Sei sulla pagina 1di 4

Chandan Kumar Sarangi

(RF Professional) Mobile:+91 9731894566/7026602548


Email: sarangichandan@gmail.com

SYNOPSIS

 An Electrical & Electronics graduate with around 12 Years of experience in RF Optimization/Planning


GSM, WCDMA and LTE, associated with Huawei Telecommunication as Deputy Manager Bangalore.
 A well experienced telecommunications professional with proven skill in RF Planning & Optimization,
Man Management, Process, Audit, Quality Control, Engineering Support, Documentation, and General
Administration.
 A keen communicator having strong analytical, logical abilities with team leading quality. To attain
exposure to various task and projects in order to contribute in the growth of the organization.

CAREER OVERVIEW

 ZTE Telecom India Pvt.Ltd.Banglore


Project-1: IDEA Karnataka LTE Rollout and 2G SRAN Solution project and Supervisory MS.
Project-2: Vodafone Karnataka & Pune 4G Small Cell, Massive MIMO and 8T-8R deployment.
Role : RF Manager

 Huawei Telecommunication(I) Pvt.Ltd.Banglore (May’14 to Nov’15)


Project-1: Bharti Karnataka 3G & LTE (Managed Services)-Project (ROK-RF Lead)
Project-2: Vodafone Karnataka 2G Swap & 3G-4G Rollout (RF Lead)
Role : Deputy Manager

 Ericsson India Global Services Pvt.Ltd.Banglore (Dec’11 to May’14)


Projects: Orange France 3G Swap Project, Bytel France 2G Swap Project, Wataniya 3G
Initial Tuning Rollout project, ZAIN Sudan 2G, 3G Modernization.
Role : Sr.Engineer CA Access

 Nokia Siemens Networks Pvt. Ltd., Siliguri & Malda ROB (Kolkata)( June’10 to Dec'11)
Project : Bharti (Airtel), ROWB
Role : RF Optimization Engineer (NPO Engineer)

 Metro Wireless Engineering (I) Pvt. Ltd., Patna & Meerut (July’09 to June’10)
Project : Bharti & Tata Docomo
Vendor : Nokia Siemens Networks
Role : Sr.RF Engineer (RF Team Lead)

 ADACellworks Wireless Networks Ltd., Kolkata, West Bengal (August’07-July’09)


Project : Bharti Airtel, ROWB
Vendor : Nokia Siemens Networks
Role : RF Optimization Engineer

 Kelly Services Pvt.Ltd., Orissa (Bhubaneswar), (June ’06-August’07)


Project : Bharti Airtel, Orissa
Vendor : Nokia Siemens
Role : RF Data Collector
ORGANISATIONAL DETAILS & RESPONSIBILITIES

 Since Nov-2015 associated with ZTE Telecommunication India Pvt.Ltd.Banglore, as RF


Manager.
Key Responsibilities:
 Responsible for 7000 2G Node swap / modernization and LTE Rollout for Idea-Karnataka.
 Overall responsibility to maintain & improve voice & data KPIs after 2G & LTE Rollout.
 65nos. Q-Cell deployed as in-building solutions (4G-IBS) in corporate houses.
 Responsible for timely report submission as per WLA to customer. Customer interaction daily &
Weekly for discussion of KPI related issues /Signoff & for cluster acceptance.
 SON Feature testing and implementation (RIM, MRO, MLB, RO and Self-Healing).
 Successful implementation of 4G ICR from IDEA to Vodafone (First across all Idea Circles).
 Successfully tested VOLTE and SRVCC services for Idea and Vodafone Karnataka Circle.
 Organizing and conducting practical and theoretical training programs, to enhance skills &
motivation levels of team.
 Managed a team size of 80+ engineers, Coaching and mentoring individuals, performance
reviews to set higher & achievable targets.
 600 outdoor Small cell E to E deployment in Vodafone KTK to meet capacity and coverage
requirement with RF AT
 Delivered 40nos. Massive MIMO and 20nos. 8T-8R, POC project for Pune Vodafone circle.
 Responsible for AMC and ELITE Project to ensure Idea-KTK Ranking in Top-5 among all 22 Circle.

Achievements:

 Part of 1st circle to launch Idea-LTE in Karnataka and swapped 2100 sites in 3month tenure.
 Received Star performer award for Delivery excellence and customer satisfaction.

 Since May-2014 to Nov-2015 associated with Huawei Telecommunication(I)


Pvt.Ltd.Banglore, as Deputy Manager.(Working as Quality Lead for ROK Region 3G & 4G)
Key Responsibilities:
 Overall responsibility to maintain & improve voice & data KPIs in 3G & LTE.
 Meeting TRAI guidelines & New site rolled out obligation as per TERM, along with broad band
testing of 30% of the sites for EMF.
 Fine tuning of parameters related to Voice & Data KPIs in the Huawei BSS, which included
conducting trials on new & advanced features offered to customer.
 Prototype feature testing, parameters & functionality testing in both 3G & LTE.
 Working in close coordination with Business team, to identify market potential and traffic growth,
and helping in gross additions and revenue generation; Involved in Utilization improvement
Projects with Sales team.
 Forecast of critical hardware, licenses etc. & planning for capacity requirements
 Analysis of 3G and LTE KPI’s (Key Performance Indicators) to improve the Accessibility,
Retainability, and Throughput and ensure to achieve MAPA targets.
 Weekly review meeting with Bharti Quality team on KPIs and Customer complains.
 Monthly meeting with H-CTO on ORM PPT discussion, support and action plans.
 Implementing special Projects viz IPL Cricket Match, Exhibitions, Festivals, Large gathering, to
take on additional voice/data load, maintaining KPIs & off loading traffic, by various cost effective
means.
 VIP Routes, event management and monthly TRAI Data submission.
 Monthly ZBM meeting along with sales team in the clusters understand their pain points and
share our action plan.
 Complaint management, customized solution and ensuring TAT / SLA targets are met.

Achievements:

 Achieved #1 position continuously for 6 quarters in top towns for Bharti 3G in comparative
Benchmarking
 Successfully Launched LTE services in Mangalore, Mysore & Hubli Towns in a very stringent time
line with all SCFT and Cluster AT. Highly appreciated by Bharti Commercial and Quality team.
 Active participant for Maximizing revenue for Bharti during special Projects
 Recipient of “Shining Star” award year 2014.
 Since Dec-2011 to May-2014 associated with Ericsson India Global Services Pvt.Ltd, as
Senior RF Engineer.

Project-1: Worked for 6 Months for Orange- France 3G Swap project (Form Nortel to Ericsson BTS).
 Post lunch KPI Analysis & Parametric Optimization of 3G network.
 Maintaining and improving WCDMA network performance and quality in terms of Radio CS, R99,
HSDPA & EUL KPIs for accessibility, retainability, mobility (SHO & IRAT Handover Success) ,R99
Data/HSDPA Throughputs, 2G/ 3G Traffic in the Network.
 Dashboard Reports, Routine daily/weekly and monthly Reports etc. involving network KPIs and
worst cells by making use of raw counters and available Performance reports.
 Accessibility, Retainability, and Service Integrity analysis for different KPI.
 BO/ENIQ for generating Daily report Reporting-Performance Scheduling & Analysis of WNCS
neighbor report.
 Processing and analysis of Ericsson OSS-RC Tools like WCDMA Measurement Results Recording
(WMRR) to figure out the overshooting cells and DL CPICH Ec/No and RSCP measurements to
isolate Interference and coverage issues in the cells.
 Analyze the FFAX recording to find out the cross-feeder & faulty antenna at the Node, Using
Ericsson OSS tools and RNC traces like GPEH, UETR & CTR for worst cell analysis.
 Recommend 3G Parameter changes to improve KPIs.

Project-2: Worked for almost 4 Months Bytel-France Swap project for MED Region. (Nortel to
Ericsson swap Project). Responsible for 2G Rollout and cluster acceptance.
 Responsible for the overall KPI maintenance of swapped BTSs & any issue detected is to the
concerns for immediate resolution.
 Daily & weekly PPT presentation for worst cell analysis.
 Service affecting Alarm, Outage, TCH availability mapping for worst cells. Also responsible for
raising Trouble Tickets for alarm affected cell.
 Weekly conduct the team meeting to explain them the new requirements & challenges. Also
arrange trainings for team members to enhance their Technical competency.

Project-3: Wataniya 4G Initial Tuning Rollout project for Algeria Region.


 Analysis of LTE KPI’s (Key Performance Indicators) to improve the Accessibility, Retainability,
Throughput, Coverage & Interference using Acitx Analyzer.
 Perform parameter audit using ERTT and compare same with Gold Standard, accordingly
recommending parameter change for network using ERTT tools.
 Perform PCI audit to find any PCI collision in network and according to level of PCI collision and
HOSR, change, HO parameters optimization or physical optimization.
 Worked on Tems Discovery and Gladiator for Post processing and analyze Layer-3 events for
Drops and Setup fail issues. Responsible for timely report submission as per WLA to customer.

 Since June’10 to Dec-2011 associated with Nokia Siemens Networks Pvt. Ltd ,as RF
Optimization Engineer (NPI) on Bharti project in ROB (Central & North Bengal) Circle.

The Attainments

 The Network consists of 16 MSSs & 121 BSCs with 2, 00,000 BBH & 1, and 84,000 NBH Erlang.
 Responsible for the overall performance of 18 assigned BSCs with 1800 plus cell sites of North
Bengal (Siliguri) zone both Showcase & Non Showcase town.
 To keep track of Daily Voice & Data KPIs like SDCCH Assignment, SDCCH drop, TCH Assignment,
TCH drop, Handover Success Rate & Downlink Quality, TBF Failure, TBF Assignment and DL
Throughput. To maintain overall network KPIs in coordination with core team.
 New site/4th sector planning for capacity augmentation and fill the coverage holes. Also validation of
RX Level & Quality samples in Net-Act planning tool.
 Use direct OSS login through TNMS & BSC using Reflection, for any parametric changes or
optimization activities .to identify the exact issue & escalate the BSS team for proper resolution.
 Analysis of ND & MML reports to eliminate handover discrepancies & Handover failures.
 Responsible for Frequency & Handover tuning. Review and analysis of existing Frequency Plan (BCCH
and Hopping) & recommendations for new Schema Plan.
 To drive the implementation of dual band (900/1800 MHz) sector addition & TRX addition plan for
over utilized sectors.
 Since July’09-June’10 associated with Metro Wireless Engineering (I) Pvt. Ltd., Patna &
Meerut as RF Team Lead NSN Bharti & Tata Docomo Project in Patna & UP (West) Circle.

 Responsible for project delivery and performance of 6 Optimization & 10 Drive Test Engineers.
 Coordination with the NSN RF team for final sign off of the cell sites after ZQ removal.
 Responsible for driving the new cell site optimization & Capacity planning of Patna NSN Bharti project
& Meerut NSN Tata Docomo Project.
 Cluster wise optimization & handing over the sites to customer. Identifying the parametric
discrepancies & suggest customer for solution.
 Aug’07-June’09 associated with ADACellworks Wireless Networks Limited, Kolkata as RF
Optimization Engineer on NSN Bharti project.
The Attainments

 Optimization of New rollout sites.


 Responsible for Drive test team coordination & to meet the KPI bench mark consistently for 3 day
along with proper drive test data.
 Responsible for RF/AT data submission, Coordinate with NSN Project team for quick ZQ removal
process, Preparing Integration sheet sheet for Newtown sites & Cabex sites.
 TRX Grow Degrow Plan, performance check after TMA deployment.

 Nov’06-Aug’07 associated with Nokia Siemens Networks Limited in rolls of Kelly Services
Pvt. Ltd., Orissa as Cluster Engineer RF Data Collector on Bharti MS project;
 RF field optimization (Drive test /Data Collection & Physical optimization using NEMO).
 Attending customer complaints and suggesting adequate solution to improve coverage, Quality and
capacity problems.
 Survey for Repeater /IBS in building/congested areas. Suggest to my project lead to plan a new
Repeater or BTS site.
 TEC & TRAI Testing Monitoring Coordinating team to complete Drive test & making the CDR report in
desired format asked by BHARTI (Orissa Circle).

TOOLS USED
 TEMS 9.0.2 GSM Drive Test Tool, NEMO 5.4 Outdoor drive test, post processing GSM.
 Tems Discovery & Gladiator, Genex-Probe and Assistant, Actix Post Processing Tool.
 Net-Act tool for planning validation, Anritsu / Bird Site Analyzer.
TECHNICAL TRAINING
 Training on LTE Air Interface, LTE/SAE in a Nutshell / System Overview.
 Training on WCDMA Air Interface, WCDMA System Overview and WCDMA Functionality.
 Training on BSSPAR (BSS Parameter) at NSN Gurgaon.
 Training on RANNOP (Radio Network Optimization) at NSN Kolkata.
EDUCATIONAL BACKGROUND

 B.TECH. (2006) : Secured 74% marks in Electrical & Electronics Engineering branch from
Bijupattnaik University of Technology, Orissa.
 10+2(2001) : Secured 59% marks from C.H.S.E. Board Examination, Orissa.
 10(1999) : Secured 84% marks from Orissa Board Examination.

PERSONAL DETAILS
Date of Birth : April 01, 1984
Passport No. : G2161497
Current Address : Bangalore, Karnataka
Marital Status : Married
CHANDAN KUMAR SARANGI

Potrebbero piacerti anche