Sei sulla pagina 1di 12

PRESUPUESTO

OBRA : MURO DE CONCRETO CICLOPEO


PROPIETARIO : Gobierno Regional de Tacna
FORMULA 01 : MURO DE CONCRETO CICLOPEO
LUGAR : Pachia DEPARTAMENTO : Tacna COSTO AL : 31/03/2016

PRECIO
ITEM DESCRIPCION UND METRADO PARCIAL TOTAL
UNIT

01.01.00 Corte y Excavación M3 29,000.00 6.74 195,460.00


01.02.00 Relleno compactado mat. propio M3 18,600.00 34.29 637,846.08
01.03.00 Concreto Ciclopeo1:8 + 30% PM M3 9,600.00 190.25 1,826,400.00
01.04.00 Encofrado y Desencofrado M2 22,400.00 34.81 779,744.00 3,439,450.08

COSTO DIRECTO 3,439,450.08


Gastos Generales Fijo (2%) 68,789.00
Gastos Generales Variable (13%) 0.200 859,862.52 447,128.51
Utilidad (10%) 343,945.01
Sub Total 4,299,312.60
IGV 773,876.27

Total 5,073,188.87

RELACION DE INSUMOS
IU DESCRIPCION UND CANTIDAD PRECIO PARCIAL
MANO DE OBRA
47 CAPATAZ HH 2,087.04 20.50 42,784.32
47 OPERARIO HH 20,297.84 18.60 377,539.82
47 OFICIAL HH 15,104.00 15.50 234,112.00
47 PEON HH 56,099.38 13.80 774,171.44

MATERIALES
02 CLAVO KG 896.00 4.50 4,032.00
02 Alambre p/encofrar KG 2,240.00 4.50 10,080.00
43 MADERA P2 85,120.00 5.00 425,600.00
21 CEMENTO BLS 36,960.00 18.60 687,456.00
05 PIEDRA MEDIANA M3 4,320.00 30.00 129,600.00
38 HORMIGON M3 8,160.00 40.00 326,400.00
30 AGUA M3 1,632.00 6.00 9,792.00

EQUIPO Y HERRAMIENTAS MANUALES


37 HERRAMIENTAS MANUALES 71,464.00 71,464.00
48 MEZCLADORA HM 3,072.00 20.00 61,440.00
49 Tractor Sobre Oruga HM 580.00 320.00 185,600.00
49 Plancha compact. HM 8,265.84 12.00 99,190.08

TOTAL 3,439,261.66

188.42
96

859,862.52 0.200

INCIDENCIA

0.010
0.088
0.054
1,428,607.58 0.180 0.332 0.332 100%

0.001
0.002 0.003 0.000
0.099 0.099 0.102 100%
0.160 0.160 0.160 59.61%
0.030 0.030 0.268 0.030 11.24%
0.076 0.078 0.078 29.15%
1,592,960.00 0.002 0.000 0.000 0.268 100%

0.017 0.017 0.000


0.014 0.014 0.000
0.043
417,694.08 0.023 0.066 0.097 100%
GGUU 0.200 0.200 0.200 100%
1.000 1.000 1.000
Partida :0 Corte y Excavación
Unidad : M3
Rendimiento : 400.00 M3/DIA P.U. 6.74

I.U. DESCRIPCIÓN UND CUADRILLA CANTIDAD PRECIO PARCIAL SUB TOTAL

MANO DE OBRA

47 CAPATAZ HH 0.10 0.0020 20.5 0.04


47 PEON HH 1.00 0.0200 13.8 0.28 0.32

EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 0.32 0.02
49 Tractor Sobre Oruga HM 1.00 0.0200 320.00 6.40 6.42

Partida :0 Relleno compactado mat. propio


Unidad : M3
Rendimiento : 18.00 M3/DIA P.U. 34.29

I.U. DESCRIPCIÓN UND CUADRILLA CANTIDAD PRECIO PARCIAL SUB TOTAL

MANO DE OBRA
47 CAPATAZ HH 0.10 0.0444 20.5 0.91
47 OPERARIO HH 1.00 0.4444 18.6 8.27
47 PEON HH 3.00 1.3333 13.8 18.40 27.58

MATERIALES
-
- -

EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 27.58 1.38
49 Plancha compact. HM 1.00 0.4444 12.00 5.33 6.71

Partida : Concreto Ciclopeo1:8 + 30% PM


Unidad : M3
Rendimiento : 25.00 M3/DIA P.U. 190.25

I.U. DESCRIPCIÓN UND CUADRILLA CANTIDAD PRECIO PARCIAL SUB TOTAL

MANO DE OBRA

47 CAPATAZ HH 0.10 0.0320 20.5 0.66


47 OPERARIO HH 1.00 0.3200 18.6 5.95
OFICIAL HH 2.00 0.6400 15.5 9.92
47 PEON HH 10.00 3.2000 13.8 44.16 60.69

MATERIALES
05 PIEDRA MEDIANA M3 0.4500 30.00 13.50
05 HORMIGON M3 0.8500 40.00 34.00
21 CEMENTO PORTLAND TIPO I (42.5KG) BOL 3.8500 18.60 71.61
30 AGUA M3 0.1700 6.00 1.02 120.13

EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 60.69 3.03
49 -
48 MEZCLADORA CONCRETO TAMBOR 11P3 -HM 1.00 0.3200 20.00 6.40 9.43

Partida :0 Encofrado y Desencofrado


Unidad M2
Rendimiento : 20.00 M2/DIA P.U. 34.81

I.U. DESCRIPCIÓN UND CUADRILLA CANTIDAD PRECIO PARCIAL SUB TOTAL

MANO DE OBRA
47 CAPATAZ HH 0.10 0.0400 20.5 0.82
47 OPERARIO HH 1.00 0.4000 18.6 7.44
47 OFICIAL HH 1.00 0.4000 15.5 6.20 14.46

MATERIALES
Madera tornillo p/encofrado P2 3.8000 5.00 19.00
Clavo p/encofrar Kg 0.0400 4.50 0.18
Alambre p/encofrar Kg 0.1000 4.50 0.45 19.63

EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 14.46 0.72
- 0.72
M3
29,000.00

58.00
580.00

580.00
580.00

M3
18,600.00

825.84
8,265.84
24,799.38

-
-

25,668.00
8,265.84

M3
9,600.00

307.20
3,072.00
6,144.00
30,720.00

4,320.00
8,160.00
36,960.00
1,632.00

29,088.00
-
3,072.00

M3
22,400.00

896.00
8,960.00
8,960.00

85,120.00
896.00
2,240.00

16,128.00
FORMULA POLINOMICA

K= 0.313 Jr/Jo + 0.106 Mr/Mo + 0.166 Cr/Co + 0.112 Hr/Ho + 0.103Er/Eo +0.200 GGUr/GGUo

% ENE. 2015 OCT. 2015


MON ELEMENTO COEF.
COD. IU MON INICIAL IU BASE K IU
MANO DE OBRA J 0.313 523.15 544.59
1 47 100.00%
MADERA NACIONAL PARA ENCOFRADO M 0.106 794.1 829.45
2 43 100.00%
CEMENTO PORTLAND TIPO I C 0.166 389.65 389.65
3 21 100.00%
HORMIGON H 0.112 861.5 864.73
4 38 100.00%

5 MAQUINARIA Y EQUIPO IMPORTADO E 0.103 268.53 291.08


49 100.00%
INDICE GENERAL DE PRECIOS AL CONSUMIDOR GU 0.200 405.5 419.35
6 39 100.00%

K=

K= 0.313 Jr/Jo + 0.106 Mr/Mo + 0.279 CPHr/CPHo + 0.102Er/Eo +0.200 GGUr/GGUo

% ENE. 2015 OCT. 2015


MON ELEMENTO COEF.
COD. IU MON INICIAL Partic. IU BASE K IU
MANO DE OBRA J 0.313 523.15 544.59
1 47 100.00%
MADERA NACIONAL PARA ENCOFRADO M 0.106 794.1 829.45
2 43 100.00%

3 21 CEMENTO PORTLAND TIPO I CPH 0.268 59.61% 389.65 389.65

05 AGREGADO GRUESO 11.24% 396.59 404.23

38 HORMIGON 29.15% 861.5 864.73


4 MAQUINARIA Y EQUIPO IMPORTADO E 0.102 268.53 291.08
49 100.00%
INDICE GENERAL DE PRECIOS AL CONSUMIDOR GU 0.200 405.5 419.35
5 39 100.00%

0.989 K=
r/Eo +0.200 GGUr/GGUo

OCT. 2015 ENE. 2009

K IU K
0.326

0.111

0.166

0.112

0.112

0.207

1.034

+0.200 GGUr/GGUo

OCT. 2015 NOV. 2015

K IU K

0.326

0.111

0.160

0.031

0.078

0.111

0.207

1.024
FORMULA POLINOMICA

K= 0.313 Jr/Jo + 0.106 Mr/Mo + 0.166 Cr/Co + 0.113 Hr/Ho + 0.102Er/Eo +0.200 GGUr/GGUo

%
MON COD. IU ELEMENTO SIMBOLO COEF. INCID.
Particip.

1 47 MANO DE OBRA J 0.313 100.00%


2 43 MADERA NACIONAL PARA ENCOFRAD M 0.106 100.00%
3 21 CEMENTO PORTLAND TIPO I C 0.166 100.00%
4 38 HORMIGON H 0.113 100.00%
5 49 MAQUINARIA Y EQUIPO IMPORTADO E 0.102 100.00%
6 39 INDICE GENERAL DE PRECIOS AL CO GU 0.200 100.00%

1.000

K= 0.313 Jr/Jo + 0.106 Mr/Mo + 0.279 CAHr/CAHo + 0.102Er/Eo +0.200 GGUr/GGUo

%
MON COD. IU ELEMENTO SIMBOLO COEF. INCID.
Particip.

1 47 MANO DE OBRA J 0.313 100.00%


2 43 MADERA NACIONAL PARA ENCOFRAD M 0.106 100.00%
3 21 CEMENTO PORTLAND TIPO I CAH 0.279 59.61%
05 AGREGADO GRUESO 11.24%
38 HORMIGON 29.15%
4 49 MAQUINARIA Y EQUIPO IMPORTADO E 0.102 100.00%
5 39 INDICE GENERAL DE PRECIOS AL CO GU 0.200 100.00%

1.000
POLINOMICA

2Er/Eo +0.200 GGUr/GGUo

ENE. 2015 OCT. 2015 NOV. 2015

IU BASE K IU K IU K
523.15 544.59 0.326 544.59 0.326
794.10 829.45 0.111 838.84 0.112
389.65 389.65 0.166 389.65 0.166
861.50 864.73 0.113 866.15 0.114
268.53 291.08 0.111 298.83 0.114
405.56 419.35 0.207 420.8 0.208

K= 1.034 1.040

Eo +0.200 GGUr/GGUo

ENE. 2015 OCT. 2015 NOV. 2015

IU BASE K IU K IU K
523.15 544.59 0.326 544.59 0.326
794.10 829.45 0.111 838.84 0.112
389.65 389.65 0.166 389.65 0.166
396.59 404.23 0.032 406.4 0.032
861.50 864.73 0.082 866.15 0.082
268.53 291.08 0.111 298.83 0.114
405.56 419.35 0.207 420.8 0.208

K= 1.035 1.040

Potrebbero piacerti anche