PRECIO
ITEM DESCRIPCION UND METRADO PARCIAL TOTAL
UNIT
Total 5,073,188.87
RELACION DE INSUMOS
IU DESCRIPCION UND CANTIDAD PRECIO PARCIAL
MANO DE OBRA
47 CAPATAZ HH 2,087.04 20.50 42,784.32
47 OPERARIO HH 20,297.84 18.60 377,539.82
47 OFICIAL HH 15,104.00 15.50 234,112.00
47 PEON HH 56,099.38 13.80 774,171.44
MATERIALES
02 CLAVO KG 896.00 4.50 4,032.00
02 Alambre p/encofrar KG 2,240.00 4.50 10,080.00
43 MADERA P2 85,120.00 5.00 425,600.00
21 CEMENTO BLS 36,960.00 18.60 687,456.00
05 PIEDRA MEDIANA M3 4,320.00 30.00 129,600.00
38 HORMIGON M3 8,160.00 40.00 326,400.00
30 AGUA M3 1,632.00 6.00 9,792.00
TOTAL 3,439,261.66
188.42
96
859,862.52 0.200
INCIDENCIA
0.010
0.088
0.054
1,428,607.58 0.180 0.332 0.332 100%
0.001
0.002 0.003 0.000
0.099 0.099 0.102 100%
0.160 0.160 0.160 59.61%
0.030 0.030 0.268 0.030 11.24%
0.076 0.078 0.078 29.15%
1,592,960.00 0.002 0.000 0.000 0.268 100%
MANO DE OBRA
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 0.32 0.02
49 Tractor Sobre Oruga HM 1.00 0.0200 320.00 6.40 6.42
MANO DE OBRA
47 CAPATAZ HH 0.10 0.0444 20.5 0.91
47 OPERARIO HH 1.00 0.4444 18.6 8.27
47 PEON HH 3.00 1.3333 13.8 18.40 27.58
MATERIALES
-
- -
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 27.58 1.38
49 Plancha compact. HM 1.00 0.4444 12.00 5.33 6.71
MANO DE OBRA
MATERIALES
05 PIEDRA MEDIANA M3 0.4500 30.00 13.50
05 HORMIGON M3 0.8500 40.00 34.00
21 CEMENTO PORTLAND TIPO I (42.5KG) BOL 3.8500 18.60 71.61
30 AGUA M3 0.1700 6.00 1.02 120.13
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 60.69 3.03
49 -
48 MEZCLADORA CONCRETO TAMBOR 11P3 -HM 1.00 0.3200 20.00 6.40 9.43
MANO DE OBRA
47 CAPATAZ HH 0.10 0.0400 20.5 0.82
47 OPERARIO HH 1.00 0.4000 18.6 7.44
47 OFICIAL HH 1.00 0.4000 15.5 6.20 14.46
MATERIALES
Madera tornillo p/encofrado P2 3.8000 5.00 19.00
Clavo p/encofrar Kg 0.0400 4.50 0.18
Alambre p/encofrar Kg 0.1000 4.50 0.45 19.63
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 14.46 0.72
- 0.72
M3
29,000.00
58.00
580.00
580.00
580.00
M3
18,600.00
825.84
8,265.84
24,799.38
-
-
25,668.00
8,265.84
M3
9,600.00
307.20
3,072.00
6,144.00
30,720.00
4,320.00
8,160.00
36,960.00
1,632.00
29,088.00
-
3,072.00
M3
22,400.00
896.00
8,960.00
8,960.00
85,120.00
896.00
2,240.00
16,128.00
FORMULA POLINOMICA
K= 0.313 Jr/Jo + 0.106 Mr/Mo + 0.166 Cr/Co + 0.112 Hr/Ho + 0.103Er/Eo +0.200 GGUr/GGUo
K=
0.989 K=
r/Eo +0.200 GGUr/GGUo
K IU K
0.326
0.111
0.166
0.112
0.112
0.207
1.034
+0.200 GGUr/GGUo
K IU K
0.326
0.111
0.160
0.031
0.078
0.111
0.207
1.024
FORMULA POLINOMICA
K= 0.313 Jr/Jo + 0.106 Mr/Mo + 0.166 Cr/Co + 0.113 Hr/Ho + 0.102Er/Eo +0.200 GGUr/GGUo
%
MON COD. IU ELEMENTO SIMBOLO COEF. INCID.
Particip.
1.000
%
MON COD. IU ELEMENTO SIMBOLO COEF. INCID.
Particip.
1.000
POLINOMICA
IU BASE K IU K IU K
523.15 544.59 0.326 544.59 0.326
794.10 829.45 0.111 838.84 0.112
389.65 389.65 0.166 389.65 0.166
861.50 864.73 0.113 866.15 0.114
268.53 291.08 0.111 298.83 0.114
405.56 419.35 0.207 420.8 0.208
K= 1.034 1.040
Eo +0.200 GGUr/GGUo
IU BASE K IU K IU K
523.15 544.59 0.326 544.59 0.326
794.10 829.45 0.111 838.84 0.112
389.65 389.65 0.166 389.65 0.166
396.59 404.23 0.032 406.4 0.032
861.50 864.73 0.082 866.15 0.082
268.53 291.08 0.111 298.83 0.114
405.56 419.35 0.207 420.8 0.208
K= 1.035 1.040