Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Installation Guide
18-1140-46
18114046ac.book Page 2 Monday, June 23, 2003 6:10 PM
18114046ac.book Page 3 Monday, June 23, 2003 6:10 PM
WARNING! www.amershambiosciences.com
This is a Class A product. In a domestic environment, it © Copyright Amersham Biosciences AB 2003
may cause radio interference, in which case the user - All rights reserved
may be required to take suitable measures.
Amersham Biosciences AB
SE–751 84 Uppsala
Sweden
18114046ac.book Page 4 Monday, June 23, 2003 6:10 PM
18114046ac.book Page 5 Monday, June 23, 2003 6:10 PM
Contents
Contents
1 About this installation guide .......................... 7
2 Safety .......................................................... 8
3 Pre-requisites ............................................. 10
Contents
2 Safety
2 Safety
• The system is designed for indoor use only.
Safety 2
3 Pre-requisites
3 Pre-requisites
Installation overview 4
4 Installation overview
• Unpack ÄKTAFPLC .................................................................12
5 Installation of ÄKTAFPLC
5 Installation of ÄKTAFPLC
Begin by creating a clean and dry working area of 200 x 80 cm that
allows easy access. Then follow the step-by-step instructions below and
fill in the Installation record as you go along, see page 25.
Note: Some items are packed in separate boxes delivered with the
system.
Installation of ÄKTAFPLC 5
yy
;;
;;
yy ;
y;;
yy
;
y
6 Remove the plastic Grasp here
cover from the
system by gently
;;y;yy
yy ;;
;;
yy
;
y
tilting the system 0.6 ml
backwards and
grasping it below the
system rack. Pull out
;;
yy ;;
yy
50
0
µl
yy
;;
forwards grasping it
at the top rear and
pull away the plastic
cover completely.
yy
;;
the equipment has to
be re-packed, for transportation or otherwise, it is important that
the system can be safely packed using the original packing material.
;;
yy;
y;;
yy
;
y
8 Open the system Plastic foam
rack by lifting the
gate handle and
swinging out.
;;
yy;;
yy
;
y;;
yy
;
y
0.6 ml
;;
yy;;
yy
10 Close the system
50
0
µl
rack.
;;
yy
Gate handle
Lift and swing out
5 Installation of ÄKTAFPLC
;yy;yy
;;
yy
;
y
11 Turn the system so Plastic foam Injection valve Mixer
that the component
side is facing you.
;;
;;
yy
;
y
12 Lift the optical unit 0.6 ml
;;
yy
13 Cut and remove the 50
0
µl
pushing them
sideways in their
mounting rails.
50
0
µl
Installation of ÄKTAFPLC 5
Lamp
To UPC-900
21 Unpack and install
100-200 V- 50-60 Hz 30 VA
Pressure
Analogue out 0-1 V
UniNet 2
equipment
them to the left of the
system. Do not
Mains
To fraction collector
5 Installation of ÄKTAFPLC
Conductivity
Optical Analogue
UniNet 1
To PC controller board
Unit out 0-1 V
Flow Cell
pH-GroundpH-Probe
Mains
Lamp
Pressure
Analogue out 0-1 V
Remote
UniNet 2
UniNet-2 chain
UniNet 1
Mains output
Four LEDs
To fraction
collector Voltage Frequency Power, max Fuse
Mains
UniNet-1 chain
24 Connect the system mains cable from the mains inlet to a properly
grounded mains socket.
Installation test 6
6 Installation test
The installation test checks the function of the liquid delivery and the
UV monitoring system of ÄKTAFPLC. The installation test can also be
used at any time to check the condition of the system, e.g., after a
prolonged stop.
6 Installation test
Method Guide
Buffer A: Distilled water (200 ml)
Buffer B: 0.4% acetone in distilled water (200 ml)
Flow rate: 5 ml/min.
Test run time: Approximately 25 minutes
Installation test 6
3 Click the Instant Run button . The Instant Run window opens.
6 Installation test
7 Click START in the Result Name window to start the installation test.
Installation test 6
• UV
• Conc
11 When the test run is finished, the printer automatically prints the
chromatogram and the test result.
100%
95%
70%
30%
5% 0%
Gradient
result Step response result
6 Installation test
If any of the evaluated values fall outside the specified range, go to step
6.4 Correcting faulty evaluation results.
The curve should be linear between 10% B and 90% B and void of
discontinuities.
Installation test 6
1 Subtract the base line value (0% B) from each of the values in
column 2 in the Step response table of the Test record (see page 24)
and enter the results in column 3.
The values of column 4 should all fall within the intervals given in
column 5.
7 Test record
7 Test record
Date: ..........................................................................
1 2 3 4 5
Programmed Value Baseline Normalised Allowed
Conc.%B read corrected value interval
value
100
95 94 - 96
70 69 - 71
30 29 - 31
5 4- 6
0
Installation record 8
8 Installation record
Check Sign Remarks
1 Unpacking
• No visible damage.
2 Installation
3 Installation test
• Solutions prepared.
• ÄKTAFPLC prepared.
8 Installation record
Registration form 9
✂
9 Registration form
IMPORTANT!
WARRANTY REGISTRATION INFORMATION
Please ensure that this form is completed and returned to Service Administration
to register the users' equipment under warranty.
Name: ...............................................................................................................................
Institute/company: ..........................................................................................................
Address: ...........................................................................................................................
Department/location: ......................................................................................................
Signature of Installer:...........................................................................
Installation Accepted:......................................Date:............................
9 Registration form
9.1 Components
ÄKTAFPLC system serial numbers: .....................................................
Mixer M-925
Monitor UPC-900
Pump P-920
Fraction collector
INV-907
Computer
Computer display
Registration form 9
9 Registration form