P0022-CS-E-009

RAPID PROJECT REFINERY TANK FARM

Sheet 1 of 1

REV 1

EQUIPMENT GROUNDING INSTALLATION AND CONNECTION REFERENCE DRAWING:


CHECKLIST
TAG DESCRIPTION: TAG NO:
Location SYSTEM/DUTY:
Type of Conductors
Type of Electrodes
ITEM
DESCRIPTION OF CHECK
EQUIPMENT GROUNDING CONNECTION

INSPECTION: Verify the following are in accordance with design documents CONTRACTOR IPMT
1
Visual inspection during pulling cable
2 Check cable size and installation
3 Primary conductor is correct size and type in accordance with drawings
4 Ground/ear thing conductor burial depth and routing per drawings and specifications
5 Thermal/compression connections checks (no cold joints or burnouts)
6 Check cable clamp and layout
7 Exothermic (Thermite) welds shall be installed in accordance with the listing requirements and
manufacturer's instructions.
[NEC 110.3(B)]
8 Location, type, size and insulation colour of equipment taps per drawings and protected during
construction
9 Inspect resistance of each/groups Resistance Reading (Resistance to Earth and Loop Continuity)
P0022-CS-E-008
10 All field Revisions recorded on as-build drawings

11 Check grounding connection proper fixing with standard Lugs


12 Check cable clamp and layout
13 Calibration details of equipment measuring tester

14 General Requirements

15 Ground busses in switchgear and motor control centres (control Gear) and all other electrical
equipment shall have two Connections to the main ground electrode.
16 Metallic enclosures for switchgear and motor control centres
(Control gear) and all other electrical equipment shall be
Connected to a supplementary grounding electrode when not
Bolted to grounded structural steel.
17 Frames of switchgear and control assemblies and all other
Electrical equipment shall be connected to an equipment
Grounding conductor or, where permitted, the grounded
Conductors. (NEC 490.36)
18 System grounding connections shall be made directly to the main ground electrode.
19
Tanks of medium and high voltage transformers and ground busses for switchgear and motor control
centres shall have two paths for current to flow to this ground electrode.

20
Cable should be cleaned prior to welding. (NEC 110.3B) [ERICO Prod. A-1K-03]

21
Equipment grounding shall be done as per of except that required local supplementary grounding of
motors, low voltage transformers, etc. which are not in the main substation area may be done by using
a bonding jumper that is connected to structural steel or deck plate by brazing or exothermic welding .

C REMARKS/OBSERVATIONS:

CONTRACTOR QA/QC INSPECTOR IPMT/QA/QC INSPECTOR


NAME: NAME:

SIGNATURE: SIGNATURE:

DATE: DATE: