Senior : Susan N. Paner (SNP) Duration : May 2015 to ---
Date Details of Revision
Revision No. 0.0 4/28/2015 Start of Modelling of Structure 1.0 5/1/2015 Updated Archi Drawing based from Data given by Thermax 2.0 5/9/2015 Intermediate Beams were inserted per level on the Model 3.0 5/13/2015 Updated model as per AD 3.1 5/18/2015 Updated model as per AD 4.0 5/20/2015 Control room was incorporated on the model 5.0 5/22/2015 Changes in loadings of the structure are applied 5.1 5/23/2015 Wind load in Control Room was computed and applied separately 6.0 5/27/2015 Pedestal and FTB was inserted on the model 6.1 5/28/2015 Col. Sizes for both models satisfied all criteria 6.2 5/29/2015 Reduction on Ratio of Steel Design and Reapplication of loading Redefine the effective length of columns and rotated the column at 7.0 6/1/2015 the back 7.1 6/2/2015 Reapply loadings on roof deck using 2-way slab tributary areas Additional column was added on the model. Reapplication of 8.0 6/3/2015 loadings are necessarry. 9.0 6/10/2015 Structures was remodeled Additional beam between grid D & E was modeled on the structure 10.0 6/18/2015 and was loaded based from the forces provided by THERMAX. (PZ ZXW1 DF02-1). References Remarks AD-A1-1/04-29-15 Inactive Legend: AD-A1-1/04-30-15 Inactive AD Archi Drawing Inactive AD-A1-1/05-11-15 Inactive AD-A1-1/05-18-15 Inactive As per SNP Inactive As per SNP Inactive Inactive As per SNP Inactive Inactive As per SNP Inactive As per SNP Inactive As per SNP Inactive As per SNP Inactive As per SNP Inactive