Arabian Fal Holding Prepared Date : 3-Nov-16

APPROVAL TO RECEIVE THE RPO Location : ABQAIQ

Contract # 6600026589 Start Date 6/4/2011 Extended 6 Month

End Date 10/13/2016

Proponent Name RPO / PR 3000693645


Badge No. Actual Start Date 12/18/2016

Contact Number Actual End Date 12/31/2016


No. of RPO Start Date RPO End Date RPO DETAILS
Sl No. Cost Center Category Manpower Remarks
Required No. of Days Item Hours Daily Working Hours

1 AT-26589 Cs Welders 10 December 18, 2016 December 31, 2016 13 1560 12

2 AT-26589 SS Welders 4 December 18, 2016 December 31, 2016 13 624 12

3 AT-26589 Fabricator 6 December 18, 2016 December 31, 2016 13 936 12

4 AT-26589 Blaster 8 December 18, 2016 December 31, 2016 13 1248 12

5 AT-26589 Painter 8 December 18, 2016 December 31, 2016 13 1248 12

6 AT-26589 Pipe fitter 40 December 18, 2016 December 31, 2016 13 6240 12

Reviewed By : Approved by

Asst. to ED - TUR Operations Executive Director

Manpower : To mobilize manpower


Payroll : To issue the Timesheet
Note to : PM
- Do not supply the Manpower to an Expired RPO with out Managemen
- Do not exceed the RPO Hours / Quantity
- Do not supply the Manpower to an Expired RPO with out Management approval
Arabian Fal Holding Prepared Date :
Location :
Start Date 6/4/2011 Extended 6 Month

Contract # 6600026589 End Date 10/13/2016

RPO Acceptacne Request

Manpower & Equipment Requirement Analysis Proponent Name


Badge No.
Contact Number
No. of Manpower / RPO DETAILS
Sl No. Cost Center Category Equipment RPO Start Date RPO End Date Daily Working
No. of Days Item Hours
Required Hours
1 AT-26589 Cs Welders 10 December 18, 2016 December 31, 2016 13 1560 12

2 AT-26589 SS Welders 4 December 18, 2016 December 31, 2016 13 624 12

3 AT-26589 Fabricator 6 December 18, 2016 December 31, 2016 13 936 12

4 AT-26589 Blaster 8 December 18, 2016 December 31, 2016 13 1248 12

5 AT-26589 Painter 8 December 18, 2016 December 31, 2016 13 1248 12

6 AT-26589 Pipe fitter 40 December 18, 2016 December 31, 2016 13 6240 12

TOTAL
Reviewed By : Verified by

Project Incharge Area Incharge


epared Date : 3-Nov-16
cation : ABQAIQ

RPO / PR 3000693645
Actual Start Date 12/18/2016
Actual End Date 12/31/2016
RPO DETAILS
Cost Remarks
U. Rate Total

21.00 32,760.00 32,760.00


35.00 21,840.00 13,104.00
21.00 19,656.00 15,912.00
17.50 21,840.00 6,240.00
18.00 22,464.00 22,464.00
22.00 137,280.00 106,080.00

255,840.00 196,560.00 59,280.000