Sei sulla pagina 1di 4

ASSESMENT SHEET

STQA Lab - I (CS 45141)


Class & Semester: Final Year B. Tech (CSE), Sem – VIII
Batch: --------------- Academic Year: 2018 – 2019

Phase – I ( Each Experiment: 10 Marks: 1 or 4-Poor, 5-Average, 8- Good, 10- Excellent)

To study Review system Create a test Install and


basics of specification for any plan generate test case
Software given system (e.g. document for
using Selenium.
testing and ATM System) and any
design test report the various application  Install
case any bugs. (e.g. Library Selenium IDE
in Firefox Team
known Management work and
application. System)  Study IDE
Features Active Total Date of
PRN  Use your Participati (Out of 50) Submis Sign
unique base on sion
url i.e. website
 Develop test
cases using all
possible
methods

Date: - Date: - Date: - Date: -

Head of Department Subject In-Charge Student Signature


Phase – II ( Each Experiment : 10 Marks: 1 or 4-Poor, 5-Average, 8- Good, 10- Excellent)

a) Write and Demonstrate Performance Testing Perform Cross Team work Total Date of Sign
test a Selenium: WebDriver using JMeter Browser Testing and Active (Out of Submis
program to  Demonstrate Do the Performance  Perform Cross Participatio 50) sion
update 10 different Browser Testing n
Testing for
student browsers (ie, on
records into firefox, chrome, www.gmail.com and https://www.quo
table into safari) www.ritindia.edu ra.com and find at
Excel file.  Perform different using Jmeter. least 10 defects
actions(resize, 1. simulate traffic and report the
b) Write and forward, 2. Generate load from defects in defect
test a backward, up to 10 different tracking format
program to refresh, close, (Bugzilla).
locations
select the quit etc)
number of  Run different test simultaneously
PRN students who cases using 3. collect back end
have scored different base information from the
more than 60 URLs system being tested,
in any one such as:
subject  CPU usage
( or all
 Memory usage
subjects ).
 Disk I/O
 Network I/O
4. Graph of the
Performance
5. Any Other suitable
information
Date: - Date: - Date: - Date: -

Head of Department Subject In-Charge Student Signature


Phase – III ( Each Experiment : 10 Marks: 1 or 4-Poor, 5-Average, 8- Good, 10- Excellent)

Demonstrate Demonstrate the test Demonstrate Revision Team work


the bug management tool (e.g. Mobile testing tool and Active
tracking tool Test Director, Testuff ) and generate test Participation
(e.g. Bugzilla, cases. Total
(Out of 50) Date of
PRN bugbit) Sign
Submission

Date: - Date: - Date: - Date: -

Head of Department Subject In-Charge Student Signature


Sr. No Experiment Assessment Metric s Evaluation Method

1 Excellent  Problem Statement implemented Successfully


 Understood concept and problem clear in manner
 Given answer based on best of his knowledge
 Teamwork and Active Participation
2 Good  Problem Statement implemented Successfully
 Concept and problem understood satisfactory manner
 Given Answer of his knowledge
 Teamwork and Active Participation
3 Average  Problem Statement partially implemented Successfully
 Understood Concept and problem somewhat level
 Ideal during Question- Answer of his knowledge
 Teamwork and Active Participation
4. Poor  Problem Statement Not implemented
 Not Understood concept and problem
 Not given answer
 No Active Participation

Head of Department Subject In-Charge Student Signature

Potrebbero piacerti anche