METRADO EN VIGAS PRINCIPALES

IMAGEN REF.

VIGA PRINCIPAL B - B
CARGA UNITARIA CARGA TOTAL (Tn) CARGA ACUMULADA
ELEMENTO BASE ALTURA LONGITUD (tn/m3, tn/m2) (Tn.)
VIGA PRINCIPAL B - B 0.25 0.55 14.58 2.4 4.81
VIGA SECUNDARIA 0.25 0.55 12 2.4 3.96
Losa Alig. e=0.25 69.634 69.63 0.3 20.89
Tabiqueria (E = 0.15) 15.03 2.85 0.15 1.5 9.64
Tabiqueria (E = 0.10) 6.55 0.4 0.15 1.5 0.59
Acabado 73.299 0.1 7.33
COLUMNAS 0.3 3.25 2.4 2.34
CARGA DE OCUPACION 73.299 0.5 36.65
Cm = 49.56 Tn
86.21Tn
Cv = 36.65 Tn

* RESULTADOS EN LA VIGA PRINCIPAL B - B Cm = 49.56 Tn


Cv = 36.65 Tn
qu = 1.4*Cm + 1.7*Cv qu = 131.69 Tn

* CARGA DISTRIBUIDA PARA LA VIGA QU = 9.032Tn/m

METODO TRES MOMENTOS M1(L1) + 2M2(L1+L2) + M3(L2) =- 6A1a1/L1 - 6B1b1/L2


MA MB MC -6A1a1/L1 - 6B1b1/L2

L1 10.67 TRAMO IAB 21.34 10.67 -2742.949


L2 4.67 TRAMO ABC 10.67 30.68 4.67 -2972.921
W 9.032 TRAMO BCI 4.67 9.34 -229.972

MA -94.639

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

MB -63.529
MC 7.551

HALLAMOS LAS CORTANTES

VA 51.101
VB 45.270
VB´ 36.310 DFC
VC 5.869
51.1014344788
GRAFICAMOS DFC
35.91
F X
XA 51.101 0.00
X1 0 5.66
XB -45.270 10.67 2; 0 5; 0
-5.8691908808
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
XB´ 35.91 10.67
X2 0 14.65
CX -5.869 15.34
-45.2701317609

GRAFICAMOS DMF DMF


49.978
M X
XA -94.639 0.00
X1 49.978 5.66 9.009
XB -63.529 10.67 7.551
XB´ -63.529 10.67 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
X2 9.009 14.71
CX 7.551 15.34

-63.529

-94.639

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL B-B

DMF
49.978

9.009
7.551
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-63.529

-94.639

DATOS: DATOS:
Mu = 49.978 tn/m Mu = 49.978 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 25 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a = 24.888 cm a= 18.035 cm
As = 35.205 cm2 As = 22.043 cm2
Ru= 79.9648 kg/cm2 Ru= 41.989498 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= 0.0440 Pd1= 0.0716
Pd2= 0.040733 CAMBIAR Pd2= 0.013148287 OK!!
Pmin= 0.0024152 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 70*25


ACERO = 3.18 7.92
NV= 2.7831483 3 EXCESO = 1.717465578 7.79159758 11 OK!!
SR= 2.78 2.54 OK!!

3 V #10

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

2.78

DISEÑO DE VIGA PRINCIPAL B-B

DMF
49.978

9.009
7.551
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-63.529

-94.639

DATOS:
Mu = 9.009 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a = 4.486 cm
As = 4.991 cm2
Ru= 14.4144 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0807
Pd2= 0.004002 OK!!
Pmin= 0.0024152
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 1.27 1.27
NV= 3.9295723 4 EXCESO = 0.089443153 1.792247958 11 OK!!
SR= 3.34 2.54 OK!!

4 V #1/2

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3.3

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

IMAGEN REF.

VIGA PRINCIPAL C - C
CARGA UNITARIA CARGA TOTAL (kg) CARGA ACUMULADA
ELEMENTO BASE ALTURA LONGITUD (kg/m3, kg/m2) (Tn.)
VIGA PRINCIPAL C - C 0.25 0.55 14.58 2400 4811.40
VIGA SECUNDARIA 0.25 0.55 14.4 2400 4752.00
Losa Alig. e=0.25 75.072 75.07 300 22521.60
Tabiqueria (E = 0.15) 17.47 2.85 0.15 1500 11202.64
Tabiqueria (E = 0.10) 9.49 0.4 0.15 1500 854.10
Acabado 81.117 100 8111.70
COLUMNAS 0.3 3.25 2400 2340.00
CARGA DE OCUPACION 81.117 500 40558.50
Cm = 54.59 Tn
95.15Tn
Cv = 40.56 Tn

* RESULTADOS EN LA VIGA PRINCIPAL C - C Cm = 54.59 Tn


Cv = 40.56 Tn
qu = 1.4*Cm + 1.7*Cv qu = 145.38 Tn

* CARGA DISTRIBUIDA PARA LA VIGA QU = 9.971Tn/m

METODO TRES MOMENTOS M1(L1) + 2M2(L1+L2) + M3(L2) =- 6A1a1/L1 - 6B1b1/L2


MA MB MC -6A1a1/L1 - 6B1b1/L2

L1 10.67 TRAMO IAB 21.34 10.67 -3028.177


L2 4.67 TRAMO ABC 10.67 30.68 4.67 -3282.062
W 9.971 TRAMO BCI 4.67 9.34 -253.886

MA -106.24

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

MB -71.318
MC 8.4764

HALLAMOS LAS CORTANTES

VA 56.469
VB 49.923
VB´ 40.369 DFC
VC 6.196

GRAFICAMOS DFC 56.4693276385


F X
40.3693739542
XA 56.469 0.00
X1 0 5.66
XB -49.923 10.67
XB´ 40.369 10.67 2; 0 -6.196183376
5; 0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
X2 0 14.72
CX -6.196 15.34

-49.9234982102

GRAFICAMOS DMF DMF


M X
53.660
XA -106.240 0.00
X1 53.660 5.66
XB -71.318 10.67 10.402
XB´ -71.318 10.67 8.476
X2 10.402 14.72 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
CX 8.476 15.34

-71.318

-106.240

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL C-C

DMF
53.660

10.402
8.476
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-71.318

-106.240

DATOS: DATOS:
Mu = 53.66 tn/m Mu = 53.66 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 30 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 26.722 cm a= 16.136 cm
As = 38.745 cm2 As = 23.298 cm2
Ru= 85.856 kg/cm2 Ru= 37.56913814 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= #VALUE! Pd1= 0.0732
Pd2= #VALUE! #VALUE! Pd2= 0.01149928 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 75*30


ACERO = 2.86 6.41
NV= 3.634594489 4 EXCESO = 2.342249325 10.05354275 11 OK!!
SR= 2.886666667 2.54 OK!!

4 V #9

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

2.9
DISEÑO DE VIGA PRINCIPAL C-C

DMF
53.660

10.402
8.476
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-71.318

-106.240
DATOS:
Mu = 10.402 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 5.180 cm
As = 5.804 cm2
Ru= 16.6432 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0801
Pd2= 0.004659 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 1.27 1.27
NV= 4.570368166 5 EXCESO = 0.54563243 9.400376921 11 OK!!
SR= 2.1875 2.54 CAMBIAR

4 V #1/2

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

2.2

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

IMAGEN REF.

VIGA PRINCIPAL D - D
CARGA UNITARIA CARGA TOTAL (kg) CARGA ACUMULADA
ELEMENTO BASE ALTURA LONGITUD (kg/m3, kg/m2) (Tn.)
VIGA PRINCIPAL D - D 0.25 0.55 14.58 2400 4811.40
VIGA SECUNDARIA 0.25 0.55 14.4 2400 4752.00
Losa Alig. e=0.25 75.072 75.07 300 22521.60
Tabiqueria (E = 0.15) 19.67 2.85 0.15 1500 12613.39
Tabiqueria (E = 0.10) 15.19 0.4 0.15 1500 1367.10
Acabado 81.117 100 8111.70
COLUMNAS 0.3 3.25 2400 2340.00
CARGA DE OCUPACION 81.117 500 40558.50
Cm = 56.52 Tn
97.08Tn
Cv = 40.56 Tn

* RESULTADOS EN LA VIGA PRINCIPAL D - D Cm = 56.52 Tn


Cv = 40.56 Tn
qu = 1.4*Cm + 1.7*Cv qu = 148.07 Tn

* CARGA DISTRIBUIDA PARA LA VIGA QU = 10.156Tn/m

METODO TRES MOMENTOS M1(L1) + 2M2(L1+L2) + M3(L2) =- 6A1a1/L1 - 6B1b1/L2


MA MB MC -6A1a1/L1 - 6B1b1/L2

L1 10.67 TRAMO IAB 21.34 10.67 -3084.275


L2 4.67 TRAMO ABC 10.67 30.68 4.67 -3342.864
W 10.156 TRAMO BCI 4.67 9.34 -258.589

MA -108.21

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

MB -72.639
MC 8.634

HALLAMOS LAS CORTANTES

VA 57.516
VB 50.848
VB´ 41.117 DFC
VC 6.311

GRAFICAMOS DFC 57.5156454364


F X 41.1173170454
XA 57.516 0.00
X1 0 5.66
XB -50.848 10.67
XB´ 41.117 10.67 2; 0 -6.3108930626
5; 0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
X2 0 14.72
CX -6.311 15.34

-50.8481665235

GRAFICAMOS DMF DMF


M X
54.653
XA -108.210 0.00
X1 54.653 5.66
XB -72.639 10.67 10.595
XB´ -72.639 10.67 8.634
X2 10.595 14.72 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
CX 8.634 15.34

-72.639

-108.210

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL D-D

DMF
54.653

10.595
8.634
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-72.639

-108.210

DATOS: DATOS:
Mu = 54.653 tn/m Mu = 54.653 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 30 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 27.216 cm a= 16.435 cm
As = 39.730 cm2 As = 23.787 cm2
Ru= 87.4448 kg/cm2 Ru= 38.26437023 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= #VALUE! Pd1= 0.0730
Pd2= #VALUE! #VALUE! Pd2= 0.011752749 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 75*30


ACERO = 2.86 6.41
NV= 3.71094717 4 EXCESO = 1.852828641 7.78919281 11 OK!!
SR= 2.886666667 2.54 OK!!

4 V #9

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

2.9
DISEÑO DE VIGA PRINCIPAL D-D

DMF
54.653

10.595
8.634
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-72.639

-108.210
DATOS:
Mu = 10.595 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 5.276 cm
As = 5.918 cm2
Ru= 16.952 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0800
Pd2= 0.004751 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 1.59 1.98
NV= 2.988919736 3 EXCESO = 0.021938922 0.370711316 11 OK!!
SR= 5.165 2.54 OK!!

4 V #1/2

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

5.2

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

IMAGEN REF.

VIGA PRINCIPAL D - D
CARGA UNITARIA CARGA TOTAL (kg) CARGA ACUMULADA
ELEMENTO BASE ALTURA LONGITUD (kg/m3, kg/m2) (Tn.)
VIGA PRINCIPAL D - D 0.25 0.55 14.58 2400 4811.40
VIGA SECUNDARIA 0.25 0.55 14.4 2400 4752.00
Losa Alig. e=0.25 69.169 69.17 300 20750.70
Tabiqueria (E = 0.15) 10.97 2.85 0.15 1500 7034.51
Tabiqueria (E = 0.10) 13.20 0.4 0.15 1500 1188.00
Acabado 72.814 100 7281.40
COLUMNAS 0.3 3.25 2400 2340.00
CARGA DE OCUPACION 72.814 500 36407.00
Cm = 48.16 Tn
84.57Tn
Cv = 36.41 Tn

* RESULTADOS EN LA VIGA PRINCIPAL D - D Cm = 48.16 Tn


Cv = 36.41 Tn
qu = 1.4*Cm + 1.7*Cv qu = 129.31 Tn

* CARGA DISTRIBUIDA PARA LA VIGA QU = 8.869Tn/m

METODO TRES MOMENTOS M1(L1) + 2M2(L1+L2) + M3(L2) =- 6A1a1/L1 - 6B1b1/L2


MA MB MC -6A1a1/L1 - 6B1b1/L2

L1 10.67 TRAMO IAB 21.34 10.67 -2693.508


L2 4.67 TRAMO ABC 10.67 30.68 4.67 -2919.335
W 8.869 TRAMO BCI 4.67 9.34 -225.827

MA -94.501

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

MB -64.436
MC 7.54

HALLAMOS LAS CORTANTES

VA 50.135
VB 44.500
VB´ 36.122 DFC
VC 5.297
50.1349616277
GRAFICAMOS DFC
36.1220307676
F X
XA 50.135 0.00
X1 0 5.65
XB -44.500 10.67 2; 0 -5.2971913672
5; 0
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
XB´ 36.122 10.67
X2 0 14.74
CX -5.297 15.34
-44.4995351984

GRAFICAMOS DMF DMF


M X 47.198
XA -94.501 0.00
X1 47.198 5.65 9.122
XB -64.436 10.67 7.540
XB´ -64.436 10.67 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
X2 9.122 14.74
CX 7.540 15.34

-64.436

-94.501

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

DISEÑO DE VIGA PRINCIPAL E-E

DMF
47.198

9.122
7.540
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-64.436

-94.501

DATOS: DATOS:
Mu = 47.198 tn/m Mu = 47.198 tn/m
d= 50 cm d= 69 cm
f´c = 210 kg/cm2 f´c = 210 kg/cm2
b= 25 cm b= 30 cm
ø= 0.9 ø= 0.9
fy = 4200 kg/cm2 fy = 4200 kg/cm2
a= 23.504 cm a= 14.193 cm
As = 32.645 cm2 As = 20.170 cm2
Ru= 75.5168 kg/cm2 Ru= 33.04487853 kg/cm2
øfy = 3780 øfy = 3780
0.59*øfy₂ /fc= 44604 0.59*øfy₂ /fc= 44604
Pd1= 0.0525 Pd1= 0.0748
Pd2= 0.032253043 CAMBIAR Pd2= 0.009898107 OK!!
Pmin= 0.002415229 Pmin= 0.002415229
Pmax= 0.0140625 Pmax= 0.0140625
no cumple se elige otro diseño

CON LA NUEVA SECCION DE LA VIGA 75*30


ACERO = 2.54 5.07
NV= 3.978400406 4 EXCESO = 0.10950994 0.542921565 11 OK!!
SR= 3.313333333 2.54 OK!!

4 V #8

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3.3
DISEÑO DE VIGA PRINCIPAL D-D

DMF
47.198

9.122
7.540
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

-64.436

-94.501

DATOS:
Mu = 9.122 tn/m
d= 50 cm
f´c = 210 kg/cm2
b= 25 cm
ø= 0.9
fy = 4200 kg/cm2
a= 4.543 cm
As = 5.056 cm2
Ru= 14.5952 kg/cm2
øfy = 3780
0.59*øfy₂ /fc= 44604
Pd1= 0.0807
Pd2= 0.004055 OK!!
Pmin= 0.002415229
Pmax= 0.0140625

SECCION DE LA VIGA 50*25


ACERO = 1.27 1.27
NV= 3.981206504 4 EXCESO = 0.02386774 0.472055298 11 OK!!
SR= 3.34 2.54 OK!!

4 V #8

UNIVERSIDAD DE HUANUCO - E.A.P. INGENIERIA CIVIL


METRADO EN VIGAS PRINCIPALES

3.3