WALEEDCOURSE
PMP PREPARATION ELBASYOUNI
Planning
BY PROCESS
®
& GROUPS
Project Control Engineer
Based On PMBOK Guide Sixth Edition
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
About Instructor
Engr. WALEED ELBASYOUNI, BSc, PMP, PMI-RMP, TOT
• Senior Project Control and Project Management Engineer With More Than 10 Years Experience In Construction
Prepared By Engr. :
Industry At Mega Projects In Egypt And Saudi Arabia.
• BSc. of Architectural Engineering, Cairo‐Egypt .
WALEED ELBASYOUNI
• Project Management Professional (PMP®) Certified By The Project Management Institute (PMI®), USA.
• Strategic Planning Diploma from NSP, Arab Center for Strategic Planning Studies.
2. WALEED
What is the Best Manner Of Study in thisELBASYOUNI
Course?
3. Planning
Who Is The & Project Control Engineer
Target Audience?
4. PMP®,
Why We Need StudyPMI-RMP®, TOT®,
PMP® By Process Groups ? MSc (Cand.)
5. After We Completed This Course, What Will We Learn?
7. Course Contents
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Course & Exam Requirements?
Course and Exam requirements?
• To be familiar with this Course all Students should be working in a Project environment organization.
Prepared By Engr. :
WALEED ELBASYOUNI
PMP Certification Eligibility Criteria
PMP®, PMI-RMP®,
Years of Project
Management Experience
TOT®,
3 Years (36 Months) MSc (Cand.)
5 Years (60 Months)
Hours Leading &
4,500 Hours 7,500 Hours
Directing Projects
• Hard or soft copy of the "A Project Management Body of Knowledge (PMBOK® Guide, Sixth Edition)" would
• This Course use the vertical way Method to study PMP® preparation Course, Presented by Process Groups.
Prepared By Engr. :
WALEED ELBASYOUNI
We will Follow the smart study way to gait a maximum benefits
Anyone who wishes to learn about Project Management according to PMI® Methodology.
Prepared •
By Engr. :
Project Managers, Project Sponsors, Project Management Office (PMO) team, Business
owners, Engineers, Project management field Start-ups, Management Consultants.
WALEED
• Anyone who wishes ELBASYOUNI
to improve his management skills of high complexity projects, in
• Anyone who wishes to shift his career to Project Management field, with Professional
PMP®, PMI-RMP®,
study. TOT®, MSc (Cand.)
• Fresh graduate Individuals who are willing to start a profession in the field of project
planning and management.
Prepared
•
By Engr. :
To understand how to implement the project management
Knowledge with more reality.
WALEED • ELBASYOUNI
Because the PMP® Exam designed by process groups Domains
• Describe and understand all Project Management processes, as outlined in the PMI® PMBOK® Guide
6th Edition. Prepared By Engr. :
• WALEED
Gain the all must necessary information to ELBASYOUNI
prepare for the Project
1. New Methodology
Prepared By Engr. :
• Change Management Methodology, Terminologies and all most information
Narrative Transferred from waterfall Management to agile management
WALEED
Methodology. ELBASYOUNI
Planning
•
& Project Control Engineer
From (systematic, linear, and traditional Method ) to (shortest time possible, more
flexibility)
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
What`s New in PMBOK Guide Sixth Edition
Waterfall
Prepared By Engr. :
It Is The More Traditional Project Management Methodology,
WALEED ELBASYOUNI
In Which Every Phase Of The Project Must Be Fully
It Is Ongoing, iterative and more flexibility Based On Principles Of Interaction And
Collaboration Among Team Members, Where Tasks Are Executed Quickly And In An
Adaptive Manner, This Helps To Improve The Overall Output With Every Iteration.
What`s New in PMBOK Guide Sixth Edition
2. Information Narrative
Prepared By Engr. :
• Add 4 new sections in each Chapter (Knowledge area).
KEY CONCEPTS
• Focus on Strategic and Business Knowledge and it`s
WALEED
relation with Project Management . ELBASYOUNI
TAILORING CONSIDERATIONS
What`s New in PMBOK Guide Sixth Edition
3. Structure
Prepared By Engr. :
• Added New Chapter On THE ROLE OF THE PROJECT MANAGER
WALEED ELBASYOUNI
Including The PMI Talen Triangle (Technical Project Management,
Leadership, Strategic And Business Management).
Planning & Project Control Engineer
•
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Added New Appendix (APPENDIX X3) about AGILE PRACTICE GUIDE, it`s
describes the use of agile from the perspective of the Project Management
Process Groups.
• Added, Moved, Eliminated, and Change Name on some of KNOWLEDGE AREA
AND PROCESS.
What`s New in PMBOK Guide Sixth Edition
3. Structure
Prepared By Engr. :
Added, Moved, Eliminated, and Change Name on some of KNOWLEDGE AREA AND PROCESS.
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
What`s New in PMBOK Guide Sixth Edition
3. Structure
Prepared By Engr. :
Added, Moved, Eliminated, and Change Name on some of KNOWLEDGE AREA AND PROCESS.
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
• Close Procurement Process has been removed as a process and
moved to Control Procurement and Close Project or Phase Process.
Management.
What`s New in PMBOK Guide Sixth Edition
3. Structure
Prepared By Engr. :
Added, Moved, Eliminated, and Change Name on some of KNOWLEDGE AREA AND PROCESS.
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
What`s New in PMBOK Guide Sixth Edition
3. Structure
Prepared By Engr. :
Added, Moved, Eliminated, and Change Name on some of KNOWLEDGE AREA AND PROCESS.
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
49
Processes
For More info. About PMBOK Changes follow
Appendix X1 Page 639 in PMBOK 6th Edition
Prepared By Engr. :
WALEED ELBASYOUNI
COURSE CONTENTS
Planning & Project Control Engineer
PMP®, PMI-RMP®,
To Cover 35 Hours PDUsTOT®,
Required toMSc (Cand.)
PMP Exam
Course Contents
PART 1
Prepared By Engr. :
• INTRODUCTION IN PROJECT MANAGEMENT
Course Contents
WALEED ELBASYOUNI
PART 2
Planning & Project Control Engineer
• THE ROLE OF THE PROJECT MANAGER
PMP®, PMI-RMP®,
PART 3
TOT®, MSc (Cand.)
• KNOWLEDGE ARIA (10 KNOWLEDGE ARIAS)
PART 4
• CORE COURSE BY PROCESS GROUPS (5 PROCESS GROUPS)
Course Contents
1. INTRODUCTION IN PROJECT MANAGEMENT
• Overview, Foundational Elements, Terminologies, Code Of Ethics And Professional Conduct.
2.
3.
THE ROLE OF THE PROJECT MANAGER.
Prepared By Engr. :
EACH KNOWLEDGE ARIA (10 KNOWLEDGE ARIAS)
•
•
WALEED ELBASYOUNI
Overview About All Processes.
Key Concepts
•
•
Planning
Trends And Emerging Practices
Tailoring Considerations
& Project Control Engineer
• PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Considerations For Agile/Adaptive Environments
4. CORE COURSE, STUDY PMP® PREPARATION BY PROCESS GROUPS.
• Overview About All Process Groups.
• Each Process Groups (5 Process Groups)
• Definition, Key Benefits, Inputs, Outputs, Tools And Techniques
• Application On All Most PM Forms And Templates
• Solve All Most Practical Questions About Each Process Groups
• Focus On Each Process Key Words
Prepared By Engr. :
Lecture 1
WALEED ELBASYOUNI
PROJECT MANAGEMENT FRAMEWORK
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Course Contents
KNOWLEDGE AREA
Prepared By Engr. :
PM FRAMEWORK & ROLE
OF THE PROJECT MANAGER
OVERVIEW
5 Lecture 1 2
WALEED ELBASYOUNI 5 Lecture
(10 KNOWLEDGE AREAS)
PROCESS GROUPS
3 4 AGILE‐ EXAM STRATEGY‐
(5 PROCESS GROUPS) MOCK EXAM‐FINAL REVISION
12 Lecture 4 Lecture
Course Availability
First 4 Lecture will be available in:
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
All Course Contents
with 35 Hours PDUs Certificate
Required to PMP Exam
Lecture 1 Agenda
PROJECT MANAGEMENT FRAMEWORK
Prepared By Engr. :
1. OVERVIEW AND PURPOSE
WALEED ELBASYOUNI
Planning & Project Control Engineer
2. FOUNDATIONAL ELEMENTS
• Prepared By Engr. :
Outcomes Of These Projects Were The Result Of Leaders And Managers Applying Project Management Practices,
WALEED ELBASYOUNI
Principles, Processes, Tools, And Techniques To Their Work.
Prepared By Engr. :
Why PMI Publishes The Code Of Ethics and Professional Conduct?
• To Instill Confidence In The Project Management Profession.
WALEED• ELBASYOUNI
To Help An Individual In Making Wise Decisions, Particularly
Planning & Project Control Engineer
When Faced With Difficult Situations .
PMP®, PMI-RMP®,•
TOT®, MSc (Cand.)
The Code Of Ethics and Professional Conduct Affirms These Four
Values As Its Foundation (Responsibility, Respect, Fairness, And
Honesty).
Project Management Framework
FOUNDATIONAL ELEMENTS
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
WHAT IS THE PROJECT ?
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
FOUNDATIONAL ELEMENTS
WHAT IS THE PROJECT ?
A Project is a Temporary Endeavor Undertaken To Create a Unique Product, Service, Or Result.
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
THE PROJECT DEFINITION ?
01
1.Temporary
WALEED ELBASYOUNI
Projects Drive Change In Organizations It`s Moving
04
An Organization From One State To Another State In
02
Because The Characteristics of The Both.
Project Will Not Be Repeated.
Project Management Framework
FOUNDATIONAL ELEMENTS
THE PROJECT DEFINITION ?
Prepared By Engr. :
3.Projects Drive Change
Projects Drive Change In Organizations It`s Moving
WALEED ELBASYOUNI
An Organization From One State To Another State
THE PROJECT DEFINITION ?
4. Business Value Creation
Prepared By Engr. :ﻣﻧﺎﻓﻊ ﻣﺎﺩﻳﺔ ﻭﻣﻧﺎﻓﻊ ﻣﻌﻧﻭﻳﺔ
The Benefit From Projects May Be Tangible, Intangible, Or Both.
01 WALEED ELBASYOUNI 02
Planning &
Examples of
Tangible Elements
Project Control Engineer
Examples of
Intangible Elements
PMP®, PMI-RMP®, TOT®, MSc
• Monetary assets (Cand.)
• Goodwill
• Stockholder equity • Brand recognition
• Utility • Public benefit
• Fixtures • Trademarks
• Tools • Strategic alignment
• Market share • Reputation
Project Management Framework
FOUNDATIONAL ELEMENTS
PROJECT INITIATION CONTEXT
ﺳﻳﺎﻕ ﺑﺩء ﺍﻟﻣﺷﺎﺭﻳﻊ
Prepared
• Organizational Leaders Initiate Projects in Response
to Factors Acting Upon Their Organizations.
By Engr. :
• WALEED
There are Four Fundamental Categories for These ELBASYOUNI
Factors.
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
FOUNDATIONAL ELEMENTS
FACTORS THAT LEAD TO THE CREATION OF A PROJECT New
technology
Prepared By Engr. :
Environmental Competitive
These Factors Ultimately Should Link to the Strategic considerations forces
Examples of
Political
changes
Creation of a
Business
Project
Economic
process
changes
improvements
Legal Customer
requirement request
Stakeholder
demands
Project Management Framework
FOUNDATIONAL ELEMENTS
Prepared By Engr. :
WHAT IS A DIFFERENCE AND SIMILARITIES BETWEEN
WALEED ELBASYOUNI
PROJECT & OPERATION?
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
FOUNDATIONAL ELEMENTS
WHAT IS A DIFFERENCE AND SIMILARITIES BETWEEN PROJECT & OPERATION?
Prepared By Engr. :
Differences
WALEED ELBASYOUNI
•
•
Planning & Project Control Engineer
Project is Temporary and Unique.
Operation is On‐going and Repetitive.
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Similarities
• Both of them Planned, executed and controlled.
• Both of them Need and Performed By Man Power.
Project Management Framework
FOUNDATIONAL ELEMENTS
Prepared By Engr. :
WHAT IS PROJECT MANAGEMENT?
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
WHAT IS THE IMPORTANCE OF PROJECT
MANAGEMENT ?
Project Management Framework
FOUNDATIONAL ELEMENTS
WHAT IS PROJECT MANAGEMENT?
Prepared By Engr. :
• Project Management is the Application of Knowledge, Skills, Tools, and Techniques
WALEED ELBASYOUNI
to Project Activities to Meet the Project Requirements.
Processes Identified For The Project.
• Project Management Enables Organizations To Execute Projects
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
WHAT IS THE IMPORTANCE OF
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
PROJECT MANAGEMENT ?
Project Management Framework
FOUNDATIONAL ELEMENTS
THE IMPORTANCE OF PROJECT MANAGEMENT
Effective
Prepared By Engr. :
Poorly
Project Management
WALEED ELBASYOUNI Project Management
Prepared By Engr. :
WALEED ELBASYOUNI
The Relationship Between
Planning & Project
PROJECT, PROGRAM, PORTFOLIO, Control Engineer
PMP®, PMI-RMP®,
AND OPERATIONS MANAGEMENT TOT®, MSc (Cand.)
Project Management Framework
FOUNDATIONAL ELEMENTS
RELATIONSHIP OF PROJECT, PROGRAM, PORTFOLIO, AND OPERATIONS MANAGEMENT
WALEED ELBASYOUNI
Scenarios:
• As a Stand‐alone Project (Outside Of A Portfolio
Prepared By Engr. :
• Projects: a temporary endeavor undertaken to create
a unique product, service, or result.
•
WALEED ELBASYOUNI
Planning & Project Control Engineer
Programs: is a group of related projects, subsidiary
programs, and program activities that are managed in
PMP®, PMI-RMP®,
a coordinated manner to obtain benefits not
available from managing them individually.
TOT®, MSc (Cand.)
• Portfolios: is a collection of projects, programs,
subsidiary portfolios, and operations managed as a
group to achieve strategic objectives.
Project Management Framework
FOUNDATIONAL ELEMENTS
PROJECT, PROGRAM, PORTFOLIO AND OPERATIONS MANAGEMENT WITH ORGANIZATIONAL STRATEGY
WALEED ELBASYOUNI
Components are Grouped Together in Order To Facilitate
The Effective Governance and Management of The Work
Planning & Project Control Engineer
That Helps To Achieve Organizational Strategies and
Prepared By Engr. :
program and project goals and objectives.
WALEED ELBASYOUNI
• Managing program risks that may impact multiple projects in the
program.
Prepared By Engr.ﺇﺩﺍﺭﺓ
ﺍﻟﻣﺣﺎﻓــــﻅ :
WALEED• Guide Organizational Investment Decisions.
ELBASYOUNI
Planning & Project Control Engineer
• Select The Optimal Mix Of Programs and Projects To Meet Strategic
Prepared By Engr. :
Operations Management: is an area that is outside the scope of formal project management as described in this guide, is
concerned with the ongoing production of goods and/or services.
WALEED ELBASYOUNI
OPERATIONS AND PROJECT MANAGEMENT:
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PROJECT
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
AND DEVELOPMENT LIFE CYCLES
Project Management Framework
FOUNDATIONAL ELEMENTS
PROJECT LIFE CYCLES 4. Ending the Project
Closing Processes PHASE 4
Prepared By Engr. :
3. Carrying Out the Work
WALEED ELBASYOUNI
Executing Processes PHASE 3
2. Organizing and Preparing
Planning & Project ControlMonitoring And Controlling Processes
Planning Processes PHASE 2 Engineer
Throughout the project Timeline we handling
PROJECT AND DEVELOPMENT LIFE CYCLES
Project Management Framework
FOUNDATIONAL ELEMENTS
PROJECT AND DEVELOPMENT LIFE CYCLES
The Project Life Cycle Needs To Be Flexible Enough, This Flexibility May Be Accomplished By:
Prepared By Engr. :
•
WALEED ELBASYOUNI
Identifying The Process Or Processes Needed To Be Performed
• PMP®,
Performing PMI-RMP®,
The Process TOT®,
Or Processes Identified In The MSc (Cand.)
Appropriate Phase.
Project Management Framework
FOUNDATIONAL ELEMENTS
PROJECT AND DEVELOPMENT LIFE CYCLES
WALEED ELBASYOUNI
• Costs and the Team is a little
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
FOUNDATIONAL ELEMENTS
PROJECT LIFE CYCLES TYEPS
Prepared By Engr. :
1. In a Predictive Life cycle:
• The Project Scope, Time, And Cost Are Determined In The Early
Phases Of The Life Cycle. WALEED ELBASYOUNI
3. In An Incremental Life Cycle:
Prepared By Engr. :
WALEED ELBASYOUNI
• The Deliverable Is Produced Through A Series Of Iterations That
Successively Add Functionality Within A Predetermined Time Frame.
• Planning & Project Control Engineer
The Deliverable Contains The Necessary And Sufficient Capability To
4. Adaptive life cycles are agile, iterative, or incremental:
• The detailed scope is defined and approved before the start of an
iteration.
• Adaptive life cycles are also referred to as agile or change‐driven life
cycles. See Appendix X3.
Project Management Framework
FOUNDATIONAL ELEMENTS
PROJECT LIFE CYCLES TYEPS
5. A Hybrid Life Cycle:
Prepared By Engr. :
WALEED ELBASYOUNI
• Is A Combination Of A Predictive And An Adaptive Life Cycle.
Planning & Project Control
• Those Elements Of The Project That Are Well Known Or Have Fixed
Engineer
PMP®,
Requirements Follow A PMI-RMP®,
Predictive Development Life TOT®,
Cycle, And MSc (Cand.)
Those Elements That Are Still Evolving Follow An Adaptive
Development Life Cycle.
Project Management Framework
PMBOK 6th STRUCTURE
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMBOK 6 STRUCTURE
TH
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
PMBOK 6th STRUCTURE
Prepared By No.
Page Engr.25 :
WALEED• ELBASYOUNI
Project Management Knowledge Areas ( 10 Knowledge Areas)
( 10 Knowledge Areas)
(5 Process Groups )
Project Management Framework
PMBOK 6th STRUCTURE
Prepared By Engr. :
WALEED ELBASYOUNI Outputs
• Outputs 1
Planning & Project Control Engineer •• Outputs 2
Outputs 3
PMP®, PMI-RMP®, TOT®, MSc (Cand.)• Outputs 4
Inputs
• Input 1
• Input 2
• Input 3
• Input 4 Tools & Techniques
Project Management Framework
PMBOK 6th STRUCTURE
Do You Implement All 49 Process In Your Project ? Do You Have any Categorization?
• Prepared By Engr. :
The Number Of Process Iterations and Interactions Between Processes Varies Based
WALEED ELBASYOUNI
on the Needs of the Project.
•
Planning & Project Control Engineer
Processes Generally Fall Into One Of Three Categories.
1. Processes Used Once Or At Predefined Points In The
Project.
The Processes Develop Project Charter And Close Project Or Phase
Project Management Framework
PMBOK 6th STRUCTURE
Do You Implement All 49 Process In Your Project ? Do You Have any Categorization?
• Prepared By Engr. :
The Number Of Process Iterations and Interactions Between Processes Varies Based
WALEED ELBASYOUNI
on the Needs of the Project.
•
Planning & Project Control Engineer
Processes Generally Fall Into One Of Three Categories.
2. Processes That Are Performed Periodically As Needed.
The Process Acquire Resources Is Performed As Resources Are Needed.
Project Management Framework
PMBOK 6th STRUCTURE
Do You Implement All 49 Process In Your Project ? Do You Have any Categorization?
• Prepared By Engr. :
The Number Of Process Iterations and Interactions Between Processes Varies Based
WALEED ELBASYOUNI
on the Needs of the Project.
•
Planning & Project Control Engineer
Processes Generally Fall Into One Of Three Categories.
3. Processes That Are Performed Continuously Throughout
The Project.
The Process Define Activities May Occur Throughout The Project Life Cycle, Many
Of The Monitoring And Control Processes Are Ongoing From The Start Of The
Project
Project Management Framework
Summary
• Prepared By Engr. :
Project Management Historical Background
•
WALEED
Code Of Ethics and Professional Conduct
ELBASYOUNI
Planning & Project Control Engineer
What is The Project ?
• Project Definition and Characteristic?
• PMP®, PMI-RMP®,
What is a Difference and Similarities Between TOT®, MSc (Cand.)
Project & Operation?
• What is Project Management?
• What Is The Importance of Project Management ?
• The Relationship Between Project, Program, Portfolio, and Operations Management
Prepared By Engr. :
WALEED ELBASYOUNI
1. Project Management Data and Information Flow
2. Tailoring
Planning & Project Control Engineer
3. Project Management Business Documents
Through Project Life Cycle 3
Prepared By 2 Engr. :Work Performance Reports
1 WALEED ELBASYOUNI
Work Performance Information
Work Performance Data
Planning
Aggregation
& Project
Transfer Control Engineer
Analysis
PMP®, PMI-RMP®, TOT®, MSc (Cand.) Overall
Executing Project Control
Processes Controlling
Processes
Project Management Framework
Project Management Data & Information Flow
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Page 27
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
TAILORING
ﺍﻟﺗﺧـﺻﻳــﺹ
Project Management Framework
Tailoring
Tailoring Project Management To The Project
Prepared
•
By Engr. :
Selection Project Management Processes, Inputs, Tools, Techniques, Outputs,
WALEED ELBASYOUNI
and Life Cycle Phases Should Be Selected To Manage a Project. This Selection
ﻳﺟ ﺏ ﻋﻠ ﻰ ﻣ ﺩﻳﺭ ﺍﻟﻣﺷ ﺭﻭﻉ ﺍﻥ ﻳﺗﻌ ﺎﻭﻥ ﺑﺩﺭﺟ ﺔ ﻛﺑﻳ ﺭﺓ ﻣ ﻊ ﻓﺭﻳ ﻖ ﺍﻟﻣﺷ ﺭﻭﻉ ﻭﺍﻟﺟﻬ ﻪ
.ﺍﻟﺭﺍﻋﻳﺔ ﻟﻪ ﻭﺍﻻﺩﺍﺭﺓ ﺍﻟﺗﻧﻅﻳﻣﻳﺔ ﻟﻠﻣﻧﻅﻣﺔ ﻓﻰ ﻋﻣﻠﻳﺔ ﺍﻟﺗﺧﺻﻳﺹ ﻭﺗﺣﺩﻳﺩﻫﺎ ﺑﻌﻧﺎﻳﺔ ﺷﺩﻳﺩﺓ
Project Management Framework
Tailoring
Why Tailoring is Necessary for Each Project ?
•
Prepared By Engr. :
Because Each Project Is Unique, So Not Every Process, Tool, Technique, Input,
WALEED ELBASYOUNI
Or Output Identified In The PMBOK® Guide Is Required On Every Project.
PMP®,
Quality, and Risk and PMI-RMP®,
Make Balance Between The TOT®,
Importance Of MSc
Each (Cand.)
Constraint Is Different For Each Project.
• The Project Manager Tailors the Approach for Managing These Constraints Based on the Project Environment,
Organizational Culture, Stakeholder Needs, and other Variables.
Prepared By Engr. :
WALEED ELBASYOUNI
PROJECT MANAGEMENT
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
BUSINESS DOCUMENTS
Project Management Framework
Project Management Business Documents
WALEED ELBASYOUNIProject Management Approach Captures The Intent
Maintained Throughout The Project Life Cycle.
Project Management Framework
Project Management Business Documents
01
Project Business Documents Project
Prepared By Engr. : Business Case
WALEED ELBASYOUNI
Planning 04
& Project Control Engineer
Project Charter
PMP®, PMI-RMP®, TOT®, MSc Project (Cand.)
03 Management Plan
Project
Benefits Management Plan 02
Project Management Framework
Project Management Business Documents
Prepared By Engr. :
Business/Project Documents
WALEED ELBASYOUNI
Pre‐Project Work (Before Initiating)
Project Charter
Organizing and Preparing (Planning)
Project Management Plan
Project Management Framework
Project Management Business Documents
1
Project Business Documents
Prepared
PROJECT BUSINESS CASE By Engr. :
WALEED ELBASYOUNI
•
Planning & Project Control Engineer
A Documented Economic Feasibility Study Used To
Initiation.
• It Helps Measure The Project Success at The End Of
The Project Vs The Project Objectives.
Project Management Framework
Project Management Business Documents
1 Project Business Documents
Prepared BySITUATION ANALYSIS
PROJECT BUSINESS CASE Engr. :
WALEED ELBASYOUNI • Identification Of Organizational Strategies, Goals,
PMP®,
Precedes The PMI-RMP®, TOT®, MSc (Cand.)
• Identification Of Root Cause(s) Of The Problem
• Often Business Case To
• Identification Of Known Risks
Understanding Business Goals, Objectives,
• Identification Of Critical Success Factors
Issues, and Opportunities and Recommending
Proposals to Address Them. • Identification Of Decision Criteria
Project Management Framework
Project Management Business Documents
2 Prepared
Project Business Documents
PROJECT BENEFITS MANAGEMENT PLAN
By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
•
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Is The Document That Describes How and When the Benefits of
That Should Be In Place To Measure Those Benefits.
Project Management Framework
Project Management Business Documents
2
Project Business Documents
Prepared By Engr. :
PROJECT BENEFITS MANAGEMENT PLAN
• WALEED ELBASYOUNI
Target Benefits
• Planning
Strategic Alignment& Project Control Engineer
PMP®,
•
PMI-RMP®, TOT®, MSc (Cand.)
Timeframe For Realizing Benefits
• Benefits Owner
• Metrics
• Assumptions
• Risks
Project Management Framework
Project Management Business Documents
Project Business Documents
Prepared
3 By Engr. :
PROJECT CHARTER
WALEED ELBASYOUNI
Planning & Project
• Control Engineer
One of Most Important Document of any Project
PMP®, PMI-RMP®,
• TOT®,
Defined as a Document MSc (Cand.)
Issued By The Project
Sponsor That Formally Authorizes The Existence of a
Project.
• Provides The Project Manager With The Authority .
Project Management Framework
Project Management Business Documents
Project Business Documents
4 Prepared By Engr.
PROJECT MANAGEMENT PLAN :
WALEED ELBASYOUNI
• Planning & Project Control Engineer
Defined as The Document That Describes How The
HOW TO MANAGE
PROJECT
Prepared By Engr. :
SUCCESS MEASURES
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
Project Success Measures
Challenges in Project Management
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc One Of The (Cand.)
Most Common Challenges in
Whether or Not a Project is Successful.
Project Management Framework
Project Success Measures
We Have Three Questions That The Project Manager And Key Stakeholders Should
Answer:
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
Project Success Measures
Project Success Objectives May Include but are not Limited to:
Prepared By Engr. :
• Completing The Project Benefits Management Plan
• Meeting The Financial Measures Documented In The Business Case.
WALEED ELBASYOUNI
• Net Present Value (NPV)
THE PROJECTS ENVIRONMENT
Project Management Framework
The Projects Environment
Project Influences
Prepared By Engr. : Project
WALEED ELBASYOUNI
Projects exist and operate in environments that may have an
influence on them, These influences can have a Positive or
Influences
2 OPA
OPAs are internal to the organization.
Project Management Framework
The Projects Environment
Prepared
EEFs and OPAs
By Engr. :
WALEED ELBASYOUNI
• Are Considered As Inputs To Many Project Management Processes,
Planning & Project Control Engineer
Specifically For Most Planning Processes.
Options.
Influence On The Outcome.
Project Management Framework
The Projects Environment
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
The Projects Environment
1 EEF
Prepared By
ENTERPRISE ENVIRONMENTAL FACTORS Engr. :
EEFs Internal To The Organization
WALEED ELBASYOUNI • Organizational Culture, Structure, And Governance
•
Planning & Project Control
Not Under The Control Of The Project Team, That
Engineer
• Geographic Distribution Of Facilities And Resources
• Employee Capability
Project Management Framework
The Projects Environment
1 EEF
Prepared By
ENTERPRISE ENVIRONMENTAL FACTORS Engr. :
EEFs EXTERNAL TO THE ORGANIZATION
WALEED ELBASYOUNI • Marketplace conditions
•
Planning & Project Control
Not Under The Control Of The Project Team, That
Engineer
• Social and cultural influences and issues
• Physical environmental elements
Project Management Framework
The Projects Environment
2 OPA
Prepared By
ORGANIZATIONAL PROCESS ASSETS Engr. :
Processes, Policies, and Procedures
• Issue and Defect Management Procedures
• Project Closure Guidelines or Requirements
Project Management Framework
The Projects Environment
2 OPA
Prepared By• Engr.
ORGANIZATIONAL PROCESS ASSETS
Organizational Knowledge Repositories
:
WALEED ELBASYOUNI
Configuration Management (Software And
• Measurement Data On Processes
• Project Files From Previous Projects
Project Management Framework
Summary
• Prepared By Engr. :
Project Management Data & Information Flow
•
WALEED
Tailoring Project Management To The Project
ELBASYOUNI
Planning & Project Control Engineer
Project Management Business Documents
• Project Business Case
• Project Charter
• Project Management Plan
• Project Success Measures
• The Projects Environment
• Enterprise Environmental Factors ‐ Organizational Process Assets
Prepared By Engr. :
Lecture 3
WALEED ELBASYOUNI
PROJECT MANAGEMENT FRAMEWORK
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Lecture 3 Agenda
PROJECT MANAGEMENT FRAMEWORK
Prepared By Engr. :
1. ORGANIZATIONAL SYSTEMS
WALEED ELBASYOUNI
2. PROJECT MANAGEMENT OFFICE
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
3. PROJECT CONSTRAINTS
4. PROJECT STAKEHOLDERS
Project Manager Needs To Understand his Responsibility
Prepared By Engr. :
WALEED ELBASYOUNI
The Project Manager Needs to Understand Where Responsibility,
Project.
ﻋﻠ ﻲ ﻣ ﺩﻳﺭ ﺍﻟﻣﺷ ﺭﻭﻉ ﺍﻥ ﻳ ﺗﻔﻬﻡ ﺣ ﺩﻭﺩ ﻭﺍﺟﺑﺎﺗ ﻪ ﻭﺻ ﻼﺣﻳﺎﺗﻪ ﺟﻳ ﺩﺍ ﻟﻳﺻ ﺑﺢ ﺍﻛﺛ ﺭ ﺗ ﺎﺛﻳﺭﺍ
.ﻭﺗﻛﻭﻥ ﻟﻪ ﺍﻟﻘﺩﺭﻩ ﻋﻠﻰ ﺍﺳﺗﺧﺩﺍﻡ ﻗﻭﺗﻪ ﻭﺗﺎﺛﻳﺭﻩ ﻓﻰ ﺍﻛﻣﺎﻝ ﻋﻣﻠﻳﺔ ﻧﺟﺎﺡ ﺍﻟﻣﺷﺭﻭﻉ
Project Management Framework
Organizational Systems
WALEED ELBASYOUNI
Organizations. This Framework Includes But Is Not Limited To:
ORGANIZATIONAL STRUCTURE TYPES
Prepared
What is the Factors In Organization Structure Selection ?
•
By Engr. :
WALEED ELBASYOUNI
Degree of alignment with organizational objectives
• Specialization
•
PMP®,
Delegation capabilities
Responsibility
PMI-RMP®, TOT®, MSc (Cand.)
• Efficiency of performance
• Cost considerations
• Clear communication
• locations
Project Management Framework
Organizational Systems
ORGANIZATIONAL STRUCTURE TYPES
1. Organic or Simple
Prepared By Engr. :
2. Functional (centralized)
WALEED 3.ELBASYOUNI
Multi‐divisional
5. Matrix – weak
Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
6. Matrix – balanced
7. Project‐oriented
8. Virtual
9. Hybrid
10. PMO
Page 47
Project Management Framework
Organizational Systems
ORGANIZATIONAL STRUCTURE TYPES
Prepared By Engr. :
Organizational Structures on Projects can classify by some Factors
WALEED
Project Manager’s Authority ELBASYOUNI
Resource Availability
Work Groups Arranged by Project
Management Administrative Staff
Project Management Framework
Organizational Systems
ORGANIZATIONAL STRUCTURE TYPES
Prepared By Engr. :
Organic or Simple
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Functional(centralized)
Project Management Framework
Organizational Systems
ORGANIZATIONAL STRUCTURE TYPES
Project Management Office (PMO) Types
01
• Prepared By Engr. :
A Project Management Office (PMO) Is an
Supportive
WALEED ELBASYOUNI
Organizational Structure That Standardizes The
Project Management Office (PMO) Types
Supportive.
Prepared By Engr. :
• Provide A Consultative Role To Projects By Supplying Templates, Best Practices,
Training, Access To Information, And Lessons Learned From Other Projects.
WALEED ELBASYOUNI
• The Degree Of Control Provided By The PMO Is Low.
PlanningControlling.
& Project Control Engineer
PMP®, PMI-RMP®, TOT®, ‐ Use Of MSc (Cand.)
• Provide Support And Require Compliance Through Various Means (Conformance
To Governance Frameworks Specific Templates, Forms, Methodologies
And Tools)
• The Degree Of Control Provided By The PMO Is Moderate.
Directive.
• Take Control Of The Projects By Directly Managing The Projects. Project
Managers Are Assigned By And Report To The PMO.
• The Degree Of Control Provided By The PMO Is High.
Project Management Framework
Project Management Office
Project Management Office (PMO) a Primary Function and Authority
Prepared By Engr. :
PMO Authority
A PMO may have the authority to act as an integral stakeholder and a key decision
WALEED
maker throughout the life ELBASYOUNI
of each project in order to keep it aligned with the
PMO Primary Function
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
• Managing shared resources across all projects
• Coaching and training
• shared documentation (organizational process assets)
• Coordinating communication across projects
Prepared By Engr. :
WALEED ELBASYOUNIProject
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Constraint
Project Management Framework
Project Constraint
Customer Satisfaction
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc
Resources Risk
(Cand.)
Prepared By Engr. :
WALEED ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project
STAKEHOLDERS
Project Management Framework
Project Stakeholders
Prepared By Engr. :
Affect, Be Affected By, Or Perceive Itself To Be Affected By A Decision,
Activity, Or Outcome Of A Project, May Be Internal Or External May
WALEED
Have A Positive Or Negative Impact On The Project . ELBASYOUNI
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
Project Management Framework
Project Stakeholders
Prepared By Engr. :
WALEED ELBASYOUNI
Internal Stakeholders
• Sponsor
Planning
• Resource Manager
& Project Control Engineer
External Stakeholders
• Customers
PMP®, PMI-RMP®, TOT®,
• Project Management Office MSc (Cand.)
• End users
(PMO) • Suppliers
• Portfolio Manager • Shareholders
• Program Manager • Regulatory bodies
• Project Managers Of Other • Competitors
Projects Team Members
Project Management Framework
Summary
– Organizational Structures on Projects can classification Factors
• PROJECT MANAGEMENT OFFICE
• Project Management Office (PMO) a Primary Function and Authority
• Project Constraint
• Project Stakeholders ( Internal – External )
Thank You
Prepared By Engr. :
ﻙWALEEDُ َ ﺭﻙ َﻭﺃﺗ
ﻭﺏ ﺇﻟ ْﻳ ْ ELBASYOUNI
َ ﺳﺗ ْﻐ ِﻔ ﺃﻥ ﻻ ﺇﻟﻪ ﺇﻻ ﺃ ْﻧﺕ ﺃ َ ﺳ ْﺑﺣﺎﻧَﻙ ﺍﻟﻠﱠ ُﻬ ّﻡ ﻭﺑ َﺣ ْﻣ
ْ ﺩﻙ ﺃﺷْﻬ ُﺩ
Planning & Project Control Engineer
PMP®, PMI-RMP®, TOT®, MSc (Cand.)
ﻻﺗﻧﺳﻲ ﺍﻹﺷﺗﺭﺍﻙ ﻓﻰ ﺍﻟﻘﻧﺎﺓ ﻟﻳﺻﻠﻙ ﻛﻝ ﺟﺩﻳﺩ
If You Need Any Further Comments Or Help Feel Free To Contact With Me On