Summary of DRIP file ­ DRIP LS CO SUBBASE.drp
Roadway Geometry

Width of surface (b) = 7. m
Distance from edge of surface to edge of base (c) = 0.5 m
Width of drainage path (W) = 4. m
Longitudinal slope (S) = 0.0800 m/m
Transverse slope (Sx) = 0.0250 m/m
Resultant slope of drainage path (SR) = 0.0838 m/m
Resultant length of drainage path (LR) = 13.41 m

Sieve Analysis

Sieve Analysis Permeable Base

P200 = 5.00 %
D10 = 0.3874 mm
D12 = 0.5905 mm
D15 = 0.9856 mm
D30 = 4.7500 mm
D50 = 15.5120 mm
Sieve Size Lower Bound Upper Bound
D85 = 51.9407 mm
0.075 0. 10.0
Cu = 60.77 4.75 15.0 45.0
Cc = 60.77 75.0 100.0 100.0
Unit Weight = 2100. kg/m3
Specific Gravity = 2.6
Porosity (n) = 0.192
Water loss/content = %
Effective Porosity (Ne) = 0.077
Permeability (kbase) = 0.304 m/d
Sieve Analysis Separator

P200 = 5.00 %
D10 = 0.3874 mm
D12 = 0.5905 mm
D15 = 0.9856 mm
D30 = 0.3874 mm
D50 = 15.5120 mm Sieve Size Lower Bound Upper Bound
D85 = 51.9407 mm 0.075 0. 10.0
file:///C:/Users/David%20Borda/LA%20SIBERIA%20­%20COMARAPA/REVISION%20ESTUDIO%20LA%20SIBERIA­COMARAPA/PAVIMENTOS/PAVIMENT… 1/2
21/7/2016 DRIP Summary File ­ C:\Users\Wilfredo Tejerina\Desktop\Ing Tejerina\EPIZANA COMARAPA\INFORME DE REVISION\PAVIMENTOS\TRAMO IV\A…

Cu = 60.77 4.75 15.0 45.0


Cc = 60.77 75.0 100.0 100.0
Unit Weight = 2100. kg/m3
Specific Gravity = 2.6
Porosity (n) = 0.192
Water loss/content = %
Effective Porosity (Ne) = 0.077
Permeability (kseperator) = 0.304 m/d

Inflow

Infiltration Ratio Method

Infiltration coefficient (IC) = 2.58e­06 m3/s/m
Number of contributing cracks (NC) = 
Length of transverse contributing joints or cracks (WC) = 3.5 m
Width of drainage path (W) = 4. m
Spacing of transverse joints or cracks (CS) = m
Permeability of the pavement surface (kp) = 0. m/d

Rate of infiltration through surface (qi) = m3/s/m2

Permeable Base

Time to Drain Method

Effective porostity (Ne) = 0.077
Permeability of base (ksub) = 0.304 m/d
Resultant slope of drainage path (SR) = 0.0838 m/m
Resultant length of drainage path (LR) = 13.41 m
Percent saturation (S) = 79.948 %
Thickness of the base (H) = 0.2 m
Percent drainage (U) = 50. %
Time to drain U% of water from base (t) = 315.61 hr