Sei sulla pagina 1di 5

HXsteel International Engineering W.l.

Work Diary Report


Date July 24,2012 Tuesday Weather Fair, Hot humid

Site Proposed GDI headquarters Office


Description of Overall Work Progress

Work in Progress
Description of Work Done Today
-Fabrication of forms works for foundation of footing slabs and installation
-Fabrication and installation of rebars at foundation footing slabs and Pedestals

Obstruction None
(存在问题)
Summary of Resources (资源汇总)
No of labor(工人人数) 1-project engineer,1-site supervisor,1 - Driver
Worker : 1.Dev Narayan 2.Sat Nerayan 3.Kishori Yadav 4.Ram Kumar
5.Kahmud Mandal 6.BJ Mochi
List of Tools (工具清单) 1 unit- Plate compactor ,1 unit- Bar cutter machine, 1 unit- wood cutter
machine, 4- knipex, 2- shovel , 1- wheel borrow, 1 –Fabricated wooden
box, 1 roll- extension wire
Material / Consumable Petrol ,plywood, wooden, re- bars
Work in detailed Progress -Fabrication of forms works for foundation of footing slabs and
installation -- completed , installation 60 %
-Fabrication and installation of rebars at foundation footing slabs and
Pedestals -- completed – installation 40%
Work Planned for Next Day :
-Installation of formworks for footing slabs at inside location final fixing and bracings
-Installation of reinforcing bars for footing slabs and pedestal final fixing location

Planning of Resources (资源计划)


No of labor(工人人数) 1-project engineer,1-site supervisor,1- Driver
Worker : 1.Dev Narayan 2.Sat Nerayan 3.Kishori Yadav 4.Ram
Kumar 5.Kahmud Mandal 6.BJ Mochi
List of Tools (工具清单) 1 unit- Plate compactor ,1 unit- Bar cutter machine, 1 unit-
wood cutter machine, 4- knipex, 2- shovel , 1- wheel borrow, 1
–Fabricated wooden box, 1 roll- extension wire
PPE (劳保用品) Hard hat, safety shoes, gloves, safety goggles ,
Material / Consumable (材料消耗) Petrol,plywood, wooden,Rebars
Site Alexander D. Orongan Recorded by : Alexander D. Orongan