Mark Ltd.

(9356)
BK Bari, Taltoli, Mirzapur Bazar, Gazipur.
(+24.125172N, 90.379235E)
29.06.2014
Identified Priority 1 Concerns

None
Identified Priority 2 Concerns
1. Poor documentation
2. Steelwork roof connections to brick walls of building number 03, 05, 06, 07 and 08 are
poorly designed.
1st Priority 2 Concern

Our concerns are due to the


following elements seen during our
survey:
−There are no completed master
plan for the entire premises. The
factory engineer only provided us
with partial master plans.
−Most structural steel roof has no
detailed drawings. Only buildings 01
and 04 seem to have proper
Extension of utility building not documentation.
shown in drawing. −Most of the buildings have poor
documentation that does not provide
any details.

Partial master plan not


according to scale
2nd priority 2 Concern

Our concerns are due to the


following elements seen during our
survey:
−The connection between the brick
walls or bricks masonry columns and
the structural steel roof has no
details.
−An engineering assessment is
recommended to verify all
connections.

Tag & Local Chemical Store


Identified Priority 3 Concerns

• None
Overall Stability System
We require that these items
be investigated in a Detail
Engineering Assessment.

Concerns on the stability system for wind loading and


seismic loading. There is no obvious lateral stability
system in most of the building.

Building Extents – Overall Stability System


Some concerns are also due to the
following elements seen during our
survey:
• No compression members were
provided at the beams and the
columns joint.
• The diagonals bracings are loose
therefore not effective.
• Some of the bracings were
removed to make pathway or
brick walls.

Prayer and dining shed


Missing compression
Missing Vertical bracing member

Building Extents – Overall Stability System


Water Ingress at Roof Level
No waterproofing membrane were
visible on the RC roofs of all the
buildings.

We request the installation of a


waterproofing membrane
otherwise any cracks in roof top
surfaces will allow water to seep
into the concrete slab beneath the
finishes, and cause long-term
soaking of the slab. Structural,
electrical and architectural
damage may occur if no adequate
protection is applied.

Roof Waterproofing System


at all RCC roof
Priority Actions
Problems Observed Summary

ITEM 1: (Priority 2) Poor documentation

ITEM 2: (Priority 2) Steelwork roof connections to brick walls of building


number 03, 05, 06, 07 and 08 are poorly designed.

ITEM 3: (Priority 2) Loading plan for mezzanine of building number 4 (main


building).

ITEM 4: (Priority 3) Overall stability system.


Item No. Observation Recommended Action Plan Recommended Timeline

The factory engineer has to revise and produce drawing and documents
1 Priority 2 - Poor documentation to matched actual site conditions. Detailed structural documents are 6-weeks
required for proper investigation.

Priority 2 - Steelwork roof connections to brick walls of Carry out an Engineering Assessment to verify that the connections are
2 6-weeks
building number 03, 05, 06, 07 and 08 are poorly designed. properly design against wind loading.

Priority 2 - Steelwork roof connections to brick walls of


3 Carry out any remedial work required by the Engineering Assessment. 6-months
building number 03, 05, 06, 07 and 08 are poorly designed.

Priority 2 - Loading plan for mezzanine of building number Carry out an Engineering Assessment to verify the maximum loading
4 6-weeks
4 (main building). on the mezzanine.

Priority 2 - Loading plan for mezzanine of building number Display maximum loading in storage area of the mezzanine (if
5 6-months
4 (main building). applicable).

Verify that the bracing are properly installed.


6 Priority 3 - Overall stability system. Carry out an Engineering Assessment on all buildings to verify that they 6-weeks
are stable under lateral loading.

7 Priority 3 - Overall stability system. Carry out highlight of Engineering Assessment recommendations. 6-months