Sei sulla pagina 1di 12

PROJECT : 15 Units Four Storey Residential Building

LOCATION : #57 N. Roxas St., St. Lourdes, Q.C.


SUBJECT : TARGET SCHEDULE & SCOPE OF WORKS
DATE : December 18, 2017

CIVIL WORKS and PAINTERS (Target Schedule)


WORKERS DECEMB
UNIT LOCATION SCOPE OF WORKS MANPOWER
NAME 13 14 15 16 17 18 19

A occupied

B paid

D occupied

E 3rd Floor
occupied

Tiles Setting / Mason 1 1


Hallway Rectification Labor 1 1

2nd Floor Tiles Setting / Mason 1 1


Family Area Rectification Labor 1 1

Tiles Setting / Mason 1 1


GF Living Area
Rectification Mason 1 1

3rd Floor Ceiling retouch Painter 1 1 1 1


Bedroom 3 Walls retouch Painter 1 1 1 1

F
and 4 Sash - top coat (finish) Painter 1 1 1 1
2nd Floor Ceiling retouch Painter 1 1 1 1 1 1 1
Master BR and Walls retouch Painter 1 1 1
BR 2 Sash - top coat (finish) Painter 1 1 1
Ceiling retouch Painter 1 1 1 1
GF Living Area Walls retouch Painter 1 1 1
Sash - top coat (finish) Painter 1 1 1
Ceiling retouch Painter
Car Garage/ Walls retouch Painter
Entrance/
Walls-exterior retouch Painter
Sash - top coat (finish) Painter
Exterior
Cleaning WHM / Helper 1
waiting for bank guarantee

G occupied

H waiting for bank guarantee

I occupied

Manpower: 1 - Mason Total Manpower 7 7 7 7 7 7 6


1 - Helper / WHM
5 - Painter
Average Manpower = 5 person
ECEMBER 2 0 1 7
20 21 22 23 24 25 26 27 28 29 30 31
NO
NO

NO

1
WORK
WORK

WORK

1
1

1
1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1
1 1 1 1 1 1 1 1 1
6 5 5 5 0 0 5 4 4 4 4 0
Prepared by:
Engr. Chris Dulay
PROJECT : 15 Units Four Storey Residential Building
LOCATION : #57 N. Roxas St., St. Lourdes, Q.C.
SUBJECT : TARGET SCHEDULE & SCOPE OF WORKS
DATE : December 19, 2017

CIVIL WORKS and PAINTERS (Target Schedule)


WORKERS DECE
UNIT LOCATION SCOPE OF WORKS MANPOWER
NAME 13 14 15 16
Electrician
Bulbs Not Installed
4th Floor CR2 Helper
Lockset Carpenter
Electrician
Bulbs Not Installed
4th Floor BR2 Helper
Lockset Carpenter
Electrician
Bulbs Not Installed
4th Floor BDR1 Helper
Lockset Carpenter
4th Floor Stair Electrician
Walang Abang
Hallway Helper
Electrician
3rd Floor MBCR Busted Bulbs
Helper
Electrician
Busted Bulbs
3rd Floor Walk-in Helper
Closet Window Sealant Glass Installer
Lockset Carpenter
Electrician
Bulbs Not Installed
3rd Floor Master Helper
Bedroom Burnt Laminated Carpenter
Lockset Carpenter
3rd Floor Balcony Cleaning Bodegero
Glass Installer
3rd Floor Window Awang at Sealant Mason

A
Facing Stair
A 3rd Floor Stair Varnishing Painter
Wall Repaint Painter
2nd Floor Maids Ceiling Retouch Painter
Room
Lockset Carpenter
2nd Floor Laundry Repaint Painter
Area
Repaint wall Painter
2nd Floor Maids Replace Tiles Mason
CR
Repair Ceiling Carpenter
Repaint Painter
2nd Floor Kitchen, Lockset Carpenter
Dining And Living Granite Awang Subcon
Room Busted And Not Installed Electrician
Bulbs Helper
2nd Floor Hallway Repaint Painter
2nd Floor Stair Varnishing Painter
Ground Floor Repaint Painter
Hallway
Ground Floor Garag Retouch Ceiling Painter
Cistern Linis Bodegero
Replace Busted Lights Electrician
Exterior 4th to GF
Repaint Painter

For Resale

Leak from CR2 Plumber


3rd Floor Hallway Repaint Damaged Paint Due

B to Leak

Occupied
Painter

Replace Tiles Mason


4th Floor CR1
Replace Bulb Lavatory Electrician
4th Floor Stair Varnishing Painter
3rd Floor MBCR Replace Tiles Mason
3rd Floor Stair Varnishing Painter
Window Sealant Glass Installer
3rd Floor Walk-in Electrician
Closet Busted Bulbs
Helper
3rd Floor Balcony Cleaning Bodegero

D 2nd Floor Kitchen,


Dining And Living
Room
Replace Tiles Mason

Electrician
Laundry Area Busted Lamp
Helper
Electrician
Busted Bulbs
Exterior 4th to GF Helper
Repaint Painter

Waiting For Bank Gurantee

GF Office Area Downspout Leak Plumber

E Repaint

Occupied
Painter

GF Office Area Repaint Baseboard and Walls Painter


Gate Repaint Painter

F Balcony Retouch

Paid
Painter

G Paid

H Paid

I Occupied

J 3rd Floor Window


Occupied
Leak Glass Installer
3rd Floor MBR Replace Laminated Carpenter

K Repaint Painter
K Occupied

3rd Floor Cr2 Awang Mason

L Balcony Retouch
Paid
Painter

4th floor Cr Kapak Mason


3rd Floor Cr Kapak Mason

M 2nd Floor Kitchen Repaint


Paid
Painter

Fence Repaint Painter

N 3rd Floor Window Leak

Occupied
Glass Installer

3rd Floor Window Leak Glass Installer


3rd Floor MBR Repaint Wall & Baseboard Painter

O 2nd Floor Skylight Repaint

Occupied
Painter

P Occupied

Manpower: 1 - Mason/Carpenter Total Manpower 0 0 0 0


1 - Electrician
1 - Helper
8 - Painter
1 - Bodegero
Average Manpower = 9 person
chedule)
DECEMBER 2 0 1 7
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1
1

1
NO WORK
NO WORK
NO WORK
1

1
1

1
1

2
1

2
1

2
1

2
NO WORK
NO WORK
NO WORK

1
1
2

1
1
1
1
1
1 1

1 1
1 1
1 1 1

1 1 1

1 1
1 1

0 9 9 9 9 11 9 0 0 0 0 0 0 0 0
Prepared by:
Engr. Mark Gerald Regala