Sei sulla pagina 1di 1

ROHTAS FASTENERS PVT. LTD.

DAIDO INDIA PVT.


PROCESS FLOW DIAGRAM Customer :
LTD.
PART DESCRIPTION:- ROLLER (DID-428) PFD No.: PFD-SA-125
Part No:- T44053-30 Rev. No.: 0; Rev. Date: 15.06.16 PFD Rev. No.: 00
USED AS MOVEMENT SYMBOL CAN BE
DIRECTION :- Rev. Date: 15.06.16
IN EITHER DIRECTION AS APPROPRIATE
PROCESS :- FORGING , FINAL INSPECTION
PREPARED BY:- ENGG. APPROVED BY :-

STEP OPERATION MOVEMENT STORE INSPECT PROCESS DESCRIPTION REMARKS

RECEIVING WIRE FROM RAW


MATERIAL SUPPLIER

10 RECEIVING INSPECTION (WIRE)

STORAGE OF WIRE

MOVE WIRE TO FORGING SHOP

20 FORGING (PATROL INSPECTION )

MOVED TO FINAL INSPECTION

30 FINAL INSPECTION

MOVED FOR PACKAGING SECTION

PACKAGING
40
(Apply RP Oil before Packing)

MOVED TO F.G. STORE (OPTIONAL )

F.G. STORAGE (OPTIONAL)

50 DISPATCH