Approval)

Mark : D -3
Type: Single Swing PVC Door
Dimensions:
Door .60m x 2.10m set 112.00
Location:
• Ground Floor to 8th floor
(unit entry rooms)

4.0 10 mm Thk. Double Leaf Tempered Glass


Door on powder coated FD100 frame
(submit sample for Architect Approval)

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 128 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
Mark : D-4
Type: Swing Hollow Core Flush Door
Dimensions:
Door 1.00m x 2.10m set 1.00
Location:
• Ground Floor (main entry)

Page 2 / 08000 / 1 of 8

Provide all cost of materials & labor including


supervision and other incidentals necessary
to complete the work as per plan and
specifications .

08100 DOORS & WINDOW FRAMES

8310 STEEL DOORS & JAMBS

3.0 G.A. #18 Mild Steel Door W/ 2 Hrs Fire rating

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 129 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost
on G.A. #14 Tubular frame single rabbet jamb
& header; provide epoxy primer on lacquer paint
finish w/ passage panic device
(submit sample for Architect Approval)
Mark : D -5
Type: Single Swing mild steel Door
Dimensions:
Door .60m x 2.10m set 20.00
Location:
• Ground Floor to 8th floor (fire exit)
4.0 Single swing G.A. #18 mild steel door w/ louver
on G.A. #14 tubular frame w/ single rabbet jamb
& header on epoxy lacquer paint finish
(submit sample for Architect Approval)

Mark : D -6
Type: Swing Hollow Core Flush Door
Dimensions:
Door 1.00m x 2.10m set 10.00
Location:
• Second Floor to roof deck

ATMCI-F-CTL-02/02e Revision 01
FOR QUOTATION
(CP-01) GENERAL CONSTRUCTION AND TRADE WORKS
(ARCHITECTURAL WORKS)
Project : MR VALENZUELA BUILDING 3
Page 130 of 140
Location : Maysan Road Corner I, Miranda Street, Valenzuela City
Section No. MAIN WORKS
Bill No. 08000 - Doors & Frames

CODE UNIT COST


QTY
NO. DESCRIPTION UNIT Material Labor &
Other Cost

Page 2 / 08000 / 1 of 8
Page 2 / 09000 / 26 of 26 TO SUMMARY (Doors & Windows)

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 131 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

- -
- -
- -

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 132 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 133 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

- -
- -

- -

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 134 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

- -
- -

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 135 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

- -

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 136 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 137 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 138 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 139 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

ATMCI-F-CTL-02/02e Revision 01
OR QUOTATION
ONSTRUCTION AND TRADE WORKS
HITECTURAL WORKS)
Page 140 of 140

Date: 01 September 2015

TOTAL
Total AMOUNT

ATMCI-F-CTL-02/02e Revision 01