Date Task Asignee

Demo & Documentation Timeline

Dry Run With Pradeep, Eko, Keshav, Keshav


23th June Rana, Nirbhay, Stanley Giria
PPT, Demo System set up, System dry Keshav
25th June run Giria
Keshav
26th June Demo with Carvil Team Giria

Localization of Software (in Bhasa Keshav


27th June Language) Giria

Keshav
28th June Localization+ Training Material Giria
Keshav
29th June Localization+ Training Material Giria

Keshav
30-Jun Localization+ Training Material Giria
Date Task Asignee
Deployment Timeline

Local Deployment Rehearsal at


25-Jun Rana
Delhi

26-Jun Testing Rana, Vipin, Rahul

27-Jun Testing Rana, Vipin, Rahul

Cloud Server Setup &


28-Jun Load codes on Cloud Server in Rana, Vipin, Rahul
Day time @ Delhi

29-Jun Rana Arrive at Jakarta

29-Jun External Sync Setup Rana & Jatin Rana will connect through
Remote
Super Admin Testing with Sync on
Cloud Server
30th June Environment Creation & Resource Rana & Keshav
Gathering for Deployment at
Store
2nd Jul Deployment at Store Rana & Keshav
3rd Jul Deployment at Store Rana & Keshav
4th Jul Deployment at Store Rana & Keshav
5th Jul Communication & System Testing Rana & Keshav

6th Jul Communication & System Testing Rana & Keshav


6 Hours(Keshav+ Rana) will Setup in Delhi if
Installation of Super Admin + Data Migration cloude server received before 27 Junr
Store Admin:Per Store Deployement
TASK HOURS ELAPSED
Installation of SQL server + Configuration
firewall instalation + configuration 2 Hrs
IIS server Installation + Configuration
Internal Communications between Store Admin and POS 1 Hour(Rana)
System setup 1 Hour(Keshav)
System Test 1 Hour(Keshav)
Communication Test 1 Hour(Keshav)
Depend on System
Confuguration & Internet
Cloud Server with following Configuration
For Central Cloud Server

8gb ram
3GHz processor (4 cores)
500GB storage
Windows Hosting, IIS (Latest Version), Code guard, Site
Lock and SSL.

Store Server: The Store Server required for execution of the


proposed System with following configuration.
(Only in case of multiple billing counters at the store)

Intel i5 CPU Octacore


8 GB memory
1 TB storage
SSD (May Be Required at Later Stage as if Execution Speed will
be Down)
Unmetered SQL Server Database
.Net Framework 4.0/4.5
IIS 7.0 or Latest
Firewall
Intranet/Internet Accessibility
Unmetered bandwidth

Store POS Terminal (For single billing counter): The Store


Terminal required for execution of the proposed System (For
Multiple Billing Counter)

Intel i3 CPU Quadcore


4 GB memory
500 GB storage
SQL Server Database
.Net Framework 4.0/4.5
IIS 7.0 or Latest
Firewall
Unmetered bandwidth