METRADO EN VIGAS PRINCIPALES

IMAGEN REF.

VIGA PRINCIPAL A - A
CARGA UNITARIA CARGA TOTAL (kg) CARGA ACUMULADA
ELEMENTO BASE ALTURA LONGITUD (kg/m3, kg/m2) (Tn.)
VIGA PRINCIPAL A - A 0.25 0.55 16.72 2400 5517.60
VIGA SECUNDARIA 0.25 0.55 12 2400 3960.00
Losa Alig. e=0.25 70.68 70.68 300 21204.00
Tabiqueria (E = 0.15) 7.20 2.85 0.15 1500 4617.00
Tabiqueria (E = 0.10) 8.26 0.4 0.15 1500 743.40
Acabado 74.86 100 7486.00
COLUMNAS 0.2 3.25 2400 1560.00
CARGA DE OCUPACION 74.86 500 37430.00
Cm = 45.09 Tn
82.52Tn
Cv = 37.43 Tn

* RESULTADOS EN LA VIGA PRINCIPAL A - A Cm = 45.09 Tn


Cv = 37.43 Tn
qu = 1.4*Cm + 1.7*Cv qu = 126.75 Tn

* CARGA DISTRIBUIDA PARA LA VIGA QU = 7.581Tn/m

METODO TRES MOMENTOS M1(L1) + 2M2(L1+L2) + M3(L2) =- 6A1a1/L1 - 6B1b1/L2


MA MB MC -6A1a1/L1 - 6B1b1/L2

L1 10.14 TRAMO IAB 20.28 10.14 -1975.968


L2 5.24 TRAMO ABC 10.14 30.76 5.24 -2248.652
W 7.581 TRAMO BCI 5.24 10.48 -272.684

MA -73.067

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

MB -48.735
MC -1.6518

HALLAMOS LAS CORTANTES

VA 40.835
VB 36.036
VB´ 28.848 DFC
VC 10.877
40.8352391351
GRAFICAMOS DFC
F X 28.8475447076
XA 40.835 0.00
X1 0 5.39
XB -36.036 10.14
2; 0 5; 0
XB´ 28.848 10.14 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
-10.8768576847
X2 0 13.95
CX -10.877 15.38

-36.0360280898

GRAFICAMOS DMF DMF


M X
XA -73.067 0.00 36.913
X1 36.913 5.39
XB -48.735 10.14
6.151
XB´ -48.735 10.14
X2 6.151 13.95 -1.652
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
CX -1.652 15.38

-48.735

-73.067

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL A-A

DMF

36.913

6.151

-1.652
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-48.735

-73.067

DATOS: DATOS:
Mu = 73.067 tn/m Mu = 73.067 tn/m
d= 50 cm d= 74 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 35 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 36.386 cm a= 17.561 cm
As = 60.772 cm2 As = 29.638 cm2
Ru= 116.9072 kg/cm2 Ru= 38.12323907 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= #VALUE! Pd1= 0.0730
Pd2= #VALUE! #VALUE! Pd2= 0.011701126 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 80*35


ACERO = 3.18 7.92
NV= 3.742189366 4 EXCESO = 2.0418602243 6.88929953 11 OK!!
SR= 4.126666667 2.54 OK!!

4 V #10

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

4.1

DISEÑO DE VIGA PRINCIPAL A-A

DMF

36.913

6.151

-1.652
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-48.735

-73.067
DATOS:
Mu = 6.151 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 3.063 cm
As = 3.357 cm2
Ru= 9.8416 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0821
Pd2= 0.002689 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 0.95 0.71
NV= 4.728640044 5 EXCESO = 0.1926655691 5.738646925 11 OK!!
SR= 2.5875 2.54 OK!!

5 V # 3/8

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

2.6

DISEÑO DE VIGA PRINCIPAL A-A

DMF

36.913

6.151

-1.652
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-48.735

-73.067

DATOS: DATOS:
Mu = 36.913 tn/m Mu = 36.913 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 25 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 18.382 cm a= 13.320 cm
As = 23.929 cm2 As = 15.665 cm2
Ru= 59.0608 kg/cm2 Ru= 31.01281243 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= 0.0641 Pd1= 0.0755
Pd2= 0.020662362 CAMBIAR Pd2= 0.009204087 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 70*25


ACERO = 2.86 6.41
NV= 2.443786859 3 EXCESO = 1.0353262325 6.60930606 11 OK!!
SR= 3.58 2.54 OK!!

3 V #10

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3.6

DISEÑO DE VIGA PRINCIPAL A-A

DMF

36.913

6.151

-1.652
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-48.735

-73.067

DATOS: DATOS:
Mu = 48.735 tn/m Mu = 48.735 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 25 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 24.269 cm a= 17.586 cm
As = 34.049 cm2 As = 21.414 cm2
Ru= 77.976 kg/cm2 Ru= 40.94517958 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= 0.0492 Pd1= 0.0720
Pd2= 0.03549705 CAMBIAR Pd2= 0.012750423 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 70*25


ACERO = 3.18 7.92
NV= 2.703819382 3 EXCESO = 2.3457504965 10.95415693 11 OK!!
SR= 2.78 2.54 OK!!

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3 V #10

2.78

DISEÑO DE VIGA PRINCIPAL A-A

DMF

36.913

6.151

-1.652
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-48.735

-73.067
DATOS:
Mu = 6.151 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 3.063 cm
As = 3.357 cm2
Ru= 9.8416 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0821
Pd2= 0.002689 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 0.95 0.71

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

NV= 4.728640044 5 EXCESO = 0.1926655691 5.738646925 11 OK!!


SR= 2.825 2.54 OK!!

5 V # 3/8

2.8

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

IMAGEN REF.

VIGA PRINCIPAL B - B
CARGA UNITARIA CARGA TOTAL (kg) CARGA ACUMULADA
ELEMENTO BASE ALTURA LONGITUD (kg/m3, kg/m2) (Tn.)
VIGA PRINCIPAL B - B 0.25 0.55 16.04 2400 5293.20
VIGA SECUNDARIA 0.25 0.55 9.6 2400 3168.00
Losa Alig. e=0.25 75.245 75.25 300 22573.50
Tabiqueria (E = 0.15) 4.80 2.85 0.15 1500 3078.00
Tabiqueria (E = 0.10) 13.49 0.4 0.15 1500 1214.10
Acabado 79.278 100 7927.80
COLUMNAS 0.2 3.25 2400 1560.00
CARGA DE OCUPACION 79.278 500 39639.00
Cm = 44.81 Tn
84.45Tn
Cv = 39.64 Tn

* RESULTADOS EN LA VIGA PRINCIPAL B - B Cm = 44.81 Tn


Cv = 39.64 Tn
qu = 1.4*Cm + 1.7*Cv qu = 130.13 Tn

* CARGA DISTRIBUIDA PARA LA VIGA QU = 8.113Tn/m

METODO TRES MOMENTOS M1(L1) + 2M2(L1+L2) + M3(L2) =- 6A1a1/L1 - 6B1b1/L2


MA MB MC -6A1a1/L1 - 6B1b1/L2

L1 10.14 TRAMO IAB 20.28 10.14 -2114.541


L2 5.24 TRAMO ABC 10.14 30.76 5.24 -2406.348
W 8.113 TRAMO BCI 5.24 10.48 -291.807

MA -78.191

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

MB -52.153
MC -1.767

HALLAMOS LAS CORTANTES

VA 43.699
VB 38.563
VB´ 30.871 DFC
VC 11.639
43.6989331285
GRAFICAMOS DFC 30.8707647402
F X
XA 43.699 0.00
X1 0 5.39
XB -38.563 10.14 2; 0 5; 0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
XB´ 30.871 10.14 -11.6394670303
X2 0 13.95
CX -11.639 15.38
-38.5632329313

GRAFICAMOS DMF DMF


M X
39.502
XA -78.191 0.00
X1 39.502 5.39
XB -52.153 10.14 6.583
XB´ -52.153 10.14 -1.767
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
X2 6.583 13.95
CX -1.767 15.38

-52.153

-78.191

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL A-A

DMF
39.502

6.583
-1.767
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-52.153

-78.191

DATOS: DATOS:
Mu = 78.191 tn/m Mu = 78.191 tn/m
d= 50 cm d= 74 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 35 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 38.937 cm a= 18.792 cm
As = 67.752 cm2 As = 32.019 cm2
Ru= 125.1056 kg/cm2 Ru= 40.79672336 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= #VALUE! Pd1= 0.0721
Pd2= #VALUE! #VALUE! Pd2= 0.012694297 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 80*35


ACERO = 2.86 6.41
NV= 4.995144837 5 EXCESO = 0.031121593 0.097197638 11 OK!!
SR= 2.7 2.54 OK!!

4 V #10

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

2.7

DISEÑO DE VIGA PRINCIPAL A-A

DMF
39.502

6.583
-1.767
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-52.153

-78.191

DATOS:
Mu = 6.583 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 3.278 cm
As = 3.601 cm2
Ru= 10.5328 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0819
Pd2= 0.002885 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 0.95 0.71
NV= 5.07200015 6 EXCESO = 0.658879893 18.29652646 11 CAMBIAR
SR= 1.88 2.54 CAMBIAR

6 V # 3/8

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

1.9

DISEÑO DE VIGA PRINCIPAL A-A

DMF
39.502

6.583
-1.767
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-52.153

-78.191

DATOS: DATOS:
Mu = 39.502 tn/m Mu = 39.502 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 25 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 19.671 cm a= 14.254 cm
As = 26.019 cm2 As = 16.890 cm2
Ru= 63.2032 kg/cm2 Ru= 33.18798572 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= 0.0618 Pd1= 0.0748
Pd2= 0.02291842 CAMBIAR Pd2= 0.009947543 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 70*25


ACERO = 2.86 6.41
NV= 2.634932978 3 EXCESO = -0.18992039 -1.12445995 11 OK!!
SR= 3.58 2.54 OK!!

3 V #10

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3.6

DISEÑO DE VIGA PRINCIPAL A-A

DMF
39.502

6.583
-1.767
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-52.153

-78.191

DATOS: DATOS:
Mu = 52.153 tn/m Mu = 52.153 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 25 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 25.971 cm a= 18.820 cm
As = 37.275 cm2 As = 23.153 cm2
Ru= 83.4448 kg/cm2 Ru= 43.8168452 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= #VALUE! Pd1= 0.0709
Pd2= #VALUE! #VALUE! Pd2= 0.01385782 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 75*25


ACERO = 3.18 7.92
NV= 2.923394455 3 EXCESO = 0.606715918 2.620431364 11 OK!!
SR= 2.78 2.54 OK!!

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3 V #10

2.78

DISEÑO DE VIGA PRINCIPAL A-A

DMF
39.502

6.583
-1.767
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-52.153

-78.191

DATOS:
Mu = 6.583 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 3.278 cm
As = 3.601 cm2
Ru= 10.5328 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0819
Pd2= 0.002885 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 1.27 1.27

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

NV= 2.835527643 3 EXCESO = 0.208879893 5.800414512 11 OK!!


SR= 5.17 2.54 OK!!

3 V # 1/2

5.2

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

IMAGEN REF.

VIGA PRINCIPAL C - C
CARGA UNITARIA CARGA TOTAL (kg) CARGA ACUMULADA
ELEMENTO BASE ALTURA LONGITUD (kg/m3, kg/m2) (Tn.)
VIGA PRINCIPAL C - C 0.25 0.55 15.38 2400 5075.40
VIGA SECUNDARIA 0.25 0.55 4.8 2400 1584.00
Losa Alig. e=0.25 38.704 38.70 300 11611.20
Tabiqueria (E = 0.15) 10.02 2.85 0.15 1500 6425.33
Tabiqueria (E = 0.10) 13.07 0.4 0.15 1500 1176.30
Acabado 42.549 100 4254.90
COLUMNAS 0.2 3.25 2400 1560.00
CARGA DE OCUPACION 42.549 500 21274.50
Cm = 31.69 Tn
52.96Tn
Cv = 21.27 Tn

* RESULTADOS EN LA VIGA PRINCIPAL C - C Cm = 31.69 Tn


Cv = 21.27 Tn
qu = 1.4*Cm + 1.7*Cv qu = 80.53 Tn

* CARGA DISTRIBUIDA PARA LA VIGA QU = 5.236Tn/m

METODO TRES MOMENTOS M1(L1) + 2M2(L1+L2) + M3(L2) =- 6A1a1/L1 - 6B1b1/L2


MA MB MC -6A1a1/L1 - 6B1b1/L2

L1 10.14 TRAMO IAB 20.28 10.14 -1364.733


L2 5.24 TRAMO ABC 10.14 30.76 5.24 -1553.067
W 5.236 TRAMO BCI 5.24 10.48 -188.334

MA -50.465

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

MB -33.66
MC -1.1409

HALLAMOS LAS CORTANTES

VA 28.203
VB 24.889
VB´ 19.924 DFC
VC 7.512

GRAFICAMOS DFC 28.2034700508


F X
19.9240753941
XA 28.203 0.00
X1 0 5.39
XB -24.889 10.14
XB´ 19.924 10.14 2; 0 5; 0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
-7.5122051651 18.00
X2 0 13.95
CX -7.512 15.38

-24.88887439

GRAFICAMOS DMF DMF


25.494
M X
XA -50.465 0.00
X1 25.494 5.39 4.248
XB -33.660 10.14
-1.141
XB´ -33.660 10.14 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
X2 4.248 13.95
CX -1.141 15.38

-33.660

-50.465

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL A-A

DMF
25.494

4.248

-1.141
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-33.660

-50.465

DATOS: DATOS:
Mu = 50.465 tn/m Mu = 50.465 tn/m
d= 50 cm d= 74 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= #VALUE! cm b= 35 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= #VALUE! cm a= 12.129 cm
As = #VALUE! cm2 As = 19.652 cm2
Ru= #VALUE! kg/cm2 Ru= 26.33048106 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= #VALUE! Pd1= 0.0771
Pd2= #VALUE! #VALUE! Pd2= 0.00765769 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 80*35


ACERO = 2.54 5.07
NV= 3.87607718 4 EXCESO = 0.628288697 3.197119513 11 OK!!
SR= 4.98 2.54 OK!!

4 V #8

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

2.7

DISEÑO DE VIGA PRINCIPAL A-A

DMF
25.494

4.248

-1.141
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-33.660

-50.465

DATOS:
Mu = 4.248 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 2.115 cm
As = 2.296 cm2
Ru= 6.7968 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0829
Pd2= 0.001838 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 1.27 1.27
NV= 1.808025877 2 EXCESO = 0.243807137 10.61788584 11 OK!!
SR= 12.56 2.54 OK!!

6 V # 3/8

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

12.6

DISEÑO DE VIGA PRINCIPAL A-A

DMF
25.494

4.248

-1.141
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-33.660

-50.465

DATOS: DATOS:
Mu = 25.494 tn/m Mu = 25.494 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 25 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 12.695 cm a= 9.200 cm
As = 15.450 cm2 As = 10.473 cm2
Ru= 40.7904 kg/cm2 Ru= 21.41902962 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= 0.0721 Pd1= 0.0786
Pd2= 0.012691909 OK!! Pd2= 0.006106411 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 70*25


ACERO = 1.91 2.85
NV= 3.674633835 4 EXCESO = -0.89270643 -8.5241235 11 OK!!
SR= 3.02 2.54 OK!!

4 V #6

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL A-A

DMF
25.494

4.248

-1.141
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-33.660

-50.465
DATOS: DATOS:
Mu = 33.66 tn/m Mu = 33.66 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 25 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 16.762 cm a= 12.146 cm
As = 21.396 cm2 As = 14.151 cm2
Ru= 53.856 kg/cm2 Ru= 28.27977316 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= 0.0666 Pd1= 0.0765
Pd2= 0.018123433 CAMBIAR Pd2= 0.008292941 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 75*25


ACERO = 2.54 5.07
NV= 2.791119455 3 EXCESO = 1.059024362 7.48375511 11 OK!!
SR= 3.74 2.54 OK!!

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3 V #8

2.78

DISEÑO DE VIGA PRINCIPAL A-A

DMF
25.494

4.248

-1.141
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-33.660

-50.465

DATOS:
Mu = 1.141 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 0.568 cm
As = 0.607 cm2
Ru= 1.8256 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0843
Pd2= 0.000486 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 0.95 0.71
NV= 0.855145774 1 EXCESO = 0.1028465 16.93912663 11 CAMBIAR

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

SR= #DIV/0! 2.54 #DIV/0!

3 V # 1/2

#DIV/0!

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL