Sei sulla pagina 1di 1

adop utility cannot be used when a previous patching

cycle is incomplete
Checking for existing adop sessions.
Session Id : 2
Prepare phase status : NOT APPLICABLE
Apply phase status : ATLEAST ONE PATCH IS ALREADY APPLIED
Cutover phase status : NOT APPLICABLE
Abort phase status : NOT APPLICABLE
Session status : FAILED
[UNEXPECTED]The adop utility cannot be used when a previous patching cycle is incomplete
[UNEXPECTED]Ensure there is no existing patching cycle before trying to apply more patches
[UNEXPECTED]Unrecoverable error occurred. Exiting current adop session.

[STATEMENT] Please run adopscanlog utility, using the command

"adopscanlog -latest=yes"

to get the list of the log files along with snippet of the error message corresponding to each log file.

adop exiting with status = 2 (Fail)

$adop phase=abort

$adop phase=cleanup cleanup_mode=full

Run the following statement to find out the session that is in running state:
SQL>select adop_session_id from ad_adop_sessions where status='R';

Set the status to 'C' (Completed) for that session, to re-try the phase that was interrupted:

SQL>update ad_adop_sessions set status='C' where status='R;

SQL>commit;

Potrebbero piacerti anche