Sei sulla pagina 1di 1

KEYPLAN:

CEILING WILL BE SUBMITTED SEPARATELY


6 6 7 8 9 10

CORRIDOR
SMOKE PROTECTED GLAZED BOX

B
LIFT

LIFT

C
CORRIDOR

D
AC Duct
Refer MEP.

Primary Runner
SAFETY, HEALTH AND ENVIRONMENTAL
INFORMATION
In addition to the hazards/risks normally associated with the
types of work detailed on this drawing, note the following:

MIHRAB WILL BE CONSTRUCTION


SUBMITTED
SEPARATELY

MAINTENANCE/CLEANING

A 04

A04 A04 DECOMMISSIONING/DEMOLITION

It is assumed that all works will be carried out by a competent


contractor working, where appropriate, to an approved method
statement
Notes:

2 1. DIMENSIONS ARE IN MM, EXCEPT OTHERWISE MENTIONED


54654
2. CEILING WILL BE PROVIDED SEPARATELY

3. FLOOR FINISH DETAILS HAVE BEEN PROVIDED IN PREVIOUS


SUBMISSIONS

4. ALL LEVEL START WITH FINISH FLOOR LEVEL ( FFL )


L17
5. CLOUDED AREA ARE IN PROGRESS

Reference Documents:
F 01
4 M003-QGD-ARC-DWG-RSST010-CL-69018 REV.3
54655 M003-QGD-ARC-DWG-RSST010-CL-69019 REV.3
M003-QGD-ARC-DWG-RSST010-CL-69020REV.3
M003-QGD-ARC-DWG-RSST010-CL-69063 REV.3
M003-QGD-ARC-DWG-RSST010-CL-69064 REV.3
M003-QGD-ARC-DWG-RSST010-CL-69087 REV.3

FLOOR REF TO DWG NO.-


M003-QGD-ARC-DWG-RSSTNNN-AA-54607

A FEMALE PRAYER ROOM ELEVATION A


54649 SCALE: 1:20
A

CEILING WILL BE
Legend:
SUBMITTED
SEPARATELY (1200 x 2400) Gyproc Regular Board

MIHRAB WILL BE
SUBMITTED Existing Block Work
SEPARATELY

Vertical Studs 1.2 mm thk.(63 x 34 x 3300)

Gypframe Gl1 Gyplyner Stud (0.9mm thk.)

Scale: 0 1 2 3 4 5 [m]

SCALE 1:100
Drawing Revision History
A 04 Rev Description App. Date
0.1 FIRST SUBMISSION 27.04.2017
1 SECOND SUBMISSION 27.07.2017

Purpose of Issue:

FOR CONSTRUCTION
Design Validation:
SONO Reference: Date:
DVE Reference: Date:
Client

A04 Qatar Railways Company


P.O. Box 29988
Doha + Qatar

Originator: Contractor:
M003-QGD-ARC-MD2-RSST010-ZZ-50995.rvt 1.2
FILE NAME: M003-QGD-ARC-MD2-RSST010-ZZ-69547.rvt 0.1

P.O. BOX: 22403


DOHA + QATAR
D-1.41 A TEL: 4131770 PO Box 19389 Tornado Tower
FAX: 4369529
www.groupimar.com
Dafna Area Doha, State of Qatar

Project:

Qatar Integrated Railway Project


Design + Build Package 2
L17
Red Line South Underground
L17
Discipline:
ARCHITECTURE
Drawing Title:
AL DOHA AL JADEDA STATION
F 01 CONCOURSE LEVEL (FOH)
FEMALE PRAYER ROOM-WALL
CLADDING SUBSTRUCTURE
ELEVATIONS - SHEET 1
Originator: Contractor:
Drawn LNY 27.07.2017 Checked
FLOOR REF TO DWG NO.-
Checked SS 27.07.2017
M003-QGD-ARC-DWG-RSSTNNN-AA-54607 Approved GZD Approved
27.07.2017
17:04:38PM

B FEMALE PRAYER ROOM ELEVATION B Scale: AS SHOWN Sheet Size: A1


28/02/2017 4:57:33

Drawing No: Rev:


54649 SCALE: 1:20
SECTION B
10/15/2016

M003-QGD-ARC-DWG-RSST010-CL-54649 1
0 1 2 5 10 M @ 1 : 100
THE DRAWING AND ANY INFORMATION OR DESCRIPTIVE MATTER SET OUT HEREON IS LICENSED TO THE QATAR RAILWAYS COMPANY AND IS CONFIDENTIAL AND SUBJECT TO COPYRIGHT. IT MUST NOT BE DISCLOSED, LOANED, COPIED OR USED FOR MANUFACTURING, TENDERING OR FOR ANY OTHER PURPOSE WITHOUT WRITTEN PERMISSION. © QATAR RAILWAYS COMPANY.
100mm on Original

Potrebbero piacerti anche