ITEM DESCRIPTION UNIT QTY. RATE AMOUNT


1 PRELIMINARIES AND GENERALS

1.1 Allow a sum for surety, insurance, workmen`s compensation L/S 1.0
etc as required by the general and special conditions for civil
engineering

1.2 Allow for establishment of site including clearing on L/S 1.0


completion

1.3 Allow for provisional sum for sign Boards L/S 1.0

1.4 One water point will be made available on site. Allow for any
additional services not included in the site reticulation

1.5 Allow provisional sum for the alteration to existing service L/S 1.0

1.6 Allow for provisional sum of extra works ordered by the


Engineer (to be paid at days works rates)

1.7 Allow for road Compaction tests sum sum

1.8 Allow for City of Harare Inspection fees sum sum

Total $16,523.48

Item Description Unit Qty Rate Amount

1 Clearing
1.1 Clear the road areas of all bush and
small trees (girth less than 1m
measured 1m above ground)
including grubbing, stumps and
root system disposal. m2 16500 1.00 16,500.00
1.2 Removal of trees, girth exceeding
1m No rate only 75.00
2 Earthworks
2.1 Remove topsoil up to 300mm thick
from all road formation including all
grass and roots and spread within
1km radius of site, excludes drain
areas m2 16500 4.00 70,000.00
2.2 Cut to waste of unsuitable materials
or expansive sections m3 1800 6.00 12,800.00
2.3 Shaping of road formation by
cutting and filling and compacting to
93% Mod. AASHTO in 150mm m2 9000 2.50 25,000.00
layers.
2.6 Anthill excavation to waste including
treatment of affected areas. No.
2.7 Borrow to fill. Rate to include win from borrow, load ,
haul and dump. To be measured after
compaction m3 1700 28.00 47,600.00

Import approved gravel, dump,spread, water, mix and compact Base 2 to


2.8 m3 1,400.00 28.00 39,200.00
96% HCE

Import approved gravel, dump,spread, water, mix and compact Base 1 to


2.9 m3 1,400.00 29.00 40,600.00
96% HCE

3 SURFACING
Sweep base course and supply all materials and apply TP7 or MC30 as a
3.1 m2 8,800.00 1.80 15,840.00
prime at a rate of 0.8 litres/surface

Supply all materials and apply double seal spray and chip surfacing to all
3.2
road surfaces using the following - including testing:

a) 19mm aggregate at 019m3 / m2 m2 8,800.00


b) 7mm aggregate at 007m3 / m2 m2 8,800.00
c) Tack coat using penetration grade bitumen type 150/200 at 1.20litres/
m2 8,800.00 3.00 26,400.00
m2
d) Seal coat using penetration grade bitumen type 150/200 at 1.0litre/ m2 m2 8,800.00 2.50 25,000.00

Supply all materials and construct mountable kerbs, complete with


3.3 m 50.00
concrete haunching

3.4 Supply all materials and paint kerbing in alternating black and white paint m2

3.5 Supply and spray to a width of 100mm carriageway markings: nil

a) White undercoat paint m R/O


b) White reflectorised paint m R/O

3.6 Supply and erect a give way sign at intersection no

3.7 Supply and erect a stop sign at intersection no 2.00 250.00 1,000.00

4.0 STORMWATER DRAINAGE

Excavate stormwater drain to level before lining and as directed by


4.1 m 1,700.00 3.00 5,100.00
Engineer

Construct lined trapezoidal drain 1m width x 0.6 m deep(minimum) and 0.6


4.3 m 1,700.00 30.00 54,000.00
base or as directed by Engineer.

Construct 8m long culvert with n stormwater pipes complete with


4.4 no 8.00 2000.00 16,000.00
headwalls and haunching under the instruction of the Engineer.

Total $411,563.48
SUB TOTAL

Add 15% VAT

Grand Total 411,563.48